(B)_Newport B.1376 & B.1297 Renovations - Specs- Final.pdf
PDF 3 MB Posted
- Solicitation number
- ACQR6019786
About this file
This document is a solicitation for a design-build/design-bid-build, indefinite delivery/indefinite quantity, multiple award construction contract for renovations to the Child Development Center Building 1376 and the Child and Youth Development Center Building 1297 at Naval Station Newport.
The base contract requires the renovation of Building 1376 and Building 1297. Building 1297 renovations will serve as a swing space during the phased construction of Building 1376. Work at Building 1297 includes interior repairs, new exterior access, and installation of a radon mitigation system. Building 1376 renovations include replacement of all interior finishes, mechanical and electrical upgrades, and installation of a new fire alarm and mass notification system. The contract includes two options - a rental chiller for Building 1376 and installation of a radon mitigation system for Building 1297. All interior work at Building 1376, except for one classroom at a time, must be performed during nights, weekends, or holidays. The contract is limited to the eight contractors listed in the solicitation. Proposals are due in response to this solicitation.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO. 1761501
SPECIFICATIONS
FINAL SUBMISSION JUNE 2024
Volume 1 of 1
BULDING 1376 AND BUILDING 1297 CDC RENOVATIONS
At
Naval Station Newport, Newport, RI
SUBMITTED BY:
Colby Company Engineering 47A York Street
Portland, ME 04101 A/E Contract Number: N40085-22-D-0003
PREPARED BY:
Structural: Sam Thomas, P.E. Colby Company Engineering Architectural: Elizabeth Coronado, AIA, Colby Company Engineering Fire Protection: Aaron Bundy, P.E., S.E.T., Colby Company Engineering Mechanical: David Brown, P.E., Colby Company Engineering Electrical: Jason Beaulieu, P.E., Colby Company Engineering
APPROVED BY:
For Commander, NAVFAC Mid-Atlantic
B. 1297 & B. 1376 Renovat i ons FI NAL SUBMI SSI ON
NAVAL STATI ON NEWPORT JUNE 2024
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 02/ 11, CHG 1: 08/ 14 LI ST OF DRAWI NGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/ 15, CHG 2: 08/ 21 SUMMARY OF WORK
01 14 00 11/ 22 WORK RESTRI CTI ONS
01 20 00 11/ 20, CHG 2: 08/ 21 PRI CE AND PAYMENT PROCEDURES
01 30 00 11/ 20, CHG 2: 05/ 22 ADMI NI STRATI VE REQUI REMENTS
01 31 23. 13 20 05/ 17, CHG 7: 11/ 21 ELECTRONI C CONSTRUCTI ON AND FACI LI TY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 17. 00 20 05/ 18, CHG 3: 08/ 20 COST- LOADED NETWORK ANALYSI S SCHEDULES
( NAS)
01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES
01 35 26 11/ 20, CHG 3: 02/ 22 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 20 11/ 11, CHG 8: 02/ 21 QUALI TY CONTROL
01 50 00 11/ 20, CHG 2: 08/ 22 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND
CONTROLS
01 57 19 08/ 22 TEMPORARY ENVI RONMENTAL CONTROLS
01 74 19 02/ 19, CHG 3: 11/ 21 CONSTRUCTI ON WASTE MANAGEMENT AND
DI SPOSAL
01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS
01 78 23 08/ 15, CHG 2: 08/ 21 OPERATI ON AND MAI NTENANCE DATA
01 78 24. 00 20 02/ 15, CHG 3: 08/ 21 FACI LI TY ELECTRONI C OPERATI ON AND
MAI NTENANCE SUPPORT I NFORMATI ON ( eOMSI )
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 08/ 22 DEMOLI TI ON
02 42 51 11/ 19 CARPET REMOVAL AND RECLAMATI ON
02 83 00 11/ 18 LEAD REMEDI ATI ON
DI VI SI ON 05 - METALS
05 05 20 05/ 22 POST- I NSTALLED CONCRETE AND MASONRY
ANCHORS
05 51 33 02/ 16, CHG 2: 02/ 18 METAL LADDERS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 08/ 16, CHG 2: 11/ 18 ROUGH CARPENTRY
06 20 00 08/ 16, CHG 2: 11/ 18 FI NI SH CARPENTRY
06 41 16. 00 10 08/ 10, CHG 1: 11/ 18 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL
CABI NETS
06 61 16 08/ 20 SOLI D SURFACI NG FABRI CATI ONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 84 00 05/ 10, CHG 1: 08/ 13 FI RESTOPPI NG
07 92 00 08/ 23 JOI NT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 08/ 20 STAI NLESS STEEL DOORS AND FRAMES
08 14 00 08/ 16, CHG 1: 08/ 18 WOOD DOORS
PROJECT TABLE OF CONTENTS Page 1
08 41 13 08/ 18, CHG 1: 08/ 18 ALUMI NUM- FRAMED ENTRANCES AND
STOREFRONTS
08 71 00 02/ 16, CHG 4: 02/ 22 DOOR HARDWARE
08 81 00 05/ 19 GLAZI NG
DI VI SI ON 09 - FI NI SHES
09 06 00 08/ 22 SCHEDULES FOR FI NI SHES
09 22 00 02/ 10, CHG 2: 08/ 18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/ 16, CHG 4: 02/ 20 GYPSUM BOARD
09 30 10 08/ 20 CERAMI C, QUARRY, AND GLASS TI LI NG
09 51 00 08/ 20 ACOUSTI CAL CEI LI NGS
09 65 00 08/ 10, CHG 3: 08/ 18 RESI LI ENT FLOORI NG
09 68 00 11/ 17, CHG 2: 08/ 20 CARPETI NG
09 77 00 08/ 17, CHG 1: 08/ 18 WALL AND CEI LI NG LI NER PANELS
09 90 00 02/ 21 PAI NTS AND COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 21 13 08/ 20 TOI LET COMPARTMENTS
10 26 00 08/ 20 WALL AND DOOR PROTECTI ON
10 28 13 08/ 20 TOI LET ACCESSORI ES
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 08/ 20 ROLLER WI NDOW SHADES
12 48 13 08/ 17 ENTRANCE FLOOR MATS AND FRAMES
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/ 15, CHG 4: 05/ 21 PLUMBI NG, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00. 00 20 08/ 10, CHG 3: 08/ 18 BASI C MECHANI CAL MATERI ALS AND METHODS
23 30 00 05/ 20, CHG 1: 02/ 22 HVAC AI R DI STRI BUTI ON
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 05/ 21, CHG 1: 08/ 23 CYBERSECURI TY FOR FI RE PROTECTI ON
SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 20 00 08/ 19, CHG 3: 11/ 21 I NTERI OR DI STRI BUTI ON SYSTEM
26 51 00 05/ 20, CHG 1: 05/ 21 I NTERI OR LI GHTI NG
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 08/ 20 I NTERI OR FI RE ALARM AND MASS
NOTI FI CATI ON SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 21 13 11/ 18 RADON MI TI GATI ON
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 31 13 11/ 21 CHAI N LI NK FENCES AND GATES
PROJECT TABLE OF CONTENTS Page 2
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 3
DOCUMENT 00 01 15
LI ST OF DRAWI NGS
02/ 11, CHG 1: 08/ 14
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "
1. 2 CONTRACT DRAWI NGS
Cont r act dr awi ngs ar e as f ol l ows:
SHEET
NO.
SHEET NAVSTA
DWG. NO.
NAVFAC
DWG. NO.
DRAWI NG TI TLE
1 G- 001 47270- 427 12910744 COVER SHEET
2 G- 002 47271- 427 12910745 LI ST OF DRAWI NGS
3 G- 101 47272- 427 12910746 SI TE ACCESS PLAN
4 G- 102 47273- 427 12910747 PROJECT PHASI NG PLAN
5 G- 121 47274- 427 12910748 B. 1297 - FI RST FLOOR GENERAL ARRANGEMENT PLAN
6 C- 111 47275- 427 12910749 B. 1297 - EXI STI NG CONDI TI ONS & SI TE PLAN
7 S- 021 47276- 427 12910750 B. 1297 - STRUCTURAL GENERAL NOTES AND
ABBREVI ATI ONS
8 S- 121 47277- 427 12910751 B. 1297 - STRUCTURAL FLOOR PLAN - SOUTH END
9 S- 521 47278- 427 12910752 B. 1297 - STRUCTURAL DETAI LS
10 AD121 47279- 427 12910753 B. 1297 - ARCHI TECTURAL DEMOLI TI ON FLOOR PLAN
11 AD122 47280- 427 12910754 B. 1297 - ARCHI TECTURAL REFLECTED CEI LI NG
DEMOLI TI ON PLAN
12 A- 121 47281- 427 12910755 B. 1297 - ARCHI TECTURAL FLOOR PLAN
13 A- 122 47282- 427 12910756 C: \ User s\ Ben Townsend\ CCE Dr opbox\ Col by Company Engi neer i ng\ Engi neer i ng\ 297 Por t smout h Naval Shi pyar d\ 297. 220. 001 - Newpor t B. 1376
14 A- 521 47283- 427 12910757 B. 1297 - ARCHI TECTURAL PART PLAN, I NTERI OR
ELEVATI ON & DETAI LS
15 A- 621 47284- 427 12910758 B. 1297 - SCHEDULES AND DOOR DETAI LS
16 A- 821 47285- 427 12910759 B. 1297 - EXI STI NG PHOTOS
17 E- 121 47286- 427 12910760 B. 1297 - ELECTRI CAL PLANS & DETAI LS
DOCUMENT 00 01 15 Page 1
18 C- 101 47287- 427 12910761 SI TE PLAN
19 C- 501 47288- 427 12910762 CI VI L DETAI LS
20 A- 001 47289- 427 12910763 ARCHI TECTURAL GENERAL NOTES, LEGEND, AND
ABBREVI ATI ONS
21 AD101 47290- 427 12910764 PART DEMO FLOOR PLAN
22 AD102 47291- 427 12910765 PART DEMO FLOOR PLAN
23 AD103 47292- 427 12910766 PART DEMO REFLECTED CEI LI NG PLAN - NORTH END
24 AD104 47293- 427 12910767 PART DEMO REFLECTED CEI LI NG PLAN - SOUTH END
25 AD105 47294- 427 12910768 PART DEMO ATTI C PLAN - NORTH END
26 AD106 47295- 427 12910769 PART DEMO ATTI C PLAN - SOUTH END
27 A- 101 47296- 427 12910770 PART FLOOR PLAN
28 A- 102 47297- 427 12910771 PART FLOOR PLAN - SOUTH END
29 A- 103 47298- 427 12910772 PART REFLECTED CEI LI NG PLAN - NORTH END
30 A- 104 47299- 427 12910773 PART ARCHI TECTURAL REFLECTED CEI LI NG PLAN -
SOUTH END
31 A- 401 47300- 427 12910774 I NTERI OR ELEVATI ONS
32 A- 402 47301- 427 12910775 I NTERI OR ELEVATI ONS
33 A- 403 47302- 427 12910776 I NTERI OR ELEVATI ONS
34 A- 404 47303- 427 12910777 I NTERI OR ELEVATI ONS
35 A- 501 47304- 427 12910778 ARCHI TECTURAL DETAI LS
36 A- 601 47305- 427 12910779 ROOM FI NI SH SCHEDULE
37 A- 602 47306- 427 12910780 DOOR SCHEDULE
38 A- 701 47307- 427 12910781 PART FI NI SH PLAN
39 A- 702 47308- 427 12910782 PART FI NI SH PLAN
40 A- 801 47309- 427 12910783 EXI STI NG PHOTOS
41 A- 802 47310- 427 12910784 EXI STI NG PHOTOS
42 FA001 47311- 427 12910785 FI RE ALARM AND MASS NOTI FI CATI ON NOTES,
LEGENDS, AND ABBREVI ATI ONS
43 FA101 47312- 427 12910786 PART DEMOLI TI ON FLOOR PLAN - NORTH
44 FA102 47313- 427 12910787 PART DEMOLI TI ON FLOOR PLAN - SOUTH
DOCUMENT 00 01 15 Page 2
45 FA103 47314- 427 12910788 FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM PLAN -
NORTH
46 FA104 47315- 427 12910789 FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM PLAN -
SOUTH
47 FA501 47316- 427 12910790 FI RE ALARM AND MASS NOTI FI CATI ON DETAI LS
48 P- 001 47317- 427 12910791 PLUMBI NG GENERAL NOTES, LEGEND, ABBREVI ATI ONS
AND SCHEDULES
49 PD101 47318- 427 12910792 PART DEMO FLOOR PLAN
50 PD102 47319- 427 12910793 PART DEMO FLOOR PLAN
51 P- 101 47320- 427 12910794 PART FLOOR PLAN
52 P- 102 47321- 427 12910795 PART FLOOR PLAN
53 M- 001 47322- 427 12910796 MECHANI CAL GENERAL NOTES, LEGEND & ABBREVI ATI ONS
54 MD101 47323- 427 12910797 PART DEMO FLOOR PLAN
55 MD102 47324- 427 12910798 PART DEMO FLOOR PLAN
56 M- 101 47325- 427 12910799 PART FLOOR PLAN
57 M- 102 47326- 427 12910800 PART FLOOR PLAN
58 M- 501 47327- 427 12910801 DETAI LS AND SCHEDULES
59 E- 001 47328- 427 12910802 ELECTRI CAL LEGEND ABBREVI ATI ONS, GENERAL NOTES &
ONE LI NE DI AGRAM
60 ED101 47329- 427 12910803 ELECTRI CAL DEMOLI TI ON PLAN - NORTH
61 ED102 47330- 427 12910804 ELECTRI CAL DEMOLI TI ON PLAN - SOUTH
62 E- 101 47331- 427 12910805 ELECTRI CAL PLAN NORTH
63 E- 102 47332- 427 12910806 ELECTRI CAL PLAN SOUTH
64 E- 601 47333- 427 12910807 LI GHT FI XTURE SCHEDULE & CONTROL SCHEDULE
65 E- 602 47334- 427 12910808 PANEL SCHEDULES
- - End of Document - -
DOCUMENT 00 01 15 Page 3
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00
SUBMI TTAL PROCEDURES:
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes t he f ol l owi ng at Bui l di ng 1297:
I nst al l at i on of l adder on ext er i or of bui l di ng t o access r oof .
I nt er i or space r epai r s i ncl udi ng r emoval and r epl acement of door s, wal l f i ni shes, cei l i ngs, pai nt i ng, ent r y door canopy, ext er i or r amp, and r ubber f l oor i ng as i ndi cat ed i n t he cont r act document s.
The pr oj ect al so i ncl udes i nst al l at i on of a r adon mi t i gat i on syst em as a bi d opt i on. The Cont r act or must hol d t he pr i c i ng f or t hi s opt i on f or 4 mont hs.
The wor k i ncl udes t he f ol l owi ng at Bui l di ng 1376:
Repl acement of al l ar chi t ect ur al i nt er i or f i ni shes t o i ncl ude l i nol eum, car pet , wal l bases; cabi net r y i ncl udi ng count er t op, s i nks and f aucet s; and damaged bui l t - i n mi l l wor k. Exi st i ng door s wi l l be r ef i ni shed as r equi r ed al ong wi t h al l wood wi ndow si l l s . Door har dwar e wi l l be r epl aced as r equi r ed al ong wi t h pr ovi di ng new f i nger guar ds at al l door s i n t he f aci l i t y on bot h t he push and pul l s i de of door s. Al l wal l s i n t he f aci l i t y wi l l be r epai r ed, pat ch/ sand, pr i me and pai nt . Exi st i ng bl ackboar d pai nt ed wai nscot i n cor r i dor t o be pai nt ed over wi t h compl i ment ar y or mat chi ng pai nt t o upper wal l s and not chal kboar d t ype pai nt . Pr ovi de bot t om gal vani zed bl ack PVC coat ed r ai l at ext er i or f ence ar ound pl aygr ound.
The pr oj ect al so i ncl udes r emovi ng/ r el ocat i ng f i ber gl ass i nsul at i on above t he cei l i ng t i l es; new suspended acoust i c cei l i ng t i l es and gr i ds;
r epl acement of any vent i l at i on and ai r condi t i oni ng ( HVAC) di f f user s and r et ur n gr i l l s as r equi r ed; and r emoval and r epl acement of al l l i ght f i x t ur es and l i ght cont r ol s wi t h LED l i ght s and mot i on det ect or l i ght cont r ol s. Pr ovi de a connect i on wi t h t he gi ant voi ce base wi de ar ea mass not i f i cat i on syst em net wor k and l i mi t ed not i f i cat i on cover age as out l i ned i n cont r act document s and i nci dent al r el at ed wor k.
The pr oj ect i ncl udes t he r epl acement of t he f i r e al ar m syst em.
The wor k at Bui l di ng 1297 and 1376 have speci f i c r est r i ct i ons on t he days and t i mes wor k wi l l be al l owed t o be conduct ed wi t hi n t he bui l di ng as summar i zed f ur t her i n t he speci f i cat i ons.
SECTI ON 01 11 00 Page 1
1. 2. 2 Locat i on
The wor k i s l ocat ed at t he Chi l d Car e Devel opment Cent er l ocat ed i n Bui l di ng 1376 and Bui l di ng 1297 on t he Naval St at i on Newpor t Rhode I s l and.
The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .
1. 3 OCCUPANCY OF PREMI SES
Bui l di ng( s) wi l l be occupi ed dur i ng per f or mance of wor k under t hi s Cont r act .
Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches, cor r i dor s, and st ai r ways.
The Cont r act or i s r esponsi bl e f or movi ng, r el ocat i ng, and st or i ng f ur ni t ur e wi t hi n each space under const r uct i on f or each phase of const r uct i on.
1. 4 EXI STI NG WORK
I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 2
SECTI ON 01 14 00
WORK RESTRI CTI ONS
11/ 22
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Li st of Cont act Per sonnel ; G
Phasi ng Pl an; G
1. 2 SPECI AL SCHEDULI NG REQUI REMENTS
a. Have mat er i al s, equi pment , and per sonnel r equi r ed t o per f or m t he wor k at t he s i t e pr i or t o t he commencement of t he wor k.
b. The bui l di ng wi l l r emai n i n oper at i on dur i ng t he ent i r e const r uct i on per i od. The Cont r act or must conduct t hei r oper at i ons so as t o cause t he l east possi bl e i nt er f er ence wi t h nor mal oper at i ons of t he act i v i t y.
c. Per mi ssi on t o i nt er r upt any Act i v i t y r oads, r ai l r oads, or ut i l i t y ser vi ce must be r equest ed i n wr i t i ng a mi ni mum of 15 cal endar days pr i or t o t he desi r ed dat e of i nt er r upt i on.
d. The wor k under t hi s cont r act r equi r es speci al at t ent i on t o t he schedul i ng and conduct of t he wor k i n connect i on wi t h exi st i ng oper at i ons. The pr oj ect must be phased as f ol l ows:
- Const r uct i on at B. 1297
- Const r uct i on at B. 1376
The Const r uct i on of t he ar eas wi t hi n Bui l di ng 1297 and t he common spaces ( non- cl assr ooms) i n Bui l di ng 1376 ( unl ess ot her wi se not ed i n t he Phasi ng Pl an) must be compl et ed dur i ng t he hour s of 1800 Fr i day t hr ough 0600 Monday i ncl udi ng hol i days. Ext er i or wor k can be compl et ed dur i ng nor mal hour s wi t h a 15 day not i f i cat i on r equi r ement . The Cont r act or wi l l be pr ovi ded access t o at l east one cl assr ooms i n Bui l di ng 1376 and t he const r uct i on wi t hi n t hese cl assr ooms can be compl et ed dur i ng nor mal busi ness hour s ( 0700 t o 1600) Monday t hr ough Fr i day. Access wi l l onl y be per mi t t ed t o t hese cl assr ooms f r om t he ext er i or and no access i n any ot her spaces wi t hi n t he bui l di ng wi l l be per mi t t ed dur i ng nor mal oper at i ng hour s. Wor k may be per mi t t ed i nsi de t he f aci l i t y out s i de of t he nor mal oper at i ng hour s, as not ed i n t he NAVFAC Phasi ng Pl an.
1. 2. 1 Phasi ng Pl an
The Cont r act or must submi t a phasi ng pl an out l i ni ng t he pr oposed appr oach f or compl et i ng t he wor k wi t hi n each ar ea based on t he phasi ng r equi r ement s of t he cont r act . The phasi ng pl an must al so i dent i f y s i gnage, means of egr ess, and bot h Cont r act or and occupant access t hr oughout t he dur at i on of
SECTI ON 01 14 00 Page 1 t he pr oj ect .
Pr ovi de a secur e t empor ar y pr ot ect i ve bar r i er separ at i ng t he wor k ar ea f r om t he r emai ni ng space t hat i s st i l l i n oper at i on. Mai nt ai n secur i t y, exi st i ng exi t s, and exi t access pat hs t hr ough t he space. Bar r i er must be sel f - suppor t ed or br aced t o pr event possi bi l i t y of over t ur ni ng. The t empor ar y par t i t i ons must be pai nt ed pl ywood ( or s i mi l ar ) and must have a smoot h sur f ace f r ee of chi ps, damage, spl i nt er s, or scr ews/ nai l s on t he chi l d car e cor r i dor s i de of t he par t i t i on. Par t i t i on must be l ocat ed t o mi ni mi ze t he wor k ar ea f oot pr i nt t o t he gr eat est ext ent possi bl e t o compl et e t he wor k. Par t i t i on must pr ovi de dust , f ume, and sound cont r ol .
A means f or c l eani ng of f const r uct i on debr i s upon ent er i ng and exi st i ng t he wor k ar ea space such as a c l ean mat or st i cky mat must be pr ovi ded and mai nt ai ned i n wor ki ng condi t i on.
Pr ovi de submi ssi on of par t i t i on desi gn f or appr oval by owner .
1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 3. 1 Act i v i t y Regul at i ons
Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear appr opr i at e per sonal pr ot ect i ve equi pment ( PPE) i n desi gnat ed ar eas. Do not ent er any r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Ensur e al l Cont r act or equi pment , i ncl ude del i ver y vehi c l es, ar e c l ear l y i dent i f i ed wi t h t hei r company name.
1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s
Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.
1. 3. 1. 2 Addi t i onal Per sonnel Requi r ement s
1. 3. 1. 2. 1 Gener al Const r uct i on and Fi ni sh Wor k
Gener al const r uct i on and f i ni sh wor k must be per f or med by U. S. f i r ms usi ng U. S. c i t i zens. Gener al const r uct i on i ncl udes const r uct i on act i v i t i es such as ext er i or f ence r epai r s. Fi ni sh Wor k i ncl udes const r uct i on act i v i t i es such as i nsul at i on, f l oor , par t i t i on, and cei l i ng syst ems; cabi net wor k;
speci al t i es; bui l di ng f ur ni shi ngs, f i x t ur es, and equi pment ; and mechani cal and el ect r i cal ser vi ces and equi pment i ncl udi ng t hose speci al i zed f or f i r e pr ot ect i on, secur i t y, communi cat i on, cont r ol , ener gy conser vat i on, saf et y, comf or t , conveni ence, and si mi l ar pur poses.
1. 3. 1. 3 I nst al l at i on Access
Obt ai n access t o Navy i nst al l at i ons t hr ough par t i c i pat i on i n t he Def ense Bi omet r i cs I dent i f i cat i on Syst em ( DBI DS) . Requi r ement s f or Cont r act or empl oyee r egi st r at i on, and t r ansi t i on f or empl oyees cur r ent l y under Navy Commer ci al Access Cont r ol Syst em ( NCACS) , ar e avai l abl e at ht t ps: / / www. cni c. navy. mi l / om/ dbi ds. ht ml No f ees ar e associ at ed wi t h obt ai ni ng a DBI DS cr edent i al .
SECTI ON 01 14 00 Page 2
Par t i c i pat i on i n t he DBI DS i s not mandat or y, and Cont r act or per sonnel may appl y f or One- Day Passes at t he Base Vi s i t or Cont r ol Of f i ce t o access an i nst al l at i on.
1. 3. 1. 3. 1 Regi st r at i on f or DBI DS
Regi st r at i on f or DBI DS i s avai l abl e at ht t ps: / / www. cni c. navy. mi l / om/ dbi ds. ht ml Pr ocedur e i ncl udes:
a. Pr esent a l et t er or of f i c i al awar d document ( i . e. DD For m 1155 or SF 1442) f r om t he Cont r act i ng Of f i cer , t hat pr ovi des t he pur pose f or access, t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve.
b. Pr esent val i d i dent i f i cat i on, such as a passpor t or Real I D Act - compl i ant st at e dr i ver ' s l i cense.
c. Pr ovi de compl et ed SECNAV FORM 5512/ 1 t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve t o obt ai n a backgr ound check. Thi s f or m i s avai l abl e f or downl oad at ht t ps: / / www. ci ni c/ navy. mi l / om/ dbi ds. ht ml
d. Upon successf ul compl et i on of t he backgr ound check, t he Gover nment wi l l compl et e t he DBI DS enr ol l ment pr ocess, whi ch i ncl udes Cont r act or empl oyee phot o, f i nger pr i nt s, base r est r i ct i on and sever al ot her assessment s.
e. Upon successf ul compl et i on of t he enr ol l ment pr ocess, t he Cont r act or empl oyee wi l l be i ssued a DBI DS cr edent i al , and wi l l be al l owed t o pr oceed t o wor ksi t e.
1. 3. 1. 3. 2 DBI DS El i gi bi l i t y Requi r ement s
Thr oughout t he l engt h of t he cont r act , t he Cont r act or empl oyee must cont i nue t o meet backgr ound scr een st andar ds. Per i odi c backgr ound scr eeni ngs ar e conduct ed t o ver i f y cont i nued DBI DS par t i c i pat i on and i nst al l at i on access pr i v i l eges. DBI DS access pr i v i l eges wi l l be i mmedi at el y suspended or r evoked i f at any t i me a Cont r act or empl oyee becomes i nel i gi bl e.
An adj udi cat i on pr ocess may be i ni t i at ed when a backgr ound scr een f ai l ur e r esul t s i n di squal i f i cat i on f r om par t i c i pat i on i n t he DBI DS, and Cont r act or empl oyee does not agr ee wi t h t he r eason f or di squal i f i cat i on.
The Gover nment i s t he f i nal aut hor i t y.
1. 3. 1. 3. 3 DBI DS Not i f i cat i on Requi r ement s
a. I mmedi at el y r epor t i nst ances of l ost or st ol en badges t o t he Cont r act i ng Of f i cer .
b. I mmedi at el y col l ect DBI DS cr edent i al s and not i f y t he Cont r act i ng Of f i cer i n wr i t i ng under t he f ol l owi ng ci r cumst ances:
( 1) An empl oyee has depar t ed t he company wi t hout havi ng pr oper l y r et ur ned or sur r ender ed t hei r DBI DS cr edent i al s.
( 2) Ther e i s a r easonabl e basi s t o concl ude t hat an empl oyee, or f or mer empl oyee, mi ght pose a r i sk, compr omi se, or t hr eat t o t he saf et y or secur i t y of t he I nst al l at i on or anyone t her ei n.
SECTI ON 01 14 00 Page 3
1. 3. 1. 3. 4 One- Day Passes
One day passes wi l l not be al l owed under t hi s cont r act .
1. 3. 1. 4 No Smoki ng Pol i cy
Smoki ng i s pr ohi bi t ed wi t hi n and out si de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.
1. 3. 2 Wor ki ng Hour s
Bui l di ng 1297: Regul ar wor ki ng hour s consi st of t he t i me per i od bet ween 1800 Fr i day t hr ough 0600 Monday i ncl udi ng hol i days. Ext er i or wor k can be compl et ed dur i ng nor mal hour s wi t h a 15 day not i f i cat i on r equi r ement .
Bui l di ng 1376: Regul ar wor ki ng hour s consi st of t he t i me per i od bet ween 1800 Fr i day t hr ough 0600 Monday i ncl udi ng hol i days. Ext er i or wor k can be compl et ed dur i ng nor mal hour s wi t h a 15 day not i f i cat i on r equi r ement .
Regul ar wor ki ng hour s f or t he c l assr ooms ( t wo cl assr ooms at a t i me) wi l l consi st of an 8 1/ 2 hour per i od , bet ween 7 a. m. and 3: 30 p. m. , Monday t hr ough Fr i day, excl udi ng Gover nment hol i days.
1. 3. 3 Wor k Out si de Regul ar Hour s
Wor k out si de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .
Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out si de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer . Make ut i l i t y cut over s af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days unl ess di r ect ed ot her wi se.
1. 3. 4 Ut i l i t y Cut over s and I nt er r upt i ons
a. Make ut i l i t y cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i daysweekends. Conf or m t o pr ocedur es r equi r ed i n par agr aph WORK OUTSI DE REGULAR HOURS.
b. I nt er r upt i on t o wat er , sani t ar y sewer , t el ephone ser vi ce, el ect r i c ser vi ce, ai r condi t i oni ng, heat i ng, and f i r e al ar m, ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph WORK OUTSI DE REGULAR HOURS.
c. Oper at i on of St at i on Ut i l i t i es: The Cont r act or must not oper at e nor di st ur b t he set t i ng of cont r ol devi ces i n t he st at i on ut i l i t i es syst em, i ncl udi ng wat er , sewer , el ect r i cal , and st eam ser vi ces. The Gover nment wi l l oper at e t he cont r ol devi ces as r equi r ed f or nor mal conduct of t he wor k. The Cont r act or must not i f y t he Cont r act i ng Of f i cer gi v i ng r easonabl e advance not i ce when such oper at i on i s r equi r ed.
SECTI ON 01 14 00 Page 4
1. 4 SECURI TY REQUI REMENTS
Cont r act Cl ause FAR 52. 204- 2 Secur i t y Requi r ement s and Al t er nat e I I and t he f ol l owi ng appl y:
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 14 00 Page 5
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Schedul e of Pr i ces; G
1. 2 SCHEDULE OF PRI CES
1. 2. 1 Dat a Requi r ed
Thi s Cont r act r equi r es t he use of a cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Schedul e of Pr i ces must not be used wi t h cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Use Ear ned Val ue Repor t der i ved f r om cost - l oaded NAS. Pr ovi de a det ai l ed br eakdown of t he Cont r act pr i ce, gi v i ng quant i t i es f or each of t he var i ous k i nds of wor k, uni t pr i ces and ext ended pr i ces.
Cont r act or over head and pr of i t i ncl udi ng sal ar i es f or f i el d of f i ce per sonnel , i f appl i cabl e, must be pr opor t i onat el y spr ead over al l pay i t ems and not i ncl uded as i ndi v i dual pay i t ems.
1. 2. 2 Payment Schedul e I nst r uct i ons
Payment s wi l l not be made unt i l t he Ear ned Val ue Repor t f r om t he cost - l oaded NAS has been submi t t ed t o and accept ed by t he Cont r act i ng Of f i cer .
Addi t i onal l y, t he Ear ned Val ue Repor t must be separ at ed as f ol l ows:
a. Pr i mar y Faci l i t i es Cost Br eakdown:
Def i ned as wor k on t he pr i mar y f aci l i t i es out t o t he 5 f oot l i ne.
Wor k out t o t he 5 f oot l i ne i ncl udes const r uct i on encompassed wi t hi n a t heor et i cal l i ne 5 f oot f r om t he f ace of ext er i or wal l s and i ncl udes at t endant const r uct i on, such as pad mount ed HVAC cool i ng equi pment , cool i ng t ower s, and t r ansf or mer s pl aced beyond t he 5 f oot l i ne.
b. Suppor t i ng Faci l i t i es Cost Br eakdown:
Def i ned as s i t e wor k, i ncl udi ng i nci dent al wor k, out s i de t he 5 f oot l i ne.
1. 3 CONTRACT MODI FI CATI ONS
I n conj unct i on wi t h t he Cont r act Cl ause DFARS 252. 236- 7000 Modi f i cat i on Pr oposal s- Pr i ce Br eakdown, and wher e act ual owner shi p and oper at i ng cost s of const r uct i on equi pment cannot be det er mi ned f r om Cont r act or account i ng r ecor ds, base equi pment use r at es upon t he appl i cabl e pr ovi s i ons of t he
SECTI ON 01 20 00 Page 1
EP 1110- 1- 8.
1. 4 CONTRACTOR' S I NVOI CE AND CONTRACT PERFORMANCE STATEMENT
1. 4. 1 Cont ent of I nvoi ce
Request s f or payment wi l l be pr ocessed i n accor dance wi t h t he Cont r act Cl ause FAR 52. 232- 27 Pr ompt Payment f or Const r uct i on Cont r act s and FAR
52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s. I nvoi ces not compl et ed i n accor dance wi t h cont r act r equi r ement s wi l l be r et ur ned t o t he Cont r act or f or cor r ect i on of t he def i c i enci es. The r equest s f or payment shal l i ncl ude t he document s l i s t ed bel ow.
a. The Cont r act or ' s i nvoi ce, on NAVFAC For m 7300/ 30 f ur ni shed by t he Gover nment , showi ng i n summar y f or m, t he basi s f or ar r i v i ng at t he amount of t he i nvoi ce. For m 7300/ 30 must i ncl ude cer t i f i cat i on by Qual i t y Cont r ol ( QC) Manager as r equi r ed by t he Cont r act .
b. The Ear ned Val ue Repor t f r om t he cost - l oaded NAS.
c. Cont r act or ' s Mont hl y Est i mat e f or Voucher and Cont r act or s Cer t i f i cat i on ( NAVFAC For m 4330) wi t h Subcont r act or and suppl i er payment cer t i f i cat i on. Ot her document s, i ncl udi ng but not l i mi t ed t o, t hat need t o be r ecei ved pr i or t o pr ocessi ng payment i ncl ude t he f ol l owi ng submi t t al s as r equi r ed. These i t ems ar e st i l l r equi r ed mont hl y even when a pay voucher i s not submi t t ed.
d. Mont hl y Wor k- hour r epor t .
e. Updat ed Const r uct i on Pr ogr ess Schedul e and t abul ar r epor t s r equi r ed by t he cont r act .
f . Cont r act or Saf et y Sel f Eval uat i on Checkl i st .
g. Updat ed submi t t al r egi st er .
h. Sol i d Wast e Di sposal Repor t .
i . Cer t i f i ed payr ol l s.
j . Updat ed t est i ng l ogs.
k. Ot her suppor t i ng document s as r equest ed.
1. 4. 2 Submi ssi on of I nvoi ces
I f DFARS Cl ause 252. 232- 7006 Wi de Ar ea Wor kFl ow Payment I nst r uct i ons i s i ncl uded i n t he Cont r act , pr ovi de t he document s l i s t ed i n above par agr aph CONTENT OF I NVOI CE i n t hei r ent i r et y as at t achment s i n Wi de Ar ea Wor k Fl ow ( WAWF) f or each i nvoi ce submi t t ed. The maxi mum si ze of each WAWF at t achment i s t wo megabyt es, but t her e ar e no l i mi t s on t he number of at t achment s. I f a document cannot be at t ached i n WAWF due t o syst em or s i ze r est r i ct i on, pr ovi de i t as i nst r uct ed by t he Cont r act i ng Of f i cer .
Mont hl y i nvoi ces and suppor t i ng f or ms f or wor k per f or med t hr ough t he anni ver sar y awar d dat e of t he Cont r act must be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 5 cal endar days of t he dat e of i nvoi ce. For exampl e, i f Cont r act awar d dat e i s t he 7t h of t he mont h, t he dat e of each mont hl y i nvoi ce must be t he 7t h and t he i nvoi ce must be submi t t ed by t he
SECTI ON 01 20 00 Page 2
12t h of t he mont h.
1. 4. 3 Fi nal I nvoi ce
a. A f i nal i nvoi ce must be accompani ed by t he cer t i f i cat i on r equi r ed by DFARS 252. 247. 7023 Tr anspor t at i on of Suppl i es by Sea, and t he Cont r act or ' s Fi nal Rel ease. I f t he Cont r act or i s i ncor por at ed, t he Fi nal Rel ease must cont ai n t he cor por at e seal . An of f i cer of t he cor por at i on must s i gn and t he cor por at e secr et ar y must cer t i f y t he Fi nal Rel ease.
b. For f i nal i nvoi ces bei ng submi t t ed v i a WAWF, t he or i gi nal Cont r act or ' s Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea must be pr ovi ded di r ect l y t o t he r espect i ve Cont r act i ng Of f i cer pr i or t o submi ssi on of t he f i nal i nvoi ce. Once r ecei pt of t he or i gi nal Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea has been conf i r med by t he Cont r act i ng Of f i cer , t he Cont r act or must t hen submi t f i nal i nvoi ce and at t ach a copy of t he Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea i n WAWF.
c. Fi nal i nvoi ces not accompani ed by t he Cont r act or ' s Fi nal Rel ease and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea wi l l be consi der ed i ncompl et e and wi l l be r et ur ned t o t he Cont r act or .
1. 5 PAYMENTS TO THE CONTRACTOR
Payment s wi l l be made on submi ssi on of i t emi zed r equest s by t he Cont r act or whi ch compl y wi t h t he r equi r ement s of t hi s sect i on, and wi l l be subj ect t o r educt i on f or over payment s or i ncr ease f or under payment s made on pr evi ous payment s t o t he Cont r act or .
1. 5. 1 Obl i gat i on of Gover nment Payment s
The obl i gat i on of t he Gover nment t o make payment s r equi r ed under t he pr ovi s i ons of t hi s Cont r act wi l l , at t he di scr et i on of t he Cont r act i ng Of f i cer , be subj ect t o r educt i ons and suspensi ons per mi t t ed under t he FAR and agency r egul at i ons i ncl udi ng t he f ol l owi ng i n accor dance wi t h FAR
32. 103 Pr ogr ess Payment s Under Const r uct i on Cont r act s:
a. Reasonabl e deduct i ons due t o def ect s i n mat er i al or wor kmanshi p;
b. Cl ai ms whi ch t he Gover nment may have agai nst t he Cont r act or under or i n connect i on wi t h t hi s Cont r act ;
c. Unl ess ot her wi se adj ust ed, r epayment t o t he Gover nment upon demand f or over payment s made t o t he Cont r act or ; and
d. Fai l ur e t o mai nt ai n accur at e " as- bui l t " or r ecor d dr awi ngs i n accor dance wi t h FAR 52. 236. 21.
1. 5. 2 Payment f or Onsi t e and Of f s i t e Mat er i al s
Pr ogr ess payment s may be made t o t he Cont r act or f or mat er i al s del i ver ed on t he si t e, f or mat er i al s st or ed of f const r uct i on s i t es, or mat er i al s t hat ar e i n t r ansi t t o t he const r uct i on s i t es under t he f ol l owi ng condi t i ons:
a. FAR 52. 232- 5( b) Payment s Under Fi xed Pr i ce Const r uct i on Cont r act s.
SECTI ON 01 20 00 Page 3
b. Mat er i al s del i ver ed on t he si t e but not i nst al l ed, i ncl udi ng compl et ed pr epar at or y wor k, and of f - s i t e mat er i al s t o be consi der ed f or pr ogr ess payment must be maj or hi gh cost , l ong l ead, speci al or der , or speci al t y i t ems, not suscept i bl e t o det er i or at i on or physi cal damage i n st or age or i n t r ansi t t o t he const r uct i on s i t e. Exampl es of mat er i al s accept abl e f or payment consi der at i on i ncl ude, but ar e not l i mi t ed t o, st r uct ur al st eel , non- magnet i c st eel , non- magnet i c aggr egat e, equi pment , machi ner y, l ar ge pi pe and f i t t i ngs, pr ecast / pr est r essed concr et e pr oduct s, pl ast i c l umber ( e. g. , f ender pi l es/ cur bs) , and hi gh- vol t age el ect r i cal cabl e. Mat er i al s not accept abl e f or payment i ncl ude consumabl e mat er i al s such as nai l s, f ast ener s, condui t s, gypsum boar d, gl ass, i nsul at i on, and wal l cover i ngs.
c. Mat er i al s t o be consi der ed f or pr ogr ess payment pr i or t o i nst al l at i on must be speci f i cal l y and separ at el y i dent i f i ed i n t he Cont r act or ' s est i mat es of wor k submi t t ed f or t he Cont r act i ng Of f i cer ' s appr oval i n accor dance wi t h Ear ned Val ue Repor t r equi r ement of t hi s Cont r act .
Request s f or pr ogr ess payment consi der at i on f or such i t ems must be suppor t ed by document s est abl i shi ng t hei r val ue and t hat t he t i t l e r equi r ement s of t he c l ause at FAR 52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s have been met .
d. Mat er i al s ar e adequat el y i nsur ed and pr ot ect ed f r om t hef t and exposur e.
e. Pr ovi de a wr i t t en consent f r om t he sur et y company wi t h each payment r equest f or of f s i t e mat er i al s.
f . Mat er i al s t o be consi der ed f or pr ogr ess payment s pr i or t o i nst al l at i on must be st or ed ei t her i n Hawai i , Guam, Puer t o Ri co, or t he Cont i nent al Uni t ed St at es. Ot her l ocat i ons ar e subj ect t o wr i t t en appr oval by t he Cont r act i ng Of f i cer .
g. Mat er i al s i n t r ansi t t o t he j ob s i t e or st or age si t e ar e not accept abl e f or payment .
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 20 00 Page 4
SECTI ON 01 30 00
ADMI NI STRATI VE REQUI REMENTS
11/ 20, CHG 2: 05/ 22
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Vi ew Locat i on Map
Pr ogr ess and Compl et i on Pi ct ur es
1. 2 VI EW LOCATI ON MAP
Submi t , pr i or t o or wi t h t he f i r st di gi t al phot ogr aph submi t t al s, a sket ch or dr awi ng i ndi cat i ng t he r equi r ed phot ogr aphi c l ocat i ons. Updat e as r equi r ed i f t he l ocat i ons ar e moved.
1. 3 PROGRESS AND COMPLETI ON PI CTURES
Phot ogr aphi cal l y document s i t e condi t i ons pr i or t o st ar t of const r uct i on oper at i ons. Pr ovi de mont hl y, and wi t hi n one mont h of t he compl et i on of wor k, di gi t al phot ogr aphs, 1600x1200x24 bi t t r ue col or mi ni mum r esol ut i on i n JPEG f i l e f or mat showi ng t he sequence and pr ogr ess of wor k. Take a mi ni mum of 20 di gi t al phot ogr aphs each week t hr oughout t he ent i r e pr oj ect f r om a mi ni mum of t en di f f er ent v i ewpoi nt s sel ect ed by t he Cont r act or unl ess ot her wi se di r ect ed by t he Cont r act i ng Of f i cer . Submi t wi t h t he mont hl y i nvoi ce t wo set s of di gi t al phot ogr aphs, each set on a separ at e compact di sc ( CD) or dat a ver sat i l e di sc ( DVD) , cumul at i ve of al l phot os t o dat e. I ndi cat e phot ogr aphs demonst r at i ng envi r onment al pr ocedur es.
Pr ovi de phot ogr aphs f or each mont h i n a separ at e mont hl y di r ect or y and name each f i l e t o i ndi cat e i t s l ocat i on on t he vi ew l ocat i on sket ch. Al so pr ovi de t he vi ew l ocat i on sket ch on t he CD or DVD as a di gi t al f i l e.
I ncl ude a dat e desi gnat or i n f i l e names. Phot ogr aphs pr ovi ded ar e f or unr est r i ct ed use by t he Gover nment .
1. 4 MI NI MUM I NSURANCE REQUI REMENTS
Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 Li abi l i t y , dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act . Pr ovi de ot her i nsur ance cover age as r equi r ed by St at e l aw.
1. 5 SUPERVI SI ON
1. 5. 1 Super i nt endent Qual i f i cat i ons
Pr ovi de pr oj ect super i nt endent wi t h a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of
SECTI ON 01 30 00 Page 1 hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.
1. 5. 2 Mi ni mum Communi cat i on Requi r ement s
Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of Cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he Cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on ski l l s .
1. 5. 3 Dut i es
The pr oj ect super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng subcont r act or s and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he pr oj ect . The super i nt endent i s r equi r ed t o at t end Red Zone meet i ngs, par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance of t hi s cont r act unt i l t he wor k i s compl et ed and accept ed.
1. 5. 4 Non- Compl i ance Act i ons
The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o ensur e t i mel y compl et i on.
Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Cont r act or .
1. 6 PRECONSTRUCTI ON MEETI NG
I mmedi at el y af t er awar d, pr i or t o commenci ng any wor k at t he s i t e, coor di nat e wi t h t he Cont r act i ng Of f i cer a t i me and pl ace t o meet f or t he Pr econst r uct i on Meet i ng. The meet i ng must t ake pl ace wi t hi n 35 cal endar days af t er awar d of t he cont r act , but pr i or t o commencement of any wor k at t he s i t e. The pur pose of t hi s meet i ng i s t o di scuss and devel op a mut ual under st andi ng of t he admi ni st r at i ve r equi r ement s of t he Cont r act i ncl udi ng but not l i mi t ed t o: dai l y r epor t i ng, i nvoi c i ng, val ue engi neer i ng, saf et y, base- access, out age r equest s, hot wor k per mi t s, schedul e r equi r ement s, qual i t y cont r ol , schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, submi t t al s, cyber secur i t y, pr osecut i on of t he wor k, gover nment accept ance, f i nal i nspect i ons and cont r act c l ose- out . Cont r act or must pr esent and di scuss t hei r basi c appr oach t o schedul i ng t he const r uct i on wor k and any r equi r ed phasi ng.
1. 6. 1 At t endees
Cont r act or at t endees must i ncl ude t he Pr oj ect Manager , Super i nt endent , Si t e Saf et y and Heal t h Of f i cer ( SSHO) , Qual i t y Cont r ol Manager and maj or subcont r act or s.
SECTI ON 01 30 00 Page 2
1. 7 FACI LI TY TURNOVER PLANNI NG MEETI NGS ( Red Zone Meet i ngs)
Meet wi t h t he Gover nment t o i dent i f y st r at egi es t o ensur e t he pr oj ect i s car r i ed t o expedi t i ous c l osur e and t ur nover t o t he Cl i ent . St ar t pl anni ng t he t ur nover pr ocess at t he Pr e- Const r uct i on Conf er ence meet i ng wi t h a di scussi on of t he Red Zone pr ocess and convene at r egul ar l y schedul ed NRZ Meet i ngs begi nni ng at appr oxi mat el y 75 per cent of pr oj ect compl et i on.
I ncl ude t he f ol l owi ng i n t he f aci l i t y Tur nover ef f or t :
1. 7. 1 Red Zone Checkl i st
a. Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve ( COTR) wi l l pr ovi de t he Cont r act or a copy of t he Red Zone Checkl i st t empl at e.
b. Pr i or t o 75 per cent compl et i on, modi f y t he Red Zone Checkl i st t empl at e by addi ng or del et i ng cr i t i cal act i v i t i es appl i cabl e t o t he pr oj ect and assi gn pl anned compl et i on dat es f or each act i v i t y. Submi t t he modi f i ed Red Zone Checkl i st t o t he Cont r act i ng Of f i cer . The Cont r act i ng Of f i cer may r equest addi t i onal act i v i t i es be added t o t he Red Zone Checkl i st at any t i me as necessar y.
1. 7. 2 Meet i ngs
a. Conduct r egul ar Red Zone Meet i ngs begi nni ng at appr oxi mat el y 75 per cent pr oj ect compl et i on, or t hr ee t o s i x mont hs pr i or t o Benef i c i al Occupancy Dat e ( BOD) , whi chever comes f i r st .
b. The Cont r act i ng Of f i cer wi l l est abl i sh t he f r equency of t he meet i ngs, whi ch i s expect ed t o i ncr ease as t he pr oj ect compl et i on dr aws near er .
At t he begi nni ng, Red Zone meet i ngs may be ever y t wo weeks t hen i ncr ease t o weekl y t owar ds t he f i nal mont h of t he pr oj ect .
c. Usi ng t he Red Zone Checkl i st as a Pl an of Act i on and Mi l est ones ( POAM) and basi s f or di scussi on, r evi ew upcomi ng cr i t i cal act i v i t i es and st r at egi es t o ensur e wor k i s compl et ed on t i me.
d. Dur i ng t he Red Zone Meet i ngs di scuss wi t h t he COTR any upcomi ng act i v i t i es t hat r equi r e Gover nment i nvol vement .
e. Mai nt ai n t he Red Zone Checkl i st by document i ng t he act ual compl et i on dat es as wor k i s compl et ed and updat e t he Red Zone Checkl i st wi t h r evi sed pl anned compl et i on dat es as necessar y t o mat ch pr ogr ess.
Di st r i but e copi es of t he cur r ent Red Zone Checkl i st t o at t endees at each Red Zone Meet i ng.
1. 8 MOBI LI ZATI ON
Cont r act or shal l mobi l i ze t o t he j obsi t e wi t hi n 60 cal endar days af t er cont r act awar d . Mobi l i ze i s def i ned as havi ng equi pment AND havi ng a physi cal pr esence of at l east one per son f r om t he cont r act or ' s t eam on t he j obsi t e.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 30 00 Page 3
SECTI ON 01 30 00 Page 4
SECTI ON 01 31 23. 13 20
ELECTRONI C CONSTRUCTI ON AND FACI LI TY SUPPORT CONTRACT MANAGEMENT SYSTEM
05/ 17, CHG 7: 11/ 21
PART 1 GENERAL
1. 1 CONTRACT ADMI NI STRATI ON
Ut i l i ze t he Naval Faci l i t i es Engi neer i ng Command' s ( NAVFAC' s) El ect r oni c Const r uct i on and Faci l i t y Suppor t Cont r act Management Syst em ( eCMS) f or t he t r ansf er , shar i ng, and management of el ect r oni c t echni cal submi t t al s and document s. The web- based eCMS i s t he desi gnat ed means of t r ansf er r i ng t echni cal document s bet ween t he Cont r act or and t he Gover nment . Paper medi a or e- mai l submi ssi on, i ncl udi ng or i gi nal s or copi es, of t he document s i dent i f i ed i n Tabl e 1 ar e not per mi t t ed, except wher e eCMS i s unavai l abl e, non- f unct i onal , or speci f i cal l y r equest ed i n addi t i on t o el ect r oni c submi ssi on.
1. 1. 1 For mat Nami ng Convent i on f or Fi l es Upl oaded I nt o eCMS
I ncl ude t he i dent i f i cat i on number of t he document , t he t ype of document , t he name/ subj ect or t i t l e, and f or dai l y r epor t s, t he dat e ( day of wor k) wi t h f or mat YYYY/ MM/ DD i n t he f i l ename. For exampl e, f or RFI ' s, 0011_RFI _Roof _Leaki ng. doc; f or submi t t al s, 0032a_Submi t t al s_Li ght _Fi xt ur e. pdf ; f or Dai l y Repor t s, 0132_Dai l y_Repor t _20190504. xl s. Cont act t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) r egar di ng avai l abi l i t y of eCMS t r ai ni ng and r ef er ence mat er i al s.
1. 1. 2 Upl oadi ng Document s Pr ocessed Out si de of eCMS
When speci f i cal l y r equest ed t o pr ovi de document s out si de of eCMS, upl oad al l f i nal pr oj ect document at i on ( e. g. , document s t hat ar e s i gned and/ or adj udi cat ed by t he Gover nment ) ment i oned i n Tabl e 1 i nt o eCMS by cr eat i ng a r ecor d i n t he modul e associ at ed wi t h t hat document t ype and upl oadi ng t he document ( s) . Subj ect / t i t l e of t he r ecor d shoul d i ncl ude t he t ype of r ecor d i . e. , RFI / Submi t t al / Ot her , t he i dent i f i cat i on number ( s) , and t he st at ement " Pr ocessed Out si de of eCMS" . For exampl e, " RFI 001- 012 Pr ocessed Out si de of eCMS" .
1. 2 USER PRI VI LEGES
The Cont r act or wi l l be pr ovi ded access t o eCMS. Al l t echni cal submi t t al s and document s must be t r ansmi t t ed t o t he Gover nment v i a t he COR. Pr oj ect r ol es and syst em r ol es wi l l be est abl i shed t o cont r ol each user ' s menu, appl i cat i on, and sof t war e pr i v i l eges, i ncl udi ng t he abi l i t y t o cr eat e, edi t , or del et e obj ect s.
1. 3 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
SECTI ON 01 31 23. 13 20 Page 1
Li st of Cont r act or ' s Per sonnel ; G
1. 4 SYSTEM REQUI REMENTS AND CONNECTI VI TY
1. 4. 1 Gener al
The eCMS r equi r es a web- br owser ( pl at f or m- neut r al ) and I nt er net connect i on.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .