B. 08. IFB Atch 4 - DDJC TRACY W16-B COLUMN REPAIRS Submittal Register.pdf

PDF 73 KB Posted

Attached to
USACE DBB CONSTRUCTION - DDJC TRACY WAREHOUSE 16-B COLUMN REPAIRS, TRACY, CA
Solicitation number
W9123825B0004
Issued by

About this file

This is a Submittal Register form for the DDJC WH Column repairs construction project. The document details required submittals across multiple specification sections including preconstruction submittals, shop drawings, test reports, certificates, product data, and closeout documentation.

Key submittals include: Accident Prevention Plan, Critical Lift Plan, Contractor Quality Control Plan, Construction Site Plan, Traffic Control Plan, cybersecurity compliance statements, temporary power plan, construction waste management plan, and various schedule-related documents (bar chart schedule, initial project schedule, periodic updates). The form indicates government review requirements with "G" designations and specifies whether items require District Office (DO) or Resident Office (RO) approval. Closeout requirements include as-built drawings, record drawings, final approved shop drawings, and warranty management documentation. Each submittal is referenced to specific specification paragraphs and classified according to submittal type (SD-01 through SD-11).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES

DDJC WH Column repairs

01 14 00 SD-01 Preconstruction Submittals 1.2.1.1List of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals 1.3View Location Map 1.4Progress and Completion

Pictures 01 32 01 SD-01 Preconstruction Submittals

3.4Bar Chart Schedule

3.4.1 G DOInitial Project Schedule

3.4.2 G ROPeriodic Schedule Update

3.8.1 G ROJustification of Delay

3.8.4 G DOTime Impact Analysis

3.8.5 G DOForensic Schedule Analysis

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 35 26.00 41 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

1.7.1 GAPP - Construction

SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 G DOAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.3Crane Operators/Riggers

1.7.3.1 G ROStandard Lift Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES

01 35 26.00 41 1.7.3.2 G DOCritical Lift Plan 1.8Activity Hazard Analysis (AHA) 1.9.1Hot Work Permit 1.12.4Certificate of Compliance

01 45 00.00 41 SD-01 Preconstruction Submittals

1.5.2 G ROContractor Quality Control (CQC)

Plan SD-06 Test Reports

1.12.3Verification Statement 01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

3.4.1 G ROTraffic Control Plan

1.7.1.4 G ROContractor Computer

Cybersecurity Compliance Statements

1.7.6 G ROContractor Temporary Network

Cybersecurity Compliance Statements

1.4 G DOTemporary Power Plan

SD-06 Test Reports

3.5Backflow Preventer Tests SD-07 Certificates

1.5.1Backflow Tester 1.5Backflow Preventers 1.5.2Backflow Prevention Training

Certificate

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES

01 58 00 SD-02 Shop Drawings

1.3.1 G ROSign Legend Orders

01 71 10 SD-01 Preconstruction Submittals

1.5 GMobilization/Demobilization Work

Plan 01 74 19 SD-01 Preconstruction Submittals

1.6 G ROConstruction Waste Management

Plan

SD-06 Test Reports 1.8.2Quarterly Reports 1.8.3Annual Report

SD-11 Closeout Submittals

1.9 SFinal Construction Waste

Diversion Report 01 78 00 SD-03 Product Data

1.6.1Warranty Management Plan SD-08 Manufacturer’s Instructions

1.6.1Instructions SD-11 Closeout Submittals

3.1 G DOAs-Built Drawings

3.4 G RORecord Drawings

3.6Final Approved Shop Drawings 3.7Construction Contract

Specifications

3.2 G DO Final As-Built Record Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .