This document is an Engineering Guideline issued by the U.S. Army Corps of Engineers Europe District in July 2016, providing a standard format and detailed requirements for preparing structural calculations for construction projects. The guideline specifies a comprehensive nine-section structure for structural calculation submissions, including a cover sheet, table of contents, preliminary remarks, overview drawings, load assumptions, detailed calculations and verifications, bearing reaction tables, a final signed page, and attachments.

Key requirements include ensuring calculations are self-contained, complete, readable, reviewable, and reproducible. The document mandates specific details for each section, such as project information, materials used, location details, load assumptions, system drawings, structural capacity calculations, connection force tables, and verification of load-bearing capacity. The guideline aims to standardize structural calculation submittals within the USACE NAU Area of Responsibility, guaranteeing a consistent and executable quality level for structural design documentation.

View the file

Other files

File Type Posted
B.08 RFP_Att 2 Conceptual Site Plan AMD1.pdf PDF
B.08 W912GB25RA0070001 - SF 30.pdf PDF
A.02 SOW_Nampula Hospital, Mozambique (dated 22 April 2025).pdf PDF
B.08 W912GB25RA007 Nampula Surgical Suite Renovation, MOZ(s)30MAY25.pdf PDF
B.08 RFP_Att 10_Bank Letter of Assurance (BLA).docx DOCX document
B.08 RFP_Att 11_Bank Letter of Guarantee (BLG).docx DOCX document
B.08 RFP_Att 9_Period of Performance Clause.docx DOCX document
B.08 RFP_Att 1 Location Map.pdf PDF
B.08 RFP_Att 13_Past Performance Overview Sheet_Rev 19 Jan 2023.xlsx XLSX spreadsheet
B.08 RFP_Att 14_Past Performance Questionnaire PPQ.docx DOCX document
B.08 RFP_Att 6_Scope For Independent Structural Proofing.pdf PDF
B.08 RFP_Att 12_Past Performance Information Sheet_Rev 13 Feb 2023.docx DOCX document
B.08 RFP_Att 16_Instructions and Evaluation Criteria_IAF-25-0032 Nampula, MOZ v2.pdf PDF
B.08 RFP_Att 2 Conceptual Site Plan.pdf PDF
B.08 RFP_Att 3_Floor Plans.pdf PDF
B.08 RFP_Att 8_Price Schedule.docx DOCX document
B.08 RFP_Att 7_Specs Binder_Nampula Hospital, Mozambique (dated May 2024).pdf PDF
B.08 RFP_Att 5_Dedication Plaque.pdf PDF
B.08 RFP_01 22 00 Price and Payment Procedures.docx DOCX document
B.08 RFP_Att 15_Commitment Letters.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

U.S. ARMY CORPS OF ENGINEERS

EUROPE DISTRICT

CMR 410, BOX 1

APO AE 09096-0001

CENAU-EC-E July 2016

ENGINEERING GUIDELINE 01/2016

SUBJECT: PREPARATION OF STRUCTURAL CALCULATIONS

I. BACKGROUND

The intent of the Guideline is to provide a standard format to be used for all structural calculations prepared for construction projects within the USACE NAU Area of Responsibility.

The application of this guideline for all Structural Calculation Submittals will guarantee a reviewable and executable structural submittal at a standard quality level.

II. ENGLISH VERSION

A. For all structural calculations, the following requirements apply:

Each calculation must be self-contained and complete.

It must enable further use by third-parties.

It must be clearly and fully structured.

It must be readable and reviewable.

It must be able to be copied and scanned.

Stress and deflection of the loadbearing system is to be verified in a complete, clearly presented and reviewable way for all construction components and connections.

It must contain all information required for the connection design.

Print-outs of digitally supported calculations must be complete, comprehensible and reproducible. They shall clearly define input data such as the magnitude and location of all loads, member sizes, support locations and fixity, and the units of measure.

The essential results of the calculations shall be highlighted (e.g. the internal forces used for follow on calculations)

B. Structural calculations are to be structured as follows:

1. Cover sheet

2. Table of contents

3. Preliminary remarks

4. Overview drawings, position plans,

5. Load assumptions/approaches

6. Calculations and verification, construction sketches

7. Bearing reaction (connection force table)

8. Signed final sheet

9. Attachments

CENAU-EC-E ENGINEERING GUIDELINE 01/2016

C. The following paragraphs provide more detailed descriptions on the outline of the subsequent items:

1. Cover sheet

Project name

Project number

Ordering party / responsible construction agent

Designer

Date

2. Table of contents

3. Preliminary remarks

Short description of the building/structure (dimensions, use, structural systems for the transfer of vertical and horizontal loads, special characteristics of the supporting structure), deflection limits, positioning of expansion joints etc.

Information on the location (e.g. wind load zones, snow load zones, elevation above MSL, special geographic location (e.g. on a mountain top), seismic zone,…

Materials used

Information on subgrade conditions

Standoff distances and applicable explosive weight for blast pressures and impulse loads

Codes and literature used

Computer software used, under indication of the version number and the name of the company

Listing of the drawings that belong to the structural assessment

4. Overview drawings, position plans Drawings that enable the review of the feasibility of the structure and the bracing elements, the location of the designed element positions in the overall supporting structure as well as all structural drawings/sketches:

Well viewable depiction of the structural stability systems

Axis and row denominations as well as height marks (height above datum)

Global coordinate system

System dimensions

Position numbers

Joint layout

5. Load assumptions/approaches

Information on load assumptions/approaches such as self-weight, snow loads, wind loads, seismic loads, live loads etc.

CENAU-EC-E ENGINEERING GUIDELINE 01/2016

6. Calculations, verification and structural sketches

Calculations for all internal forces and deflections as well as the verification of load-bearing capacity, usability, fatigue, position stability etc. The layout shall look as follows for each item:

Indication of the position number and name of the supporting structure components (e.g. eaves purlin, gable wall strut etc.)

System drawing with dimensioning, load-bearing situation and information on bracing quality

List of loads and load combinations

Calculations of structural capacity, if applicable insert computerized/digital print-outs

Assessment of structural capacities

Verifications

Information on cambering

Structural sketches on all verified details

Verification of all connections to include the structural sketches or reference to connection force tables

7. Bearing reaction (connection force tables), delegated design components

If the transfer of loads is interrupted at some point of the design (e.g. designer calculates the structural system and provides loads to another to design the foundations), then the forces to be transferred must be presented in such a way that third parties can conduct corresponding design or review/verification of these loads at all times. These loads shall be presented in foundation load tables and connection force tables for all connections that are not a part of the detailed structural design. Forces for f = 1.0 from each load condition are to be indicated with reference to the global coordinate system.

For delegated design components the design shall provide applicable load and deflection criteria.

8. Final page

Designer’s name plus stamp and signature.

9. Attachment e.g. computerized/digital print-outs

Points of Contact

CENAU POC for this Engineering Guideline 01/2016 is:

Achim Knacksterdt, Chief, Technical Engineering Section

JAMES NOBLE

CHIEF, ENGINEERING BRANCH

CENAU-EC-E