B05 Amend A0004.pdf

PDF 1 MB Posted

Attached to
Lodge Grass Dental, HIM and Pharmacy Remodel
Solicitation number
75H70123R00006
Issued by

About this file

This document summarizes a federal contract solicitation to provide construction services for the renovation of dental, pharmacy, and medical records departments at a health clinic in Lodge Grass, Montana. The scope of work involves renovating approximately 3,200 square feet across the three departments to improve clinic layout, airflow, and patient access. The period of performance is 300 calendar days from notice to proceed. The contract type is firm-fixed price. The magnitude is estimated between $1 million to $5 million. The solicitation will use lowest price technically acceptable evaluation criteria and full and open competition. The site visit details and submission deadlines are in the solicitation. The contracting agency is the Department of Health and Human Services Indian Health Service.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A0004

Indian Health Service (IHS) Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1650 Seattle, WA 98104

See item 6

75H70123R00006

BI22CR400C812/09/2022

10/19/2022

See continuation page.

1 14

SF30 CONTINUATION OF BLOCK 14 NARRATIVE 75H701-23-R-00006

A0004

SUMMARY OF CHANGES

The solicitation is hereby amended to address the following:

1) Include a revised Section C, A.2, removing “new furniture” from the renovation of the existing waiting room space. (2 pages)

2) Section J is revised to include the following attachments (see attachments)

a) B01 RFP ATTACHMENT J08 – 055000 – METAL FABRICATIONS

b) B01 RFP ATTACHMENT J09 – 085653 – SECURITY WINDOWS

c) B01 RFP ATTACHMENT J10 – 088853 – SECURITY GLAZING

d) B01 RFP ATTACHMENT J11 – 134900 – RADIATION PROTECTION

3) Provide answers to questions submitted by prospective offerors (9 pages)

*** The proposal due date remains unchanged, proposals are due 15 December 2022 at 2:00PM PST.

No other questions will be accepted at this time.

NOTICE TO OFFERORS: Offerors must acknowledge receipt of any and all amendments by number and all amendments by number and date on their cover letter in their offeror or by submitting a signed copy of the SF30. All other terms and conditions remain unchanged.

Lodge Grass Dental, HIM and Pharmacy Remodel Crow Service Unit Lodge Grass, MT

Indian Health Service

A. PURPOSE

The purpose of this project is to provide construction services for the renovation and modification of the Lodge Grass Health Clinic’s existing Dental, Medical Records (HIM), Pharmacy departments and Waiting areas at the Lodge Grass Clinic in Lodge Grass, MT. The Dental, HIM, Pharmacy and Waiting areas shall be renovated per the design plans and to current codes.

The primary goal of this work is to provide for the following:

1) Renovation of existing dental space, renovate HIM to be pharmacy and renovate pharmacy spaces for HIM.

2) Renovation of existing waiting room space as required for improved patient flow and access.

1. Renovation of existing dental, HIM and pharmacy spaces.

The dental area (~980sqft) of the clinic is currently not being used to see patients and considered “down for construction”; however the remainder of the clinic remains open. The dental space is located in the southwest section of the building. The interior of the dental area shall be renovated to best fulfil the needs of the dental department and overall clinic with a intent of a minimum of 3 enclosed operatories. This includes, but is not limited to, new cabinetry, flooring, walls, electrical, HVAC, plumbing and mechanical.

The existing HIM area (~640sqft) of the clinic is currently in-use by the clinic. It is located in the center of the clinic. The HIM space shall be swapped with the pharmacy space and renovated to best fulfil the needs of the department and the clinic. This includes, but is not limited to, new cabinetry, flooring, walls, electrical, HVAC, plumbing and mechanical.

The existing pharmacy area (~350sqft) of the clinic is currently in-use by the clinic. It is located in the southeast of the clinic. The pharmacy space shall be swapped with the HIM space and renovated to best fulfil the needs of the department and the clinic. This includes, but is not limited to, new cabinetry, flooring, walls, electrical, HVAC, plumbing and mechanical. The pharmacy shall have a lockable patient interaction window open to the waiting area.

2. Renovation of existing waiting room space.

This waiting room space (~900sqft) of the clinic is currently in-use. It is located in the central southern area of the clinic. The waiting room space shall be renovated as needed to accommodate the other spaces’ renovations and/or to improve patient flow. This shall include but is not limited to new furniture, flooring, and electrical.

B. SERVICES

The Contractor shall perform standard services for various phases of construction services included in this scope of work.

C. COORDDINATION FOR WORK

The Lodge Grass Clinic HIM and Pharmacy departments must remain operational throughout the duration of construction and may not be 100% shut down at any time without advanced notice and coordinated scheduling with the Facility Manager, CO, COR, and the PM. Final phasing shall be closely coordinated with all IHS staff.

In the event any Pharmacy systems must be shut down any time for any reason, contractor will be required to conduct shut down and work outside the normal business hours of 8 AM – 5 PM MST. Contractor shall plan to work on premium time outside normal business hours or weekends, and bid work accordingly if it is anticipated that the HIM or Pharmacy will need to be shut down anytime for any reason. The contractor(s) will be required to submit a detailed shut down schedule for any and all shut down periods. All contractors will be required to work around the hospital staff and operations for coordination and scheduling of any shut down periods.

D. CODES, STANDARDS, AND GUIDELINES

All work and documents shall be in accordance with the Codes, Standards, and Guidelines as outlined in the following:

• 2018 Facilities Guidelines Institute for Design and Construction of Hospitals and Outpatient Facilities

• IHS Technical Handbook (specifically Section 21.4.5)

• ASHRAE guidelines (Standard 170 – 2021)

• CDC Guidelines for Environmental Infection Control in Health-care Facilities (HICPAC)

• International Building Code (IBC)

• NFPA 101 The Life Safety Code.

E. COR/PROJECT MANAGER

Information to be provided at time of award.

SECTION J

LIST OF ATTACHMENTS

The following listed attachments are a part of this solicitation and any resultant contract.

B01 RFP ATTACHMENT J01 – Wage Determination MT20220056 B01 RFP ATTACHMENT J02 – Combined Drawings B01 RFP ATTACHMENT J03 – Combined Specifications B01 RFP ATTACHMENT J04 – Subcontracting Plan (applicable to large businesses only) B01 RFP ATTACHMENT J05 – Past Performance Questionnaire (PPQ) B01 RFP ATTACHMENT J06 – Company Specialized Experience Form B01 RFP ATTACHMENT J07 – Key Personnel Resume Form

B01 RFP ATTACHMENT J08 – 055000 – METAL FABRICATIONS

B01 RFP ATTACHMENT J09 – 085653 – SECURITY WINDOWS

B01 RFP ATTACHMENT J10 – 088853 – SECURITY GLAZING

B01 RFP ATTACHMENT J11 – 134900 – RADIATION PROTECTION

END OF SECTION

Question and Answers

LG Dental, Pharmacy, HIM Remodel

75H70123R00006

Item # Question Response

1 What level of ICRA if any is required for this project? Clinic has PCRA includes ICRA. Will provide to contractor post award

Section L-4 mentions minority and female participation.

Are these goals for all trades or just a goal for the entire project?

The goal is for each trade on all construction work in the covered area IAW FAR 52.222-23.

Hours of work outside any shutdowns of the HIM or pharmacy can be done during normal operating hours, correct?

Correct. Contractor should work with IHS Staff on scheduling work to help ensure minimal work stoppages.

Contractor will need to follow the notification process pursuant to solicitation clause H.3. WORK HOURS for any after-hours work.

Who handles waste and sanitary services in the area? The contractor shall handle cleanup during the project.

Waste and sanitary utility is provided by the Town of Lodge Grass

Is the Buy American standard a goal to be 100%? If buy American is not available, what is the process to submit and use?

Please refer to the updated clause in A0002 - FAR.52.225- 9 Buy American – Construction Materials (Oct 2022) for the process to submit exceptions to the Buy American Act.

6 What items are owner furnished and contractor installed?

Pharmacy equipment, dental chairs, existing dental head-end cabinetry, dental x-ray

There are areas in the building that get work done on them IE MEP demo, demo that is not defined in the plan to perform. 1 area to note is HIM 89 has millwork, shelving not shown on the demo plan but is a remodeled area. There are multiple areas like this. Will the plans be updated to show this?

Plans can be updated to include general notes on the demo plan that state all millwork and shelving within remodeled areas shall be removed as part of the demo.

MEP demo shows the removal of the sink in the existing pharmacy but can have a keynote added to further clarify the demo.

Will all the equipment, furniture, etc. be moved prior to construction?

Existing non-demo FF&E will be moved out prior to construction. Everything listed in question 6 will be moved

9 Are we to secure storage for any of the items mentioned in question 8?

All government owned FF&E will be stored by the owner

Existing ceilings are 7’5” +/-, ceilings call to be 8’-0”.

Due to the existing conditions this elevation can’t, be achieved. Should ceilings be installed as high as possible?

Yes, install as high as possible

There is a sink in the pharmacy that will need to be removed but is not on the demo plan. Is this correct?

Yes

There is a plywood floor with a rail system that is not shown to do anything with. This location will be in the new pharmacy so will it need to be removed.

Contractor will remove.

13 Is the back of the building within the fence we can use for laydown material and storage?

Yes

Who is the bid bond made out to? The bid bond will be submitted on Standard Form 24.

That can be found on the GSA website at:

https://www.gsa.gov/forms-library/bid-bond

Will the existing lead on the walls and any other possible asbestos issues need to be removed by an abatement contractor? Who procures the abatement contractor?

There is no LBP or asbestos in the facility. Contractor shall procure an abatement contractor as necessary for lead lined walls.

Will a full-time superintendent be required on-site during the construction phase?

The contractor will ensure that the Project Superintendent is on site at all times work is being performed by the contractor or subcontractor(s).

Reference solicitation Clause H.8, Superintendent on Site and FAR Clause FAR 52.236-6 Superintendence by the Contractor, for additional information.

17 Will the contractor be required to limit loud noises during normal working hours?

Will be covered in PCRA

Is there a specific vendor the contractor needs to utilize for DDC/Temperature controls for this building? If so, can you please provide contact information for the vendor?

Any vendor that meets the plans and specifications shall be acceptable. Standard Plumbing and Heating has completed DDC/Temperatures for this building. Please note they are not the vendor the contractor is required to use. We are providing this information as an FYI:

Standard Plumbing and Heating Jason Michael 406-422-3966 Spokane, WA

19 Can we get the CAD drawings for this project? CAD drawings will not be provided

Sheet A151 indicates a ceiling height of 8’ but the existing ceiling is at 7’5”. Is the intent to have this ceiling height at 8’, if so all ductwork, electrical, fire suppression, etc. items will have to be raised if there is even enough room. Please advise

See question 10

21 Do we need to set up temporary barriers during construction? If so, what level of barrier is needed?

Will be covered in PCRA

22 Does construction need to be phased or can it be completed all at the same time?

HIM and Pharmacy must be completed simultaneously or a phasing schedule for relocation needs to be determined

Will the new dental equipment/casework be taken out during construction and if so, who is responsible for moving it and storing it?

Owner will remove and store 12 o’clock units

Will the Xray machines be moved out during construction and if so, who responsibility is it to disconnect, store and reconnect it?

Owner will remove dental Xray machines

Will the existing furniture in the construction areas be moved prior to construction? If so, who’s responsible for moving it and storing it?

See questions 8 & 9

26 Does Commissioning need to be a 3rd party (independent contractor) to the general contractor?

Yes

Please confirm that the Dentist 1 and Dentist 3 are the only wall locations that receive lead lined drywall.

Provide lead-lined walls as follows:

1. West wall of X-RAY 110 @ X-RAY side.

2. West wall of DENTIST 1 109 @ DENTIST 1 side.

3. West wall of DENTIST 2 107 @ DENTIST 2 side.

4. East wall of DENTIST 2 107 @ DENTIST 2 side.

East wall of DENTIST 3 105 @ DENTIST 3 side.

28 Please provide the type of finish for the quartz countertops. Either Polished or Suede

Polished

Please provide a list of items that LSI all providing. They are shown to provide all the PL-1 Casework and correlating tops. Please advise

Casework construction and finishes are described on Sheets A401, A402, and A411 in text notes and keynotes.

Provide all products of same type from same manufacturer/supplier.

30 Who is going to move the security equipment? Contractor will remove the security equipment.

Who is going to move the fire alarm? The current fire alarm company is Summit Fire

Protection, the contractor should coordinate with them to move the fire alarm for the renovation.

Day or night work for all trades? Or does electrical, mechanical, plumbing, fire alarm have certain times they can and/or cannot work?

Possibly can be scheduled to work around regular business hours. Need to coordinate with COR/on-site POC. Contractor will need to follow the notification process pursuant to solicitation clause H.3. WORK HOURS for any after-hours work.

33 Who is moving the dental equipment? See questions 8, 9, 22, 23

Do happen to know the height from the finished floor to the bottom of the roof truss system that is above the finished acoustic ceiling

See question 10

DEA and IHS guidelines require bullet proof glass for all windows located in new pharmacies. This is not called out in the drawings.

For Window Type W2 at the PHARMACY 101:

The IHS Indian Health Manual, Chapter 7 (Pharmacy), Section 3-7.7 (Pharmacy Security), paragraph E states:

“Pharmacy…Windows on the exterior of the pharmacy but interior of the facility will have barriers sufficient to prevent unauthorized access to the pharmacy. Barriers may include bars, bullet-proof glass, or security shutters.

If security shutters are used, pharmacy personnel must be physically present at all times while shutters are open.” Reference new Specification Sections 085653 Security Windows and 088853 Security Glazing.

Pharmacy transaction window counter tops show 34” but some are standing workstations. These should be installed at 40” not 34” as indicated on plans.

Yes. The transaction window enclosed as the “Training area” should be the lower counter. The other two transaction windows may be 40”

Is there a code requirement for a plumbed safety shower and eyewash station in the Dental lab. Could self-contained units be used in its place? Is safety shower really required?

There is no code requirement for a safety shower. There is an existing eye wash/safety shower combo unit that is planned to be relocated to the new space.

38 Need to verify that tooling air is not needed in new Dental lab.

Correct, tooling air is not needed in the lab

39 Please confirm there are no TERO requirements for this project.

TERO is not required for this project.

Is a hazardous material survey available for this building? If not, please confirm only a hazardous materials survey is required as part of this contract.

Should any items come back hot, confirm the abatement of these items will be treated as a differing site condition and a change order to the contract.

Will be included with PCRA. There is no LBP or asbestos present in the facility

A111 shows new windows in the Dentist offices. S100 shows new? steel lintels at window openings. Demo sheet A071 does not show any demo work in this exterior wall. Please clarify the scope of work at this wall. Please provide specs for steel and for masonry veneer. Please provide jamb and sill details for these openings.

Header and jamb for wood header are per header schedule on S100. Steel angle header bears on veneer.

Reference new Specification Sections 055000 Metal Fabrications.

There are several references to spec section 072100 “Thermal Insulation” which was not issued. Does this spec apply? If so, please provide.

The only exterior work will be replacement of existing exterior windows at the southwest corner of the building with new windows type W1. Existing thermal insulation at these window openings shall be repaired or replaced to match existing as required.

Will any penetrations need to be made in the roof? Is the roof under warranty? If so, please provide the contact information for the warranty holder.

No new penetrations are required. We are tying into existing exhaust penetrations and existing plumbing vents.

There is no current roof warranty.

Section 233300 references section 230923 “Direct Digital Control (DDC) System for HVAC” which was not provided. Are DDC controls to be part of this project?

If so, please provide spec.

See question 18

Solicitation Section C item C states the HIM and Pharmacy departments must remain operational throughout the duration of construction and may not be 100% shut down at any time without advanced notice.

1. Will a phasing plan be provided by the Owner?

2. Since the HIM and Pharmacy departments are being renovated as part of this project, how does the Owner expect to keep these departments operational during construction? Will they be moved to a different area of the building? Will a temporary trailer need to be provided to house these departments? Etc.

See question 22

Please confirm there is only a 2-page limit on the experience write-up per project and otherwise there is no page limit on either Volume I or II

Correct, per the RFP on page 50 there is a 2-page limit per project for that factor. There is no page limit for either Volume I or II.

47 What is the liquidated damages value for this job? Not applicable.

Questions in regard to the lead wall: Highlighted area below is that we need to request this information that was prepared by the Owner’s radiation health physicist.

• Thickness or weight of lead needed?

• How high up does the lead need to be?

• Size of the lead laminated drywall?

2.1 SOURCE LIMITATIONS

A. Obtain each type of radiation protection product from single source from single manufacturer.

2.2 PERFORMANCE REQUIREMENTS

A. Provide materials and workmanship, including joints and fasteners, that maintain continuity of

Reference Specification Section 134900 Radiation Protection. This section describes Lead Lined Drywall products that are specifically designed for radiation shielding in health care facilities. Section 134900 has been revised. Paragraph 2.2.B has been deleted since this owner specialist and report do not exist.

radiation protection at all points and in all directions equivalent to materials specified in thicknesses and locations indicated.

B. Materials, thicknesses, and configurations of radiation protection products indicated are based on radiation protection design prepared by Owner's radiation health physicist. This design is available to Contractor upon request.

C. Lead-Lined Assemblies: Unless otherwise indicated, provide lead thickness in lead-lined assemblies of not less than lead thickness indicated for assemblies in which they are installed.

2.3 L EAD-LINED GYPSUM BOARD

A. 5/8-inch-thick gypsum board complying with Section 092900 "Gypsum Board," of width and length required for support spacing and to prevent cracking during handling, and with a single sheet of lead laminated to the back of the board.

1. Manufacturers and Products:

a. Mars Metal Group Inc.: Marshield Lead Lined Drywall.

b. RPP Radiation Protection Products Inc.: Lead Lined Gypsum Drywall.

c. Pitts Little Radiation Shielding: Lead Lined Drywall.

2. Lead Sheet Lining: Full width and length of board.

Extend lead sheet lining 1 inch beyond one vertical edge of board.

3. Furnish 2-inch-wide lead strips for backing joints.

4. Furnish finishing materials, accessories, and trim for lead-lined gypsum board complying with Section 092900 "Gypsum Board."

Is this lead in the walls already or does this need to be added per the drawings? From the site visit and from the pictures we took from that day, the walls are constructed and looked to be almost finished. Please advise if the walls that are indicated on the drawings need to be lead lined.

Vestibule Rm 130 on A111 has some sort of shelving on the west wall, but I could not find an elevation for this item. Please provide.

These are tall 15” wide X 12” deep X 84” high plastic laminate cabinets with adjustable shelving and a full height door. Construction shall be similar to plastic laminate casework shown on Sheets A402 and A411.

Provide toe kick 3” deep X 3 1/2” high. Reference Specification Section 064116. They sit on the floor

What is the existing slab thickness? The building is not slab on grade. It is modular on a foundation with a crawl space accessible through two trap doors in the floor. The landings at the bottom of the trap door ladders are 20x20 concrete pads (images 3275, 3276). The floor is supported by piers (images 3273, 3274). The thickness of these slabs is shown to be 4” thick on the original building plans, but ‘as built’ may vary depending on location

51 Can a detail be provided for plumbing trench pour backs in the existing slab?

Plumbing trenching not required. All plumbing redesign is in crawlspace below floor.

Sheet S100 shows us to “remove existing gypsum board and increase nailing to 3” edge spacing.” The demo of this gyp is not shown on the demo sheet A071, and it looks like this wall is outside of our Area of Work per A005. Does this note apply to this project? If so, please provide more information on the purpose for this note, the height extent of this work, what these rooms are (office, exam room, etc.), what the finish will be on the new gyp walls, etc.

The purpose of this note is that we are removing a portion of the wall to open up the pharmacy. In the previous modification plans, this wall was designated a shear wall with 6” edge nailing. The additional nailing is required to add shear capacity to the remaining wall to account for removed portion.

3/P211 shows the waste line in room 108 connecting on the other side of the wall, in a corridor that is not in the area of work. Please provide information to the existing floor in the hallway that we will need to match and replace.

Floor will not need to be replaced. All plumbing work to be performed in crawlspace below floor.

Can you clarify if the air and vacuum lines going to the dental chairs on P111/P211 are to be run under the slab, or overhead?

All air and vacuum lines shall be run under the floor in the crawlspace where they are currently run.

096513-2.2.D says the rubber base color will either match existing, or will be selected from manufacturer’ full range. Do you know if we will be matching or picking a new color?

Matching to existing

56 What is the existing floor material that we are demoing in this building?

Carpet and VCT

Since we are just relocating fire sprinkler heads for this project, can the delegated-design and submittals (211313-1.2.C) be removed from the SOW?

A delegated-design and submittal is not required. It will be removed from the required submittal list after award.

58 What payment method will be used? Payments will be made through ipp.gov.

59 Is the contractor responsible for pharmacy and lobby furniture?

No, the SOW section A.2 has been revised to remove “new furniture”

60 Can you provide blue prints of all measurements? Blue prints of all measurements cannot be provided.

In the specs, highlighted below indicates the CxA will be through the government under a separate contract, but on the Q&A’s, it indicates that the general contractor needs to carry the CxA. Please confirm if the CxA will be under the government or under the GC.

The GC will carry the CxA

Door 104 is an aluminum sliding door, but the Hardware Group 3 assigned to it is for a swing door.

Please clarify.

This will be a sliding door - hardware for this door should match

The mortice locks in the door hardware spec list an 8200 series CRMG MK, which we were unable to find.

Can a new mortice lock model number be provided?

Reference Specification Section 087100. Paragraph 3.2.A reads, in part: “The door hardware sets represent the design intent and direction of the Government. They are a guideline only and should not be considered a detailed hardware schedule. Discrepancies, conflicting hardware and missing items should be brought to the attention of the Government with corrections made prior to the bidding process.” Contractor shall propose an equal alternate that most closely matches existing mortise locksets on the project.

64 Is there an anticipated NTP date for this project? Anticipated NTP date is February 2023

ADP92A8.tmp
Lodge Grass Dental, HIM and Pharmacy Remodel
Crow Service Unit
1. Renovation of existing dental, HIM and pharmacy spaces.
2. Renovation of existing waiting room space.