A06_0040602915_Drawings_MALU_Replace_EBC_Lift.pdf

PDF 10 MB Posted

Attached to
REPLACE EBC LIFT-CONSTRUCTION Federal contract opportunity
Solicitation number
140P5123R0003
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document contains drawings and specifications for replacing the incline and vertical lifts at the Ebenezer Baptist Church at the Martin Luther King, Jr. National Historical Park in Atlanta, Georgia. The project requires removal of the existing lifts and installation of a new incline lift and hybrid lift, with the hybrid lift requiring a new machine room to be constructed in the existing attic. The drawings show existing and proposed panel layouts, floor plans, and mechanical, structural, and electrical drawings related to the lift replacements. The associated federal contract opportunity is from the Department of the Interior National Park Service Southeast Region and seeks to replace the EBC lift through construction services. The solicitation specifies replacement of the existing incline and vertical lifts with a new incline lift and hybrid lift, along with installation of the required machine room for the hybrid lift.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Signed on 06/14/2021 using a Digital Signature.

DocuSign Envelope ID: 5B1439FD-5057-44C3-9D0B-348D97B6A90C

EXISTING PANEL:PB-3 AMP:125

VOLTAGE:120/208 MAIN:MLO (100A UPSTREAM CB)

PHASE:3, 4 WIRE + G. AIC RATING:10,000

EQUIPMENT kVA CB CKT A B C CKT CB kVA EQUIPMENT

BALCONY LIGHTING 1.0 20/1 1 1.2 2 20/1 0.2 DOOR ELECTRIC-FAN

BALCONY LIGHTING 1.0 20/1 3 1.0 4 20/1 SPARE

BALCONY LIGHTING 1.0 20/1 5 1.0 6 SPACE ONLY

BALCONY FLOOR REC 1.0 20/1 7 2.0 8 20/1 1.0 REC FRONT DOOR

BALCONY FLOOR REC 1.0 20/1 9 2.0 10 20/1 1.0 REC EAST STAIRWELL

SPARE 20/1 11 1.0 12 20/1 1.0 REC EAST STAIRWELL

WEST STAIR LIGHTING 1.0 20/1 13 2.0 14 20/1 1.0 REC SANCTUARY

SIGN 1.0 20/1 15 2.0 16 20/1 1.0 REC SANCTUARY

LIFT 2.5 30/2 17 2.5 18 20/1 SPARE

---- 2.5 -- 19 5.0 20 30/2 2.5 PUMP IN COURTYARD

LIFT CAB LIGHTING 0.1 20/1 21 2.6 22 -- 2.5 ----

REC MACHINE RM 0.2 20/1 23 0.2 24 20/1 SPARE

LTG MACHINE RM 0.1 20/1 25 0.1 26 20/1 SPARE

SPARE 20/1 27 2.5 28 30/2 2.5 CHV-FRONT ENTRANCE

SPARE 20/1 29 2.5 30 -- 2.5 ----

HEATER-MACHINE RM 1.3 15/3 31 1.3 32 20/1 SPARE

---- 1.3 -- 33 1.3 34 20/1 SPARE

---- 1.3 -- 35 1.3 36 20/1 SPARE

HEATER - ENTRANCE 2.5 30/2 37 2.5 38 SPACE ONLY

---- 2.5 -- 39 2.5 40 SPACE ONLY

SPACE ONLY 41 0.0 42 SPACE ONLY

PHASE TOTALS 14.1 13.9 8.5

CONNECTED AMPS: 101.5 CONNECTED kVA: 37

DEMAND AMPS: 93.22 DEMAND kVA: 34

* NEW CIRCUIT.

EXISTING PANEL:PB-5 AMP: 225

VOLTAGE:120/208 MAIN:MLO (100A UPSTREAM CB)

PHASE:3, 4 WIRE + G. AIC RATING:10,000

EQUIPMENT kVA CB CKT A B C CKT CB kVA EQUIPMENT

LTG FELLOWSHIP HALL 1.0 20/1 1 2.0 2 20/1 1.0 LTG KITCHEN

LTG RST RM & BACK HALL 1.0 20/1 3 2.0 4 20/1 1.0 WATER FOUNTAIN

REC STAGE 0.4 20/1 5 1.4 6 20/1 1.0 EXIT SIGNS & EMER LTG

MECH RM LTG & EXHAUST 1.0 20/1 7 2.0 8 20/1 1.0 EXIT SIGNS & EMER LTG

SPARE 20/1 9 1.0 10 20/1 1.0 LTG FELLOWSHIP HALL

LTG FELLOWSHIP HALL 1.0 20/1 11 1.0 12 20/1 SPARE

REC KITCHEN 1.0 20/1 13 2.5 14 20/1 1.5 BLOWER CONTACTOR

EXIT SIGN, REC FELL. HALL

1.0 20/1 15 1.8 16 20/2 0.8 WHEELCHAIR LIFT

REC STAGE 0.4 20/1 17 1.2 18 -- 0.8 ----

PHASE TOTALS 6.5 4.8 3.6

CONNECTED AMPS: 41.3 CONNECTED kVA: 15

DEMAND AMPS: 42.41 DEMAND kVA: 15

* NEW CIRCUIT.

100CD_ARCH
MALUCOV-COVER
PLOT
G1.0-G1.0
PLOT
A1.0-A1.0
PLOT
A1.1-A1.1
PLOT
A1.2-A1.2
PLOT
A1.3-A1.3
PLOT
A1.4-A1.4
PLOT
A1.5-A1.5
PLOT
A2.0-A2.0
PLOT
A2.1-A2.1
PLOT
A2.2-A2.2
PLOT
A4.0-A4.0
PLOT
A4.1-A4.1
PLOT
A4.2-A4.2
PLOT
STUD CONNECTION
100CD_STRUCT
Sheets and Views
S0.1
PLOT
Sheets and Views
S1.1
PLOT
Sheets and Views
S2.1
PLOT
100CD_MECH
M1.0
100CD_ELEC
E0.1_LEGN
E1.0_FP
E1.1_FP

File details come from the government source that posted it. Updated .