B01 Att J03 - Combined Specifications.pdf

PDF 6 MB Posted

Attached to
Lodge Grass Dental, HIM and Pharmacy Remodel
Solicitation number
75H70123R00006
Issued by

About this file

This federal solicitation requests proposals for construction services for the renovation and modification of the Lodge Grass Health Clinic's Dental, Pharmacy, and Medical Records departments in Lodge Grass, Montana. The project scope includes remodeling approximately 3,200 total square feet of existing space for Dental, Pharmacy, and Medical Records to improve clinic layout, airflow, and patient access to care. The period of performance is 300 calendar days from notice to proceed. The estimated value of the construction project is between $1 million and $5 million. The solicitation will use lowest price technically acceptable source selection procedures and result in a firm fixed price construction contract awarded by the Indian Health Service. The closing date for proposals and additional procurement details will be provided in the solicitation.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of Health and Human Services

Indian Health Service Lodge Grass Dental, HIM, and Pharmacy Renovation

Lodge Grass, Montana

CONSTRUCTION DOCUMENTS

Project Specifications

Volume 1

US DEPARTMENT OF HEALTH AND HUMAN SERVICES

INDIAN HEALTH SERVICE

July 1, 2022

Lodge Grass Dental Office Table of Contents

VOLUME 1

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

000105 Certifications (Professionals of Record)

DIVISION 01 - GENERAL REQUIREMENTS

011000 Summary 012500 Substitution Procedures 013100 Project Management and Coordination 013200 Construction Progress Documentation 013233 Photographic Documentation 013300 Submittal Procedures 014000 Quality Requirements 015000 Temporary Facilities and Controls 017300 Execution 017329 Cutting and Patching 017419 Construction Waste Management and Disposal 017700 Closeout Procedures 017823 Operation and Maintenance Data 017839 Project Record Documents 017900 Demonstration and Training 019113 General Commissioning Requirements

DIVISION 02 – EXISTING CONDITIONS

024119 Selective Demolition

DIVISION 03 - CONCRETE

NOT USED

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

061000 Rough Carpentry 064116 Plastic-Laminate-Clad Architectural Cabinets

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

079200 Joint Sealants

DIVISION 08 - OPENINGS

081113 Hollow Metal Doors and Frames 061416 Flush Wood Doors 083113 Access Doors and Frames 085113 Aluminum Windows 087111 Door Hardware 088000 Glazing

DIVISION 09 - FINISHES

092216 Non-structural Metal Framing 092900 Gypsum Board 095113 Acoustical Panel Ceilings 096513 Resilient Base and Accessories

096519 Luxury Vinyl Tile Flooring 099123 Interior Painting

DIVISION 10 - SPECIALTIES

101400 Building Signage 102600 Wall and Door Protection

DIVISION 12 - FURNISHINGS

13553.16 Plastic-Laminate-Clad Laboratory Casework

123661.16 Solid Surfacing Countertops

DIVISION 13 – SPECIAL CONSTRUCTION

134900 Radiation Protection

VOLUME 2

DIVISION 21 – FIRE PROTECTION

210529 Hangers and Supports for Fire Suppression Piping and Equipment 210553 Identification for Fire-Suppression Piping and Equipment 211313 Wet-Pipe Sprinkler Systems

DIVISION 22 - PLUMBING

220500 Plumbing Basic Materials and Methods 220517 Sleeves and Sleeve Seals for Plumbing Piping 220518 Escutcheons for Plumbing Piping

220523.12 Ball Valves for Plumbing Piping

220523.14 Check Valves for Plumbing Piping

220529 Hangers and Supports for Plumbing Piping and Equipment

220548.13 Vibration Controls for Plumbing Piping and Equipment 220553 Identification for Plumbing Piping and Equipment 220719 Plumbing Piping Insulation 221116 Domestic Water Piping 221119 Domestic Water Piping Specialties 221316 Sanitary Waste and Vent Piping 221319 Sanitary Waste Piping Specialties

