B03-Attachment_3_-_WD-ME20240036-4_05_24-mod2.pdf
PDF 2 MB Posted
- Attached to
- ACAD - REPLACE GREAT MEADOW CULVERT Federal contract opportunity
- Solicitation number
- 140P4325R0001
About this file
This is a Davis-Bacon Act wage determination (ME20240036) for highway construction projects in Hancock County, Maine, effective April 5, 2024. The document details required minimum wage rates and fringe benefits for various construction worker classifications.
The wage determination establishes two minimum wage thresholds based on contract dates: $17.20 per hour for contracts entered after January 30, 2022, and $12.90 per hour for contracts awarded between January 1, 2015, and January 29, 2022. Specific wage rates are listed for different worker classifications, including power equipment operators ($28.60/hour plus $13.80 fringe), carpenters ($18.34/hour plus $2.84 fringe), and various laborers and operators ranging from $9.00 to $22.30 per hour with corresponding fringe benefits. The document also specifies that contractors must provide paid sick leave benefits for contracts awarded after January 1, 2017, at a rate of 1 hour per 30 hours worked, up to 56 hours annually.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4325R0001_Amd_0006.pdf | ||
| B09-Amendment_-_006_-RFIs_20-21_0006.xlsx | XLSX spreadsheet | |
| B09-Amendment_-_005_-RFIs_18-19_0005.xlsx | XLSX spreadsheet | |
| Sol_140P4325R0001_Amd_0005.pdf | ||
| Sol_140P4325R0001_Amd_0004.pdf | ||
| Sol_140P4325R0001_Amd_0003.pdf | ||
| B09-Amendment_-_003_-RFIs_15-17_0003.xlsx | XLSX spreadsheet | |
| Sol_140P4325R0001_Amd_0002.pdf | ||
| B09-ACAD_251732_Great_Meadow_Culvert_-_Geotech_Design_Memo_0002.pdf | ||
| B09-Amendment_-_002_-RFIs_1-14-_0002.xlsx | XLSX spreadsheet | |
| Sol_140P4325R0001_Amd_0001.pdf | ||
| B08-Attachment_6-Past_Performance_Questionnaire.doc | DOC document | |
| B03-Attachment_1_-_Specifications.doc | DOC document | |
| Sol_140P4325R0001.pdf | ||
| B03-_Attachment_2_-_Drawings.pdf | ||
| B08-Attachment_4_-Construction_Contract_Administration.pdf | ||
| B08-Attachment_5_-_Subcontracting_Percentage_Worksheet.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .