This document is a Past Performance Questionnaire that is to be completed by a client of a contractor proposing for a construction contract with the Indian Health Service (IHS). The questionnaire asks the client to evaluate the contractor's performance across several categories including quality, schedule, cost control, management, small business, and regulatory compliance. The rating scale ranges from "Exceptional" to "Unsatisfactory" with definitions provided for each rating. The client is instructed to complete the form, sign it, and return it to the contractor to submit with their proposal.

The related federal contract opportunity is for a construction project to replace the HVAC unit and cabinetry in the CT room at the Quentin N. Burdick Memorial Hospital in Belcourt, North Dakota. The project is a 100% Small Business set-aside under NAICS code 236220 with a size standard of $45 million. The anticipated contract type is Firm Fixed Price and the period of performance is 200 calendar days. The solicitation will be procured as a Request for Quote and award will be based on price and other factors. The magnitude of the construction project is between $100,000 and $250,000.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

Instructions to client:

The contractor is proposing for a construction contract with Indian Health Service https://www.ihs.gov/ You are requested to complete this form, sign, and return it to the contractor so it may be submitted with their proposal.

PART I CONTRACT INFORMATION (Contractor to complete)

Contractor Name:

Project Title

Award Value

Period of Performance

Prime Contractor or Subcontractor
☐ Prime ☐ Subcontractor

Agency or Entity Name and Address

PART II PERFORMANCE INFORMATION (Client to complete)

Name / Title

Phone #

Email Address

Contract Type

Signature

Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance. See Part III for rating guidance.

Category
Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
N/A

Quality

Schedule

Cost Control

Management

Small Business

☐☐☐☐☐☐
Regulatory Compliance
☐☐☐☐☐☐
Comments (expand as needed)

PART III RATING GUIDANCE

RATING
DEFINITION
NOTE
(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.
(S) Satisfactory
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.
(M) Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.

File details come from the government source that posted it. Updated .