This document is a Bank Letter of Guarantee template for a U.S. Army Corps of Engineers contract for the Ndava Primary School Construction project in Oyem, Gabon. The letter guarantees that the bank will provide financial assurance for the contractor's performance, with the guarantee covering up to 10% of the contract value. The bank commits to making immediate payment to the U.S. Treasury within five calendar days of a request from the Contracting Officer if the contractor fails to meet contract obligations.

The letter of guarantee will remain in effect until the project is fully accepted by the government, with the guarantee amount reducing to 5% after final acceptance. The associated federal contract opportunity (Solicitation Number W912GB25R0041) involves a design-build project to construct a new school facility, including two classroom buildings, rainwater collection systems, ventilated improved pit latrines, a perimeter fence, access road, parking lot, and necessary infrastructure. The project is a full and open procurement under NAICS code 236220, with a size standard of $45,000,000, and is being managed by the Department of the Army European Command.

View the file

Other files

File Type Posted
B.08 RFP Att 15- Price Schedule AMD1.docx DOCX document
B.08 Solicitation W912GB25R00410001 Ndava Primary School Construction.pdf PDF
B.08 SF30 W912GB25R00410001 Ndava Primary School Construction.pdf PDF
B.08 RFP Att 18 - Specs Binder (dated 05-24).pdf PDF
B.08 RFP Att 6 - Scope For Independent Structural Proofing.pdf PDF
B.08 RFP Att 17 - Commitment Letters.docx DOCX document
B.08 RFP Att 2 - Conceptual Site Plan.pdf PDF
B.08 RFP Att 5 - Dedication Plaque.pdf PDF
B.08 RFP Att 14 - Past Performance Questionnaire PPQ.pdf PDF
B.08 RFP Att 16 -Site Visit Attendee Worksheet.xlsx XLSX spreadsheet
B.08 RFP Att 15 - Price Schedule.docx DOCX document
B.08 RFP Att 9 - TAG13 The Design of Ventilated Improved Pit (VIP) Latrines.pdf PDF
B.08 Solicitation - W912GB25R0041(s)_27MAY25.pdf PDF
B.08 RFP Att 10 - Bank Letter of Assurance Sample.docx DOCX document
B.08 RFP Att 1 - Location Map.pdf PDF
B.08 RFP Att 3 - Conceptual Floor Plan, Section and Elevations.pdf PDF
B.08 RFP Att 12 - Past Performance Information Sheet_Rev 13 Feb 2023.docx DOCX document
B.08 RFP Att 13 - Past Performance Overview Sheet_Rev 19 Jan 2023.xlsx XLSX spreadsheet
B.08 RFP Att 7 - Gabon Standard Classroom Plan.pdf PDF
B.08 RFP Att 8 - Ventilated Improved Pit (VIP) Latrine.pdf PDF
B.08 RFP Att 4 - Structural Calculations Guideline.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BANK LETTER OF GUARANTEE

(BANK LETTERHEAD)

US Army Corps of Engineers Europe District Konrad Adenauer Ring 39, Box 7 ATTN: Contracting Officer 65187 Wiesbaden, Germany

LETTER OF GUARANTEE NUMBER: _______________ DATE: _________

I/We, the undersigned, acting as the duly authorized representative of the Bank, declare that the Bank hereby guarantees and is jointly and severally liable as the guarantor with FILL-IN (CONTRACTOR NAME) (herein after called the Contractor), to effect payment to the Contracting Office by check made payable to the Treasury of the United States, within five (5) calendar days after receipt of a simple request, by registered mail, from the Contracting Officer designated in the contract described below, or his successor, immediately and entirely without any need for the Contracting Officer to protest or take any legal action or obtain the prior consent of the Contractor, or for any other proof, action or decision by any other authority, up to the sum of 10% of CONTRACT VALUE, which represents the deposit required of the Contractor to guarantee fulfillment of its obligation for the satisfactory completion and timely performance of the work under Contract W912GB-25-X-00XX for CONTRACT dated (AWARD DATE) at Oyem, Gabon in strict compliance with the terms and conditions of said contract, entered into between the United States of America and the Contractor, plus legal interest to be calculated from the date of receipt of the Contracting Officer’s registered letter request until the date of payment. Registered letter request shall inform the Bank that the Contractor failed to comply with the terms and conditions of the contract, or did not fulfill his undertaking in whole or in part.

I/We agree and consent that said contract may be modified by change order or supplemental agreement, affecting the contract amount and/or time of performance without prior consent of the bank and without affecting the validity of this guarantee; provided, however, that the amount of this guarantee shall be adjusted as required under the provisions of contract clause 52.228-2, Additional Bond Security (Oct 1997).

This letter of guarantee will continue in effect until the work has been finally accepted by the Government, and will continue thereafter in an amount equal to Five Percent (5%), until all applicable guarantees, or extensions thereof under the contract, have expired.

NAME & ADDRESS OF THE BANK

Signed By: ______________________________________

(TYPE NAME UNDERNEATH SIGNATURE)

Title:_______________________________________
Endorsement By:_______________________________________
(TYPE NAME UNDERNEATH SIGNATURE)
Title:_______________________________________

NOTE: Certificate of Authority is attached evidencing authority of the signers to bind the bank in this document.