B08_40622956_Attachment_3_Submittal_List.xlsx
XLSX spreadsheet 36 KB Posted
- Attached to
- ELMA-CREATE UNIVESALLY ACCESSIBLE TRAIL Federal contract opportunity
- Solicitation number
- 140P1324R0004
About this file
This document is an Attachment to a federal contract opportunity, providing instructions and a template for a Submittal List with Review Estimate. The attachment is for the Design Services and Construction Services phases of a project.
The key details are:
- The attachment provides instructions for the Design Architect/Engineer and Construction Contracting Officer Representative to complete the Submittal List and Review Estimate template.
- It outlines the required information to be included, such as the park acronym, PMIS number, project title, submittal requirements (informational or action), and an estimate of the Architect/Engineer's review time by discipline.
- The template is to be used to negotiate the submittal review portion of the Architect/Engineer's Construction Services task order.
- The related federal contract opportunity is for the "ELMA-CREATE UNIVESALLY ACCESSIBLE TRAIL" project, solicited by the Department of the Interior National Park Service Intermountain Region.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Submittal List with Review Estimate Instructions | |
| National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21 | |
| DESIGN SERVICES (Construction Documents (CD) Phase) | |
| Responsible Party: Design Architect/Engineer (A/E) | |
| 1 | Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title. |
| 2 | Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals. |
| 3 | In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals. |
| 4 | Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page. |
| CONSTRUCTION SERVICES (Construction Phase) | |
| Responsible Party: Construction Contracting Officer Representative (COR) | |
| 1 | Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary. |
| 2 | Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services. |
| 3 | Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline. |
| 4 | Add discipline heading column as required. |
| 5 | Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews. |
| 6 | Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order. |
| 7 | Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative. |
| Responsible Party: Architect/Engineer (A/E) | |
| 1 | Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section. |
| 2 | All Informational submittals will be reviewed by Construction Management Representative (CMR). |
| 3 | Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate. |
| 4 | Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order. |
&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N
ELMA
| Submittal List with Review Estimate |
| National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21 |
| SUBMITTAL LIST | ACTION SUBMITTAL | |||||||||||
| REVIEW ESTIMATE | ||||||||||||
| Park Acronym/Project Management Information System (PMIS) Number: | ELMA 306704 | (Complete this portion for Architect / Engineer (A/E) | ||||||||||
| Project Title: | El Calderon Trail | construction service task order negotiation.) | ||||||||||
| SUBMITTAL | REQUIREMENTS | ARCHITECT / ENGINEER REVIEW TIME | ||||||||||
| (Indicate with X) | (Indicate in whole or partial hours.) | |||||||||||
| INFORMATIONAL | ACTION | |||||||||||
| SPECIFICATION SECTION | PARAGRAPH NUMBER | DESCRIPTION | CERTIFICATIONS OR LABORATORY TESTS | REPORTS OR CALCULATIONS | ||||||||
| OR PLAN | MANUFACTURER DATA | |||||||||||
| AND INSTRUCTIONS | OTHER | SAMPLES | SHOP DRAWINGS | MANUFACTURER DATA | ||||||||
| AND INSTRUCTIONS | OTHER | CIVIL ENGINEER | STRUCTURAL ENGINEER | MECHANICAL ENGINEER | ELECTRICAL ENGINEER | PROJECT MANAGER COORDINATION | LANDSCAPE ARCHITECT | |||||
| 013216 | 1.3 | Construction Schedule | ||||||||||
| Electronic Copies | X | |||||||||||
| Schedule of Values | X | |||||||||||
| Construction Baseline Schedule | X | |||||||||||
| CPM Reports | X | |||||||||||
| Construction Schedule Updates | X | |||||||||||
| Construction Schedule Revisions and Time Impact Analysis | X | |||||||||||
| 013233 | 1.2 | Photo Documentation | ||||||||||
| Construction Images | X | |||||||||||
| Closeout | X | |||||||||||
| 013513.22 | 1.3 | Archeological Protection | ||||||||||
| Construction Site Plan | x | |||||||||||
| Daily Work Schedule | X | |||||||||||
| 013523 | 1.3 | Safety Requirements | ||||||||||
| Accident Prevention Plan | X | |||||||||||
| 014000 | 1.4 | Quality Requirements | ||||||||||
| Quality Control Plan | X | |||||||||||
| Qualification Data | X | |||||||||||
| Contractor Quality Control Daily Reports | X | |||||||||||
| Test Reports | X | |||||||||||
| Accessibility Inspection Report | X | |||||||||||
| Off-Site Inspection Reports | X | |||||||||||
| CQC Plan and Quality Daily Reports | X | |||||||||||
| Permits, Licenses, and Certificates | X | |||||||||||
| 015723 | 1.3 | Temporary Storm Water Pollution Prevention | ||||||||||
| Storm Water Pollution Prevention Plan | X | |||||||||||
| Inspection Schedule (pollution prevention) | X | |||||||||||
| Inspection Schedule (storm water pollution prevention) | X | |||||||||||
| Erosion Control Products | X | |||||||||||
| 016700 | 1.3 | Product Requirements | ||||||||||
| Record Submittals | X | |||||||||||
| Material Safety Data Sheets | X | |||||||||||
| 017340 | 1.2 | Execution | ||||||||||
| Certificates | X | |||||||||||
| Landfill Receipts | X | |||||||||||
| Certified Surveys | X | |||||||||||
| Quantity Surveys | X | |||||||||||
| 017419 | 1.4 | Construction Waste Management and Disposal | ||||||||||
| Waste Management Plan | X | |||||||||||
| Waste Reduction Calculations | X | |||||||||||
| Records of Donations | X | |||||||||||
| Records of Sales | X | |||||||||||
| Recycling and Processing Facility Records | X | |||||||||||
| Landfill and Incinerator Disposal Records | X | |||||||||||
| Progress Payment Requirements | X | |||||||||||
| Closeout Submittals | X | |||||||||||
| 017700 | 1.3 | Closeout Procedures | ||||||||||
| Environmental Record Documents | X | |||||||||||
| Posted Operating Instructions | X | |||||||||||
| Touch up and repair and restore marred exposed finishes | X | X | ||||||||||
| 017823 | 1.2 | Operation and Maintenance Data | ||||||||||
| Manuals | X | X | ||||||||||
| 033000 | 1.3 | Cast In Place Concrete | ||||||||||
| Concrete Mix Design | X | X | X | |||||||||
| Steel Reinforcing | X | |||||||||||
| Synthetic Reinforcement | X | X | ||||||||||
| 044000 | 1.3 | Stonework | ||||||||||
| Stone samples | X | X | X | X | ||||||||
| mockup | X | X | X | |||||||||
| 051200 | 1.4 | Structural Steel Framing | ||||||||||
| Product Data | X | |||||||||||
| Shop drawings | X | X | ||||||||||
| Manufacturer Certificates | X | |||||||||||
| Welder Certificates | X | X | ||||||||||
| Mill Test Reports | X | |||||||||||
| Source Quality Control | X | |||||||||||
| Field Quality Control | X | |||||||||||
| Qualification Statements | X | X | ||||||||||
| 051213 | 1.2 | Architecturally Exposed Structural Steel Framing | ||||||||||
| Shop drawings | ||||||||||||
| Manufacturer Certificates | X | |||||||||||
| Welder Certificates | X | X | ||||||||||
| Mill Test Reports | X | |||||||||||
| Source Quality Control | X | |||||||||||
| Field Quality Control | X | |||||||||||
| Qualification Statement | X | |||||||||||
| 057316 | 1.2 | Cable Railing | ||||||||||
| Product Data | X | |||||||||||
| Shop Drawings | X | X | X | |||||||||
| Warranty Information | X | |||||||||||
| 099713 | 1.2 | Steel Coating - Reactive Color Treatment for Galvanized Steel | ||||||||||
| Product Data | X | |||||||||||
| Safety Data Sheet | X | |||||||||||
| Material Lab Test | X | X | ||||||||||
| Material Bend Test | X | X | ||||||||||
| Cross Sectional Metallographic Exam | X | X | ||||||||||
| Corrosion Resistance Performance Test | X | X | ||||||||||
| Color Treatment Compound Test | X | X | ||||||||||
| Applicator Qualification | X | |||||||||||
| Sample Section | X | |||||||||||
| 129301 | 1.2 | Signage | ||||||||||
| Product Data | X | |||||||||||
| Color Samples for Each Product | X | X | ||||||||||
| Alternate Products | X | X | ||||||||||
| Shop Drawings | X | X | ||||||||||
| Wood Grade | X | |||||||||||
| MUTCD Sign Shop Drawings | X | X | ||||||||||
| Relocated Site Signage | X | |||||||||||
| 310300 | 1.2 | Tree Protection | ||||||||||
| Product Data | X | |||||||||||
| 312323 | 1.2 | Fill | ||||||||||
| Product Data | X | X | ||||||||||
| Fill Lab Test | X | X | ||||||||||
| Material Source | X | |||||||||||
| Manufacturer Certificates | X | |||||||||||
| Installation Inspections | X | |||||||||||
| In-Place Compaction Testing | X | |||||||||||
| 321123 | 1.2 | Aggregate Base Courses | ||||||||||
| Product Data | X | |||||||||||
| Aggregate Fill Test | X | |||||||||||
| Material Source | X | |||||||||||
| Manufacturer Certificates | X | |||||||||||
| 321216 | 1.2 | Asphalt Paving | ||||||||||
| Product Data | X | X | ||||||||||
| 32 13 13 | Concrete Paving | |||||||||||
| Product Data | X | |||||||||||
| Strength Test Samples | X | |||||||||||
| Field Testing | X | |||||||||||
| 1.2 | Color | X | ||||||||||
| 32 15 40 | Crusher Fines Paving | |||||||||||
| Product Data | X | X | ||||||||||
| Sieve Analysis | X | |||||||||||
| Manufacturer Data | X | |||||||||||
| Paving Mock-Up | X | |||||||||||
| 321723 | Pavement Markings | |||||||||||
| Product Data | X | X | ||||||||||
| Manufacturer Certificates | X | |||||||||||
| AASHTO Tests | X | |||||||||||
| Manufacturer Instructions | X | |||||||||||
| Manufacturer/Applicator Qualifications | X | |||||||||||
| Manufacturer Approval | X | |||||||||||
| 1.2 | Performance Tests | X | ||||||||||
| 32 32 36 | Gabion Retaining Wall | |||||||||||
| Product Data | X | |||||||||||
| Shop Drawings | X | X | ||||||||||
| Samples | X |
Total: 0 0 0 0 0 0
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N
File details come from the government source that posted it. Updated .