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

230500 HVAC Basic Materials and Methods 230513 Common Motor Requirements for HVAC Equipment 230517 Sleeves and Sleeve Seals for HVAC Piping 230529 Hangers and Supports for HVAC Piping and Equipment

230548.13 Vibration Controls for HVAC

230553 Identification for HVAC Piping and Equipment 230593 Testing, Adjusting, and Balancing for HVAC 230713 Duct Insulation 232300 Refrigerant Piping 233113 Metal Ducts 233300 Air Duct Accessories 233346 Flexible Ducts

233713.13 Air Diffusers

233713.23 Registers and Grilles

236313 Air-Cooled Refrigerant Condensers 238126 Split-System Air-Conditioners

DIVISION 26 - ELECTRICAL

260519 Low Voltage Electrical Power Conductors and Cables 260523 Control-Voltage Electrical Power Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533 Raceways and Boxes for Electrical Systems 260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 260553 Identification for Electrical Systems 260923 Lighting Control Devices 262416 Panelboards 262726 Wiring Devices 262813 Fuses 262816 Enclosed Switches and Circuit Breakers 265119 LED Interior Lighting 265213 Emergency and Exit Lighting

DIVISION 27 - COMMUNICATIONS

270526 Grounding and Bonding for Communication Systems 270533 Identification for Communication Systems 271513 Communications Copper Horizontal Cabling

DIVISION 28 – SECURITY AND FIRE ALARM & DETECTION

282000 Video Surveillance

284621.13 Conventional Fire Alarm Systems

END OF TABLE OF CONTENTS

IHS LODGE GRASS DENTAL, HIM, AND PHARMACY

RENOVATION

CONSTRUCTION DOCUMENTS 000105 - 1

I hereby certify that this technical submission was prepared by me or under my direct supervision and responsible charge in accordance with the rules and regulations governing Architects and Engineers practicing in the State of Montana. I am a duly registered Professional in the State of Montana.

Discipline: ARCHITECTURAL

Professional Seal with Signature

CONSTRUCTION DOCUMENTS 000105 - 2

THIS PAGE INTENTIONALLY LEFT BLANK

CONSTRUCTION DOCUMENTS 000105 - 3

I hereby certify that this technical submission was prepared by me or under my direct supervision and responsible charge in accordance with the rules and regulations governing Architects and Engineers practicing in the State of Montana. I am a duly registered Professional in the State of Montana.

Discipline: ELECTRICAL

Professional Seal with Signature

07/01/2022

CONSTRUCTION DOCUMENTS 000105 - 4

CONSTRUCTION DOCUMENTS 000105 - 5

I hereby certify that this technical submission was prepared by me or under my direct supervision and responsible charge in accordance with the rules and regulations governing Architects and Engineers practicing in the State of Montana. I am a duly registered Professional in the State of Montana.

Discipline: MECHANICAL, PLUMBING

Professional Seal with Signature mmassa Snapshot mmassa Snapshot

CONSTRUCTION DOCUMENTS 000105 - 6

SUMMARY

CONSTRUCTION DOCUMENTS 011000 - 1

SECTION 011000

SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Use of premises.

4. Work restrictions.

5. Specification formats and conventions.

1.2 PROJECT INFORMATION

A. Project Identification: US Department of Health and Human Services, Indian Health Service Lodge Grass Dental, HIM, and Pharmacy Renovation.

1. Project Location: Lodge Grass, MT 59050.

B. Owner (Government): US Department of Health and Human Services – Indian Health Service, IHS Great Plains Area.

C. Architect: Short Elliott Hendrickson Inc. (SEH).

1. Architect's Representative: Matt Massa, Project Manager.

2. Architect’s Representative: Alex Jauch, Project Manager.

D. Web-Based Project Software: Project software will be used for purposes of managing communication and documents during the construction stage.

