B.08 RFP_Att 13_Past Performance Overview Sheet_Rev 19 Jan 2023.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Nampula Surgical Suite Renovation, Mozambique
- Solicitation number
- W912GB25RA007
- Issued by
-
Department of the Army European Command
About this file
The document is a Past Performance Overview Sheet Excel template designed to capture details of previous construction projects. The sample entry demonstrates a project at Aviano Air Base, Italy, involving renovation of a multi-story building and construction of a new parking structure. The project was valued at $750,000, completed between December 13, 2021, and December 12, 2022, with 51% of work self-performed.
The template is structured to track key project information including project type (design-build, design-bid-build), construction categories (new construction, major renovations, vertical construction, road repair), and contractor roles (prime, subcontractor, joint venture). The sample entry highlights experience with U.S. government work, specifically Department of Defense and U.S. Army Corps of Engineers projects, with geographic emphasis on Eastern European and NATO countries. This template appears to be a tool for contractors to document past performance when responding to federal solicitations, such as the related Nampula Surgical Suite Renovation project in Mozambique.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Project Name Performed by: Total Amount Project Start Date Project Completion Date Percentage of work that was self-performed Design-Build Construction Project Design-Bid-Build Construction Project Project located in Estonia, Latvia, Lithuania, Poland Demonstrate working for the United States Government (i.e., Department of Defense, U.S. Army Corps of Engineers). New Construction Major Renovations of Existing Buildings Vertical Construction Road and Pavement Repair Building Insulation
| Prime | Subcontractor | Joint Venture | Key Subcontractor | ||||||||||||||
| SAMPLE Renovate a multi-story building and build new parking structure, Aviano Air Base, Italy | x | $ 750,000 | 12/13/21 | 12/12/22 | 51% | x | x | x | x | x | x | x | x | x |
File details come from the government source that posted it. Updated .