B08_140P5123R0003_Attach_0004_Price_Sched_MALU_Ebenezer_Baptist_Church_Lift_Upgrades.xls

XLS spreadsheet 49 KB Posted

Attached to
REPLACE EBC LIFT-CONSTRUCTION
Solicitation number
140P5123R0003
Issued by

About this file

This price schedule solicitation is for the replacement of existing incline and vertical lifts within the Ebenezer Baptist Church located at the Martin Luther King, Jr. National Historical Park in Atlanta, Georgia. Offerors are requested to submit pricing for the base line item to remove the existing lifts and install a new incline lift and hybrid vertical lift, with the hybrid lift requiring a new machine room to be constructed in the existing church attic. A lump sum price is requested for the base line item, with a detailed cost breakdown to be provided on the attached tab. Relevant sub-items include selective demolition, interior finishes and conveying systems for the incline lift, and foundations, interior construction, finishes, conveying systems, HVAC and electrical for the vertical lift/machine room. The solicitation number is 140P5123R0003 and is issued by the National Park Service Southeast Region of the Department of the Interior.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Quote

SOLICITATION PRICE SCHEDULE
SOLICITATION NUMBER: 140P5123R0003 PROJECT TITLE: Ebenezer Baptist Church Lift Upgrades Martin Luther King, Jr. National Historic Park, Atlanta, GA
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Removal of the existing incline and vertical lifts within the church and installation of a new incline lift and new hybrid lift. The new hybrid lift requires a machine room that will be installed in the existing attic at the Ebenezer Baptist Church at the Martin Luther King, Jr. National Historical Park Atlanta, Georgia per the specification, drawings, and other supporting documents.1LS
TOTAL PROPOSED PRICE
NOTE: PLEASE PROVIDE A DETAILED COST BREAKOUT OF YOUR LUMP SUM PRICE PROPOSAL WITH ATTACHMENT 0004. ALL COSTS ASSOCIATED WITH YOUR PRICE PROPOSAL SHALL BE INCLUDED. PLEASE PROVIDE COST BREAKDOWN ON THE DETAILED COST BREAKDOWN TAB.

&RPARK - PMIS

CPS - &P

Detailed Cost Breakdown

SOLICITATION PRICE SCHEDULE
SOLICITATION NUMBER: 140P5123R0003 PROJECT TITLE: Ebenezer Baptist Church Lift Upgrades Martin Luther King, Jr. National Historic Park, Atlanta, GA
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
Bid Item No.Bid Item DescriptionTotal Material CostTotal Labor CostTotal Equipment CostTotal Direct Construction CostsDesign Contingency
%General Conditions
%General Contractor Overhead
%General Contractor Profit
%Contracting Method AdMustment
%Inflation EscalationBid Item Total
APRMonths
%
Bid Item: 1Selective DemolitionTOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY if any :$ -
$$$$
F20Selective Building Demolition$$$$
$$$$
Total - Bid Item1Selective Demolition$$$$$$$$$$$$
Bid Item: 2Incline LiftTOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY if any :$ -
$$$$
C30Interior Finishes - Incline$$$$
D10Conveying Systems - Incline$$$$
$$$$
Total - Bid Item2Incline Lift$$$$$$$$$$$$
Bid Item: 39ertical Lift Machine RoomTOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY if any :$ -
A10Foundations$$$$
C10Interior Construction$$$$
C10Interior Finishes - Vert Hybrid$$$$
C30Conveying Systems - Vert Hybrid$$$$
D30HVAC$$$$
D50Electrical$$$$
$$$$
Total - Bid Item3Vertical Lift/Machine Room$$$$$$$$$$$$
Total Bid Items 1-10$$$$$$$$$$$$

File details come from the government source that posted it. Updated .