1. See Section 013100 "Project Management and Coordination." for requirements for using web-based Project software.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following:

1. The Indian Health Service (IHS) is an agency within the U.S. Department of Health and Human Services that provides comprehensive, culturally appropriate health services to American Indian and Alaskan Native people. The project involves renovation of the existing Dental Office, Pharmacy, and office space within the Lodge Grass Health Clinic. It will include expanding size of existing dental operatories, reconfiguring the pharmacy layout for better efficiencies and relocating the health records to smaller space due to reduction

SUMMARY

CONSTRUCTION DOCUMENTS 011000 - 2

of physical file storage. The project includes all associated mechanical, and electrical work, as well as other Work indicated in the Contract Documents.

B. Type of Contract:

1. Project will be constructed under a single prime contract.

1.4 USE OF PREMISES

A. Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits and in the Section. Government will provide on-site areas for temporary facilities, contractor parking and storage of materials as well as the immediate work area for construction.

B. Schedule and sequence operations necessary to complete the work, including coordination with other crafts relative to the Contractor's requirements. Schedule Work in such manner as to avoid delays in overall construction and permit proper installation of work.

C. Limit use of premises to areas within the Contract limits and as allowed by the Government. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Government Occupancy: Allow for Government occupancy and operations at Project site.

Government personnel will be continuously occupying areas adjacent to the work area.

Conduct work in a manner that will minimize needs for disruption of normal Government operations. Provide minimum 72 hours advance notice to Government of activities that will impact normal Government operations. Secure Government’s written approval of activities that will impact normal Government operations to avoid delays in overall construction and permit proper installation or work.

2. Driveways and Entrances: Keep driveways, parking and entrances serving premises clear and available to Government, Government employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

1.5 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:30 a.m. to 5:00 p.m., Monday through Friday, except when otherwise indicated.

1. Work Hours outside normal business hours may be allowed as coordinated with the Government.

B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Government. Submit requests 48 hours in advance of the work to the Government for approval.

C. No signs or advertisements shall be displayed on the construction site or within the premises unless approved by the Government.

D. Existing Utilities

SUMMARY

CONSTRUCTION DOCUMENTS 011000 - 3

1. Existing Utilities: Notify Government and utility companies of proposed locations and times for excavation.

2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

E. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Government not less than two business days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Government’s written permission.

F. Smoking is not permitted within any building or within 25 feet of entrances, operable windows, or outdoor air intakes.

1.6 SPECIFICATION FORMATS AND CONVENTIONS

A. Specification Format: The Specifications are organized into Divisions and Sections using the CSI/CSC's "Masterformat" numbering system.

1. Division 01 – General Requirements: Sections in Division 01 govern the execution of the Work of all Sections in the Specifications.

B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate.

Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

2. Imperative mood and streamlined language are generally used in the Specifications.

Requirements expressed in the imperative mood are to be performed by Contractor.

Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.

a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

C. Terminology: All references to “Owner” and “Contracting Officer” shall be replaced with the term “Government” (when referring to the person acting for the Government). All references to “Architect” or “Engineer” shall be replaced with the term “Government” (when referring to the person who is to be contacted regarding the project).

SUMMARY

CONSTRUCTION DOCUMENTS 011000 - 4

1.7 Buy American Act (BAA)

A. All products incorporated into the Work are required to comply with the Buy American Act (BAA).

For any non-BAA-compliant product that may be specified or shown on the Drawings, the Contractor shall submit an equal BAA-compliant product substitution for approval.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

SUBSTITUTION PROCEDURES

CONSTRUCTION DOCUMENTS 012500 - 1

SECTION 012500

SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

B. Related Requirements:

1. Section 012300 "Alternates" for products selected under an alternate.

1.2 DEFINITIONS

A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents.

1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.

2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not required to meet other Project requirements but may offer advantage to Contractor or Owner.

1.3 ACTION SUBMITTALS

A. Substitution Requests: Submit documentation identifying product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Substitution Request Form: Use form that is part of web-based Project management software.

2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

a. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable.

b. Coordination of information, including a list of changes or revisions needed to other parts of the Work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section.

Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.

d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

SUBSTITUTION PROCEDURES

CONSTRUCTION DOCUMENTS 012500 - 2

e. Samples, where applicable or requested.

f. Certificates and qualification data, where applicable or requested.

g. List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.

h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.

i. Research reports evidencing compliance with building code in effect for Project, from ICC-ES.

j. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.

k. Cost information, including a proposal of change, if any, in the Contract Sum.

l. Contractor's certification that proposed substitution complies with requirements in the Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.

m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

3. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within seven days of receipt of a request for substitution.

Architect will notify Contractor of acceptance or rejection of proposed substitution within 10 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.

a. Forms of Acceptance: Change Order, Construction Change Directive, or Architect's Supplemental Instructions for minor changes in the Work.

b. Use product specified if Architect does not issue a decision on use of a proposed substitution within time allocated.

1.4 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.

1.5 PROCEDURES

A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.

1.6 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 10 days prior to time required for preparation and review of related submittals.

SUBSTITUTION PROCEDURES

CONSTRUCTION DOCUMENTS 012500 - 3

1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:

a. Requested substitution is consistent with the Contract Documents and will produce indicated results.

b. Substitution request is fully documented and properly submitted.

c. Requested substitution will not adversely affect Contractor's construction schedule.

d. Requested substitution has received necessary approvals of authorities having jurisdiction.

e. Requested substitution is compatible with other portions of the Work.

f. Requested substitution has been coordinated with other portions of the Work.

g. Requested substitution provides specified warranty.

h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

B. Substitutions for Convenience: Architect will consider requests for substitution if received within 30 days after the Notice to Proceed. Requests received after that time may be considered or rejected at discretion of Architect.

1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:

a. Requested substitution offers Owner a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities Owner must assume. Owner's additional responsibilities may include compensation to Architect for redesign and evaluation services, increased cost of other construction by Owner, and similar considerations.

b. Requested substitution does not require extensive revisions to the Contract Documents.

c. Requested substitution is consistent with the Contract Documents and will produce indicated results.

d. Substitution request is fully documented and properly submitted.

e. Requested substitution will not adversely affect Contractor's construction schedule.

f. Requested substitution has received necessary approvals of authorities having jurisdiction.

g. Requested substitution is compatible with other portions of the Work.

h. Requested substitution has been coordinated with other portions of the Work.

i. Requested substitution provides specified warranty.

j. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 012500

PROJECT MANAGEMENT AND COORDINATION

CONSTRUCTION DOCUMENTS 013100 - 1

SECTION 013100

PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Definitions.

2. Informational submittals.

3. Coordination procedures.

4. Coordination drawings.

5. Project meetings.

6. Requests for Interpretation (RFIs).

7. Digital project management procedures.

8. Environmental coordination.

9. Permits.

1.2 DEFINITIONS

A. Request for Interpretation (RFI): Request from Contractor seeking interpretation or clarification of the Contract Documents.

1.3 INFORMATIONAL SUBMITTALS

A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

1. Name, address, telephone number, and email address of entity performing subcontract or supplying products.

2. Number and title of related Specification Section(s) covered by subcontract.

1.4 COORDINATION PROCEDURES

A. Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections that depend on each other for proper installation, connection, and operation.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

PROJECT MANAGEMENT AND COORDINATION

CONSTRUCTION DOCUMENTS 013100 - 2

1. Prepare similar memoranda for Government and separate contractors if coordination of their Work is required.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Preinstallation conferences.

7. Project closeout activities.

8. Startup and adjustment of systems.

1.5 COORDINATION DRAWINGS

A. Coordination Drawings: Prepare Coordination Drawings according to requirements in individual Sections and where installation is not completely indicated on the Shop drawings, where limited space availability necessitates coordination, or if coordination is required for installation of products and materials fabricated by separate entities.

1. Content: Project-specific information, drawn accurately to scale. Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

b. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Government for resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.

c. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.

d. Show location and size of access doors required for access to concealed dampers, valves, and other controls.

B. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:

1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings.

2. File Submittal Format: Submit or post coordination drawing files using Portable Document Format (PDF) file format.

3. Government will furnish Contractor one set of digital data files of drawings and models, according to Section 1.8, prepared by Government, for use in preparing coordination digital data files.

PROJECT MANAGEMENT AND COORDINATION

CONSTRUCTION DOCUMENTS 013100 - 3

1.6 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Government of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.

3. Minutes: Record significant discussions and agreements. Distribute the meeting minutes to everyone concerned, including Government, within three days of the meeting.

B. Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to Government, but no later than 15 days after execution of the Agreement. Hold the conference at Project site or other convenient location. Conduct the meeting to review responsibilities and personnel assignments, review required work, project drawings, specifications, construction schedules, payroll, payments, and administrative provisions of the Contract. Be prepared to summarize and explain procedures planned for the project and present specified preconstruction submittals.

1. Attendees: Authorized representatives of Government, Contractor and its superintendent;

major subcontractors; suppliers; and other concerned parties shall attend the conference.

All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. The mechanical and electrical subcontractor’s attendance will be required.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Tentative construction schedule.

b. Critical work sequencing and long-lead items.

c. Designation of key personnel and their duties.

d. Procedures for processing field decisions and Modifications.

e. Procedures for RFIs.

f. Procedures for testing and inspecting.

g. Procedures for processing Applications for Payment.

h. Distribution of the Contract Documents.

i. Submittal procedures.

j. Preparation of Record Documents.

k. Use of the premises.

l. Work restrictions.

m. Government occupancy requirements.

n. Responsibility for temporary facilities and controls.

o. Construction waste management and recycling.

p. Parking availability, office, work, and storage areas.

q. Equipment deliveries and priorities.

r. First aid.

s. Security.

t. Progress cleaning.

u. Working hours.

3. Minutes: Record and distribute meeting minutes.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.

PROJECT MANAGEMENT AND COORDINATION

CONSTRUCTION DOCUMENTS 013100 - 4

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Government of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents.

b. Options.

c. Related RFIs and Related Modifications.

d. Purchases, Deliveries, Submittals.

e. Review of mockups.

f. Possible conflicts and/or Compatibility problems.

g. Time schedules and Weather limitations.

h. Manufacturer's written recommendations.

i. Warranty requirements.

j. Acceptability of substrates.

k. Space and access limitations.

l. Regulations of authorities having jurisdiction.

m. Testing and inspecting requirements.

n. Installation procedures.

o. Coordination with other work.

p. Required performance results.

q. Protection of adjacent work.

r. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present.

5. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

D. Progress Meetings: Conduct progress meetings at weekly intervals. Hold the meetings at the project site. Coordinate dates of meetings with preparation of payment requests. Additional progress meetings may be requested by either the Government or Contractor.

1. Attendees: In addition to representatives of Government, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented. All participants shall be familiar with Project and authorized to conclude matters relating to the Work.

2.

3. Agenda: Review and correct or approve minutes of previous progress meeting. Review items of significance that could affect progress. Include as appropriate:

a. Contractor's Construction Schedule: Review progress since the last meeting.

Determine whether each activity is on time, ahead or behind schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

1) Review schedule for next period.

b. Review present and future needs of each entity present, including the following:

1) Interface requirements.

PROJECT MANAGEMENT AND COORDINATION

CONSTRUCTION DOCUMENTS 013100 - 5

2) Sequence of operations.

3) Status of submittals.

4) Deliveries.

5) Off-site fabrication.

6) Access.

7) Site utilization.

8) Temporary facilities and controls.

9) Work hours.

10) Hazards and risks.

11) Progress cleaning.

12) Quality and work standards.

13) Status of correction of deficient items.

14) Field observations.

15) RFIs.

16) Status of proposal requests.

17) Pending changes.

18) Status of Modifications.

19) Pending claims and disputes.

20) Documentation of information for payment requests.

c. Reporting: Record the meeting minutes. Distribute minutes of the meeting to each party present and to parties who should have been present.

d. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

1.7 REQUESTS FOR INTERPRETATION (RFIs)

A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation at Project meeting, prepare and submit an RFI in the form specified.

1. RFIs shall originate with Contractor. RFIs submitted directly by entities other than Contractor will be returned with no response.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing interpretation and the following:

1. Project name.

2. Date.

3. Name of Contractor.

4. Name of Contracting Officer.

5. RFI number, numbered sequentially.

6. Specification Section number and title and related paragraphs, as appropriate.

7. Drawing number and detail references, as appropriate.

8. Field dimensions and conditions, as appropriate.

9. Contractor's suggested solution(s). If Contractor's solution(s) impact the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

10. Contractor's signature.

11. Requested date for response.

12. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop

Drawings, and other information necessary to fully describe items needing interpretation.

PROJECT MANAGEMENT AND COORDINATION

CONSTRUCTION DOCUMENTS 013100 - 6

Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Forms: Software-generated form with substantially the same content as indicated above, acceptable to Government.

1. Identify each page of attachments with the RFI number and sequential page number.

D. Government's Action: Government will review each RFI, determine action required, and return it.

Allow fifteen calendar days for Government’s response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.

1. The following RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor’s means and methods.

d. Requests for coordination information already indicated in the Contract Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Government’s actions on submittals.

g. Incomplete RFIs or RFIs with numerous errors.

2. Government’s action may include a request for additional information, in which case Government’s time for response will start again.

E. On receipt of Government’s action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Government within seven days if Contractor disagrees with response.

F. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.

Submit log monthly. Include the following:

1. Project name.

2. Name and address of Contractor.

3. Name and address of Contracting Officer.

4. RFI number including RFIs that were dropped and not submitted.

5. RFI description.

6. Date the RFI was submitted.

7. Date Government’s response was received.

8. Identification of related bilateral or unilateral modifications, extensions, and changes in scope, as appropriate.

1.8 DIGITAL PROJECT MANAGEMENT PROCEDURES

A. Use of Government's Digital Data Files: Digital data files of Government's CAD drawings will be provided by Government for Contractor's use during construction.

1. Digital data files may be used by Contractor in preparing coordination drawings, Shop Drawings, and Project record Drawings.

2. Government makes no representations as to the accuracy or completeness of digital data files as they relate to Contract Drawings.

3. Digital Drawing Software Program: Drawings are available in AutoCAD Civil 3D 2018.

PROJECT MANAGEMENT AND COORDINATION

CONSTRUCTION DOCUMENTS 013100 - 7

B. PDF Document Preparation: PDFs are required to be submitted shall be prepared as follows:

1. Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each item.

2. Name file with submittal number or other unique identifier, including revision identifier.

3. Certifications: Where digitally submitted certificates and certifications are required, provide a digital signature with digital certificate on where indicated.

1.9 ENVIRONMENTAL COORDINATION

A. Contractor’s Environmental Manager: Designate an on-site party responsible for overseeing the Contractor’s conformance to environmental goals for the project and implementing procedures for environmental protection.

1. Qualifications: Minimum 3 years Construction experience on projects of similar size and scope; with environmental procedures similar to those of this project; must be familiar with environmental regulations applicable to construction operations.

2. Responsibilities: Responsibilities shall include:

a. Ensure compliance with applicable Federal, State, and local environmental regulations, including maintaining required documentation.

b. Implement the Waste Management Plan (WMP).

c. Implement the Indoor Air Quality (IAQ) Management Plan.

d. Present an overview of environmental issues and summarize site specific procedures relating to management plans at the Preconstruction conference.

e. Provide training for Contractor personnel in accordance with their position requirements.

f. Monitor and document environmental procedures.

B. Perform project quality control in accordance with specified requirements including:

1. Quality Requirements.

2. Regulatory Requirements.

3. Indoor Air Quality (IAQ) Management.

4. Noise & Acoustics Management.

5. Temporary Storm Water Pollution Management.

6. Construction Waste Management.

7. Compliance with environmental regulations: As specified in Regulatory Requirements.

Submit Contractor 40 CFR employee training records upon request of Government.

C. Provide documentation for environmental procedures as specified herein.

1.10 PERMITS

A. General:

1. Permits and Responsibilities: The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The

PROJECT MANAGEMENT AND COORDINATION

CONSTRUCTION DOCUMENTS 013100 - 8

Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the work.

2. For the purpose of this contract the Contractor will not be considered an agent of the Government. Therefore the Contractor will comply with the appropriate Federal, State and local laws.

B. Coordination with Agencies with Jurisdiction for Utility Connections: Contact the Agency(ies) with Jurisdiction as needed and sufficiently in advance to avoid delaying the work: Coordinate meetings, reporting requirements, inspections, or any other requirements.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 013100

CONSTRUCTION PROGRESS DOCUMENTATION

CONSTRUCTION DOCUMENTS 013200 - 1

SECTION 013200

CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Contractor's Construction Schedule.

2. Submittals Schedule.

3. Daily construction reports.

4. Field condition reports.

1.2 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.

1. Critical activities are activities on the critical path. They must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network.

3. Successor Activity: An activity that follows another activity in the network.

B. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of Project.

C. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float.

D. Float: The measure of leeway in starting and completing an activity.

E. Major Area: A story of construction, a separate building, or a similar significant construction element.

1.3 SUBMITTALS

A. Submittals Schedule: Submit electronic (pdf) copy of schedule. Arrange the following information in a tabular format:

1. Scheduled date for first submittal.

2. Specification Section number and title.

3. Submittal category (action or informational).

4. Name of subcontractor.

CONSTRUCTION PROGRESS DOCUMENTATION

CONSTRUCTION DOCUMENTS 013200 - 2

5. Description of the Work covered.

6. Scheduled date for Government’s final release or approval.

B. Contractor's Construction Schedule: Submit electronic (pdf) copy of initial schedule, large enough to show entire schedule for entire construction period.

C. CPM Reports: Concurrent with CPM schedule, submit electronic (pdf) copy of each of the following computer-generated reports. Format for each activity in reports shall contain activity number, activity description, cost and resource loading, original duration, remaining duration, early start date, early finish date, late start date, late finish date, and total float in calendar days.

1. Activity Report: List of all activities sorted by activity number and then early start date, or actual start date if known.

2. Logic Report: List of preceding and succeeding activities for all activities, sorted in ascending order by activity number and then early start date, or actual start date if known.

3. Total Float Report: List of all activities sorted in ascending order of total float.

D. Daily Construction Reports: Submit electronic (pdf) copy at weekly intervals.

E. Field Condition Reports: Submit electronic (pdf) copy at time of discovery of differing conditions.

1.4 COORDINATION

A. Coordinate Contractor's Construction Schedule with the list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from parties involved.

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

1.5 SUBMITTALS SCHEDULE

A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, resubmittal, ordering, manufacturing, fabrication, and delivery when establishing dates.

1. Coordinate Submittals Schedule with list of subcontracts and Contractor's Construction Schedule.

2. Submit concurrently with the first complete submittal of Contractor's Construction Schedule.

1.6 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of Final Completion.

1. Contract completion date shall not be changed by submission of a schedule unless specifically authorized by Modification.

CONSTRUCTION PROGRESS DOCUMENTATION

CONSTRUCTION DOCUMENTS 013200 - 3

B. Activities: Treat each story or separate area as a separate numbered activity for each principal element of the Work. Comply with the following:

1. Procurement Activities: Include procurement process activities for the following long lead items and major items, requiring a cycle of more than 60 days, as separate activities in schedule.

2. Submittal Review Time: Include review and resubmittal times.

3. Startup and Testing Time: Include required startup and testing times.

4. Substantial Completion: Indicate completion in advance of date established for Substantial

Completion, and allow time for Government’s administrative procedures necessary for certification of Substantial Completion.

C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.

D. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and Final Completion.

E. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a time-impact analysis to demonstrate the effect of the proposed change on the overall project schedule.

F. Contractor's Construction Schedule Updating: At a minimum of monthly intervals, and at any major occurrence impacting schedule, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.

G. Distribution: Distribute copies of approved schedule to Government, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.

