This document is a solicitation for a construction project issued by the Indian Health Service (IHS) under solicitation number 75H70124Q00025. The purpose of the project is to replace the HVAC unit and cabinets in the CT room at the Quentin N. Burdick Memorial Healthcare Facility in Belcourt, North Dakota. The project includes design, demolition, and installation of a new rooftop HVAC unit with a direct steam injection humidifier, and replacement of the cabinets in the CT room. This is a 100% small business set-aside under NAICS code 236220 with a size standard of $45 million. The period of performance is 200 calendar days from the notice to proceed. The anticipated construction magnitude is between $100,000 and $250,000. The solicitation requires offerors to submit quotes electronically by the due date, and states that price is the discriminating factor for award among eligible offers. The government reserves the right to not award based on budget limitations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING SERVICES

SEATTLE

Solicitation Number: 75H70124Q00025

Belcourt RTU and Cabinet – CT Area Belcourt, ND

PROPOSAL DUE DATE: SEE SF1442 BLOCK 13.

SITE VISIT: See Section L (FAR 52.236-27)

PROJECT TABLE OF CONTENTS:

Section Section A Standard Form 1442, Solicitation, Offer, and Award Section B Schedule of Items / Price Schedule Section C Description and Specification (Statement of Work) Section D Packaging and Markings Section E Inspection and Acceptance Section F Deliveries or Performance Section G Contract Administration Data Section H Special Contract Requirements Section I Contract Clauses Section J List of Documents, Exhibits Section K Representations and Certifications Section L Instruction, Conditions and Notices Section M Evaluation Factors for Award

Proposals must set forth full, accurate, and complete information as required by this request for proposal (including attachments). The penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.

This page not included in page count

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR

INFORMATION CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF PAGES

75H70124Q00025

TBD

Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104

Indian Health Service - Seattle DES is issuing RFQ 75H70124Q00025

Project: GP22TM300H10 Belcourt RTU & Cabinet Replacement

Location(s): Quentin N. Burdick Memorial Hospital 1300 Hospital Lp, Belcourt, ND 58316

This RFP is being solicited as 100% Small Business Set Aside under 236220 Commercial and Institutional Building Construction Size standard $45M. See Section M

Magnitude of Construction is between $100,000.00 and $250,000.00

U.S. Department of Labor Wage Determination: See Attachment 1.

Site Visit: See Section L - FAR 52.236-27, Site Visit Construction.

TERO is applicable. See SOW Section 9.

See Item 7

TBD

Thupten Tsering 206-615-2452

GP22TM300H10

1 4105/29/2024

6/28/2024

2:00 PM

FAR 52.211-10

AWARD (To be completed by Government)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES

CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

B.4

IHS Great Plains Area Office 115 4th Avenue SE, Room 309 Aberdeen, SD 57401

Thupten Tsering

SECTION B. PRICE SCHEDULE

B.1. PRICE SCHEDULE (Offeror fill-in)

CLIN DESCRIPTION QTY UNIT TOTAL PRICE

Contractor shall provide all labor, materials, supplies, and services to complete work for Project GP22TM300H10 Belcourt RTU & Cabinets – CT Area in accordance with the SOW, specifications, drawings and other documents incorporated into this contract.

1 LS $

Total Price $

KEY: LS Lump Sum

SCHEDULE NOTES

B.2. Incidental Payment Items: The intent of the contract is to provide for the complete work of the project described in the contract. Unless otherwise provided, the contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, and perform all work required to complete the project in accordance with the drawings, specifications, and provisions of the contract. All other work and materials will be considered as incidental to and included in the payment for items shown.

B.3. Pricing Data Submission: In accordance with FAR 15.403-3(a)(ii), Requiring Data Other Than Certified Cost or Pricing Data, it is requested that pricing data be submitted to show the breakdown of costs for the above CLIN. This is requested so that the Contracting Officer can make the determination of a fair and reasonable price. For example, the price breakdown shall have the direct labor cost and direct material cost broken out.

B.4. SF1442, Block 24: HHSAR 352.232-71, Electronic Submission of Payment Requests (March 2022) has been added in full text in Section I.

B.5. Other Important Information: Under no circumstances will any oral statements made be binding upon the Government unless such statements or agreements are issued in writing by the Contracting Officer.

Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed within the change and shall immediately notify the Contracting Officer.

END OF SECTION

SECTION C. STATEMENT OF WORK

1. Project Description A. Title: RTU & Cabinets – CT Area – Design-Build

B. Location: This project is at the Quentin N. Burdick Memorial Health Facility, in Belcourt, ND.

C. Period of Performance: 200 calendar days from notice to proceed.

D. Description: The project defined within this Scope of Work is for the design and replacement of the HVAC unit for the CT room. The RTU will include a direct steam injection humidifier tied into the existing low-pressure steam system. Additionally, the cabinets inside the CT room will be replaced with new.

E. Background: The existing unit covering the CT is aging and in need of replacement. The existing unit is not designed to provide the air flow and humidity required by applicable building code.

Therefore, a new unit will need to be designed and installed to meet the minimum requirements of the building code.

F. Related Documents

This SOW and any other standard government or IHS documents are included and considered a part of this contract.

1. NFPA 70 National Electric Code (NEC)

2. NFPA 101 Life Safety Code – 2012

3. NFPA 99 Healthcare Facilities Codebook – 2012

4. 2022 Guidelines for Design and Construction of Hospitals and Outpatient Facilities – The Facilities Guidance Institute

5. ANSI/ASHRAE/ASHE Standard 170-2021

G. Common Acronyms or Definitions

1. IHS – Indian Health Service

2. CO – Contracting Officer

3. COR – Contracting Officer’s Representative

4. PM – Project Manager

5. IGCE – Independent Government Cost Estimate

6. RFI – Request for Information

2. Scope of Work (SOW) The scope of this project includes all demo, new installation, and clean up for installation of the products described below. The contractor shall provide all engineering, design, material, labor, equipment and supervision required to accomplish the following:

A. Design Scope: The Design Builder shall have a licensed mechanical engineer size a new roof top HVAC unit and direct steam humidifier for the CT room at the Quentin N. Burdick Memorial Health Facility. The design shall include a plan to demolish the existing RTU, install a new properly sized RTU, install a new direct steam injection humidifier, install necessary electrical connections, and install connection to the building automation system. The design shall include a plan to run new low pressure steam piping to the steam humidifier. The design shall utilize the existing supply ducting, supply diffusers, and return grilles.

If possible, the design shall utilize the existing roof curb. Details on the existing system can be found in the attached drawings and specifications.

B. Minimum Environmental Requirements: The RTU and steam humidifier shall be designed to consistently provide the minimum required air changes per hour. The RTU shall provide a constant air flow to the room. The RTU shall be assumed to run 24 hours a day, 365 days a year. The RTU shall be designed to meet the requirements of a Class 1 imaging room according to ANSI/ASHRAE/ASHE Standard 170-2021. Additionally, the CT unit inside the room has minimum environmental requirements that must be met. The requirements for the CT unit can be found in the attached drawings and specifications. The minimum environmental requirements are summarized in the table below.

Pressure

Relationship to Adjacent

Areas

Minimum Outdoor

Air Changes Per Hour

Minimum Total Air Changes Per Hour

Minimum Filter

Efficiencies

Design Relative

Humidity

Design Temperature

Maximum Temperature

Rate of Change

℉/Hour

Maximum Humidity Rate of Change

RH/Hour

Not Required

2 ach 6 ach MERV-8 Min. 30%

Max 60%

72-78 ℉ 5.4 ℉/Hour 5% RH/Hour

3. Other Considerations:

A. Heat Production from Equipment: The mechanical designer shall consider the heat production of the equipment inside the CT room. The largest source of heat comes from the CT unit itself. The CT unit and support equipment produce approximately 33,000 BTU/hr with a patient load of 3 per hour. See attached specifications on the CT unit. Also, see design sheet M.1 for further details.

B. Existing Unit: The current unit is a 4-ton Carrier Single-Package RTU with electric heat. The unit model number is 50HJ-005---621--. Further details can be found on design sheet M.2.

4. Steam Humidifier: The design builder shall size a direct steam injection humidifier that maintains the room between 30%-60% relative humidity. The steam humidifier shall be a low maintenance unit that requires little intervention from facility personnel. All necessary utility connections and components shall be included in the design. This shall include at least the following: steam filter, steam separator, control valve, injection lance, purging valve, & steam line. The facility has an existing low pressure steam system.

The design builder shall design and install a new steam line to include the CT room. Further details can be found on design sheet M.2, M.3, & E.1.

5. Building Automation System: The design builder shall connect the new RTU to the existing building automation system. The design builder shall install a new combination humidity and temperature controller in the CT unit control room. The new combination humidistat and thermostat shall be connected to the building automation system. The Quentin N. Burdick Memorial Healthcare Facility uses the Johnson Control’s Metasys building automation system.

