B.08 G1J028MayportJaxHbrMDFY24TOSpecs_RTA.pdf

PDF 8 MB Posted

Attached to
MAINTENANCE DREDGING U. S. NAVAL STATION MAYPORT, 50-FOOT PROJECT & JACKSONVILLE HARBOR, 47-FOOT PROJECT DUVAL COUNTY, FLORIDA
Solicitation number
GROUP1-18-R-J028
Issued by

About this file

This document is a request for proposals for maintenance dredging services at the U.S. Naval Station Mayport and Jacksonville Harbor in Duval County, Florida. The solicitation is open only to thirteen incumbent contractors awarded contracts under solicitation number W912EP18R0029. Proposals are due by November 17, 2023 and shall be submitted electronically. The work includes dredging, disposal, and environmental monitoring services with an estimated value between $10-30 million. The low price technically acceptable source selection method will be used, evaluating availability of dredging equipment, past performance, and price. The period of performance is 60-250 calendar days with $2,900 in liquidated damages per day for delays. The document provides pricing tables, wage determinations, drawings, and instructions for technical inquiries.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUP1-18-R-J028

Jacksonville District

Maintenance Dredging, U.S. Naval Station Mayport, 50-Foot Project & Jacksonville Harbor, 47-Foot Project

Duval County, Florida

Construction Solicitation and Specifications Task Order

17 OCTOBER 2023

Maintenance Dredging, U.S. Naval Station Mayport, GROUP1-18-R-J028 50-Foot Project & Jacksonville Harbor, 47-Foot Project

DESIGN AUTHENTICATION

This project was designed by the Jacksonville District, U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.

VIKTORIA M. BOGINA, P.E.

CHIEF, NAVIGATION SECTION

WATERWAYS BRANCH, ENGINEERING DIVISION

DENNIS J. ZEVENEY, P.E.

CHIEF, GEOSYSTEMS BRANCH

ENGINEERING DIVISION

WILLIAM L. REILLY, P.E.

CHIEF, WATERWAYS BRANCH

ENGINEERING DIVISION

LAUREEN A. BOROCHANER, P.E.

CHIEF, ENGINEERING DIVISION

BOGINA.VIKTORIA.M.136

6852472

Digitally signed by

BOGINA.VIKTORIA.M.1366852472

Date: 2023.09.08 15:21:18 -04'00'

BOGINA.VIKTORIA.M.

1366852472

Digitally signed by

BOGINA.VIKTORIA.M.1366852472

Date: 2023.09.08 15:23:59 -04'00'

ZEVENEY.DENNIS.J.1

249349085

Digitally signed by

ZEVENEY.DENNIS.J.1249349085

Date: 2023.09.13 08:33:33 -04'00'

MARIN.AMANDA.LAV

IGNE.1005787277

Digitally signed by

MARIN.AMANDA.LAVIGNE.1005787277

Date: 2023.09.13 10:40:13 -04'00'

GROUP1-18-R-J028 SF1442A-1

ADDENDUM TO THE STANDARD FORM 1442

MAINTENANCE DREDGING

U.S. NAVAL STATION MAYPORT, 50-FOOT PROJECT

& JACKSONVILLE HARBOR, 47-FOOT PROJECT

DUVAL COUNTY, FLORIDA

NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE

ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT

UNDER SOLICITATION NUMBER W912EP18R0029, GROUP 1 -

UNRESTRICTED:

Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025);

Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation (W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); Manson Construction Co. (W912EP19D0030); Marinex Construction, Inc. (W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc. (W912EP19D0033);

Southern Dredging Co., Inc. (W912EP19D0034); The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging (W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037).

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY

OTHER THAN THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE

GROUP 1 - UNRESTRICTED DREDGING MATOC POOL.

EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA) evaluation method. To be considered technically acceptable, an offeror’s proposal must be rated “Acceptable under all non-price factors. The factors for evaluation will be as follows:

FACTOR 1 - Availability of technically acceptable dredge(s).

FACTOR 2 - Past performance.

FACTOR 3 – Price.

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

FACTOR 1 - Availability of technically acceptable dredge(s).

The contractor shall provide a letter on company letterhead identifying the

GROUP1-18-R-J028 SF1442A-2

dredge(s) the contractor proposes to do the work and the current location of dredge(s).

Evaluation Method:

The Government will evaluate all identified dredge(s) submitted to determine whether the identified dredge(s) have been found technically acceptable by the Contracting Officer prior to the proposal due date. The Government will also determine whether the dredge(s) are available to meet the required period of performance as stated in the Notice of Intent.

To be determined Acceptable for Factor 1, the identified dredge(s) must have been found technically acceptable prior to the proposal due date and available to meet the required period of performance.

