This document contains a past performance questionnaire for the solicitation of the CHOH 141450 Paw Paw Tunnel Design Build project. The National Park Service is seeking design and construction services for improvements to the Paw Paw Tunnel located within Chesapeake and Ohio Canal National Historical Park. Offerors are required to provide information on relevant past performance and have a reference complete sections evaluating performance on quality, schedule, cost control, management, regulatory compliance, and small business subcontracting. The reference must rate performance in these areas as exceptional, very good, satisfactory, marginal, or unsatisfactory. Completed questionnaires are to be returned no later than July 23, 2020 to the National Park Service contracting staff listed.

View the file

Other files

File Type Posted
2020.08.07 Boundary SheetG1_SheetC1 - Notes Shown_0004.pdf PDF
Sol_140P2020R0109_Amd_0004.pdf PDF
B09_140P2020R0109 Amend 03.pdf PDF
Sol_140P2020R0109_Amd_0002.pdf PDF
B08_16 - CHOH 241450 HAZMAT_0001.doc DOC document
CHOH 241450 Paw Paw Tunnel Site Visit Attendees_0001.pdf PDF
B08_12 - CHOH 241450 Project Exp Questionnaire _0001.docx DOCX document
B08_14 - CHOH 241450 Proposed Equals_0001.doc DOC document
Sol_140P2020R0109_Amd_0001.pdf PDF
B08_15 - CHOH 241450 General References_0001.doc DOC document
B08_17 - CHOH Paw Paw Draft EA 508_0001.pdf PDF
B08_18 - CHOH 241450 DIVISION 1 SECTION_0001.pdf PDF
B08_5 - CHOH 241450 - Rockfall Geohazard Evaluation Report.pdf PDF
B08_6 - CHOH 241450 - Seepage Evaluation Report.pdf PDF
B08_10 - CHOH 241450 Site Access Constraints Opt.pdf PDF
B08_4 - CHOH 241450 - EX-TOPO.pdf PDF
B08_3 - CHOH 241450 - Basis of Design Report.pdf PDF
B08_2 - CHOH 241450 - FINAL SDs DRAWINGS.pdf PDF
B08_1 - CHOH 241450 - Paw Paw Tunnel DB Scope 7-21-20.pdf PDF
B08_8 - Wage Determination MD20200011 6-5-20.pdf PDF
B08_9 - Price Schedule.xlsx XLSX spreadsheet
Sol_140P2020R0109.pdf PDF
B08_11 - CHOH 241450 - Pre-Application Meeting Notes - FINAL.pdf PDF
B08_140P2020R0109.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

SOLICITATION 140P2020R0109

INSTRUCTIONS: Offeror to complete Sections A and B and transmit questionnaire to reference.

Reference to complete Sections C and D and transmit back to Contracting Officer listed in section E.

A. Contractor Information

Company Name
Company
Street Address
Address
City
City
State
State
Zip Code
XXXXX
DUNS Number
XXXXXXX
Point of Contact
Name, Email, Phone

B. Contract Information

Project Title
Title
Contract Number
XXXXXXXXXX
Contract Type
Firm Fixed Price / Time & Materials / Cost Reimbursable / Other
Awarded Contract Price
$X,XXX,XXX
Current / Final Price
$X,XXX,XXX
Contract Award Date
XX/XX/XXXX
Contract Completion Date
XX/XX/XXXX
Period of Performance
XX/XX/XXX – XX/XX/XXX
Project Location
Park or Street address, City, State
Client / Owner
Company
Brief description of the contract & work effort:
Scope of work description

C. Reference:

Name
First, Last
Position / Title
Title
Organization
Agency or Company
Phone Number
XXX-XXX-XXXX
Email Address
Email
Signature
Signature
Date
XX/XX/XXXX

D. Evaluation

Rating
Definition
Exceptional
Performance met contractual requirements and exceeded many to the owner’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good
Performance met contractual requirements and exceeded some to the owner’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory
Performance met contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal
Performance did not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Evaluation Area
Rating

Quality

Quality of workmanship (including subcontractors)?
Choose an item.
Quality of and adherence to quality control plan?
Choose an item.
Quality of informational and technical submittals?
Choose an item.
Overall Quality Rating
Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Schedule (& Time Management)

Met project schedule milestones?
Choose an item.
Responded to owner requests in a timely manner?
Choose an item.
Informational and technical submittals submitted timely?
Choose an item.
Promptly addressed scheduling issues?
Choose an item.
Overall Schedule (& Time Management) Rating
Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Cost Control

Addressed differing & unforeseen site conditions so as to minimize additional costs?
Choose an item.
Provided fair and reasonable pricing for contract modifications?
Choose an item.
Submitted accurate and complete invoices?
Choose an item.
Promptly paid subcontractors and suppliers?
Choose an item.
Overall Cost Control Rating
Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Management

General oversight by project manager and superintendent?
Choose an item.
Coordination with and control of subcontractors?
Choose an item.
Avoidance of accidents & safety violations?
Choose an item.
Addressed location factors (especially remote locations)?
Choose an item.
Maintained good working relationship with owner representatives?
Choose an item.
Demonstrated flexibility, innovativeness and cooperation in resolving potential problems?
Choose an item.
Overall Management Rating
Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Small Business Subcontracting (& Labor Standards)

Met regulatory and contractual labor standards?
Choose an item.
Successfully contracted with small and socio-economically disadvantaged businesses?
Choose an item.
Quality and adherence to applicable subcontracting plans?
Choose an item.
Overall Small Business Subcontracting (& Labor Standards) Rating
Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Regulatory Compliance

Met building and life safety codes?
Choose an item.
Overall Regulatory Compliance Rating
Choose an item.

Overall Recommendation:

Given what I know today about the contractor's ability to perform in accordance with the contract’s most significant requirements, I would recommend them for similar contracts:
Choose an item.

Overall Comments:

E. Return:

Return by
July 23, 2020 [to be updated at time of issuance of Solicitation]
Name/Title
Anne LaPorta, Contracting Officer and James Waller, Contract Specialist
Organization
National Park Service – Denver Service Center
Email
anne_laporta@nps.gov

james_waller@nps.gov

File details come from the government source that posted it. Updated .