6. Design Submission Requirements:

A. Qualifications: Engineers registered/licensed to practice in their professional field in North Dakota shall prepare the design of all drawings and specifications. The engineer shall maintain during the contract and for a period of at least 10 years after the completion of the project, professional liability insurance for issues arising from the performance of the engineer’s services caused by any negligent acts, errors or omissions for which the A/E is legally liable. Final construction documents and any subsequent design changes shall be stamped by licensed engineers licensed in the state of North Dakota.

B. Design Concept Review Meeting: The Design Builder shall attend a scheduled planning meeting after award to gather information and to discuss conceptual design and facility requirements.

C. Design Deliverables: The Design Builder shall provide mechanical HVAC design drawings, that shall include both demolition and installation. The mechanical design shall include stamp and signed plan sheets for the demolition and installation of the old and new system. The design shall also include a review of both the structural and electrical and provide at a minimum a signed report by the engineer.

The design shall include a plan for demolition of existing equipment and construction of new dry coolers.

The design shall utilize existing equipment, structures, and utilities to the maximum extent possible. The deliverable from this effort will be a set of new construction documents outlining the necessary construction to accomplish the scope of work for this project. Submit full design to the COR for approval prior to moving on to the construction.

D. 100% Design Review Meeting: The contractor shall attend a 100% design review meeting with the COR and any necessary IHS personnel.

E. Demolition: The contractor shall demolish the existing rooftop HVAC unit according to the approved design above. This shall include at a minimum removing the existing RTU, single-package steam humidifier, and undersized electrical wire.

F. RTU & Steam Humidifier Installation: The installation of the RTU shall be according to the approved design above. This shall include at a minimum installation of the new RTU, low pressure steam supply, low pressure steam return, steam humidifier system, & new electrical wire.

G. Cabinets: The design builder shall procure and install all cabinets and hardware required for the installation of the cabinet layout described in design sheets A.1 & A.2. Cabinet hardware shall include at a minimum: cabinet doors, hinges, shelves, cover panels, cabinet screws, toe kick clips, edge banding, cabinet connector bolts, toe kicks, & fillers. Contractor shall install existing sink into new countertop. Contractor is responsible for repair of wall damage during installation of the new cabinets. Cabinets shall be Midmark Synthesis® Cabinetry or approved equal. Submit on color and style.

H. RTU Commissioning: The Design Builder shall commission the RTU and steam humidifier upon completion of their construction. The systems in the building will be operated in their different modes of operation to ensure the facility operates properly as a whole. This testing provides the owner with documentation that the building was operating properly at turnover. The commissioning will ensure the installed RTU & steam humidifier meet the needs required by the facility. The contractor shall schedule and direct the testing once all construction has been completed. The contractor will provide verification to the project engineer that all systems are functioning as designed. Skilled technicians shall be provided by the appropriate contractor familiar with the system and building to execute the performance testing of the control system and perform performance testing of the equipment. A third-party commissioner is not required for this project.

The contractor shall perform the testing while the project engineer is on site.

I. Clean Up: Jobsite shall be cleaned daily and must comply with the Infection Control & Safety Officer’s requirements given with the ICRA and PRCA. The construction areas involved shall be free of any debris, rubbish and left-over material scraps upon completion of the project. Trash receptacles used for the collection of this debris and their removal from the project site shall be provided by the contractor. The site will be inspected by the engineer prior to final payment to ensure the sites return to their original condition prior to construction.

J. Site Restoration: The construction site shall be free of any materials, debris and/or rubbish. The contractor will be responsible for the removal of this debris and must restore the site to its original condition as approved by the project engineer. Photos are to be taken before construction begins for documentation the sites original condition by the contractor.

K. Additional Facility Requirements: Contractor shall comply with the requirements of the hospital’s Facility Manager, Infection Control Officer and Safety Officer. These requirements will be laid out during the pre- construction meeting. Other permits and requirements will be given after the pre-construction meeting and the ICRA and PRCA assessments are completed.

7. Submittals

A. Submittals or shop drawings shall be submitted for the following items and shall be delivered electronically to the COR or designated PM for final approval before ordering any new material or equipment.

1. Roof Top HVAC Unit

2. RTU Electrical Connection and Circuit Breaker

3. Steam Humidifier System

4. Steam Piping and steam piping insulation

5. Combination Humidistat/Thermostat

6. Cabinets

8. Schedule/Meetings A. The general contractor shall submit a detailed schedule to the COR for approval within (14) calendar days of the award.

B. Pre-Construction Meeting: One Pre-Construction meeting shall be conducted prior to the start of the construction of the contract.

C. Progress Meetings: Progress meetings shall be conducted at regular intervals as merited by the progress of the work.

D. Substantial Completion: One substantial completion meeting shall be held following notification of the Project Officer by the General Contractor that the project is Substantially Complete.

E. Final Completion: One final completion meeting shall be held following determination that the project is complete.

9. Miscellaneous

A. Security Requirements.

1. All contractors are required to check-in with the facility manager/maintenance staff before commencing work on any project.

2. The contractor will be responsible for the security of the work site. The hospital and the Indian Health Service staff shall not be responsible for the security of the contractor’s tools, equipment, or material during the course of the project.

B. Occupancy of Government Facilities. The contractor shall be responsible for properly informing the COR of any condition which would jeopardize the building or its contents, such as loss of heat, air conditioning, danger of pipes freezing, loss of electrical power, water, sewer or loss of building security.

C. Correspondence. All correspondence shall be addressed to the COR. Each letter, document, etc., shall contain the following information:

1. Date

2. Project Numbers, Contract Number, Delivery Order Number and Service Unit Name/Location.

3. Name of those who were sent copies.

D. TERO/EPA. The contractor is required to acquire and maintain a tribal business license before any work will commence. The contractor shall comply with the Tribal Employment Rights Ordinance (TERO) and pay TERO and EPA fees. The TERO POC is Sherry Baker, TERO Director, 701-477-2663 or sherryann_70@yahoo.com

E. Construction Materials and Storage

1. All materials shall be stored and handled according the manufacturers’ recommendations.

2. All materials shall be submitted to the COR prior to ordering, for approval by the project engineer.

3. The contractor(s) shall be present and on site to receive all construction material, equipment, or products. IHS staff will not be present, responsible, nor receive, or provide any type of offloading equipment for construction materials, products, or equipment. It is solely the contractor(s) responsibility to properly receive any and all construction equipment, products, and materials on site.

4. The contractor(s) shall provide their own means of storing any and all construction materials, products, or equipment required for installation. IHS staff will not be responsible or provide any means of storing construction material, products, or equipment before or during construction. All material, products, or equipment remain the contractor(s) property until the project has been deemed substantially completed by all parties.

10. Project Officer

Taylor Strand will be designated as the Contracting Officer’s Representative (COR) for this Order. His address and telephone are:

Taylor Strand Great Plains Area Indian Health Service Division of Facilities Management & Engineering 2050 36th Ave SW, Ste. 102 Minot, ND 58701 Office: 701-420-9219 mailto:sherryann_70@yahoo.com taylor.strand@IHS.gov

Any change in COR designation will be documented by the Contracting Officer in writing.

11. Closeout Documents

The Contractor shall submit one hard copy set of all final, installed submittal items, accessories, and all installation/operation/maintenance documents to the facility manager/engineer. The final installed submittal package and O&M shall also be sent electronically to the COR and/or PM.

mailto:taylor.strand@IHS.gov

SECTION D. PACKAGING AND MARKING

All shipments of materials, equipment and/or supplies to the project site must be addressed to the contractor and not the Indian Health Service. Preservation, packaging and packing must be in accordance with industry standard packaging appropriate for the item(s) involved. The Indian Health Service is not responsible in any manner for deliveries intended for the project that are not generated by the Indian Health Service.

Equipment and materials provided by the contractor must be new and, where appropriate, must arrive on-site sealed in original manufacturer’s containers. The Government reserves the right to refuse any items it determines to not meet these requirements.

SECTION E. INSPECTION AND ACCEPTANCE

The following clauses are incorporated by reference (see FAR 52.252-2):

FEDERAL ACQUISITION REGULATION (FAR)

CLAUSE

TITLE DATE

52.246-12 Inspection of Construction AUG 1996

SECTION F. DELIVERIES OF PERFORMANCE

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

Number Title Date 52.242-14 Suspension of Work Apr 1984

FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to

(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work within 200 calendar days of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises. Performance time will include submittals and approvals.

(End of Clause)

F.1. SUPERINTENDENT ON SITE

The contractor shall ensure that the Project Superintendent is on site at all times work is being performed by the contractor or subcontractor(s). They shall directly oversee all apprentice and subcontractor work. The Project Superintendent is also responsible to ensure all labor and safety requirements are complied with; and ensure that the worksite is cleaned up at the end of each work day.

All communications between the IHS and contractor concerning the day-to-day workmanship on the project will be handled through the Project Superintendent and they must have the authority to act on behalf of the Contractor in all contractual matters.

F.2. REMOVAL OF PERSONNEL

The Contracting Officer may require the contractor to remove from the job any employee who endanger persons or property; those who manufacture, distribute, dispense, possess or use controlled substances at the worksite (FAR 52.223-6, Drug-Free Workplace); and those whose continued employment under this contract is inconsistent with the interest of security or for any and all other reasons as determined by the Contracting Officer as objectionable.

SECTION G. CONTRACT ADMINISTRATION DATA

G.1. CONTRACTING OFFICER’S AUTHORITY

The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.

G.2. CONTRACTING OFFICER’S REPRESENTATIVE

(a) [TO BE ASSIGNED BY SEPARATE LETTER AT CONTRACT AWARD] is hereby designated as the Contracting Officer’s Representative (COR). The COR may be changed at any time by the Government without prior notice to the Contractor by a unilateral modification to the contract. The COR is located at: see separate letter at contract award

(b) The responsibilities and limitations of the COR are as follows:

(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.

The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the Contractor.

G.3. PAYMENT PROCESS

(a) FAR 52.232-5, Payments Under Fixed Price Construction Contracts, requires that before the first progress payment under the contract is submitted, the contractor shall prepare a proposal with value(s) for each principal category of the work which when added together equal the total contract price. A sample format is available from the Contracting Officer upon request. The following is the detail required by the Contracting Officer:

(1) The principle categories of work shall be broken into line items of sufficient detail to allow meaningful measurement of the work on a monthly basis as determined by the COR. Units of measure appropriate to the type of work shall be used. “Lump sum” pricing of line items shall be avoided except where payment for that line item is to be requested based on 100% completion of that line item or where there is no other practical unit of measure.

(2) The cost of preparatory work (e.g., shop drawings or product submittals), field and home office overhead, profit, insurance, taxes, warranties, as built drawings, etc., shall be pro-rated into items of physical work and not listed as separate line items. Cost of Performance and Payment Bonds may be listed as a single line item and not pro-rated. Also, cost of mobilization and demobilization relating to transportation or installation costs associated with such items as site trailers, heavy equipment, temporary batch plants, temporary on site manufacturing and assembly facilities, temporary on site quarter’s facilities, temporary sanitation facilities, temporary utility connections, and/or temporary secured storage facilities may be listed as line items and not pro-rated. If mobilization is listed separately, a line item for demobilization must be included and shall be at least 20 percent of the mobilization cost. A detailed listing of the items included and the individual cost for each item shall be provided in support of proposed amounts for mobilization and demobilization.

(b) Material stored on site may be included in earned progress if the contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform in contract.

(c) The following are instructions for submitting pay requests:

(1) Requests are to be submitted with signature for the contractor certification statement (scanned signature okay) to the Designated Billing Office. Use of a format that complies with all of the requirements of the “Payments” clause of the contract is mandatory. A sample format is available from the Contracting Officer.

(2) The contractor is responsible for delivery of each request for payment electronically using the Department of Treasury Invoice Processing Platform (IPP) www.ipp.gov or successor system. Hand delivery to the COR in the field does not constitute delivery to the billing office.

(3) If the contractor wishes to inquire concerning the status of any pay request, the contractor should contact the billing office.

(4) A completed Release of Claims that complies with the requirements of the “Payments” clause must be submitted with the request for final payment. A sample format is available from the Contracting Officer.

(d) The final payment request will be rejected and returned to the contractor if all items required under the contract have not been completed, submitted, approved, and accepted prior to the receipt of the request; e.g., deficient work items, as built, payrolls, reports, O&M manuals, delivery of extra stock material, etc.

G.4. CERTIFICATION OF PAYMENTS – RELEASE OF CLAIMS (ROC)

The Contractor, when submitting final payment under this contract, shall submit to the Contracting Officer:

(a) A certification that the Contractor has made payment from proceeds of prior payments, or that he will make timely payment from the proceeds of the progress or final payment then due him, to any subcontractors and suppliers in accordance with established contractual arrangements; and

(b) A properly executed Contractor's Release. The Release of Claims form is available from the Contracting Officer. Failure to submit this completed release will result in a delay of final payment.

G.5. INVOICE REQUIREMENTS

(a) Invoices must be prepared and submitted and will be paid in accordance with the following FAR clauses specified in Section I:

(1) FAR 52.232-5, Payments Under Fixed -Price Construction Contracts (May 2014)

(2) FAR 52.232-27, Prompt Payment for Construction Contracts (Jan 2017)

(3) FAR 52.232-33, Payment by Electronic Funds Transfer-- System for Award Management (Oct 2018)

(4) FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023)

(5) HHSAR 352.232-71, Electronic Submission of Payment Requests (Mar 2022)

(b) Progress payments will be authorized for this project.

(c) The final invoice must be marked “Final” and be accompanied by a Release of Claims form, which states the final payment as outstanding, in the Remarks field. The Release of Claims form is available from the CO. Final payment will be made within 30 Calendar days upon receipt of a properly executed invoice.

(d) The contractor will contact the Contracting Officer with any payment issues or concerns.

Note: In accordance with FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Nov 2021)—Upon receipt of accelerated payments from the Government, the contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor. This applies to all small business subcontractors at all tier levels.

G.6. ADDRESS FOR CORRESPONDENCE

It is the intent of the Government to use electronic means as much as possible while administering this contract.

Most correspondence should be sent via email directly to the Contracting Officer and COR. If sending documents via postal mail, include the Contract Number on all correspondence. Overnight Mail and U.S. Mail must be sent to the Contracting Officer, unless otherwise specified, at the following address:

Indian Health Service – DES/Seattle 701 Fifth Ave, Suite 1600 Seattle, WA 98104

G.7. IDENTIFICATION OF CONTRACTOR EMPLOYEES

Identification (ID) Badges. The contractor shall provide each employee with an ID badge on contract start date or on employment start date. The ID badge shall be made of non-metallic material. The badge shall be easily readable and include the employee's name, the contractor's name, functional area of assignment, and a color photograph. The Contracting Officer or their designee will approve the ID badge template before the contract start date.

Display of ID Badges. Contractor personnel shall wear the ID badge at all times when performing work under this contract on site and when attending Government meetings and conferences off-site. Unless otherwise specified, each contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit such placement.

Utilizing Electronic Mail (e-mail). When prime contractor or subcontractor personnel send e-mail messages as part of contract performance or otherwise relating to contract matters, each sender shall include his/her name (both first and last names), e-mail address and the name of the individual’s employer.

G.8. TEST RESULTS

The contractor must submit all results of test(s) required by the contract to the COR/Project Manager for review.

G.9. PERMITS AND CERTIFICATES

The contractor must submit a copy of all permits and certificates as required by the contract to the COR/Project Manager.

SECTION H. SPECIAL CONTRACT REQUIREMENTS

H.1. SUBCONTRACTS

(a) Nothing contained in the contract shall be construed as creating any contractual relationship between any subcontractor and the Government. The divisions or sections of the specifications are not intended to control the contractor in dividing the work among subcontractors, or to limit the work performed by any trade.

(b) The contractor shall be responsible to the Government for acts and omissions of his own employees, and of subcontractors and their employees. He shall also be responsible for the coordination of the work of the trades, subcontractors, and suppliers.

(c) The Government will not undertake to settle any differences between or among the contractor and his subcontractors or suppliers.

(d) The contractor shall, without additional expense to the Government employ specialty subcontractors where required by the specifications. “Specialty Subcontractors,” when specified as a requirement, means a subcontractor regularly engaged in the manufacture or installation of the contract items. The specialty subcontractor shall select and combine the materials involved, maintain and have available for the purpose, workmen skilled in the specified work. The specialty subcontractor shall be the manufacturer, be licensed by the manufacturer as an installer, or work under direct supervision of the manufacturer.

H.2. SUBCONTRACTING

(a) In connection with the performance of work under this contract, the contractor shall not subcontract with any subcontractor who, at the time of subcontract award, is listed as an excluded party within the System for Award Management (SAM) unless otherwise authorized by the Government in accordance with Subpart 9.4 of the Federal Acquisition Regulations.

(b) The List of Parties Excluded from Procurement and Non-Procurement Programs is available at:

https://www.sam.gov/SAM/

(c) In the event of the contractor’s noncompliance with the foregoing requirements, the Government may terminate this contract for default or take other appropriate action, including, but not limited to, requiring the contractor to terminate any such subcontract and substitute an eligible subcontractor in lieu thereof, at no increase in the contract price or time for performance.

(d) The term “subcontractor,” as used in this clause, shall mean the individual or firm with whom the contractor proposes to enter into a subcontract for manufacturing, fabricating, installing, or otherwise performing work under this contract.

(e) Within ten days after contract award, the contractor shall furnish to the Contracting Officer in writing a list of all subcontractors scheduled to perform work under the contract on Form SF-1413.

(f) The contractor shall include the provisions of paragraphs a., b., and d. of this clause in every subcontract hereunder.

H.3. STANDARD REFERENCES

(a) Any materials, equipment, or workmanship specified by reference to the number, symbol, or title of any specific standard shall comply with the latest edition or revision thereof, and any amendment or supplement thereto, in effect on the date of the solicitation, except as limited to type, class or grade, or modified in the specifications.

(b) Standards referred to in the plans and specifications, except as modified, shall have full force and effect as though printed in the plans and specifications.

(c) The contractor shall maintain on the site, a complete current set of manufacturers’ and standards referenced from work under the contract.

H.4. WORK HOURS AND ACTIVE GOVERNMENT OPERATIONS

Normal work days and hours are Monday through Friday, 7:00 am to 5:00pm excluding federal holidays for occupied facilities and no set times or days for unoccupied spaces. The contractor shall notify the COR a minimum of 72 hours in advance of arriving on site to complete work and check in with the COR upon arrival. A minimum of 48 hours of advance notice is required for special request to work outside of normal work hours.

H.5. MATERIALS ON SITE

Unless otherwise provided in the specifications or drawings, materials removed and not reused under the contract shall become the property of the contractor. The contractor shall remove the materials from the work site. Storage or sale of the materials on the site will not be permitted.

H.6. OPERATION AND STORAGE AREAS

Reference FAR 52.236-10 Operations and Storage Areas. The contractor shall coordinate its operations and storage with the COR.

H.7. ACCIDENT PREVENTION

Reference FAR 52.236-13 Accident Prevention. The contractor shall submit for approval a written Safety and Accident Prevention Plan showing how they will comply with FAR 52-236-13. The contractor shall also designate in writing the individual who is responsible for identifying and correcting safety hazards or violations on the job site.

H.8. AVAILABILITY OF UTILITY SERVICES

Reference FAR 52.236-14 Availability and Use of Utility Services. The Government anticipates that the proposed work will place a small demand on available utility services and therefore will not charge the contractor for their use.

H.9. PRECONSTRUCTION CONFERENCE

Reference FAR 52.236-26 Preconstruction Conference. The Contracting Officer will conduct a preconstruction conference. Location is TBD upon award, but will most likely be at the site. The Contracting Officer, COR, and contractor are required to participate. The Contracting Officer may designate required attendance for subcontractors. The Contracting Officer and COR may attend the conference via conference or video call.

H.10. TRUCKING

(a) All trucks, bringing to or removing from the site, earth, loose materials, or debris shall be loaded in a manner to prevent dropping of materials on streets.

(b) At all points, where trucks leave the project site and enter adjacent paved streets, the contractor shall maintain an installation and crew to prevent any mud from being carried onto such adjacent paved streets.

(c) Earth, loose materials, or debris deposited on the streets due to contract trucking activities shall be removed daily.

H.11. SALVAGE

The Government does not assume responsibility for any loss or damage to materials removed and not reused under the contract that become the property of the contractor.

H.12. NEW WORK

Unless otherwise noted on drawings or specified, new work in extension of existing conditions shall correspond in all respects to similar existing conditions, in material, workmanship and finish.

H.13. EXISTING WORK

(a) Existing work shall be cut, drilled, altered, removed or temporarily removed and replaced for performance of work under the contract. Work replaced shall match similar existing work. Structural members shall not be cut or altered, except as shown, without authorization of the Contracting Officer. Work remaining in place damaged or defaced during this contract shall be restored to the condition at time of award of contract.

(b) Discolored or unfinished surfaces exposed by removal of existing work and indicated to be the final exposed surfaces shall be refinished or the material shall be replaced to be uniform and harmonious with contiguous work. Work out of alignment, where exposed by removal of existing work, shall be called to the Contracting Officer’s attention. Corrective work, directed by the Contracting Officer will be subject to adjustment of the contract in accordance with FAR 52.236 2, “Differing Site Conditions.”

H.14. WARRANTY OF CONSTRUCTION

Reference FAR 52.246-21 Warranty of Construction. All warranties the contractor receives from subcontractors, manufacturers and suppliers shall be executed in writing for the benefit of the Government. The contractor shall provide the COR with copies of all warranties obtained.

H.15. AS BUILT DRAWINGS

The contractor shall maintain during the progress of the work one (1) set of completed and up to date blue line drawings, which shall be available for inspection by the Contracting Officer at any time. These drawings shall be marked up to record all changes in the work as they occur, and the exact location of all exposed and concealed pipe runs, valves, plugged outlets, cleanouts and other control points including, but not limited to, electrical conduits, and ducts, mechanical valves, shut-off switches, etc., in such a manner as will provide a complete, accurate as built record. The location of pipes or control points concealed underground, under concrete, in chases or above hung ceilings shall be dimensioned. In progress as-built documentation will be reviewed with each progress payment request as a required element. The completed set of as built paper reproducible drawings shall be delivered to the Contracting Officer, in a condition satisfactory to him. As built shall be submitted for review/approval as a condition precedent to the request for final inspection of the work.

H.16. EQUITABLE ADJUSTMENTS DUE TO CHANGES

(a) The contractor shall submit a proposal for all changes in the work within 15 days from the effective date of the change order or request for proposal. With each proposal for a change involving an increase or decrease in the amount of the contract, the contractor shall submit separately an itemized breakdown that will include, but not be limited to, the following:

(1) Material quantities and unit price (separated into trades)

(2) Labor costs (separate into labor classifications and hourly rates)

(3) Construction equipment

(4) Workmen’s compensation

(5) Overhead

(6) Profit

(7) Employment taxes under FICA, FUTA and SUTA

(8) Bond (prime contractor only)

(9) Sales Tax

(10) Direct Performance Time of Change

(11) Impact on Schedule, if any

(12) Impact Costs, if any

(b) In considering proposals for changes involving added work, omitted work, or any combination thereof, estimates will be checked in detail by the Contracting Officer, utilizing unit prices where specified or agreed upon, with the view of arriving at equitable adjustments.

(c) When the necessity to proceed with a change does not allow sufficient time to properly check a proposal, or because of failure to reach an agreement, the Contracting Officer may direct the contractor to proceed immediately with the work.

(d) Proposals and breakdown should be submitted as promptly as possible but in no event later than 30 days.

(e) Should a proposal cost exceed the certified cost or pricing data threshold or is required for a lesser amount at the direction of the Contracting Officer for a change, certified cost or pricing data should be submitted in a format which satisfies the requirements of FAR 15.4. When certified cost or pricing data are required, the Contractor shall submit an executed Certificate of Current Cost or Pricing Data (FAR 15.406-2) as soon as practicable after price agreement is reached.

(f) Allowable overhead, profit, and percentages are given below. These percentages shall be limited to three tiers only and shall be considered to include, but not limited to, all insurance other than FICA, FUTA, SUTA and Workmen’s Compensation, field and office supervisors, assistants, and clerical personnel, use of small tools, incidental job burdens, and general office expense. Incidental job burdens include, but are not limited to, review and coordination, and estimating and expediting relative to contract changes that are associated with field and office supervision.

No percentages for overhead and profit shall be allowed on FICA, FUTA, or SUTA.

The percentages of overhead to be allowed by the Contracting Officer will be 10% for all contract changes performed by the Prime Contractor personnel and 5% for all contract change work performed by subcontract personnel.

The percentage for profit to be allowed by IHS will vary according to the nature, risk, extent, and complexity of work involved, but in no case shall exceed 10%. Percentages for overhead and profit will be as follows:

Overhead Profit

To subcontractors and/or to the contractor for work performed with its own forces

10% 1% - 10%

To subcontractors and/or to the Contractor on work performed by other than its own forces:

5% 1% - 5%

The percentage of profit is to be negotiated. The burden is on the Contractor to propose and justify to the Government the percentage of profit to be paid on each modification to the contract.

On proposals involving both increases and decreases in the amount of the contract, overhead and profit will be allowed on the net increases only. On net decreases, corresponding overhead and profit will be deducted.

(g) Time Extension: when the contractor submits a change proposal without including a corresponding Time Impact Analysis meeting the requirements of the pertinent Specification Section, the Contractor acknowledges that the particular change order, modifications, delay or contract request does not require an extension of the contract time (or milestone) and the Contractor shall not thereafter be entitled to request or receive any such extension(s).

(h) Delay and Impact Costs: Any proposal for delay and impact costs that is not submitted within 60 days after completion of the work identified in the change will not be considered. This requirement is in addition to the scheduling updates required for construction of the project. If there are circumstances which prevent the Contractor from ascertaining delay for impact during this time, a status update, including but not limited to a critical path analysis, shall be submitted within this time and at 60 day intervals thereafter, explaining why the Contractor cannot yet know the extent of the impact. If this is not done, a claim for delay will not be considered unless special circumstances are shown. This requirement is necessary to enable the Government to respond to any claims for delay in light of conditions then current.

H.17. INSURANCE

FAR 52.228-5, Insurance Work on a Government Installation, states that "The contractor shall, at its own expense, provide and maintain during the entire performance period of this contract, at least the kinds and minimum amounts of insurance required in the schedule or elsewhere in the contract." The following is the minimum insurance required by the Contracting Officer:

1. Workers' Compensation and Employer's Liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes.