This Request for Proposal (RFP) solicits a design-build contract for constructing a new primary school facility in Oyem, Gabon. The project, numbered IAF-25-0004, requires building two classroom buildings with rainwater collection systems, ventilated improved pit (VIP) latrines, a perimeter fence, access road, concrete aprons, ramps, and power/lighting infrastructure. The project is located at latitude 1°34'28.88"N, longitude 11°33'10.89"E, and will follow host nation construction codes and standards.
The full and open procurement is issued by the US Army Corps of Engineers, Europe District, with a NAICS code of 236220 and a size standard of $45,000,000. Key contract details include a 450-calendar day performance period, with contractors required to begin work within 7 calendar days of award. The solicitation requires sealed offers to be submitted by 26 Jun 2025 at 10:00 AM, with performance and payment bonds required. Offerors must comply with specific submittal requirements, including technical approach, past performance documentation, and pricing information, with evaluation based on a best value trade-off process.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IAF-25-0004 GAB Ndava School Construction The Request for Proposal (RFP) provides parameters for a design-build project for construction of a new school facility in Oyem, Gabon;
Latitude 1°34'28.88"N, Longitude 11°33'10.89"E (Refer to the attached Location Map.)
This project w ill provide tw o (2) new classroom buildings w ith a rainw ater collection systems and separate ventilated improved pit (VIP) latrines on a fenced school compound. The design and construction must follow all applicable host nation codes and standards.
The project includes the follow ing general items of w ork, detailed requirements are contained elsew here in this Statement of Work:
a. Clear, grub, and grade the site
b. Construct new facility consisting of tw o classroom buildings, pit latrines and a rainw ater collection system
c. Provide new access road and parking lot
d. Provide new perimeter fence
e. Provide concrete apron around the buildings
f. Provide tw o concrete ramps to access each school building
g. Provide sloping concrete pad in the area of w ater tank
h. Provide pow er and lighting throughout
This is a full and open procurement. NAICS code is 236220. Size Standard is $45,000,000. Please note that business size in the System for Aw ard Management (SAM) is determined by the NAICS code.
MARCUS D STRINGER 011-49-611-9744-2610
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
27-May-2025
(RFP)
(IFB)
X
CALL:
Ndava School Construction, Gabon
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______7 calendar days and complete it w ithin ________450 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________26 Jun 2025 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
KONRAD ADENAUER RING 39
D-65187 WIESBADEN GERMANY
WIESBADEN 65187
W912GB
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
IAF-25-0004
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912GB25R0041 85
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 01 10 - Table of Contents
TABLE OF CONTENTS
SECTION 00 10 10 – TABLE OF CONTENTS
SECTION 00 10 00 – SOLICITATION
SECTION 00 21 00 – INSTRUCTONS
SECTION 00 70 00 – CONDITIONS OF THE CONTRACT
SECTION 00 73 00 – SUPPLEMENTARY CONDITIONS
SECTION 01 00 00 – GENERAL REQUIREMENTS
ATTACHMENTS
B.08 RFP Att 1 - Location Map B.08 RFP Att 2 - Conceptual Site Plan B.08 RFP Att 3 - Conceptual Floor Plan, Section and Elevations B.08 RFP Att 4 - Structural Calculations Guideline B.08 RFP Att 5 - Dedication Plaque B.08 RFP Att 6 - Scope For Independent Structural Proofing B.08 RFP Att 7 - Gabon Standard Classroom Plan B.08 RFP Att 8 - Ventilated Improved Pit (VIP) Latrine B.08 RFP Att 9 - TAG13 The Design of Ventilated Improved Pit (VIP) Latrines B.08 RFP Att 10 - Bank Letter of Assurance (BLA) B.08 RFP Att 11 - Bank Letter of Guarantee (BLG) B.08 RFP Att 12 - Past Performance Information Sheet_Rev 13 Feb 2023 B.08 RFP Att 13 - Past Performance Overview Sheet_Rev 19 Jan 2023 B.08 RFP Att 14 - Past Performance Questionnaire PPQ B.08 RFP Att 15 - Price Schedule B.08 RFP Att 16 - Site Visit Attendee Worksheet B.08 RFP Att 17 - Commitment Letters B.08 RFP Att 18 - Specs Binder (dated 05-24)
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Design and Construct School Building
FFP
Payment will be made for costs associated with the design, procurement, and construction of two new (3) classroom facilities at the Ndava Primary School project location, as indicated in SECTION 01 10 10. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
FOB: Destination
PSC CD: Y1JZ
NET AMT
0002 1 Job Design and Construct Latrine Facility
FFP
Payment will be made for costs associated with the design, procurement, and construction of a new (6) spot latrine facility at the Ndava Primary School project location, as indicated in SECTION 01 10 10. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
0003 1 Job OPTION Design and Construct Rainwater Catchment
FFP
Payment will be made for costs associated with the design, procurement, and construction of a new rainwater catchment system, inclusive of a handwash station, at the Ndava Primary School project location, as indicated in SECTION 01 10 10.
This work shall include all applicable demolition and removals work to support the work elements contained in this item.
0004 1 Job OPTION Design and Construct Perimeter Fence
FFP
Payment will be made for costs associated with the design, procurement, and construction of a new perimeter fence at the Ndava Primary School project location, as indicated in SECTION 01 10 10. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 450 dys. ANP 1 U.S. ARMY CORPS OF ENGINEERS, EUROPE
CENAU-CT
KONRAD-ADENAUER RING 39
WIESBADEN 65187
(+49)611-9744-2600
WK4SF6
0002 450 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0003 450 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0004 450 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
Section 00 21 00 - Instructions
INSTRUCTIONS TO OFFORERS
1. Overview:
1.1. The purpose of this Request for Proposal (RFP) is to select one contractor for the project IAF-25-0004
Gabon Ndava Primary School Construction. The Government will use the Best Value Trade-Off process to evaluate proposals. The Contracting Officer will award a firm fixed price contract to the responsible Offeror who provides the best overall value to the Government.
1.2. This Request for Proposal (RFP) outlines the parameters for a design-build project to construct one new primary school facility in the Oyem region of Gabon: Latitude 1°34'28.88"N, Longitude 11°33'10.89"E. The project includes the following general items of work, with detailed requirements provided in the attached Statement of Work:
1.2.1. Design and construction of new primary school facility.
1.2.2. Design and construction of new ventilated improved pit (VIP) latrines.
1.2.3. Construction of a perimeter fence.
1.2.4. Design and construction of a rainwater collection system.
1.2.5. Design and construction of general power and lighting systems throughout the buildings.
1.2.6. Provide site improvements inclusive of general clearing, grubbing, and grading for stormwater drainage.
1.3. Pre-Proposal Site Visit: The Government has scheduled a pre-proposal site visit on June 5, 2025.
1.3.1. Location: See Project Location Map provided as solicitation attachment #1. The project is located in Oyem, Gabon. The coordinates are Latitude 1°34'28.88"N, Longitude 11°33'10.89"E (1.574689, 11.553025).
1.3.2. Time/Date: 0900 hours local time on 5 June 2025
1.3.3. Registration Instructions: Offerors must pre-register their attendees no later than 30 May 2025. To
Pre-Register, complete the site visit attendee information sheet (attachment 16) and submit it via email to sterling.j.alphonse@usace.army.mil, kelsey.j.lahue@usace.army.mil, marcus.d.stringer@usace.army.mil, and phillip.n.tran@usace.army.mil. IMPORTANT: Any individuals planning to attend must register in advance with all information provided in the site visit attachment to be permitted access to the sites—please use the attendee information sheet attached to the RFP. Also, space may be limited, and as a result, the number of attendees per company may be limited.
1.4. Project Questions: All project questions should be submitted via ProjNet (see instructions below). Any answers given at the site visit are strictly unofficial.
1.5. If you have technical questions about this solicitation, you must submit them in writing through the "Bidder
Inquiry" feature on ProjNet at www.projnet.org\projnet. To access this feature, you will need to enter the bidder inquiry key: XABVK6-KJX9VX
1.5.1. Important Notes:
1.5.1.1. The Government reserves the right to decline answering certain questions.
1.5.1.2. Questions will not be answered later than 10 calendar days before the deadline for offers, unless it is in the Government's interest.
1.5.2. Registering on ProjNet: To stay up-to-date with Q&As related to this solicitation, we encourage you to register on ProjNet. Here's how:
1.5.2.1. Go to the ProjNet webpage and click on the "BID" tab.
1.5.2.2. Select "Bidder Inquiry" and choose "USACE" as the agency.
1.5.2.3. Enter the bidder inquiry key (XABVK6-KJX9VX) and your email address.
1.5.2.4. After logging in, enter the required information to create your user ID.
1.5.2.5. Verify the information on the next screen, and you will be able to submit and view inquiries.
1.5.3. Tracking Your Inquiries: When you submit an inquiry, you will receive a system-generated email notification once it has been processed and answered. It is your responsibility to monitor your inquiries and responses.
2. Submittal of proposals:
2.1. When submitting proposals for this project, please follow these guidelines:
2.1.1. Essential Information Only: Limit your submission to the data necessary for evaluation, to minimize time and expenses.
2.1.2. Detailed Information: Include sufficient details to clearly describe your capability to successfully complete the project.
2.1.3. Minimum Requirements: The requirements stated in this RFP are minimums.
2.1.4. Sequence of Information: Information provided out of sequence may not be evaluated and may result in disqualification from award.
2.1.5. Accessing the RFP: The RFP is available online only at the SAM website (www.sam.gov).
2.2. Electronic Submission
2.2.1. Authorized Submission Method: Submit responses electronically to:
sterling.j.alphonse@usace.army.mil, kelsey.j.lahue@usace.army.mil and marcus.d.stringer@usace.army.mil.
2.2.2. Deadline: Submit responses by the time specified in Block 13 of Standard Form 1442.
2.2.3. Unauthorized Submission Methods: Hand-carried delivery, SPS/UPS/FEDEX delivery of hard copies and/or CD-ROMs, and facsimile submission are not authorized.
2.3. Proposal Structure
2.3.1. Table of Contents: Include a table of contents and clear divisions between each section.
2.3.2. Parallel Sections: Organize sections to parallel the submission requirements identified in this RFP.
2.4. File Naming Convention
2.4.1. Solicitation Number: Begin each filename with the solicitation number (25R0041).
2.4.2. Word "RESPONSE": Follow the solicitation number with the word "RESPONSE".
2.4.3. Firm Name: Include your firm's name.
2.4.4. Brief File Description: End with a brief file description.
2.4.5. Examples:
2.4.5.1. "25R0041 Proposal _ Firmname Volume I.pdf"
2.4.5.2. "25R0041 Proposal _ Firmname Volume II.pdf"
2.5. Volume I shall include the following information:
2.5.1. Volume I – Factor I – Technical Approach & Schedule
2.5.2. Volume I – Factor II – Past Performance
2.6. Volume II shall include the following information:
2.6.1. Volume II – Factor III – Price and Pro Forma Information
2.6.2. Volume II – Tab A – Standard Form 1442 and Price Schedule
2.6.3. Volume II – Tab B – Team Arrangements
2.6.4. Volume II – Tab C – Financial Information
2.6.5. Volume II – Tab D – SAM Registration/Representations and Certifications
3. Proposal Evaluation Process:
3.1. Source Selection Evaluation Board (SSEB): Source Selection Evaluation Board (SSEB): The proposal evaluation will be conducted by a board consisting of representatives from the Corps of Engineers, the User/Customer, and other required personnel. The evaluation process will be confidential, and the technical proposals will be reviewed and rated without knowledge of the price offered.
3.1.1. Confidentiality
3.1.1.1. The number and identities of offerors will not be revealed to anyone not involved in the evaluation and award process or to other offerors.
3.1.1.2. The technical evaluation and rating of proposals will be conducted in strict confidence.
3.2. The evaluation process essentially consists of four parts: proposal compliance review and responsibility determination, technical evaluation, price evaluation, and cost/technical trade-off analysis.
3.2.1. Proposal Compliance Review: This is an initial review to ensure that all required forms and certifications are complete and that both a technical and price proposal were received.
3.2.2. Technical Evaluation: The SSEB will evaluate and rate the proposals against the RFP requirements.
Some factors will be rated using an adjectival-based system. Past Performance will be rated based on recency/relevancy and confidence.
3.2.3. Price Evaluation: The Contracting Officer/SSA will evaluate price proposals independent of the technical evaluation.
3.2.4. Cost/Technical Trade-off Analysis: After all, above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.
4. Proposal Information and Related Evaluation Factors:
4.1. Proposals will be evaluated based on the following factors, listed in order of importance:
4.1.1. Volume I, Factor I Technical Approach and Schedule: This factor is the most important and will be evaluated first.
4.1.2. Volume I, Factor II Past Performance: This factor is the second most important and will be evaluated after Technical Approach and Schedule.
4.1.3. Volume II, Factor III Price and Pro Forma Information: This factor will be evaluated last and will include the following subfactors:
4.1.3.1. Tab A: Standard Form 1442 and Price Schedule: This subfactor is not rated and will be used for administrative purposes.
4.1.3.2. Tab B: Joint Venture Agreements (if necessary): This subfactor is not rated and will be used to verify joint venture agreements, if applicable.
4.1.3.3. Tab C: Bonding Requirement: This subfactor is not rated and will be used to verify bonding requirements
4.1.3.4. Tab D: SAM Registration/Representations and Certifications: This subfactor is not rated and will be used to verify SAM registration and representations and certifications.
4.2. IMPORTANT NOTES:
4.2.1. Relative Importance of Evaluation Factors: All evaluation factors other than cost or price, when combined, are significantly more important than cost or price.
4.2.2. Initial Offer: Offerors are encouraged to include their best technical and price terms in their initial offer.
4.2.3. Discussions: Do not assume that there will be an opportunity to participate in discussions or submit a revised offer. The Government may make an award of a conforming proposal without discussions if it is deemed to be in the best interest of the Government.
4.3. Ratings: Evaluators will apply the rating for the definition that most closely matches the evaluation.
Table 1
Past Performance Relevancy Rating Method Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Table 2
Performance Confidence Assessments Rating Method Rating Definition
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Table 3
Combined Technical /Risk Rating Color Rating
Adjectival Rating
Definition
Blue
Outstanding
Proposal demonstrates an exceptional approach and understanding of the requirements and contains multiple strengths and/or at least one significant strength, and risk of unsuccessful performance is low.
Purple Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength or significant strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable
Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable, and/or risk of performance is unacceptably high.
4.4. Definitions:
4.4.1. Deficiency: A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
4.4.2. Strength: An aspect of an offerors’ proposal that has merit or exceeds specified performance or capability requirements to the advantage of the Government during contract performance.
4.4.3. Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance. See
FAR 15.001.
4.4.4. Uncertainty: Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).
4.4.5. Clarification: Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).
4.4.6. Adverse Past Performance: Past performance information that supports a less than satisfactory rating from sources where the information is from other than formal rating systems such as “Contractor’s Performance Assessment Reporting System” (CPARS) or “Federal Awardee Performance and Integrity Information System” (FAPIIS).
5. Volume I – Factor I – Technical Approach & Schedule
5.1. Technical Approach Submission Requirements: The Offeror must submit a technical approach that demonstrates an understanding of the design, construction, and administrative responsibilities of the project in accordance with the solicitation requirements.
5.1.1. Formatting Requirements:
5.1.1.1. The submission should use at least 10-pitch font.
5.1.1.2. The submission is limited to 20 pages (A4 or letter size).
5.1.1.3. If the submission exceeds 20 pages, the Government will only review the first 20 pages submitted, in the order that they are submitted.
5.2. Technical Approach Narrative: The technical approach shall include a Technical Approach Narrative that addresses each of the following:
5.2.1. Manpower Required: The Offeror must describe the manpower required to design and construct the project, including the makeup of teams by trade.
5.2.2. Specialized Tools and Equipment: The Offeror must describe any specialized tools and equipment required to construct the project.
5.2.3. Safety Processes: The Offeror must describe their safety processes.
5.2.4. Quality Control Processes: The Offeror must describe their quality control processes.
5.2.5. Knowledge of Requirements and Constraints: The Offeror must demonstrate their knowledge of requirements and constraints applicable to work in the Host Nation and regionally near the project location.
5.2.6. Assurance of Quality Workmanship: The Offeror must explain how they will use proposed personnel and subcontractor resources to assure the delivery of quality workmanship in accordance with the statement of work.
5.2.7. Subcontracting Plan: The Offeror must clearly identify if they intend to use subcontractors or if they intend to self-perform through submission of a separate Subcontracting Plan.
5.2.7.1. The plan must be specific on which technical aspects the Offeror plans to self-perform as the prime contractor and which tasks the subcontractor(s) will perform.
5.2.8. Designer of Record: The Offeror must provide information about their understanding of the design process, and the role of the designers of record, integration with the construction firm, and the involvement of construction personnel during design.
5.2.9. Schedule Narrative: The schedule narrative must not exceed eight pages (A4 or letter size), using at a minimum a 10-pitch font. Submissions exceeding eight pages will not be read or evaluated beyond the first eight pages. The narrative should accomplish the following:
5.2.9.1. Define the primary assumptions used in the Offeror’s schedule.
5.2.9.2. Discuss skilled and unskilled labor requirements the Offeror anticipates for critical schedule elements.
5.2.9.3. Explain the management of design submittal submission, potential issues, and proactive resolutions in the event of design delays/deficiencies found during US Government review.
5.2.9.4. Discuss how the Offeror will manage subcontractors, where required, from a schedule perspective.
5.2.9.5. Discuss the warranty period.
5.2.10. Schedule. The schedule submission may be submitted MS Excel, MS Word, or Adobe pdf file format and should be specifically tailored to the project contemplated by this solicitation. If prepared in Primavera "xer", the Offeror may submit a Primavera file also, the schedule should include the activities listed below regardless of format:
5.2.10.1. Contract Award
5.2.10.2. BLG, Insurance Submission and other pre-construction approvals
5.2.10.3. Notice to Proceed (NTP)
5.2.10.4. Submission of each design submittal required in the SOW.
5.2.10.5. Design submittal review periods as specified in the SOW.
5.2.10.6. Preconstruction submittals
5.2.10.7. Site Mobilization
5.2.10.8. Construction activities across various construction trades
5.2.10.9. Initial and Final Inspections
5.2.10.10. Closeout documents
5.2.10.11. Construction completion
5.2.10.12. Warranty
5.2.10.13. Construction Duration: For evaluation purposes, assume a 450-calendar-day construction duration, with the award date of 30 September 2025 and NTP issuance on 31 October
5.2.10.14. Baseline Items and Options: The schedule should assume all baseline items and options will be awarded on that date.
5.3. Technical Approach Narrative: The technical approach may include a Technical Approach Narrative that addresses each of the following:
5.3.1. Entity Responsible for Construction Permits: The Offeror should clearly identify which entity (Prime Contractor or Subcontractor) will hold and be responsible for obtaining all required construction permits.
5.3.2. Value Added Tax (VAT) Reimbursements or Exemptions: The Offeror should provide details on how they will track and manage VAT reimbursements or exemptions in the Host Nation. The Offeror must provide documentation that they will be eligible for VAT Reimbursements or Exemption.
5.4. Evaluation Criteria: The Government will evaluate the Offeror's proposal based on the following criteria:
5.4.1. Technical Approach Narrative
5.4.1.1. The Offeror's understanding of the process, procedures, and requirements to design and construct the project in accordance with the solicitation requirements.
5.4.1.2. The Offeror's ability to successfully execute the solicited project through its technical approach narrative.
5.4.1.3. The Offeror's knowledge of requirements and constraints applicable to work in the Host
Nation and regionally near the project location.
5.4.1.4. The Offeror's plan for self-performance and subcontracting, including the identification of which entity will hold and be responsible for obtaining all required construction permits.
5.4.1.5. The Offeror's assurance of quality workmanship, including their plan to use proposed personnel and subcontractor resources to deliver quality workmanship in accordance with the SOW.
5.4.1.6. The Offeror's understanding of the design process, including the role of the designers of record, integration with the construction firm, and the involvement of construction personnel during design.
5.4.2. Knowledge of Requirements and Constraints: The Government will evaluate the Offeror’s capabilities and understanding of construction projects in the host nation, to include coordination with host nation authorities for permits. The Government will evaluate if the Offeror demonstrated the ability to communicate in English. The Government will provide additional consideration to offerors who identify that the Prime Contractor will maintain possession of the construction permit.
5.4.3. Value Added Tax (VAT) Reimbursements or Exemptions: The Government will evaluate the Offeror’s capabilities and understanding of the Host Nation's VAT laws, including eligibility for VAT exemptions or reimbursements. Greater weight will be given to offerors who explain what internal systems or processes they have in place to track VAT reimbursements or exemptions.
5.4.4. Schedule Narrative and Schedule: The Government will evaluate the Offeror’s apparent understanding of the interrelated nature of activities in the proposed schedule, the Offeror's overall apparent capability to schedule the complete project within the proposed contract duration, and the realism of the schedule. The Government may use independent judgment concerning typical construction durations, as well as the Offeror’s proposed schedule logic and constraints.
5.4.4.1. Identification of critical milestones and overall critical path, and any parallel activities.
5.4.4.2. Schedule constraints related to site access, material delivery, long lead items, and US
Government review periods for design submissions.
5.4.4.3. Thoroughness of activities during design, construction, and closeout phases.
5.4.4.4. Distinction between prime and subcontractor activities if applicable.
5.4.4.5. The Government will evaluate the role of the designer in maintaining design integrity throughout the process, including their key roles during construction.
5.4.4.6. The offerors understanding of the warranty period.
5.4.5. Deficiency: Offerors that do not submit all requisite items listed in the submission requirements will receive a deficiency. The Government will not consider proposals that are incomplete or do not meet the submission requirements.
5.4.6. For this factor, Offerors will be assigned a combined technical/risk rating (Table 3 – Combined Technical /Risk Rating) based on the evaluation of the Offeror’s proposal in accordance with the requirements of the solicitation.
6. Volume I – Factor II – Past Performance
6.1. Submission Requirements: Provide descriptions of up to five (5) projects substantially complete or completed by the prime contractor (or by a joint venture member or other team member with a signed commitment letter – see attachment 17) within the last five (5) years that are similar to this project in scope, size, and location.
6.1.1. For each substantially complete project submitted, proposals shall include:
6.1.1.1. A completed Past Performance Questionnaire (PPQ) or completed CPARS Rating
(Attachment 14)
6.1.2. For each substantially complete project submitted, proposals should include:
6.1.2.1. A Past Performance Information Sheet (Attachment 12)
6.1.2.2. A Past Performance Overview Sheet (Attachment 13)
6.1.3. Projects Not Substantially Complete: For the purpose of this solicitation, a project is considered substantially complete when the project is 90% or more complete, and the remaining work is minor and does not affect the overall project scope, size, or complexity. Projects that are not substantially complete will not be evaluated.
6.1.4. Scope: Projects considered similar in scope include:
6.1.4.1. Complete design, procurement, and construction of a school facility in a remote and rural region of Africa that has limited utilities from local municipalities. This includes but is not limited to the demolition, site preparation and improvement, procurement and construction of school buildings.
6.1.4.2. In addition, projects considered similar in scope should include some or all the following:
general reinforced concrete foundations, general concrete walkways, rainwater tank and rainwater catchment systems, general electrical work for building distribution system and lighting, and VIP latrine design and construction.
6.1.4.3. Projects involving construction of new school facilities executed in rural central African regions will be rated favorably.
6.1.4.4. Trades of work that are similar in scope include:
6.1.4.4.1. Construction of interior walls,
6.1.4.4.2. Suspended ceilings,
6.1.4.4.3. Concrete pads,
6.1.4.4.4. Analysis of structural components,
6.1.4.4.5. Installation of general rainwater plumbing system,
6.1.5. Size: Projects considered similar in magnitude include projects ranging in value Between $500,000 and $1,000,000.
6.1.5.1. Projects considered similar in size include projects that required construction of school facilities in the 200-400 square meter range.
6.1.6. Location: Projects that demonstrate past performance in rural areas of the following countries:
Gabon, Nigeria, Togo, Benin, and Ghana.
6.1.7. Self-Performance: Projects must demonstrate that the Offeror (or if applicable the joint venture member or other team member with a signed commitment letter) has self- performed at least 51% of the direct contract labor (including testing and layout personnel), exclusive of other general condition or field overhead personnel, material, equipment, or subcontractors.
6.1.8. Teaming Arrangement Requirements: If a teaming arrangement is proposed, the Offeror shall provide a signed commitment letter (attachment 17) from each team member, which includes:
6.1.8.1. A description of the team member's role and responsibilities.
6.1.8.2. A description of the team member's qualifications and experience.
6.1.8.3. A statement of the team member's commitment to the project NOTE: The Government will only consider projects submitted by the prime contractor or by team members/subcontractors with a signed commitment letter.
6.1.9. PPQ Instructions: The Offeror shall complete Blocks 1-4 of the provided PPQ and have the Contracting Activity and the Technical Representative responsible for the past/current contract complete the remainder of the PPQ
6.2. Evaluation Criteria:
6.2.1. Past Performance Evaluation: The evaluation will include a relevancy rating and a confidence assessment.
6.2.1.1. Relevancy Rating (Table 1 – Past Performance Relevancy Rating): The offeror's past performance will be evaluated based on its similarity in scope, size, and location to the current project, as well as their experience working with local municipalities and the United States Government.
6.2.1.2. Confidence Assessment (Table 2 – Past Performance Confidence Assessments): A confidence rating will be assigned based on the offeror's recent and relevant performance record, using the definitions provided in Table 2.
6.2.1.3. Self-Performance: The offeror's ability to self-perform at least 51% of the direct contract labor will be evaluated as part of their overall past performance.
6.2.1.4. Additional consideration will be given for projects that contain the following features (list is not in order of importance):
6.2.1.4.1. Projects that demonstrate working for the U.S. Army Corps of Engineers.
6.2.1.4.2. Projects that demonstrate past performance procuring and executing work in logistically challenging and contested areas in Africa. Procurement is defined as sourcing basic construction materials locally to the project site and not importing them from other countries abroad.
6.2.2. Offerors will receive one rating for Factor II – Past Performance, a confidence rating.
7. Volume II – Factor III – Price and Pro Forma Information
NOTE: The information submitted in this volume is not rated but checked for compliance. Failure to submit compliant documentation may result in your proposal being rejected for non-compliance.
7.1. Submission Requirements:
7.1.1. The offeror shall complete and submit Standard Form 1442 and Attachment 15 Price Schedule.
7.1.2. The party with authority to bind the Joint Venture (if applicable) shall sign the SF 1442 and any other required documentation.
7.1.3. If more than one contractor is listed in Block 14, or the offeror listed in Block 14 is a joint venture
(JV), then a signed JV agreement must be submitted with the proposal.
7.1.3.1. Each member of the JV must submit its own Unique Entity Identifier (formerly DUNS number) with the proposal.
7.1.4. The offeror shall be registered in the System for Award Management (SAM) as a legal entity separate from the individual joint venture members.
7.2. Evaluation Criteria: The Standard Form 1442 and the Price Schedule will not be rated. The forms will be reviewed to determine if required information is provided, amendments are acknowledged, and the Offer signed.
7.2.1. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in the Solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s).
7.2.2. Prices proposed will be analyzed to determine if the prices are unbalanced. If the price analysis indicates that an offer is unbalanced, the contracting officer shall consider the risks to the Government associated with the unbalanced pricing. An offer will be rejected if the lack of balance poses an unacceptable risk to the Government.
7.3. Tab A - Standard Form 1442 and Price Schedule
7.3.1. The offeror shall complete and submit Standard Form 1442 and Attachment 15 - Price Schedule.
7.3.2. The party with authority to bind the Joint Venture (if applicable) shall sign the SF 1442 and any other required documentation.
7.4. Tab B - Team Arrangements
7.4.1. As described in FAR Subpart 9.6, it is the Government’s policy to recognize the integrity and validity of contractor team arrangements.
7.4.2. For a teaming arrangement to be recognized for purposes of source selection evaluation and the application of non-price factors, there must be full disclosure of the teaming arrangement and company relationships in the team's proposal.
7.4.3. The proposal must include a narrative that explains the major or critical aspects of the work to be performed by each team member (to include identification of team members, a full delineation of roles and responsibilities of team members, and the duration of the agreement, etc.).
7.4.4. The proposal must also include an agreement that has been or will be executed prior to award between/among all team members.
7.4.5. The proposal and agreement must be consistent; substantive inconsistencies between the proposal and agreement may be construed against the Offeror.
7.4.6. The timely submission of the executed teaming agreement prior to award shall be a precondition to a finding of responsibility.
7.5. Tab C – Bonding Requirements: Offerors must include the following in their proposal:
7.5.1. Statement of Intent: clearly state which bonding option you intend to use if awarded the contract.
7.5.2. Provide one of the following with your proposal:
7.5.2.1. Bid Bond (if choosing the 100% Performance and Payment Bond option)
7.5.2.2. If choosing the Bank Letter of Guarantee (BLG) option: a Bank Letter of Assurance (BLA) for 10% of the proposed price
7.5.2.3. Proof of ability to obtain an Irrevocable Letter of Credit for 10% of the proposed price
7.5.2.4. Commitment letter for providing a certified check, bank draft, or money order for 10% of the proposed price
7.5.2.5. Proof of ownership of U.S. bonds or notes for 10% of the proposed price
7.5.3. Failure to provide a bid guarantee or letter of assurance as prescribed above will determine your proposal to be incomplete and it will not be evaluated.
7.5.4. The successful offeror must provide the actual bond or guarantee as stated in their proposal within 14 days of contract award.
NOTE: Use the Provided Templates: For the BLA option in 7.5.2.2., use the template provided in the solicitation without alterations.
7.6. Tab D – SAM Registration and Representations & Certifications
7.6.1. Offeror shall submit the following information:
7.6.1.1. A completed clause FAR 52.204-8(d)
7.6.1.2. A copy of their current “Entity Registration” in the System for Award Management (SAM) as recorded at www.sam.gov, showing the following sections: “core data/assertions”, and “POCs”.
7.6.1.3. A copy of their current “FAR & DFARS Report” that demonstrates all their completed representations and certifications as recorded at www.sam.gov.
7.6.1.4. The offeror shall submit the name, address, and Unique Entity Identifier for any A-E subcontractor identified in the proposal. NOTE: This information will be used for the purpose of completing the Pre-Award Survey and will not be rated
7.6.1.5. Offerors are cautioned to ensure that they are fully registered in SAM in advance of proposal submission throughout the proposal review period, and through contract completion and warranty.
7.6.1.6. Failure to maintain SAM registration may render your proposal ineligible for award.
7.7. SAM Registration: In order to do business with the US Government as a contractor, a company must be registered with the System for Award Management (SAM, www.sam.gov).
7.7.1. To register on SAM, a company must obtain a NCAGE code and a Unique Entity ID (UEI). You can apply for an NCAGE code and a Unique Entity ID (UEI) simultaneously, but both must be obtained in order to register on SAM. Specific instructions how to obtain a NCAGE code, and SAM Registration are as follows:
7.7.1.1. NCAGE Code: An NCAGE code is a five-character ID number used by the US Government to identify international companies. All non-US firms must obtain an NCAGE code. How does your company obtain an NCAGE Code? If you are a vendor located outside the United States, one can be obtained at no cost by visiting NCAGE Code Request Tool (https://eportal.nspa.nato.int/Codification/Support/en/Products/NCAGE/).
7.7.1.2. Unique Entity ID (UEI): Go to https://sam.gov/content/home and click on “Get Started” under “Register your Entity”.
** END OF SOLICITATION PROVISIONS **
Section 00 70 00 - Conditions of the Contract
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.203-16 Preventing Personal Conflicts of Interest JUN 2020 52.203-18 Prohibition on Contracting With Entities That Require Certain
Internal Confidentiality Agreements or Statements-- Representation
JAN 2017
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-2 Security Requirements MAR 2021 52.204-6 Unique Entity Identifier OCT 2016 52.204-7 System for Award Management NOV 2024 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-12 Unique Entity Identifier Maintenance OCT 2016 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
DEC 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.204-27 Prohibition on a ByteDance Covered Application JUN 2023 52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
OCT 2018
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.210-1 Market Research NOV 2021 52.211-13 Time Extensions SEP 2000 52.214-34 Submission Of Offers In The English Language APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.215-2 Audit and Records--Negotiation JUN 2020 52.215-19 Notification of Ownership Changes OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data -- Modifications
NOV 2021
52.217-3 Evaluation Exclusive Of Options APR 1984 52.217-4 Evaluation Of Options Exercised At The Time Of Contract
Award
JUN 1988
52.217-5 Evaluation Of Options JUL 1990 52.222-12 Contract Termination-Debarment MAY 2014 52.222-50 Combating Trafficking in Persons NOV 2021 52.225-9 Buy American--Construction Materials OCT 2022 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-3 Worker's Compensation Insurance (Defense Base Act) JUL 2014 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984 52.228-15 Performance and Payment Bonds--Construction JUN 2020 52.228-17 Individual Surety--Pledge of Assets (Bid Guarantee) FEB 2021 52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013 52.229-11 Tax on Certain Foreign Procurements--Notice and
Representation
JUN 2020
52.229-12 Tax on Certain Foreign Procurements FEB 2021 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-11 Extras APR 1984 52.232-13 Notice Of Progress Payments APR 1984 52.232-17 Interest MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-4 Physical Data APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984
52.236-17 Layout of Work APR 1984 52.236-19 Organization and Direction of the Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.243-4 Changes JUN 2007 52.243-5 Changes and Changed Conditions APR 1984 52.243-7 Notification Of Changes JAN 2017 52.244-2 Subcontracts JUN 2020 52.246-12 Inspection of Construction AUG 1996 52.246-23 Limitation Of Liability FEB 1997 52.247-21 Contractor Liability for Personal Injury and/or Property
Damage
APR 1984
52.248-3 Value Engineering-Construction OCT 2020 52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984 52.249-10 Alt I Default (Fixed-Price Construction) (Apr 1984) Alternate I APR 1984 52.249-14 Excusable Delays APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
JAN 2023
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
SEP 2022
252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors JAN 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
MAY 2024
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2023
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a…