FACTOR 2 - Past performance.

SUBMISSION REQUIREMENT. Using the Form at Attachment 1- NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE FOR CIVIL CONSTRUCTION PROJECT provide three (3) past performance examples of recent and relevant maintenance dredging projects for the type of dredge submitted under Factor 1 – Availability of technically acceptable dredge(s). The past performance examples must be within the last six (6) years and must involve maintenance dredging projects. The past performance must demonstrate the offerors’ and its team members' (i.e. key personnel and/or major subcontractors) experience in performance of work similar to that described in the solicitation. The NAVFAC/USACE Past Performance Questionnaire (PPQ) should be completed and signed by an Owner of the Project (Client) point of contact or “POC”. All pages of each PPQ must be initialed and dated on the bottom right-hand corner by the POC. However, if a Contractor Performance Assessment Reporting System (CPARS) record is available for any of the projects submitted, the CPARS record may be submitted in lieu of the completed Past Performance Questionnaire or an official Performance Evaluation from a non-Federal agency.

The Owner of the Project (Client) or “POC” (Point of Contact) is defined as the entity that took ownership of the project after construction was complete. If the Offeror is unable to obtain a completed PPQ from the Owner of the Project (Client), before the proposal receipt date, the Offeror shall complete and submit with the proposal the first page of the Past Performance Questionnaire – Attachment 1 (Blocks 1-8) that contains contract and client information for the submitted project. NOTE: It is the Offeror’s responsibility to ensure that the client’s point of contact information is current and correct. The client point of contact reflected in (Blocks 1-8) should also be familiar with the past performance they are being asked to verify and informed that they will be contacted by the Government to verify past performance.

Evaluation Method:

The Government will evaluate the offerors’ record of past performance to ascertain the probability of successfully performing the required efforts for the project to be procured.

GROUP1-18-R-J028 SF1442A-3

There are two aspects to the past performance evaluation.

The first aspect of the past performance evaluation is the recency of the past performance. “Recent” means performance occurring within the last six (6) years for the period beginning six years prior to the solicitation release date. Based on this criteria, an offerors’ past performance will be determined either “recent” or “not recent.”

Once a project is determined to be recent, the second aspect of the past performance evaluation is the relevance of the offerors’ present/past performance information. For this acquisition, relevant past performance is defined as performance on maintenance dredging projects that are similar in size, project scope, cost magnitude, and complexity of work performed utilizing the dredge submitted in Factor 1. Past Performance includes current/on-going (present) dredging performance complete to 70% percent or greater.

After a project is considered recent and relevant, the quality of the past performance evaluation will be rated either “Acceptable” or “Unacceptable”. When determining the rating of “Acceptable” or “Unacceptable” for past performance, the components of the offerors Quality, Schedule, Management, Regulatory Compliance, and Safety/Security will be iewed within the PPQ and/or in CPARS evaluations. In order to receive an “Acceptable” rating, the past performance components (Quality, Schedule, Management, Regulatory Compliance and Safety/Security) must have received a rating of no less than “Satisfactory” in those areas within the PPQ or CPARS assessment that was deemed relevant and recent.

Table 1 – Overall Rating for Factor 2 – Past Performance is defined below: Past Performance Acceptable/Unacceptable Rating Method

NOTE: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/ unacceptability, a neutral rating shall be considered “acceptable.”

FACTOR 3 – Price.

The Offeror’s submission for this factor shall be fully completed. Offeror completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the RFP.

Rating Description Acceptable Based on offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Unacceptable Based on offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

GROUP1-18-R-J028 SF1442A-4

Offerors are required to submit the following:

(1) Completed Bid Schedule (see Section 00010A).

(2) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Attachment 8, Paragraph 2.4.3, of the MATOC.

(3) Completed “Addendum to the Standard Form 1442 with the latest revision”.

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS

TASK ORDER:

Block 7. ISSUED BY:

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

Block 9 -- For additional information contact:

A. NAME: Timothy Humphrey

EMAIL ADDRESS: Timothy.G.Humphrey@usace.army.mil

B. TELEPHONE NO.: 904-232-1072

Block 10 – THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK

DESCRIBED IN THESE DOCUMENTS:

DESCRIPTON OF WORK: Refer to Section 01 11 00 for complete description.

MAGNITUDE OF CONSTRUCTION: Between $10,000,000 and $30,000,000.

mailto:Timothy.G.Humphrey@usace.army.mil

GROUP1-18-R-J028 SF1442A-5

THIS SOLICITATION IS FOR GROUP 1 - UNRESTRICTED

YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM

THIS NOTICE OF INTENT. THE SAM WEBSITE IS LOCATED AT WWW.SAM.GOV.

THE NAICS CODE FOR THIS NOTICE OF INTENT IS 237990 AND THE SMALL

BUSINESS SIZE STANDARD IS $27.5 MILLION.

Block 11 -- The Contractor shall begin performance within 60 calendar days and complete it within 250 calendar days after receiving notice to proceed.

This performance period is mandatory. (See FAR Clause 52.210.11 in Section 00700).

Block 12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED

PERFORMANCE AND PAYMENT BONDS: YES

Block 12B. PAYMENT BONDS DUE WITHIN 10 CALENDAR DAYS AFTER

AWARD.

Block 13 ADDITIONAL SOLICITATION REQUIREMENTS:

A. Offers to perform the required work are due electronically at the following email addresses by 1:00 PM EDT on 17 November 2023: Timothy.G.Humphrey@usace.army.mil, and carbon copy (cc) Manuela.d.voicu@usace.army.mil when emailing your offer.

B. An offer guarantee is required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the Notice Intent in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, 16, 17, 19, and 20A-20D below:

Block 14. NAME AND ADDRESS OF OFFEROR (including Zip Code)

DUNS: CAGE:

http://www.sam.gov/

GROUP1-18-R-J028 SF1442A-6

Block 15. TELEPHONE NO. (Include area code):

Block 16. REMITTANCE ADDRESS: (Include only if different than Item 14)

Block 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this Notice of Intent, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D).

Block 18. The offeror agrees to furnish any required performance and payment bonds.

Block 19. ACKNOWLEDGMENT OF REVISIONS (The offeror acknowledges receipt of revisions to the notice of intent -- give number and date of each)

REVISION

NO.

DATE

Block 20A. NAME AND

TITLE OF PERSON

AUTHORIZED TO SIGN

OFFER (Type or print to include email address)

Block 20B. EMAIL

ADDRESS

Block 20C. SIGNATURE Block 20D.

OFFER DATE

Block 26 --This Task Order will be administered by:

North Florida Area Office

Block 27 -- Payment will be made by:

USACE Finance Center 5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

MAINTENANCE DREDGING

U.S. NAVAL STATION MAYPORT, 50-FOOT PROJECT

& JACKSONVILLE HARBOR, 47-FOOT PROJECT

DUVAL COUNTY, FLORIDA

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

U.S. NAVAL STATION MAYPORT

0001 MOBILIZATION AND DEMOBILIZATION JOB $______________

0002 EXCAVATION, UNCLASSIFIED

BAR CUT-3 STA. 0+00 TO MAYPORT

ENTRANCE CHANNEL STA. 15+00

(ESTIMATED QUANTITY, SEE NOTE 2) 400,000 CUBIC YARD $____________ $______________

0003 EXCAVATION, UNCLASSIFIED

MAYPORT ENTRANCE CHANNEL

STA. 15+00 TO STA. 63+41.32

(ESTIMATED QUANTITY, SEE NOTE 2) 220,000 CUBIC YARD $____________ $______________

0004 EXCAVATION, UNCLASSIFIED

TURNING BASIN

STA. 0+00 TO STA. 27+15

(ESTIMATED QUANTITY, SEE NOTE 2) 475,000 CUBIC YARD $____________ $______________

0005 EXCAVATION, UNCLASSIFIED

DESTROYER SLIP

STA. 0+00 TO STA. 15+57.37

(ESTIMATED QUANTITY, SEE NOTE 2) 25,000 CUBIC YARD $____________ $______________

0006 EXCAVATION, UNCLASSIFIED

SMALL BOAT BASIN

(ESTIMATED QUANTITY, SEE NOTE 2) 9,000 CUBIC YARD $____________ $______________

0007 TURBIDITY MONITORING JOB $______________

0008 ENDANGERED SPECIES OBSERVER

(HOPPER DREDGE ONLY) JOB $______________

0009 MARINE ANIMAL OBSERVER

(MECHANICAL DREDGING ONLY) JOB $______________

0010 MOBIIZATION AND DEMOBILIZATION FOR

SEA TURTLE/STURGEON TRAWL SWEEPING

(HOPPER DREDGE ONLY, SEE NOTE 5) JOB $______________

0011 SEA TURTLE/STURGEON TRAWL SWEEPING

(HOPPER DREDGE ONLY, SEE NOTE 5) 1 DAY $____________ $______________

0012 STANDBY TIME (ESTIMATED QUANTITY,

SEE NOTE 4) 24 HOUR $____________ $______________

0013 PARTNERING REGROUP 1 EACH $____________ $______________

SUBTOTAL (LINE ITEMS 0001 THROUGH 0013) $______________

JACKSONVILLE HARBOR

0014 EXCAVATION, UNCLASSIFIED

BAR CUT-3 STA. 198+00 TO CUT-17 STA. 0+00

ODMDS DISPOSAL

(ESTIMATED QUANTITY, SEE NOTE 2) 275,000 CUBIC YARD $____________ $______________

0015 EXCAVATION, UNCLASSIFIED

BAR CUT-3 STA. 198+00 TO CUT-17 STA. 0+00

BEACH DISPOSAL

(ESTIMATED QUANTITY, SEE NOTE 2) 325,000 CUBIC YARD $____________ $______________

GROUP1-18-R-J028 00010A-1

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

MAINTENANCE DREDGING

U.S. NAVAL STATION MAYPORT, 50-FOOT PROJECT

& JACKSONVILLE HARBOR, 47-FOOT PROJECT

DUVAL COUNTY, FLORIDA

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0016 SCREENING (ESTIMATED QUANTITY) 325,000 CUBIC YARD $____________ $______________

0017 TURBIDITY MONITORING JOB $______________

0018 ENDANGERED SPECIES OBSERVER

(HOPPER DREDGE ONLY) JOB $______________

0019 MARINE ANIMAL OBSERVER

(MECHANICAL DREDGING ONLY) JOB $______________

0020 BEACH TILLING (ESTIMATED QUANTITY) 10 ACRE $____________ $______________

0021 CONSTRUCTION/VIBRATION CONTROLS AND

MONITORING AT MAYPORT BEACH JOB $______________

0022 REMEDIATION OF NONCOMPLIANT MATERIAL

(ESTIMATED QUANTITY) 1 ACRE $____________ $______________

0023 TRANSPORTATION AND DISPOSAL

OF UNACCEPTABLE MATERIAL

(ESTIMATED QUANTITY) 50 CUBIC YARD $____________ $______________

0024 ENVIRONMENTAL SPECIES MONITORING JOB $______________

0025 POST DISPOSAL ESCARPMENT MONITORING JOB $______________

0026 POST DISPOSAL ESCARPMENT REMOVAL 1 VISIT $____________ $______________

0027 STANDBY TIME (ESTIMATED QUANTITY,

SEE NOTE 4) 24 HOUR $____________ $______________

SUBTOTAL (LINE ITEMS 0014 THROUGH 0027) $______________

TOTAL BID (LINE ITEMS 0001 THROUGH 0027) $______________

NOTES: (1) OFFER MUST PRICE ALL LINE ITEMS. SEE SECTION 00100 "INSTRUCTIONS TO OFFERORS"

(2) QUANTITY INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR

BETWEEN THE DATES OF THE SURVEYS SHOWN ON THE DRAWINGS AND ACTUAL DREDGING.

(3) BIRD MONTORING IS REQUIRED WHEN DIRECTED BY THE CONTRACTING OFFICER. SEE SECTION 01 57 20

ENVIRONMENTAL PROTECTION.

(4) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION ABOVE AND BEYOND

THE CONTRACT REQUIREMENTS AT THE DIRECTION OF THE CONTRACTING OFFICER.

SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT.

(5) SEA TURTLE TRAWL SWEEPING IS REQIRED FOR HOPPER DREDGE ONLY WHEN DIRECTED BY THE CONTRACTING OFFER. SEE SPECIFICATION 01 57 20 ENVIRONMENTAL PROTECTION, SUBPARAGRAPH

"SUSPENSION OF DREDGING (HOPPER DREDGE ONLY)".

GROUP1-18-R-J028 00010A-2

SECTION 00010A, Attachment A

INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS

Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) November 6, 2023, (EST) Eastern Standard Time. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.

All timely questions and approved answers will be made available through ProjNet.

The Solicitation Number is: GROUP1-18-R-J028

The Bidder Inquiry Key is: IJCAIP-5XY5QB

Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:

1. Identify the Agency. This should be marked as USACE.

2. Email. Enter the email address you would like to use for communication.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret

Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. Identify the Agency. This should be marked as USACE.

3. Email. Enter the email address you used to register previously in ProjNet.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

THE FOLLOWING PAGES CONTAIN ADDENDUMS

TO SPECIFIC SECTIONS OF THE ORIGINAL SOLICITATION

NUMBER W12EP18R0029

THESE ADDENDUMS ARE ONLY APPLICABLE TO

THIS SPECIFIC TASK ORDER

REQUEST FOR PROPOSAL NUMBER: GROUP1-18-R-J028

TASK ORDER PROJECT TITLE:

MAINTENANCE DREDGING

U.S. NAVAL STATION MAYPORT, 50-FOOT PROJECT

& JACKSONVILLE HARBOR, 47-FOOT PROJECT

DUVAL COUNTY, FLORIDA

NOTICE TO OFFERORS: The information on the following pages is provided for the various clauses and/or paragraphs which require information to be filled in (when applicable) on each Request for Proposal for Task Orders issued under the awarded contracts. All applicable clauses, terms and conditions contained in the original solicitation and subsequently awarded contracts become part of each Task Order.

GROUP1-18-R-J028 Clause Addendum-1

GROUP1-18-R-J028 00100-A1

ADDENDUM TO SECTION 00100, INSTRUCTIONS TO OFFERORS

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00100

ARE HEREBY PROVIDED:

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO

ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION

(FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are asfollows:

Goals for minority participation for each

Goals for female participation for each

Duval 21.8% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be

GROUP1-18-R-J028 00100-A2

measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of thesubcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Duval County, Florida.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB

1995) (CESAJ ADAPTATION)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work willbe performed.

(b) An organized site visit has been scheduled 1 November 2023 @ 10:00 AM (EDT) Eastern Daylight Time.

(c) Participants will meet at -- (Location will be provided by the contract administration office via telephone. See (d) below.)

(d) To attend the site visit, Participants must email John Rossi at John.R.Rossi@usace.army.mil or call at 904-570-4127, if unavailable email Jennifer Tyler at Jennifer.L.Tyler@usace.army.mil or call 561-379-2854 to make arrangements.

(e) Core borings are available. (If available, follow the instructions in the Physical Data paragraph in Section 00 31 32 of individual request for proposals issued for task orders under this contract to make arrangements to inspect the borings.

Failure to follow the instructions may result in a delay ranging in duration from one hour to 4 days.)

GROUP1-18-R-J028 00100-A3

(f) After the site visit, a memorandum summarizing the visit may be posted to the appropriate website under the solicitation number. This posting will be strictly for informational purposes only. The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Addendum to the Standard Form 1442.

(End of provision)

ATTACHMENT 1

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE FOR CIVIL CONSTRUCTION

PROJECT

Solicitation GROUP1-18-R-J028

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION

1. Contractor Information Firm Name:

Address:

Phone Number:

Email

CAGE Code:

UEI Number:

2. Work Performed as:

Prime Contractor/ Sub Contractor/ Joint Venture/Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy): Actual Completion Date (mm/dd/yy): Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable): Explain Differences:

4. Project Description:

Complexity of Work: High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

5. Client Information Name:

Title:

Phone Number:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

GROUP1-18-R-J028 00100A-4

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/ LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N

5. COST/FINANCIAL MANAGEMENT

GROUP1-18-R-J028 00100A-5

a) Ability to meet the terms and conditions within the contractually agreed price(s)? E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back- up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remark s section. Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N

END OF QUESTIONNAIRE

GROUP1-18-R-J028 00100A-6

GROUP1-18-R-J028 00700-A1

ADDENDUM TO SECTION 00700, CONTRACT CLAUSES

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00700

ARE HEREBY PROVIDED:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

The Contractor shall be required to (a) commence work under this contract within 60 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 250 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises. Period of performance includes the following:

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,900.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

00800A-1 GROUP1-18-R-J028

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general—

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

(End of clause)

Title File Drawing No.

Maintenance Dredging, U.S. Naval Station GROUP1-18-R-J028 Mayport, 50-Foot Project & Jacksonville Harbor, 47-Foot Project Duval County, Florida

G-01

00800A-1 GROUP1-18-R-J028

ADDENDUM TO SECTION 00800, SPECIAL REQUIREMENTS

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00800 ARE

HEREBY PROVIDED:

LIMITATIONS ON SUBSTITUTIONS FOR CERTAIN POSITIONS AND/OR

SUBCONTRACTORS

The award decision for this contract was based, in part, on an evaluation of the personnel and/or subcontractors the Contractor included in its proposal for the positions and/or items of subcontracted work identified at the end of this paragraph. The Contractor agrees these personnel and/or subcontractors will be employed as described in its proposal and no substitutes will be employed without prior written approval of the Contracting Officer or Administrative Contracting Officer. The Contractor further agrees that any proposed substitutes shall meet or exceed the qualifications of the original personnel and/or subcontractors. If the Contractor’s proposal did not name a subcontractor for an identified item of work, the Contractor will not be allowed to subcontract that item of work without prior approval of the Contracting Officer or Administrative Contracting Officer. The limitations described herein shall apply to the following: plant and equipment.

(End of paragraph number)

GROUP1-18-R-J028 00800AA-i

SECTION 00800A

WAGE DETERMINATIONS & OTHER ATTACHMENTS

LIST OF CONSTRUCTION CONTRACT ATTACHMENTS

NO. TITLE DATE NO. OF PAGES

1 NOTE 1

2 General Decision Number FL20230002 01/06/2023 5

3 General Decision Number FL20230111 09/22/2023 7

GROUP1-18-R-J028 00800AA-ii

NOTE NOTE NOTE

THIS PROJECT INCORPORATES STATEWIDE HEAVY DREDGING AND HEAVY

CONSTURCTION WAGE DECISIONS FOR DUVAL, COUNTY, FL

EXECUTIVE ORDER (EO) 14026 ESTABLISHES AN HOURLY MINIMUM

WAGE OF $16.20 FOR 2023 THAT APPLIES TO ALL CONTRACTS SUBJECT

TO THE DAVIS-BACON ACT AND ENTERED INTO AFTER 30 JANUARY 2023

IF YOU HAVE ANY QUESTIONS CONCERNING THE APPLICATION OF THE WAGE

DECISIONS FURNISHED FOR THIS PROJECT, PLEASE CONTACT:

FRAN RUSSELL, OFFICE OF COUNSEL, JACKSONVILLE DISTRICT,

U.S. ARMY CORPS OF ENGINEERS AT fran.g.russell@usace.army.mil mailto:fran.g.russell@usace.army.mil

�����$�0���� 1��2�,� �����*�#�������������������!�%����%�!�3� ��2�� �#��45�

������$�������!��6������� ���!�����������2������� �������������%�$��������6������������./� ���#��)������7���� ���#��)��������89&'������� ����2����2����./�

��!��2��1�������$ #���������2���������(� ��2�� �#��45�

�������1:������

��2�� �#��45�

�����$��2 �������1 ��2�����;���*�8&�-�3-�34-��3&<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<=+1��2��

���#��)������7���������==��� ���1����>�����!���:��=��$�������!���������� ��2����==����:� ���2��

���/�������-�&$&:����=&� 2��

����3�

�?�����������==�1����>�����!���:�������������=��������@��&�������2 ���==������������������������������=���2������� ���2���%�$���������==������������������������������=������������� �:��1����������==������������������������������=��2�$2��3�1 ������2 ���������==������������������������������=�����������1 ���2�����==������������������������������=��

���������&����������==<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<=<<<<<<<<<<<<<<<<<<<<<<<<<<<<<==+1��2��

���#��)��������89������== �����%����>�����!��:����8����=��$�������!���������� ��2����==>�����!��;:�����:������2������=��

�����=&� 2��

���1����>�����!��=��

�?���������������==��:���������������������������=��@��&�8�����2 ���2�����==������������������������������=������� ���2���%�$������������� �:==������������������������������=���1�������2�$2��3�1 ��������==������������������������������=��2 �������������1 ���==������������������������������=���2���

���������&�����==<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<=<<<<<<<<<<<<<<<<<<<<<<<<<<<<<= 2������� ���#��)�������������%�$�������%��������(�������������!&�+1��2���

1��2�./� �����1�

�����!�1 ����1 1�% ���2��

���2��%�$������������� �:��2��

�1 ����6����&,����� ������1

����6��������������% ����������2��./� ���#��)����������#����������2������%%%&� #�%2��$

��&A ��1�

GROUP1-18-R-J028 00800AA-1

�����#$%&&�.�''''''''''''''''''''(�*�'00���������� ''''''''''''''''''''(�*)'0+���������� �����#$%&&�#�''''''''''''''''''''(�**'-0���������� �����#$%&&��'''''''''''''''''''''(��0'+0���������� �������������1�������!!�������#223''''''''''''''''''''''''(��/'

�44�������� '0*,5��������36 ��''''''''''''''''''''(��0'00�44�������� '0*,5�������������''''''''''''''''''''(��+'�+�44�������� '0*,5�����$ ���67 +�44�������� '0*,5�����$� ��7 �'�*�44�������� '0*,5�����8 ��''''''''''''''''''''''''(��/'/��44�������� '0*,5�����8����#223'''''''''''''''''''(��0'0 �44�������� '0*,5�����8���7 ��9�:

���2�'''''''''''(��0'�*�44�������� '0*,5�����������9�����7

�44�������� '0*,5�����&62��7 �''''''''''''''''''''(��0'/��44�������� '0*,5�����&;�����.

�2�'''''''(��/'-/�44�������� '0*,5�����&;����.

�2�''''''''(��/'-/�44�������� '0*,5�����<�����''''''''''''''''''''''(��+'0+�44�������� '0*,5#$%&&���#%=���&���#$%&&�% �����3�# ��>�$� ��7 �>�8��6 �2�'��$��������=����;�� �2��2 ��� �2���*-���@���"����������������������#$%&&�.