1.7 CONTRACTOR'S CONSTRUCTION SCHEDULE (CPM SCHEDULE)

A. General: Prepare network diagrams using AON (activity-on-node) format.

B. Preliminary Network Diagram: Submit diagram within 14 days of date established for the Notice of Award. Outline significant construction activities for the first 60 days of construction. Include skeleton diagram for the remainder of the Work.

C. CPM Schedule: Prepare Contractor's Construction Schedule using a computerized time-scaled CPM network analysis diagram for the Work.

1. Develop network diagram in sufficient time to submit CPM schedule so it can be accepted for use no later than 30 days after date established for the Notice to Proceed.

a. Failure to include any work item required for performance of this Contract shall not excuse Contractor from completing all work within applicable completion dates, regardless of Government’s approval of the schedule.

2. Establish procedures for monitoring and updating CPM schedule and for reporting progress. Coordinate procedures with progress meeting and payment request dates.

3. Use "one workday" as the unit of time. Include list of nonworking days and holidays incorporated into the schedule.

CONSTRUCTION PROGRESS DOCUMENTATION

CONSTRUCTION DOCUMENTS 013200 - 4

D. CPM Schedule Preparation: Prepare a list of all activities required to complete the Work. Using the preliminary network diagram, prepare a skeleton network to identify probable critical paths.

1. Activities: Indicate the estimated time duration, sequence requirements, and relationship of each activity in relation to other activities. Include estimated time frames for the following activities:

a. Preparation and processing of submittals.

b. Mobilization and demobilization.

c. Purchase and delivery of materials.

d. Fabrication.

e. Utility interruptions.

f. Installation.

g. Inspections and approvals.

h. Testing and any required commissioning.

2. Critical Path Activities: Identify critical path activities, including those for interim completion dates. Scheduled start and completion dates shall be consistent with Contract milestone dates.

3. Processing: Process data to produce output data on a computer-drawn, time-scaled network. Revise data, reorganize activity sequences, and reproduce as often as necessary to produce the CPM schedule within the limitations of the Contract Time.

4. Format: Mark the critical path. Locate the critical path near center of network; locate paths with most float near the edges.

a. Subnetworks on separate sheets are permissible for activities clearly off the critical path.

E. Initial Issue of Schedule: Prepare initial network diagram from a list of straight "early start-total float" sort. Identify critical activities. Prepare tabulated reports showing the following:

1. Contractor or subcontractor and the Work or activity.

2. Description and Principal events of activity.

3. Immediate preceding and succeeding activities.

4. Early and late start and finish dates.

5. Total float or slack time.

F. Schedule Updating: Concurrent with making revisions to schedule, prepare tabulated reports showing the following:

1. Identification of activities that have changed.

2. Changes in early and late start and finish dates.

3. Changes in activity durations in workdays.

4. Changes in the critical path.

5. Changes in total float or slack time.

6. Changes in the Contract Time.

1.8 REPORTS

A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project site:

CONSTRUCTION PROGRESS DOCUMENTATION

CONSTRUCTION DOCUMENTS 013200 - 5

1. List of subcontractors at Project site.

2. Equipment at Project site.

3. Material deliveries.

4. High and low temperatures and general weather conditions.

5. Accidents.

6. Stoppages, delays, shortages, and losses.

7. Meter readings and similar recordings.

8. Orders and requests of authorities having jurisdiction.

9. Services connected and disconnected.

10. Equipment or system tests and startups.

11. Photographs

B. Field Condition Reports: Immediately on discovery of a difference between field conditions and the Contract Documents, prepare and submit a detailed report. Submit with a request for interpretation. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents.

PART 2 - PRODUCTS (Not used)

PART 3 - EXECUTION (Not used)

END OF SECTION 013200

PHOTOGRAPHIC DOCUMENTATION

CONSTRUCTION DOCUMENTS 013233 - 1

SECTION 013233

PHOTOGRAPHIC DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for the following:

1. Preconstruction photographs.

2. Concealed Work photographs.

3. Periodic construction photographs.

4. Final completion construction photographs.

B. Related Requirements:

1. Section 017700 "Closeout Procedures" for…