This document is a Project Specifications file for the National Park Service detailing the installation of communications tower infrastructure at Lake Mead National Recreation Area in Boulder City, Nevada.

The project encompasses three primary deliverables: installation of a 60-foot self-support tower with concrete foundation at Boulder Beach Ranger Station (Clark County, NV); installation of a 30-foot self-support tower with concrete foundation at Willow Beach Saddle Communications Site (Mohave County, AZ); and extension of the existing 40-foot Valmont lattice tower at Hill Top Communications Site by adding a 10-foot tower section with two antenna sector frames, waveguide ladder, and safety climb system (Clark County, NV). All work must be completed within 150 calendar days from the Notice to Proceed. For the Hill Top tower extension only, all tower steel components are Government Furnished Property available for pickup at 101 Katzenbach Drive, Boulder City, Nevada. The scope includes excavation, concrete foundations based on "normal soils" specifications, concrete compressive strength testing, grounding systems with minimum four ground rods, tower accessories (climbing ladders, safety climb systems, lightning rods, and antenna standoffs), and site restoration. Environmental compliance requirements include Desert Tortoise Awareness Training for all personnel, equipment washing protocols to prevent introduction of non-native species, and coordination with environmental contact Carrie Norman (carrie_norman@nps.gov). The contractor must provide daily logs with progress photos, submit concrete test results for COR approval, and conduct final inspections with the COR and Lake Mead Radio Shop representatives. A pre-bid site visit of approximately four hours is required. The contractor is responsible for all transportation, equipment, mobilization, quality control, safety compliance, and material disposal at no additional cost to the government.

View the file

Other files for this federal contract opportunity

Other files attached to LAKE - TWO COMMUNICATIONS TOWER INSTALLATION AND O, newest first.
File Type Posted
Sol_140P8126B0003_Amd_0001.pdf PDF
B08_-_Atch_5_-_Construction_Contraction_Administration.pdf PDF
B08_-_Atch_6_-_Limitation_on_Subcontracting_Report_Template.xlsx XLSX spreadsheet
Sol_140P8126B0003.pdf PDF
B08_-_Atch_3_-_Wage_Determination_-_NV20260024.pdf PDF
B08_-_Atch_4_-_Wage_Determination_-_AZ20260058.pdf PDF
B08_-_Atch_2_-_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAKE MEAD NATIONAL RECREATION AREA

BOULDER CITY, NEVADA

TWO COMMUNICATIONS TOWER INSTALLATION AND ONE TOWER

EXTENSION AT HILL TOP TOWER

LAKE – 284691

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

April 15, 2026

LAKE 284691 Page 2 of 45

DIVISION 1 GENERAL REQUIREMENTS

SECTION 01110 SUMMARY OF WORK

1.1 EXISTING CONDITIONS

This Project has for specific locations at Lake Mead National Recreation Area. The sites are located at: 1. Boulder Beach Ranger Station located at 115 Boulder Beach Road, Boulder City, NV. 2. Willow Beach Saddle Communications site located at N35.876253, W114.647461.

3. Hill Top Communications Site located at the park’s maintenance compound at 101 Katzenbach Drive, Boulder City, NV. All sites are accessible either directly by road or are a short distance from pavement.

1. Boulder Beach Ranger Station location is for the installation of a 60ft tall self-support tower with concrete foundation based on “NORMAL SOILS”.

2. Willow Beach Saddle Communications site is for the installation of a 30ft tall self-support tower with concrete foundation based on “NORMAL SOILS”.

3. Hill Top Tower is for the installation of a 10ft tower section to extend the height of the existing 40ft Valmont lattice tower. In addition to the tower section two new sector frame antenna mounts, one new wave guide ladder and new safety climb system are to be installed.

The purpose is to upgrade three existing Land Mobile Radio Communications sites with either new self-support/free standing towers or a tower extension to increase the functionality of the parks Land Mobile Radio System. The existing tower structures at the sites are inadequate and cannot support the required antennas needed in the radio system. This project does not include any work on the existing towers at Boulder Beach or the Willow Beach Saddle site.

1.2 GENERAL PROJECT STATEMENT

A. The work of this section consists, in general, of furnishing all labor, materials, equipment, tools, transportation, and incidentals required to install the two self-support towers with concrete foundations (one at Boulder Beach Ranger Station and one at the Willow Beach Saddle Communications Site) as well as the 10ft tower extension at the Hill Top Tower. For the Hill Top tower only: All tower steel to include tower sections, antenna mounts, wave guide ladders and safety climb devices for the Hill Top Tower will be Government Furnished Property (GFP) and available for pick up at 101 Katzenbach Drive, Boulder City, NV. 89005

B. A site visit will be scheduled for a pre-bid visit with the interested respondents. The site visit will start at the Hill Top Tower site and travel to the Boulder Beach Ranger Station and the Willow Beach Saddle Radio Site. Site visit will require approximately 4 hours to conduct.

C. Contractor shall provide their own equipment and transportation to and from the construction site including their use of either tracked or four-wheel drive vehicles/equipment for the Willow Beach Saddle Site. All other sites are accessible near existing pavement.

LAKE 284691 Page 3 of 45

1.3 SCOPE OF WORK

The scope of work for this contract consists of:

A. Boulder Beach Ranger Station are: 60ft Self Support Tower

1. 60FT Self Support Tower with concrete foundation based on “NORMAL SOILS”

2. Excavation and installation of a concrete tower foundation based upon manufacturers “NORMAL SOILS” foundation design

3. Completion of Concrete Compressive Strength test to meet manufacturers specifications for “Concrete Break Test”.

4. Installation of ground ring around concrete base of tower with a minimum of 4 ground rods with no.2 solid interconnecting wire between the rods and leads attached to the base of the tower per manufacturers recommended means. One additional no2 solid lead available above grade on side of foundation nearest the communications shelter/cabinet for additional grounding connections by others.

5. Final tower erection to full height.

i. Required tower accessories are: Step Bolts or Climbing Ladder, Safety

Climb System, Tower Top Lightning Rod, Two (2ft) antenna standoffs to be mounted at top of tower.

6. Restoration of surrounding areas to pre-construction conditions up to and including access route.

7. Spoils must be removed and properly disposed of offsite.

B. Willow Beach Saddle Communications Site: 30ft Self Support Tower

NOTE: Site is only accessible via a tracked drilling machine and crane, see site photos attached.

1. 30FT Self Support Tower with concrete foundation based on “NORMAL SOILS”

2. Excavation and installation of a concrete tower foundation based upon manufacturers “NORMAL SOILS” foundation design

3. Completion of Concrete Compressive Strength test to meet manufacturers specifications for “Concrete Break Test”.

4. Installation of ground ring around concrete base of tower with a minimum of 4 ground rods with no.2 solid interconnecting wire between the rods and leads attached to the base of the tower per manufacturers recommended means. One additional no2 solid lead available above grade on side of foundation nearest the communications shelter/cabinet for additional grounding connections by others.

5. Final tower erection to full height.

i. Required tower accessories are: Step Bolts or Climbing Ladder, Safety

Climb System, Tower Top Lightning Rod, Two (2ft) antenna standoffs to be mounted at top of tower.

6. Restoration of surrounding areas to pre-construction conditions up to and including access route.

7. Excess spoils may be spread at site.

LAKE 284691 Page 4 of 45

C. Hill Top Communications Site: 10ft tower extension with sector frames, waveguide ladder and safety climb

1. Removal of the existing safety climb and one 10ft pipe leg extension.

2. Assemble and install the new 10ft Valmont tower section to extend the overall tower height to 50ft.

3. Assembly and installation of two Valmont VFA6-SD-S antenna sector frames at the top of the newly installed tower extension.

4. Assembly and installation of a new Valmont WCL6 waveguide ladder on the towers western face. (Waveguide Ladder is in 20ft sections and will require modification prior to installation to meet tower height)

5. Assemble and install the new Valmont Universal Safety Climb System, RSC-50G to be installed on tower leg with existing step bolts.

NOTE: All removed/excess hardware to be turned over to the government for proper disposal

D. See pictures at the end of these specifications for existing site conditions and visual site conditions.

E. Laydown and storage areas shall be coordinated with the COR on a site by site basis.

F. Submittal of Concrete Break Test results for the Boulder Beach Ranger Station and Willow

Beach Saddle site shall be submitted to the COR for review and approval prior to final tower installation.

G. A final inspection shall be performed at each site with the COR and a representative of the

Lake Mead Radio Shop present.

H. All excess material that has been removed/demolished or was unused shall be disposed of outside of the park boundaries.

I. A daily log shall be prepared by the contractor representing the work that was performed that day.

1. The log shall describe the tasks performed that day and the contractor staff working.

2. 2 or more representative photos of the tasks being performed that day shall be included in each daily log.

3. The submitted daily logs shall be in a PDF format. Emailing to the CO/COR is acceptable.

4. The daily logs shall be sent to the CO/COR once a week. For every week worked in the field, the daily log shall be sent to the CO/COR.

J. The Contractor shall manage a weekly progress meeting, conference call or Teams meeting between the contractor and the COR or NPS representatives. The need for the meeting shall be determined by the CO/COR and the contractor.

LAKE 284691 Page 5 of 45

1. A weekly schedule update shall be presented at the meeting. Schedule shall show the previous weeks accomplishments and tasks. The schedule shall show the proposed work schedule for the future two (2) weeks of work. Three (3) weeks of work shall be shown. It should be updated weekly and sent to the COR in a PDF format.

2. Photographs of the work progress shall be taken. Regular submittal of a PDF file showing representative progress photos, or a log of the previous weeks work shall be done weekly.

K. Other Items related to the Installation:

1. Photos of all construction and installation activities are to be taken and provided, documenting the progress of the construction as well as final completion photos. This is especially important for all excavations prior to placement of tower base and aggregate or concrete backfill.

1. Photos shall be JPG format.

2. No labels or text shall be placed on the photographs.

3. Name or number the photos to represent the task shown in the photo.

4. Photo files shall be transmitted to the CO/COR at the end of construction as a part of the close out procedures.

1.4 ESTIMATED SCOPE OF QUANTITIES

This quantity list may not be complete and accurate. Contractor shall field verify items and adjust their quantities accordingly. This list is included but not limited to:

1. Mobilize to Site

2. Porta-potty rental and associated site safety items

3. Excavation

4. Install 4000 PSI concrete foundation

5. Soils Spoils removal and disposal

6. Clean up and dispose of extra materials

7. Superintendent and project management

8. Bonds and Insurance

1.5 LOCATION

A. Project Location: Within Lake Mead National Recreation Area (LAKE NRA).

1. Boulder Beach Ranger Station located at 115 Boulder Beach Road, Boulder City, NV, Clark County NV. 2. Willow Beach Saddle Communications site located at N35.876253, W114.647461, Mohave County AZ. 3. Hill Top Communications Site located at the park’s maintenance compound at 101 Katzenbach Drive, Boulder City, NV, Clark County NV.

LAKE 284691 Page 6 of 45

1.6 PERFORMANCE PERIOD: The project schedule is based on calendar days from the "Notice to Proceed" (NTP) date.

A NTP will be issued upon receipt of performance and payment bonds. Work to be completed 150 days after NTP issued.

1.7 FIELD VERIFICATION

A. The Contractor shall field verify all new and existing dimensions affecting the work in this contract before ordering any materials, equipment, or parts.

1.8 CONTRACTOR'S USE OF PREMISES

A. The sites are located in public areas. Security of the equipment shall be maintained during construction.

B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the recreation area visitors and employees.

C. The contractor shall at all times make the job site, laydown area and storage area safe to the public.

1. Markings, tape, or barriers shall be used to separate the work area from the public.

D. Preservation of Natural Features: Confine all operations to work limits of the project.

Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

E. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for interruption of existing utility service, if appropriate.

1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair the utility at no additional expense to the Government.

2. The NPS can assist to locate utilities, but the NPS does not know where all of the utilities are located.

F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent.

G. Work Limits: The Contractor shall be confined to conduct his work to job site area and work limits as shown on drawings or approved by the Contracting Officer. Contractor shall be responsible to pay for rehabilitation work for any resource damage outside authorized work limits.

H. Care shall be taken to ensure that fuel, oil and other spills do not occur. If spills occur, cleanup will be completed at no additional expense to the Government.

I. The contractor must provide their own accommodations for the period of construction. The

NPS will not provide any facilities.

LAKE 284691 Page 7 of 45

1.9 HOURS OF OPERATION

A. Hours of operation shall be Monday through Friday between the hours of 8:00 AM and 5:00 PM unless alternate hours are approved by the Contracting Officer and the Contracting Officers Representative (COR). Requests for changes shall be submitted to the COR.

B. Due to the location of the construction sites and vicinity of the public, these hours should be adhered to including idling of equipment, starting of equipment, backup alarms of equipment and delivery of equipment in hours outside of the approved times.

1.10 SPECIAL PROVISIONS

A. Time Constraints:

1. Quiet Hours in the park are from 10:00 PM until 6:00 AM. The Contractor shall not operate equipment or make loud noise between these hours.

2. No work will be performed on weekends or on federal holidays without the advanced, written authorization of the CO.

3. Any request to work outside of normal working days and hours shall be submitted to the CO and COR at least 3 business days before the requested event for authorization.

B. Park Entry:

1. The contractor shall furnish a list of personnel with phone contact information.

Vehicles associated with the contractor shall be waived entrance fee upon entering in a marked company vehicle or by providing the names of employees entering in personal vehicles. The entrance fee is waived only for the purpose of reporting directly to a specific work location. Any deviation for recreational purposes is subject to payment of required entrance fees.

C. Park Regulations:

1. Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.

D. Emergency Medical and Accident Reporting:

1. All accidents and incidents shall be reported to the CO and COR.

a. The Contractor or subcontractor shall contact Park Dispatch for any medical emergency or traffic accident occurring within the Park.

Emergency number: Dial 911 as needed.

Park Dispatch: 702-293-8932 EMERGENCY Park Dispatch is called so that the entrance station will be prepared should any emergency vehicles (e.g. ambulance) need to enter the Park and so that any

LAKE 284691 Page 8 of 45 available Emergency Medical Services personnel in the Park might respond until such time as the ambulance arrives.

b. The Contractor or subcontractor is required to report ANY personal injury and / or property damage incident occurring within the park. This report must be made to a Law Enforcement Ranger at the first available opportunity before leaving the park:

Park Dispatch: 702-293-8998 NON-EMERGENCY

E. Logistics:

1. The public access in the public areas shall always be maintained. NPS Employee access should be maintained to all facilities during construction.

2. The Contractor shall be responsible for the security of all materials staged/stored on LAKE NRA property.

F. Environmental Compliance Requirements:

1. The Contractor and all employees working on the Project will be required to take “Desert Tortoise Awareness Training” which will be provided by the Government at no cost to the Contractor. This training will take approximately 30 minutes or less.

2. The Contractor’s employees shall never handle a desert tortoise.

3. The Contractor and employees shall immediately report the presence of any desert tortoise to the COR.

4. Herbicides shall not be used in or around the Project site.

5. The environmental compliance contact for this project is Carrie Norman. For questions or additional information, contact Carrie via email:

Carrie Norman, Biologist, carrie_norman@nps.gov

G. Equipment Washing:

1. Equipment washing is required to preclude the introduction and spread of non-native species into the Park. Therefore, all equipment shall be cleaned outside of the Park before entering the Park. Equipment leaving the park for any reason must be re-washed before returning to the job site. Equipment that is moved from the job site, but remains within the original developed area, need not be re-washed prior to returning to the job site. It is also known that there are areas inside the Park that have non-native plants and weed species infestation. Therefore, before equipment can be moved from one developed area to another, it must be washed at the location identified on the Site Plan (see attached site plan and mileage table) to ensure weeds are not spread from one developed area to another.

2. The Contractor shall clean all equipment prior to the equipment entering Lake Mead National Recreation Area. It is recommended that cleaning be accomplished by hot water, pressure washing, using water only. All equipment surfaces shall be cleaned, mailto:carrie_norman@nps.gov

LAKE 284691 Page 9 of 45 with special emphasis given to the undercarriage. This includes, but is not limited to:

wheel wells, bumpers, radiator grills, springs, shock absorbers, wire harnesses, skid plates, oil pans, axles, frame ledges, buckets, tracks, belly pans, etc. Cleaning shall also include all dirt and debris inside the cab, or operator area. A Shop-Vac or commercial car wash vacuum system may be used for operator compartments, provided the method used effectively removes all visible debris. Equipment cleaning is for the purpose of removing any seed and soil accumulations to prevent the potential spread of non-native plant and weed species from outside the park to locations inside the park. Cleaning shall be performed in a manner that will reasonably remove all visible soil, plant and other foreign material. All equipment that requires washing shall be inspected by government personnel, or contractors/partners assigned to this duty, to ensure compliance.

3. Equipment that requires washing is generally defined as track or rubber-tired machinery intended for use primarily off-road. Examples include backhoes, loaders, earthmovers, graders, rollers, bulldozers, water trucks, etc; or four wheel drive or passenger vehicles that are driven in off road areas. Equipment may also be stationary, such as a material screening plant, conex storage containers, or a mobile office (mobile offices may be cleaned in the same manner as operator compartments as outlined in paragraph 2). The equipment is generally under the direct control of the contractor or sub-contractors, is likely to remain on the construction site for an extended period of time and may contain adhered soil and seed from other project sites.

4. Equipment/Vehicles that do not require washing are defined as those normally used for highway driving only, and travel primarily on paved surfaces and well-maintained service roads and parking areas (this includes approved staging areas). Examples include semi-tractor trailers, dump trucks, concrete trucks, pickup trucks, fuel trucks, service trucks, etc. These delivery and passenger vehicles are generally not under the direct control of the contractor, have no earth-moving function, and do not remain on the project site. These vehicles have a low probability of carrying adhered soil and seed from other projects. However, every vehicle and piece of equipment is subject to rejection from entering the park if there are obvious signs (covered in mud, plant material adhered to it, etc.) that it could be transporting non-native species into the Park.

H. Post Equipment Washing Inspections:

1. All equipment subject to inspection will be inspected by government, or other authorized personnel prior to leaving the paved surface or designated washing area identified on the Site Plan. Equipment determined to be free of soil or mud based on visual examination by government personnel will be cleared to enter the project area or proceed to other areas of the park as appropriate. The Contractor shall arrange for needed inspections by contacting the NPS inspection office no less than 5 working days prior to the inspection. Such contact shall provide sufficient time to accommodate scheduling and travel to the site. Equipment not passing initial

LAKE 284691 Page 10 of 45 inspection must be rewashed outside the park at no additional expense to the government.

2. The government Inspector for this project will be provided. Please contact via email the designated representative for inspection:

a. Carrie Norman, Biologist, carrie_norman@nps.gov

1.11 DESIGNATED OFFICIALS

A. The NPS Project Manager (PM) and Contracting Officer's Representative (COR) will be:

Mike Scherer, Communications Branch Chief, Lake Mead NRA Telephone: 702-218-8869 (cell) E-mail: mike_scherer@nps.gov

B. The Contracting Officer (CO) will be:

TBD

END OF SECTION 01010

LAKE 284691 Page 11 of 45

LAKE MEAD NATIONAL RECREATION AREA

FIGURE 1

Lake Mead Maintenance Yard/Hill Top Tower

Willow Beach Saddle Site

Boulder Beach Ranger Station

LAKE 284691 Page 12 of 45

Boulder Beach Ranger Station Site Map

FIGURE 2

LAKE 284691 Page 13 of 45

Boulder Beach Ranger Station layout overview

FIGURE 3

LAKE 284691 Page 14 of 45

Willow Beach Saddle Communications Site Map

Figure 4

LAKE 284691 Page 15 of 45

Willow Beach Saddle Communication Site access route and staging area

Figure 5

LAKE 284691 Page 16 of 45

Willow Beach Saddle Site overview

Figure 6

LAKE 284691 Page 17 of 45

Hill Top Communications Site Map

FIGURE 7

LAKE 284691 Page 18 of 45

Hill Top Communications Site tower view

Figure 8

LAKE 284691 Page 19 of 45

Tower Loading Requirements for Boulder Beach Ranger Station and Willow Beach Saddle Site towers:

Boulder Beach Ranger Station Clark County NV Lat 36.03985 Long -114.802964

Access Paved access to within 75ft of tower location

Tower New 60ft self support tower

Antenna

• 3ft Commscope dish VHLP3-7W to Consolidation Pt @ 15ft azimuth of 32deg

• Sector Antenna SA16-90-5.5VH to BB Fee Station @ 59ft azimuth of 163deg

• Sector Antenna SA16-90-5.5VH to BB ATON @ 55ft azimuth of 293deg

• Collinear Antenna ANT-150F2 @ 50ft

• 3 element VHF Yagi antenna @ 30ft

Willow Beach Saddle Site Mohave County AZ Lat 35.876236 Long -114.647492

Access

Paved access to staging area 440ft to the west of the project site.

Access to site from staging area requires tracked or four-wheel drive vehicle/equipment

Tower • New 30ft self support tower

Antenna

• 3ft Commscope dish VHLP3-7W to Mt Wilson @ 10ft azimuth 09deg

• 1ft Commscope dish VHLP1-26 to WB AP @ 13ft azimuth 225deg

• Sector Antenna SA16-90-5.5VH to area sites @25ft 220deg

• Two Collinear Antenna ANT-150F2 o @ 30ft o @ 25ft

• Two 3 Element VHF Yagi antenna o @ 18ft azimuth 09deg

@ 14ft azimuth 09deg

LAKE 284691 Page 20 of 45

SECTION 01270 DEFINITION OF BID ITEMS

1.1 DESCRIPTION

A. The intent of this section is to explain, in general, what is and what is not included in a bid item, and the limits or cut-off points where one bid item ends, and another begins.

B. If no bid item exists for a portion of the work, include the costs in a related bid item.

1.2 LIST OF ANTICIPATED BID ITEMS

A. BID ITEM No. 01 – Boulder Beach Ranger Station - Installation of a 60ft self-support tower with foundation.

1. UNIT – lump sum

2. DEFINITION – Unit price includes all necessary labor, materials, and equipment to install the 60ft self-support tower, concrete foundation and required accessories includes but is not limited to: transportation of the tower and accessories to the project site, equipment leasing, cables, anchors, lift equipment and mobilization/demobilization. All removed/demolished equipment and materials shall be transported and legally disposed of off-site.

B. BID ITEM No. 02 – Willow Beach Saddle Communications Site - Installation of a 30ft self-support tower with concrete foundation.

1. UNIT – lump sum

2. DEFINITION – Unit price includes all necessary labor, materials, and equipment to install the 30ft self-support tower, concrete foundation and required accessories.

Work also includes but is not limited to: transportation of the tower and accessories to the project site, equipment leasing, cables, anchors, lift equipment and mobilization/demobilization. All removed/demolished equipment and materials shall be transported and legally disposed of off-site.

C. BID ITEM No. 03 – Hill Top Communications Site - Installation of a 10ft Valmont tower section with all associated components and accessories, as specified.

1. UNIT – lump sum

2. DEFINITION – Unit price includes all necessary labor, materials, and equipment to install the 10ft Valmont tower section, two antenna sector frames, waveguide ladder and safety climb system. Work also includes but is not limited to: transportation of the tower and accessories to the project site, equipment leasing, cables, anchors, lift equipment and mobilization/demobilization. All removed/demolished equipment and materials shall be turned over to the National Park Service representative for disposition.

END OF SECTION 01270

LAKE 284691 Page 21 of 45

SECTION 01310 PROJECT MANAGEMENT AND COORDINATION

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on this project including, but not limited to the following:

1. Supervisory and administrative personnel.

2. Project meetings.

3. Coordination procedures.

1.2 SUPERVISORY AND ADMINISTRATIVE PERSONNEL

A. General: In addition to the project superintendent, the Contractor shall provide other supervisory and administrative personnel as required for proper work performance. This may include special personnel required for coordination of operations with subcontractors and material suppliers.

B. Staff roster:

1. Within 14 days after the NTP, the Contractor shall submit a list of staff assignments, including subcontractor personnel (if applicable), working at the job site. Identify each individual and their duties and responsibilities.

1.3 PROJECT MEETINGS

A. Submittals required prior to the Preconstruction Conference.

1. Letter designating the Project Superintendent.

2. Proposed construction schedule.

3. Schedule of values.

4. Accident prevention or Safety plan.

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

B. Preconstruction Conference: Once the contract is awarded, an initial orientation meeting will be scheduled for a time and date that is agreeable to the Government and Contractor and will be conducted in the Lake Mead Maintenance Building. Lake Mead personnel will be present to go over park specific requirements of the project with the Contractor and the Contractor’s supervisory and administrative team. The Notice to Proceed date will also be established at the Preconstruction Conference.

LAKE 284691 Page 22 of 45

1. Agenda: Items to be discussed will include but not be limited to:

1. Park Rules and Regulations.

2. General correspondence procedures.

3. Labor standards provisions.

4. Payroll reports.

5. Payments to the Contractor.

6. Acceptance/rejection of work.

7. Progress Meetings.

8. Subcontractors.

9. Documents required under contract.

10. Local emergency phone number.

11. Specifications and drawings.

2. Once the Notice to Proceed date has been established, the Contractor shall submit the proposed work schedule to the Government for approval.

1.4 COORDINATION PROCEDURES

A. Coordination: Coordinate the construction operations identified in the various Sections of this Specification to ensure the efficient installation of all materials and equipment.

1. Schedule construction operations in the proper sequence required to obtain the best results where installation of one part of the Work depends on installation of other components before or after its own installation.

2. Coordinate installation of different components with subcontractors and Government personnel to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

1.5 INSTALLATION SCHEDULE REQUIREMENT

A. Installation Baseline Schedule: Prepare Installation Baseline Schedule using computerized scheduling software.

1. Installation Baseline Schedule shall show submittal review, installation start date, work activities / staff resources, activity durations, major milestones, inspection dates, closeout activities, and project end date.

LAKE 284691 Page 23 of 45

2. Establish procedures for updating Installation Baseline Schedule and for reporting progress. Coordinate procedures with progress meeting and payment request dates.

3. Contracting Officer may request an updated Installation Schedule at any time to confirm progress of the work.

1.6 SCHEDULE OF VALUES

A. Submit a schedule of dollar values based on the Contract Bid Schedule. Include bond costs, mobilization, general condition costs, overhead, and profit in the total dollar value of unit price items and in the component parts of Work for each lump-sum item as described below. Do not include general condition costs, overhead, or profit as separate items;

however, payment for bond premiums can be made based upon evidence of payment to the surety. Bond premiums may be shown as a separate item.

B. Break down each lump sum Bid Item into component parts of Work for which progress payments may be requested. The total costs for the component parts of work shall equal the bid amount for the lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values.

C. The total cost of all items shall equal the contract total, or 100%. The Schedule of Values will form the basis for progress payments. Each progress payment request shall include the overall percentage complete to that date.

END OF SECTION 01310

LAKE 284691 Page 24 of 45

SECTION 01330 SUBMITTALS

A. The intent of this section is to explain submittal requirements before and during construction.

B. This section also includes the requirements for properly handling "Substitutions" and

"Comparable Products" the Contractor submits as being "equal" to the product that has been specified.

1.2 SUBMITTAL AND APPROVAL PROCEEDURES

A. All submittals shall be transmitted to the COR electronically using National Park Service form CM-16, dated 10/07/2020.

1. A copy of the form is available at: 2.1.1 Submittal Review - (U.S. National Park

Service).

2. No action will be taken on a submittal unless it is accompanied by a transmittal form.

3. All submittals shall be carefully reviewed by the Contractor prior to submission to the

Government to eliminate errors.

B. Content of the RFI or Submittal: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI/Submittal number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, as appropriate.

5. Drawing number and detail references, as appropriate.

6. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

7. Contractor’s signature.

8. Requested date for response.

9. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, and details of affected materials, assemblies, and attachments on attached sketches.

C. Manufactures' Catalog Sheets: Submit only pertinent pages and mark each copy of standard printed data to identify products proposed for use. Submittal forms with attached Manufactures' Catalog Sheets that are not marked to identify products proposed for use will be disapproved by the COR and shall be resubmitted by the Contractor.

D. Manufactures' Installation Instructions: Provide one (1) complete set of instructions to the

COR and keep another complete set of instructions at the job site until substantial completion.

E. The Contractor shall forward submittals to the COR in accordance with the milestones.

https://www.nps.gov/dscw/con_subreview21.htm https://www.nps.gov/dscw/con_subreview21.htm

LAKE 284691 Page 25 of 45

F. Lake Mead personnel will review and approve or disapprove and provide comment to submittals in as short a timeframe as possible, but not to exceed 7 calendar days.

G. Contracting Officer will not respond to RFIs submitted by other entities controlled by Contractor.

H. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

1.3 REQUIREMENTS FOR APPROVED EQUALS

A. For each "Substitution" or "Comparable Product" the Contractor submits as being "equal" to the product that has been specified, the Contractor shall submit supporting documentation that includes:

1. Statement indicating why specified material or product cannot be provided.

2. Detailed comparison of the characteristics of the proposed item with that specified.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of vendors.

5. Product data, including drawings, descriptions, fabrication, and samples as appropriate.

6. Manufacturer's literature regarding installation, operation and maintenance, schematics for electrical systems, and parts lists.

a. Describe availability of maintenance service and state a source of replacement parts and materials.

B. A request for approval constitutes a representation that the Contractor:

1. Has investigated the proposed item and determined that it is equal to or superior in all respects to that specified.

2. Shall provide the same warranties for the proposed item as for the item specified.

3. Has determined the proposed item is compatible with interfacing items.

4. Shall coordinate the installation of the alternate item and make all changes required in other elements of the work because of the substitution.

5. Wavier all claims for additional expenses the may be incurred as a result of the substitution.

C. If all of the requirements listed above are not met by the Contractor, the COR will disapprove the "Substitution" or "Comparable Product" request.

END OF SECTION 01330

LAKE 344611 Page 26 of 45

SECTION 01360 ACCIDENT PREVENTION

A. After contract award and before the Pre-Construction conference, submit for review an

Accident Prevention Plan. The Contracting Officer will review the proposed Plan. If the plan requires any revisions or corrections, the Contractor shall resubmit the Plan within ten

(10) days. No progress payments will be made until the Plan is accepted.

1.2 SUBMITTALS

A. Accident Prevention Plan - The Plan shall be written to comply with OSHA and project requirements including but not limited to the following information/topics:

1. The name of the responsible supervisor who shall carry out the program.

2. Documentation of the personnel training program; both initial and continuing.

3. Weekly and monthly safety meetings.

4. First aid procedures.

5. Outline the work, associated hazards, protective measures, and the methods proposed to ensure property protection, safety of the public, National Park Service personnel, and Contractor's employees.

6. Planning and checklists for possible emergency situations.

7. A fire protection plan.

8. And a fall protection plan.

9. Nevada Heat Illness Prevention Plan IAW: NV R131-24AP

B. Daily Submittals: Submit Daily Quality Control Report showing all inspections and tests on the first workday following the date covered by the report.

C. Tests: Submit electronic copies of complete test results not later than three calendar days after the test was performed. Submit failing test results and proposed remedial actions within four hours of noted deficiency.

D. Off Site Inspection Reports: Submit prior to shipment.

E. Progress Payments: If the CQC plan and Daily Quality Control Reports are not submitted in a timely manner, the Contracting Officer may retain an appropriate amount of the applicable progress payment.

1.3 QUALIFICATION OF EMPLOYEES

LAKE 344611 Page 27 of 45

A. Ensure that employees are physically qualified to perform assigned duties in a safe manner.

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

C. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment.

1.4 ACCIDENT REPORTING

A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, fires, and property damage by accident in excess of $100. Notify Contracting Officer immediately in the event of a reportable accident. Within 7 days of a reportable accident, fill out and forward to Contracting Officer an Accident/Property Damage Report (Form CM-22). Form may be obtained from the Contracting Officer.

B. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.

1.5 PERSONNEL PROTECTIVE EQUIPMENT

A. Meet requirements of National Institute for Occupational Safety and Health (NIOSH) and

OSHA.

B. Inspect personal protective equipment daily and maintain in a serviceable condition.

Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.

C. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

D. It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

1.6 EMERGENCY INSTRUCTIONS

A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

1.7 FIRST AID FACILITIES

A. Provide adequate facilities for the number of employees and the hazards associated with the types of ongoing construction work at the site.

1.7 SAFETY MEETINGS

LAKE 344611 Page 28 of 45

A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.

B. Conduct monthly safety meetings for all levels of supervision. Notify the COR of meeting dates and times. These meetings shall be used to review the effectiveness of the Contractor's safety effort, to resolve current health and safety problems, to provide a forum for planning safe construction activities, and for updating the accident prevention program.

END OF SECTION 01360

LAKE 344611 Page 29 of 45

SECTION 01400 QUALITY REQUIREMENTS

A. The intent of this section is to explain the requirements for preparing and executing a Quality Control Program.

A. Quality Control Plan: At the time of the Pre-Construction Conference the Contractor shall submit for approval a written Contractor Quality Control (CQC) plan to the Government. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days. The Government reserves the right to require changes to the plan during the contract period as necessary to obtain the quality specified. No change in the approved plan may be made without written concurrence by the Contracting Officer. The plan shall include:

1. A list of personnel responsible for quality control. Include each person's qualifications.

2. A copy of a letter of direction to the Contractor's quality control supervisor outlining assigned duties.

3. Names and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

4. Methods of monitoring and controlling environmental pollution and contamination as required by regulations and laws.

5. Methods of performing, documenting, and enforcing quality control of all work.

B. Daily Submittals: Submit Daily Quality Control Report showing all inspections and tests on the first workday following the date covered by the report.

C. Tests: Submit electronic copies of complete test results not later than three calendar days after the test was performed. Submit failing test results and proposed remedial actions within four hours of noted deficiency.

D. Off Site Inspection Reports: Submit prior to shipment.

E. Progress Payments: If the CQC plan and Daily Quality Control Reports are not submitted in a timely manner, the Contracting Officer may retain an appropriate amount of the applicable progress payment.

1.3 QUALITY ASSURANCE

A. General: Except for tests or other items of work specified to be performed by the Government, the quality of all work shall be the responsibility of the Contractor. Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.

LAKE 344611 Page 30 of 45

B. Quality Control Staff: The Contractor's job supervisory staff may be used for quality control, supplemented as necessary by additional technicians. The Contractor's designated Quality Control Supervisor shall be employed full time at the project site whenever contract work is in progress.

C. Testing Laboratory and Equipment: Employ certified independent laboratory to perform sampling and testing.

1. All measuring devices, laboratory equipment, and instruments shall be calibrated at established intervals against certified standards in accordance with NBS/NIST requirements.

2. The testing laboratory organization shall be experienced in the type of testing work to be done.

1.4 OFF-SITE CONTROL

A. Items that are fabricated or assembled off-site shall be inspected for quality control at the place of fabrication.

1.5 ON-SITE CONTROL

A. Notify the COR at least 24 hours in advance of the initial and follow-up phases.

B. Preparatory: Perform before beginning each feature of work.

1. Review control submittal requirements with personnel directly responsible for the quality control work.

2. Ensure that provisions have been made for field control testing.

3. Examine the work area to ensure that all preliminary work has been completed.

4. Verify all field dimensions and advise the COR of discrepancies.

5. Ensure that necessary equipment and materials are at the project site and that they comply with approved shop drawings and submittals.

C. Initial: As soon as work begins, inspect and test a representative portion of a particular feature of work for quality of workmanship. Review control testing procedures to ensure compliance with contract requirements.

D. Follow-Up: Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.

1.6 DOCUMENTATION

A. Maintain Daily Quality Control Reports of quality control activities and tests. Daily Quality Control Reports may not be substituted for other written reports required under the General Provisions, such as Disputes, Differing Site Conditions, or Changes.

1.7 ENFORCEMENT

LAKE 344611 Page 31 of 45

A. The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the COR. Construction shall not proceed on any feature of work containing uncorrected work.

END OF SECTION 01400

LAKE 344611 Page 32 of 45

SECTION 01510 TEMPORARY SERVICES

A. The work of this section consists of providing temporary services required for Contractor's performance of the work of this contract.

1.2 GENERAL REQUIREMENTS

A. Temporary materials may be new or used but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.

1.3 SANITARY FACILITES

A. Provide and maintain temporary toilet facilities in accordance with State Health Department and National Park Service requirements.

B. Sufficiently lighted and ventilated toilet facilities in weatherproof, sight-proof, handicap accessible, sturdy enclosures with privacy locks.

1.4 FIRE PROTECTION EQUIPMENT

A. Extinguisher shall have a minimum UL rating of 2-A: 10-B:C.

1.5 ELECTRICITY AND LIGHTING

A. Electrical services are not available on site for Contractor's use.

1.6 TELEPHONE

A. Cellular Telephone service is available on or near the project sites for Contractor's use.

LAKE 344611 Page 33 of 45

1.8 SANITARY FACILITIES

A. Place portable toilets in approved locations secluded from public observation and convenient to the work site. Relocate as work progress requires.

B. Maintain and clean toilet facilities at least weekly.

C. Completely remove sanitary facilities on completion of work.

1.9 FIRE PREVENTION AND PROTECTION

A. Responsible person: A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall include locating and maintaining fire protective equipment.

B. Hazard Control: Take all necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in existing buildings. Provide adequate ventilation during use of volatile or noxious substances.

C. Spark Arresters:

1. Written determinations of periods and areas of potential fire hazard will be issued by Contracting Officer.

2. Equip all gasoline or diesel-powered equipment used during periods of potential fire hazards or in potential forest and grass fire locations with spark arresters approved by the U. S. Forest Service.

D. Service and Refueling Areas: Locate areas a minimum of 50 feet from buildings. Shut down equipment before refueling.

E. Smoking: Smoking within buildings or temporary storage sheds is prohibited.

F. Welding: Cutting by torch or welding shall be performed only when adequate fire protection is provided.

G. Any hot work operation must meet safety requirements of RM-58, Chapter 6 and requires a permit from the Lake Mead Safety Officer or the Park Structural Fire Coordinator.

1.11 PROTECTION EQUIPMENT REQUIRED

A. Vehicles and Equipment: Provide one extinguisher on each vehicle or piece of equipment.

1.12 TRAFFIC CONTROLS

A. The contractor shall erect and maintain barricades, danger signals, and warning signs in accordance with the Manual on Uniform Traffic Control Devices (MUTCD), 2009 edition.

The contractor shall provide adequate traffic control, including flaggers or either side of any work performed in the road. Any workers on or near the road must wear highly visible, bright clothing.

LAKE 344611 Page 34 of 45

END OF SECTION 01510

LAKE 344611 Page 35 of 45

SECTION 01570 TEMPORARY CONTROLS

A. This Section includes administrative and procedural requirements for providing temporary controls.

1.2 HOUSEKEEPING

A. Keep project site neat, orderly, and in a safe condition at all times.

B. Provide enough containers for collecting construction debris and construction materials to be recycled.

C. Keep volatile wastes in covered containers.

1.3 DISPOSAL

A. Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of outside the park.

B. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the park. Do not burn or bury refuse inside the park.

1.4 FIRE PROTECTION EQUIPMENT

A. Extinguisher shall have a minimum UL rating of 2-A: 10-B: C.

1.5 AIR AND WATER POLLUTION CONTROL

A. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.

B. Do not dispose of volatile wastes or oils in storm or sanitary drains.

C. Do not allow waste materials to be washed into streams or bodies of water.

1.6 WATER

A. Non-potable water for construction is not available and must be provided by the contractor.

B. Potable water is available nearby to the site. Coordinate with COR for locations.

C. Toilets: Use of existing park toilet facilities will not be permitted.

1.7 TRAFFIC CONTROLS

LAKE 344611 Page 36 of 45

A. Traffic Controls: Erect and maintain barricades, lights, danger signals, and warning signs in accordance with Manual on Uniform Traffic Control Devices (MUTCD), Part IV, latest edition.

1. Protect existing site improvements to remain including curbs, pavement, and utilities.

2. Maintain access for fire-fighting equipment and access to fire hydrants.

3. Illuminate barricades and obstructions at night, if working nighttime hours.

4. Protect pedestrian traffic by guardrails or fences.

5. Install Barrier Tape where directed by Contracting Officer.

6. Fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry.

1.8 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

B. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.

Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.

END OF SECTION 01570

LAKE 344611 Page 37 of 45

SECTION 01600 PRODUCT REQUIREMENTS

A. This Section includes administrative and procedural requirements for selection of products for use in this Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; product substitutions; and comparable products.

1.2 DEFINITIONS

A. Products: are items purchased for…