���������3��;�� �2��� �2�>�=�75����2�3��;�� �2�>��2A����;�� �2�>���������>��.� �>�$��������.2 �2�>�$��������#��@�.2 �2�'#$%&&�.���#����B����<�����'��#$%&&�# ��8 �2�>�<�����>�%����� ��'#$%&&�#���.2 �2�'��#$%&&����&62��7 �>����36 ��>��2�7 �>�&�2@7 �>�#223>�8���7 ���2�>������������?��8�18&��%�����2� ����C�B2��6 A ��2���7 ��@2�3���=��=��%??$�#%.$��=��%.�D��#�%�=&������ '���@�E� �F��� �>��22������ �>�8�72�� 52��� �>�=6 �3��� ����� ����#6����7 �'��D ��2��#2����5���2��2B�/C�2B���� ��6����7��� ����7����;�����5���6���2� ��62����@2�3��'��5'���@�E� �F��� �>�8�72�� 52��� �>��=6 �3��� ����� �>�#6����7 �'�?����D ��2���2����5���2���2B�/C�2B���� ��6����7��;

��B2�� ���62����@2�3��'��#��=�D��?%E����%����2��2������ �2����###��$�������#����B�� ��2�"�( '/�G�$��������=�����;�� �2��2 ��� ��8 ����"�1&#������������8 �����2B�=2@����D��������8�=D"�( '/�G�$��������.2 �2��� ��52 ��"�1&#�����������52 ���2;�� �2��( '*�G�����������H8��� �3��7 �����2���7����2����������������������1&#�"�( '/�G�������H8��� �3��7 ������2���7�����1&#�"�( '/�G�%����� ���B�� ��2���= �3��7

GROUP1-18-R-J028 00800AA-2

������������"#"��"����������((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((')!�)*��(�*���"+������,�����"$���#������#�,��#���"�-�,���"�������"�����
�"�-�"��"��"����
�................................................................//�'�������"���"���
���"#"��"�������$����"
��������"-����"�"�0����-��0�����)1��0"+��2������3&45����5�4&������65�%���4�������7
������������8���������,��#������-������"��"���#��������"�#����"���8��9�)1��0"+��2������)2���6:&5;�)��$

"��"�-�7�"���"���!��+�#���<�����

������������,,
"������
����������0$=���������+"�(���������#�����"�������������"��������������������
"�"�"�������"��0�����������#���>��0�����;�4&�:���?#��"��������"����+�����$�����)2;��������������0��,��+"����,
�������"������0���#�,�"���"���
��+��#����+����6&���0����������;�0,����5���0����#�,�"���"���
�������0��$��,���"�����0���,�"���"���
��+��#�����"�����"
����;�"�=0��������������
�(��
���������;�"��
0�"�-,��+��"+�������������"����#��"
;�"�=0���;���������������
�(��
���������;�"��
0�"�-�,��+��"+�����������#�������������0
"�-�#���;���������"����#��"
���������,
����������"����+"�"���#;������"�+"�

����;���10� �����0

;������
�"�-������""���
�"�#����"����������������@0"������������������,����"����0��������)2"���+�"
����,�9 ������
�-�+ �-���"�� ��� -�+������(��������
"�����
���"#"��"�����������#�����������"��
0�����"�"�������,���#�����
���"#"��"����
"��������$���������#����������
�����,��+"����"�����
�$��������������������
�0����4A�<*��������������""���((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((B���$�����#��������-�������"��"���
"�������
���"#"��"��������-������������+��$����#�0�����$��,��+�"
"�-�#������"����,������#������0�"���"������������+�����$�������-������"��"����B����
���"#"��"��������
"����"���
,��$�"��
�������#�CC"���"#"���CC����"��"��������������,��"�0
������"����0�"���������0�����0�"�����-�"��������#���
�;���0�+����������"-�����+���-������������0�"����+���-��������"-����0�"����+���-�������
�"���*���?���"#"�����#�0��
�����
���"#"��"����$$��+"�"���"���"#"������
����"�������
"����$�-"��"�-��"���������������������CC�

CC���CC

�D�CC��������������0�"����
���"#"��"���������������,��+�"
"�-�#�������
���"#"��"���"������0�+����)1��,

�97!

�&�A%(&&��&: &� 4&�3��7!

��"������$$��+"�"���"���"#"����#���0�"�����"���,��+�"
���"������0�+���#����"��
���"#"��"��;���"���"���"���1��,

����0 ��$��7 0�$�����&�A%"��"�� ��� ��� �0�"����0�$�������"� �"� ���0��" ��0�$���������,, �;�"���;�7 0�$����!���

�&�A%��B�����1��0�$��;&&��"������1��,
�;�"�����"�����

��0�$���0����"��,������"�-

GROUP1-18-R-J028 00800AA-3

������������
�����������������������������
����������������������������������
�������������������������������
���������!�������������
�����������������������
����������'�����(����)���������#�����������
�������������������**' **�������������������������
�����������������
������������������
������������������������!���������������������!���
����������������������������!�����
�����������������
������������������
�����������������
����%����������������������������������������������
���������������������
��������,��
���-�' .%����+����/��0�������' ���������������������������������!�����
����������������������������

�1

�������������������������
��������
���������������!������2����������
!����������������
���������������������
!�����������

���/��0���������������������� �����

�����������������
��������������������������������'�������������������
���������������
�����������������������������������
��%������(����)���������#�����������
�"�&����������������� %34�������������������������

�1

������������������
���

��5��

���������6�
�������������
�����
����������������
��������,7%89.,-� %34+:;+�����<��=������� %34�����������������������������������������
�������������:;����������������������2����������
!�����������������
���������������������
!�����������
�����������������
��������������������������������%� %34����������!����������
�����������������������������
������������
��������������������������
��������������
�������#$%�����

����������� ������!�����++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++�������������������>%4,�?,2,(8)@%2):@�%99,%.'�9(:#,''��&�;������ ��!��������������������� ���� A�2�������!�-B����������������!���������������� �B������ �������� ����������������� �B����>��������;

��?�����
�����������������
������

���� B�����

���������&������:���������������
����������������
������������������C������
���
�����
������������
����?����+$��
���������
��
��)���������
�������������
����������!��

GROUP1-18-R-J028 00800AA-4

������+#����,��-.�/����(�0������,��-.�/����1��������������������������������� � �������������%�(%2�����* ���������3 �����������������������������+���������������������4������

�������������%�(%5���&������� �����!��.�!��������������������6666666666666666666666666666666666666666666666666666666666666666����������7'��8-�97'7.&$��7�)#)8:��������

00800AA-5

"General Decision Number: FL20230111 09/22/2023

Superseded General Decision Number: FL20220111

State: Florida

Construction Type: Heavy

County: Duval County in Florida.

HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the

GROUP1-18-R-J028 00800AA-6

Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023 1 01/20/2023 2 03/24/2023 3 05/05/2023 4 09/22/2023

ELEC0177-002 01/01/2023

Rates Fringes

ELECTRICIAN......................$ 32.31 14.20

PAID HOLIDAYS: New Year's Day, Memorial Day, 4th of July, Labor Day, Thanksgiving Day, The Day after Thanksgiving and Christmas Day.

ENGI0673-010 05/01/2021

Rates Fringes

OPERATOR: Oiler.................$ 27.08 12.00

* IRON0597-005 04/01/2023

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 28.50 12.98

LABO0517-002 05/01/2023

Rates Fringes

LABORER: Grade Checker..........$ 22.61 11.59

PAIN0164-006 06/01/2021

Rates Fringes

GROUP1-18-R-J028 00800AA-7

PAINTER: Brush, Roller and Spray............................$ 20.21 12.38

* SUFL2009-150 06/24/2009

Rates Fringes

CARPENTER........................$ 15.92 ** 0.00

CEMENT MASON/CONCRETE FINISHER...$ 13.23 ** 2.15

LABORER: Common or General......$ 9.84 ** 1.74

LABORER: Landscape..............$ 7.25 ** 0.00

LABORER: Pipelayer..............$ 12.38 ** 1.31

LABORER: Power Tool Operator (Hand Held Drills/Saws, Jackhammer and Power Saws Only)............................$ 10.63 ** 2.20

OPERATOR: Asphalt Paver.........$ 11.59 ** 0.00

OPERATOR: Backhoe Loader Combo............................$ 16.10 ** 2.44

OPERATOR: Backhoe/Excavator.....$ 12.94 ** 1.49

OPERATOR: Bulldozer.............$ 13.40 ** 1.19

OPERATOR: Crane.................$ 25.00 0.00

OPERATOR: Grader/Blade..........$ 16.00 ** 2.84

OPERATOR: Loader................$ 11.31 ** 2.02

OPERATOR: Mechanic..............$ 14.32 ** 0.00

OPERATOR: Roller................$ 10.03 ** 0.00

OPERATOR: Scraper...............$ 11.00 ** 1.74

OPERATOR: Trackhoe..............$ 20.92 5.50

OPERATOR: Tractor...............$ 10.54 ** 0.00

TRUCK DRIVER, Includes Dump Truck............................$ 14.50 ** 0.00

GROUP1-18-R-J028 00800AA-8

TRUCK DRIVER: Lowboy Truck......$ 13.06 ** 2.18

TRUCK DRIVER: Off the Road Truck............................$ 12.21 ** 1.97

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), GROUP1-18-R-J028 00800AA-9 a survey…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .