B08_9 - Price Schedule.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
CHOH 141450 Paw Paw Tunnel Design Build
Solicitation number
140P2020R0109
Issued by

About this file

This document contains a price schedule template for the solicitation to design and construct improvements at the Paw Paw Tunnel located along the Chesapeake and Ohio Canal in Maryland. Offerors are required to submit pricing for the base design and construction tasks as well as six optional additional construction tasks using rock bolting, drainage, and shear block installations. Pricing should be provided as lump sums for tasks or unit prices with extended totals for measurable items. The total proposed price should encompass the base tasks and all option tasks. The National Park Service is the contracting agency seeking these tunnel safety improvements through a design-build project numbered CHOH 141450.

View the file

Other files

File Type Posted
2020.08.07 Boundary SheetG1_SheetC1 - Notes Shown_0004.pdf PDF
Sol_140P2020R0109_Amd_0004.pdf PDF
B09_140P2020R0109 Amend 03.pdf PDF
Sol_140P2020R0109_Amd_0002.pdf PDF
B08_16 - CHOH 241450 HAZMAT_0001.doc DOC document
B08_13 - CHOH 241450 Past Perform Questionnaire_0001.doc DOC document
CHOH 241450 Paw Paw Tunnel Site Visit Attendees_0001.pdf PDF
B08_12 - CHOH 241450 Project Exp Questionnaire _0001.docx DOCX document
B08_14 - CHOH 241450 Proposed Equals_0001.doc DOC document
Sol_140P2020R0109_Amd_0001.pdf PDF
B08_15 - CHOH 241450 General References_0001.doc DOC document
B08_17 - CHOH Paw Paw Draft EA 508_0001.pdf PDF
B08_18 - CHOH 241450 DIVISION 1 SECTION_0001.pdf PDF
B08_5 - CHOH 241450 - Rockfall Geohazard Evaluation Report.pdf PDF
B08_6 - CHOH 241450 - Seepage Evaluation Report.pdf PDF
B08_10 - CHOH 241450 Site Access Constraints Opt.pdf PDF
B08_4 - CHOH 241450 - EX-TOPO.pdf PDF
B08_3 - CHOH 241450 - Basis of Design Report.pdf PDF
B08_2 - CHOH 241450 - FINAL SDs DRAWINGS.pdf PDF
B08_1 - CHOH 241450 - Paw Paw Tunnel DB Scope 7-21-20.pdf PDF
B08_8 - Wage Determination MD20200011 6-5-20.pdf PDF
Sol_140P2020R0109.pdf PDF
B08_11 - CHOH 241450 - Pre-Application Meeting Notes - FINAL.pdf PDF
B08_140P2020R0109.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Template

Contract Price Schedule
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:140P2020R0109
PARK - PMIS:CHOH 241450
(Project Management Information System)
Developed Area:Chesapeake and Ohio Canal (C&O); Mile Post 155 in Maryland, near Oldtown, MD.
Project Title:Paw Paw Tunnel: IMPROVE VISITOR SAFETY AND REMEDIATE ROCK FALL HAZARDS
Notice: Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of summation error, the total corrected amounts govern. Round totals & extended prices to whole dollars. Refer to section “H” of this solicitation for additional information regarding contract options.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1DESIGN1LS
2CONSTRUCTION - Tasks 1 - 4 (BASE)1LS
TOTAL BASE PRICE (Contract Line Item Number 1 through 2) ---------------------------------------------------------------------------------
3Bid Option A: Task 5 - Pin Mesh RF4 - RF8, RF101LS
4Bid Option B: Task 6 - Spot Rock Bolting RF2 - RF8, RF101LS
5Bid Option C: Task 7A - Maintenance Scaling - RF111LS
6Bid Option D: Task 7B - Maintenance Scaling - RF131LS
7Bid Option E: Task 8A - Rock Bolting, Drains, and Shear Blocks - RF111LS
8Bid Option F: Task 8B - Rock Bolting, Drains, and Shear Blocks - RF131LS
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3 through 8) -----------------------------------------------------------
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 8) --------------------------
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.