B. 08. IFB Atch 2 - DDJC TRACY W16-B COLUMN REPAIRS_Structural Drawings_BCOES comments inc.pdf
PDF 5 MB Posted
- Solicitation number
- W9123825B0004
About this file
This is a set of structural engineering drawings and specifications for concrete column repairs at the Defense Distribution Center (DDC) Tracy Warehouse 16-B in Tracy, CA. The drawings detail repairs to damaged spalled concrete columns that were affected by thermal expansion, including two repair options: 1) new steel column installation or 2) new structural steel corbel installation at damaged concrete column locations.
The specifications include detailed material properties, loading criteria, and construction requirements. Key technical requirements include: concrete strength of 4500 PSI for footings and 4000 PSI for slab-on-grade; Grade 60 reinforcing steel; structural steel conforming to ASTM A992 with Fy=50 KSI; special inspection requirements for concrete, steel, and soils work; epoxy grout specifications for column repairs; and shoring system requirements prior to demolition or excavation work. The drawings show foundation plans, roof framing plans, and detailed repair sections with dimensions and connection details. Construction includes selective demolition, temporary shoring, concrete repair with epoxy grout, and installation of new structural steel elements to address the thermal expansion issues that caused the original column damage.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THE FOLLOWING STRUCTURAL COMPONENTS REQUIRE A DEFERRED SUBMITTAL PREPARED BY
THE CONTRACTOR: STEEL FABRICATION SHOP DRAWINGS WITH CONTRACTOR FIELD
MEASUREMENTS FOR EACH REPAIR LOCATION. CONCRETE MIX DESIGN SUBMITTAL, CONCRETE
TRUCK DELIVERY TICKETS, CONTRACTOR SUPPLIED QUALITY ASSURANCE PLAN TO MEET
CONCRETE SPECIFIED MATERIAL STRENGTHS WITH LAB TEST RESULTS FOR 28 DAY STRENGTH.
2. DEFERRED SUBMITTALS CALLED OUT WILL BE SUBMITTED TO THE DESIGNER OF RECORD FOR
REVIEW AND COORDINATION, WITH APPROPRIATE QC SPECIAL INSPECTION TESTING.
SUBMITTAL ITEMS CALLED OUT "DESIGNED BY OTHERS" MUST BE DESIGNED, SIGNED AND
SEALED BY A REGISTERED PROFESSIONAL ENGINEER LICENSED IN THE JURISDICTION WHERE
WORK IS BEING PERFORMED.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION AND
SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF ANY DISCREPANCIES. DIMENSIONS
SHALL TAKE PRECEDENCE OVER SCALES SHOWN ON DRAWINGS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY TEMPORARY BRACING DURING
CONSTRUCTION.
5. SPECIFIC NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES
AND TYPICAL DETAILS.
6. OPENINGS, POCKETS, ETC. LARGER THAN 6" SHALL NOT BE PLACED IN CONCRETE SLABS,
DECKS, WALLS, ETC. UNLESS SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS OR
APPROVED BY THE CONTRACTING OFFICER.
7. LOADS DUE TO CONSTRUCTION MATERIALS PLACED ON FLOORS OR ROOF SHALL NOT EXCEED
THE DESIGN LIVE LOADS.
8. FINISHED FLOOR ELEVATION 0'-0" ON THE STRUCTURAL DRAWINGS IS FOR REFERENCE ONLY, REFER TO THE CIVIL DRAWINGS FOR ACTUAL ELEVATION.
9. DO NOT EMBED ANY ITEMS NOT SHOWN ON ALL STRUCTURAL PLANS IN STRUCTURAL
CONCRETE WITHOUT THE APPROVAL OF THE CONTRACTING OFFICER.
10. ALL EQUIPMENT ANCHOR BOLTS SHALL BE SET WITH TEMPLATES. THE CONTRACTOR SHALL
VERIFY SIZES, DIMENSIONS, AND LOCATIONS OF ALL EQUIPMENT ANCHOR BOLTS.
11. STRUCTURAL MEMBERS SHALL NOT BE CUT FOR PIPES, DUCTS, ETC. WITHOUT THE APPROVAL
OF THE CONTRACTING OFFICER.
12. DETAILS WHICH ARE NOT SHOWN WILL CONFORM, IN GENERAL, TO DETAILS OF SIMILAR
CONSTRUCTION SHOWN ELSEWHERE ON THE DRAWINGS.
GENERAL NOTES
MATERIAL PROPERTIES
CONCRETE: W/C RATIO NOT TO EXCEED 0.45
FOOTINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . f'c = 4500 PSI SLAB-ON-GRADE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . f'c = 4000 PSI
REINFORCING STEEL: (ASTM A615 AND ASTM A706) . . . . . . . . . . . . . . . . . . Fy = 60 KSI
STRUCTURAL & MISC. STEEL:
MISC. STEEL ASTM A 36 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fy=36 KSI HOLLOW STRUCTURAL SECTION ASTM A500, GRADE B. . . . . . . . . . . . . . . . Fy=46 KSI STRUCTURAL STEEL ASTM A 992 . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . Fy=50 KSI
LIGHT GAGE COLD-FORMED STEEL:
43 MIL AND LIGHTER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fy=33 KSI 54 MIL AND HEAVIER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fy=50 KSI
BOLTS:
IN CONCRETE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F1554 GR. 36 IN STRUCTURAL STEEL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASTM A-325
ASTM A-490
IN COLD FORMED STEEL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASTM A-307
SOILS: DESIGN VALUES:
ALLOWABLE SOIL BEARING PRESSURE:
COMPACTED FILL SOILS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3000 PSF
1/3 INCREASE PERMITTED FOR COMBINATIONS
WITH WIND OR SEISMIC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3500 PSF
PASSIVE SOIL COEFFICIENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.00 ACTIVE SOIL COEFFICIENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.35 SEISMIC ACTIVE COEFFICIENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.15g SOIL FRICTION ANGLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 DEG
COEFFICIENT OF FRICTION: CONCRETE ON BASE . . . . . . . . . . . . . . . . . 0.35
W/ VAPOR BARRIER . . . . . . . . . . . . . . . . . . . . . 0.20
FOUNDATION & EARTHWORK NOTES
DESIGN CRITERIA & LOADING
UFC 1-200-01 DOD BUILDING CODE, GENERAL BUILDING REQUIREMENTS
UFC 3-301-01 STRUCTURAL ENGINEERING
2018 INTERNATIONAL BUILDING CODE
LIVE LOADS
ROOF: (REDUCIBLE) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 PSF
FLOOR:
SLAB-ON GRADE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150 PSF
GROUND SNOW LOAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 PSF
WIND LOAD
(ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES)
BASIC WIND SPEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93 MPH EXPOSURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C
SEISMIC LOAD
(ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES)
SITE LOCATION: LAT: 37.715305°, LONG: -121.390813°
RISK CATEGORY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II Ss . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.098 g S1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.386 g Sds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.878 g Sd1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.492 g SITE CLASSIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D SEISMIC DESIGN CATEGORY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D ANALYSIS METHOD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ELF
LATERAL FORCE RESISTING SYSTEM
ORDINARY REINFORCED CONCRETE SHEAR WALLS (1968 ASBUILTS PRE-CAST CONCRETE PANEL
WALLS, CAST-IN-PLACE CONC. COLUMNS & FOOTINGS)
R = 4.0 OMEGA = 2.5 Cd = 4.0 RHO = 1.3 BASE SHEAR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . V = CS*W=0.0386 x W
(ULT.)
ASD =(ULT./1.5) PER AISC 16 V = 0.026 x W (ASD)
CONCRETE NOTES
1. CONCRETE SHALL BE PER SPECIFICATIONS ON DRAWINGS, WITH SPECIFIED TESTING
PROCEDURES AND SPECIAL INSPECTIONS.
A. CONTRACTOR SHALL SUBMIT MIX DESIGNS AND ASSOCIATED TESTING DATA .
B. WEATHER PROTECTION FOR CAST-IN-PLACE CONCRETE SHALL BE PER EXECUTION
NOTE REFFERENCES FOR COLD WEATHER, AND FOR HOT WEATHER.
C. FRESHLY DEPOSITED CONCRETE IS TO BE PROTECTED FROM PREMATURE DRYING
AND EXCESSIVE HOT OR COLD TEMPERATURES. CURING AND PROTECTION
PROCEDURES ARE OUTLINED IN THE EXECUTION NOTE REFFERENCES.
D. FIELD QUALITY CONTROL AND TESTING REQUIREMENTS ARE REQUIRED.
2. CLEAN AND ROUGHEN CONSTRUCTION JOINTS, WET FORMS AND SUBGRADE, PRIOR TO
PLACING CONCRETE. NEW TO CURED CONCRETE PLACEMENT SHALL HAVE DUST FREE
CLEAN SATURATED SURFACE DRY MOISTEN THE CURED CONCRETE WITH ROUGHENED
SURFACE WHERE SPECIFIED, NO PONDED WATER PERMITTED.
3. CHAMFER ALL EXPOSED CORNERS OF CAST-IN-PLACE CONCRETE 3/4", UNLESS OTHERWISE
NOTED.
4. REINFORCED BAR LAP SPLICES SHALL BE IN ACCORDANCE WITH THE PROVISIONS OF THE
BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318-19).
5. MINIMUM COVER FOR REINFORCING BARS SHALL BE IN ACCORDANCE WITH THE
PROVISIONS OF THE BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI
318-19).
6. REINFORCEMENT SPACING SHOWN ARE CENTER TO CENTER OF BARS. REINFORCEMENT IS
CONTINUOUS, UNLESS NOTED OTHERWISE.
7. WELDING OF REINFORCEMENT SHALL BE IN ACCORDANCE WITH THE PROVISIONS OF THE
AWS STRUCTURAL WELDING CODE, D1.4 AND SHALL BE CONTINUOUSLY INSPECTED. ALL
REINF. TO BE WELDED SHALL BE ASTM A706 GR. 60, U.N.O. IN THE DRAWING SET.
8. ALL REINFORCING BARS, ANCHOR BOLTS, AND OTHER CONCRETE INSERTS SHALL BE
SECURED IN POSITION PRIOR TO PLACING CONCRETE.
9. ALL BENDS IN REINFORCING BARS SHALL BE MADE WITHOUT HEATING THE BARS.
10. TYPICAL SPACING OF TEMPERATURE STEEL IN CONCRETE SLABS MAY BE ADJUSTED UP TO
6" TO AVOID INTERFERENCES WITH EMBEDDED ITEMS.
11. PROVIDE SLEEVES FOR PLUMBING AND ELECTRICAL CONDUITS IN CONCRETE. CORING OF
CONCRETE OR CUTTING OF ANY BARS IS NOT PERMITTED WITHOUT THE APPROVAL OF THE
CONTRACTING OFFICER. NO ELECTRICAL CONDUIT SHALL BE PLACED IN THE SLAB-ON-
GRADE SECTION.
12. ANY CONCRETE NOT FORMED AS SHOWN OR NOT TRUE TO THE INTENDED LINES, GRADES,
OR TOLERANCES, OR THAT HAS ROCK POCKETS, VOIDS OR EMBEDDED DEBRIS, SHALL BE
DEEMED DEFECTIVE. DEFECTIVE WORK IS TO BE REMOVED AND REPLACED WITH
CONFORMING WORK, OR WITH APPROVAL OF THE DOR AND CONTRACTING OFFICER,
REPAIRED TO SATISFACTION.
13. SLAB SHRINKAGE CRACKS, EDGE CURLS, OR SURFACES OUT OF TOLERANCE ARE DEFECTS
WHICH ARE TO BE REPAIRED OR REPLACED.
14. THE CONTRACTOR SHALL BE STRICTLY PROHIBITED FROM USING CONTRACT DRAWINGS AS
SHOP DRAWINGS.
STRUCTURAL STEEL NOTES
1. PRIOR TO WELDING OR PAINTING STEEL. MECHANICALLY WIRE BRUSH STEEL PER SSPC-SP 3
POWER TOOL CLEANING TO NEAR-WHITE METAL WITH THE SURFACE TO BE FREE OF ALL
PAINT, VISIBLE OIL, GREASE, DUST, DIRT, MILL SCALE, RUST, COATING, OXIDES, CORROSION
PRODUCTS, AND OTHER FOREIGN MATTER WHEN VIEWED WITHOUT MAGNIFICATION.
2. FIELD SNUG JAMB NUTS TO 100 FT-LBS MIN.
3. STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED IN ACCORDANCE WITH
THE PROVISIONS OF THE AISC 360-16 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS,
AND AISC 341-16 SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS.
4. ALL STEEL STRUCTURAL MEMBERS AND FASTENERS ARE TO CONFORM TO AISC THE
STANDARDS AND THE SPECIFICATIONS ON DRAWINGS
5. STRUCTURAL STEEL BOLT BEARING TYPE-CONNECTIONS ARE DESIGNED WITH THE THREADS
INCLUDED IN THE SHEAR PLANE, UNLESS OTHERWISE NOTED.
6. ALL CONNECTIONS SHALL BE DETAILED ACCORDING TO AISC PUBLICATION "DETAILING FOR
STEEL CONSTRUCTION."
7. ALL EXTERIOR STRUCTURAL STEEL AND CONNECTORS PERMANENTLY EXPOSED TO
WEATHER SHALL BE HOT-DIP GALVANIZED AFTER FABRICATION. GALVANIZING FOR IRON AND
STEEL PRODUCTS SHALL CONFORM TO ASTM A 123. GALVANIZING FOR IRON AND STEEL
HARDWARE SHALL CONFORM TO ASTM A 153. ALL AREAS DAMAGED, UNCOATED OR
WELDED AFTER HOT-DIP GALVANIZING SHALL BE REPAIRED PER ASTM A 780.
8. STEEL FABRICATOR SHALL VERIFY ALL DIMENSIONS WITH ARCHITECTURAL AND
STRUCTURAL DRAWINGS.
9. SUBMIT SHOP DRAWINGS TO THE CONTRACTING OFFICER FOR REVIEW PRIOR TO
FABRICATION OR INSTALLATION OF STEEL OR ACCESSORIES.
10. STRUCTURAL STEEL SHALL BE DELIVERED TO THE JOB SITE FREE OF EXCESSIVE RUST, MILL
SCALE, GREASE, AND OTHER DELETERIOUS SUBSTANCES, AND SHALL BE SHOP PRIMED.
11. ALL WELDS ARE TO BE MADE WITH E70XX ELECTRODES AND SHALL CONFORM TO AMERICAN
WELDING SOCIETY SPECIFICATIONS FOR THE MATERIAL BEING WELDED. WELDING SHALL
ONLY BE PERFORMED BY A CERTIFIED WELDER. SEE SECTION 05 05 23.16 FOR WELDING
SPECIFICATIONS.
12. FILLER METAL TOUGHNESS FOR CJP GROOVE WELDS SHALL HAVE A CVN TOUGHNESS OF 20
FOOT-POUNDS AT ZERO DEG FAHRENHEIT AND COMPLY WITH AWS FILLER METAL SPECS.
WELD ELECTRODES IDENTIFIED AS E70T-4 OR 120 WILL NOT MEET THIS TOUGHNESS
REQUIREMENT AND SHALL NOT BE USED IN COMPLETE OR PARTIAL PENETRATION GROOVE
WELDS.
13. WELDING OF REINFORCING BARS TO BE IN ACCORDANCE WITH AWS DI.4. REINFORCING
STEEL TO BE WELDED SHALL BE GRADE A706 AND HAVE A CE NOT EXCEEDING 0.55.
14. WELDING OF SHEET METAL SHALL BE IN ACCORDANCE WITH IBC CHAPTER 22 AND AWS D1.3, SECTION A6.
15. NONDESTRUCTIVE TESTING OF GROOVE WELDS (FOR SPLICES, MOMENT CONNECTIONS,
ETC.) SHALL BE PERFORMED FOR 100% OF WELDS.
1. THE INFORMATION STATED IN THIS SECTION IS MERELY AN OVERVIEW OF EARTHWORK AND
GEOTECHNICAL REQUIREMENTS IN PREPARATION FOR THE STRUCTURAL COMPONENTS. ALL
SITEWORK, GRADING AND FOUNDATION PREPARATION SHALL BE IN ACCORDANCE WITH THE
INTERNATIONAL BUILDING CODE, OR BY DIRECTION OF A STATE LICENSED PROFESIONAL CIVIL OR
GEOTECHNICAL ENGINEER SOILS ENGINEER.
2. CONCRETE SLAB IS TO BE CLEANLY SAW CUT THROUGH DEMOLISHED & DISPOSED OF, SOILS ON THE SITE WITHIN NEW FOUNDATION EXCAVATIONS ARE TO BE 6" OVER-EXCAVATED REMOVED TO BEARING DEPTH, BOTTOM OF INSITU SOILS COMPACTED, A 6" LIFT OF 3/4" MINUS CRUSHED ROCK CALTRANS TYPE II AGGREGATE BASE COMPACTED IN BOTTOM OF FOOTING EXCAVATION, RE-USE
OF SOILS AS PROPERLY COMPACTED FILL SOILS ABOVE TOP OF FOOTINGS AS REQUIRED,
PLACED IN 6-8 INCH LIFTS COMPACTED TO 95% OF MAXIMUM PER ASTM D1557, DISPOSE OF
EXCESS SOILS NOT UTILIZED, TYP.
3. FILL SOILS ARE TO BE FREE OF ANY EXPANSIVE MATERIALS, DEBRIS OR ORGANIC MATTER. ANY
BOULDERS AND COBBLES LARGER THAN 3 INCHES IN DIAMETER SHOULD NOT BE USED IN FILL
MATERIAL WITHIN 5 FEET OF FINISH GRADE. ALL REQUIRED FILL SHOULD BE UNIFORMLY WELL
COMPACTED AND OBSERVED AND TESTED DURING PLACEMENT.
4. SLABS-ON-GRADE AND FOUNDATIONS ARE TO BE UNDERLAIN WITH 6" INCHES OF CALTRANS TYPE II AGGREGATE BASE THAT IS COMPACTED TO AT LEAST 95%. SEE PLANS AND DETAILS HEREIN
FOR ADDITIONAL REQUIREMENTS OF BASE SECTIONS AND VARRIER BARRIERS BENEATH
CONCRETE WORK.
5. EXCAVATIONS SHALL BE KEPT CLEAR OF ALL DEBRIS. TEMPORARY DRAINAGE ROUTES ARE TO BE
MAINTAINED AT ALL TIMES IN ORDER TO KEEP SURFACE WATER OUT OF EXCAVATIONS AND
FOUNDATION FORMS. PUMP FOOTING EXCAVATIONS IF WATER ACCUMULATES.
6. ALL FOOTINGS SHALL BE FORMED. FOUNDATIONS MAY BE PLACED IN NEAT EXCAVATIONS
PROVIDED COORDINATION WITH THE CONTRACTING OFFICER, AND ALL FOOTING WIDTHS ARE TO
BE INCREASED 2 INCHES FROM THE DIMENSIONS INDICATED ON THE STRUCTURAL DRAWINGS.
7. THE CONTRACTING OFFICER SHALL BE NOTIFIED 48 HOURS PRIOR TO THE PLACEMENT OF
FOUNDATIONS.
DEAD LOADS
STRUCTURE SELF WEIGHT PLUS MECHANICAL, ELECTRICAL, ARCHITECTURAL ITEMS.
ROOF JOIST AND FRAMING DESIGN LOADS PER S-100
1. ADHESIVES SHALL BE A CARTRIDGE TYPE, TWO-COMPONENT, SOLID EPOXY BASED SYSTEM
DISPENSED AND MIXED THROUGH A STATIC MIXING NOZZLE SUPPLIED BY THE MANUFACTURER.
THE ADHESIVE SHALL MEET THE MINIMUM REQUIREMENTS OF ASTM C-881 TYPE I AND TYPE IV, GRADE 3, CLASS C. ACCEPTABLE INSTALLATION AND PERFORMANCE TEMPERATURE RANGE SHALL BE VERIFIED WITH MANUFACTURER'S REPORT ISSUED BY ICC-ES AND SHALL HAVE BEEN TESTED
IN ACCORDANCE WITH ICC-ES AC308 FOR THE FOLLOWING:
A. SEISMIC AND WIND LOADING IN CRACKED AND UNCRACKED CONCRETE
B. LONG-TERM CREEP AT ELEVATED TEMPERATURES
C. STATIC LOADING AT ELEVATED TEMPERATURES
D. DAMP HOLES
E. FREEZE-THAW CONDITIONS
F. CRITICAL AND MINIMUM EDGE DISTANCES
G. STATIC TENSION AND SHEAR LOADING
2. ADHESIVE ANCHOR SHALL CONSIST OF I.) AN INSERT, AND II.) AN ADHESIVE FORMULA. INSERTS SHALL MEET THE REQUIREMENTS OF ASTM A193 GRADE B7, OR F1554, GRADE 36 FOR THREADED
RODS OR ASTM A615, GRADE 60 FOR REBAR. FOR EXTERIOR EXPOSURE THE THREADED INSERT
SHALL BE STAINLESS STEEL OR ZINC COATED CARBON STEEL. THE ZINC COATING SHALL BE
EITHER HOT-DIPPED IN ACCORDANCE WITH ASTM A153 CLASS C OR D; MECHANICALLY DEPOSITED
IN ACCORDANCE WITH ASTM B695, CLASS 65, TYPE I.
3. EPOXY ADHESIVES SHALL BE INSTALLED ONLY BY CERTIFIED PERSONNEL, AND IN ACCORDANCE
WITH THE MANUFACTURERS SPECIFICATIONS AND INSTRUCTIONS.
4. WHEN INSTALLING DRILLED ANCHORS IN EXISTING NON-PRESTRESSED REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING REINFORCING BARS.
MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE
ANCHOR.
EPOXY ADHESIVE ANCHORS
1. WEDGE ANCHORS SHALL BE AN IMPERIAL-SIZED STEEL THREADED STUD WITH AN INTEGRAL CONE
EXPANDER AND A THREE-SEGMENT EXPANSION CLIP. THE STUD SHALL BE MANUFACTURED FROM
CARBON STEEL AND THE EXPANSION CLIP SHALL HAVE TWO UNDERCUTTING EMBOSSMENTS PER
SEGMENT AND BE MANUFACTURED FROM 316 STAINLESS STEEL. THE ANCHOR SHALL HAVE BEEN
TESTED AND QUALIFIED FOR PERFORMANCE IN CRACKED CONCRETE PER ACI 355.2 AND ICC-ES
AC193 FOR THE FOLLOWING:
A. STATIC TENSION AND SHEAR LOADING IN CRACKED AND UNCRACKED CONCRETE
B. SEISMIC AND WIND LOADING IN CRACKED AND UNCRACKED CONCRETE
2. WEDGE ANCHORS SHALL BE INSTALLED FOLLOWING THE MANUFACTURER'S INSTRUCTIONS
3. WHEN INSTALLING DRILLED ANCHORS IN EXISTING NON-PRESTRESSED REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING REINFORCING BARS.
MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE ANCHOR
EXPANSION ANCHORS
SNOW LOAD
SHORING NOTES
1. SHORING SYSTEMS PROVIDED ON DRAWINGS ARE DESIGNED SYSTEMS FOR CONTRACTOR TO UTILIZE. THE CONTRACTOR HAS THE OPTION TO HIRE A LICENSED PROFESIONAL CIVIL ENGINEER OR
STRUCTURAL ENGINEER TO DESIGN ALTERNATIVE SHORING SYSTEMS TO BE SUBMITTED TO THE GOVERNMENT FOR APPROVAL. CONTRACTOR SUBMITTED ALTERNATIVE SHORING SYSTEMS SHALL BE DESIGNED AT THE CONTRACTORS EXPENSE UNDER THE BASE BID, FOR THE CONTRACTORS MEANS AND METHODS. THE CONTRACTOR SHALL SUBMIT SHORING SYSTEMS DESIGNS FOR
GOVERNMENT APPROVAL.
A. CONTRACTOR SHALL SUBMIT STEEL SHOP DRAWINGS OF PROPOSED SHORING SYSTEM.
B. MANUFACTURE INFORMATION OF PRE-ENGINEERED SHORING SYSTEMS.
C. ENGINEERING CALCULATIONS OF SHORING SYSTEM LOADING.
D. JACKING LIMITATIONS, SHOULD BE KEPT TO MINIMAL AMOUNTS REQUIRED TO TRANSFER LOADING, WITHOUT DAMAGE TO STRUCTURAL FRAMING SYSTEMS. END OF BEAM SPANS SHALL BE
KEPT TO +OR- 3/8" OUT OF JACKING MOVEMENT UP OR DOWN FROM CURRENT DESIGNED BEAM END ELEVATIONS.
E. COLUMN EXCAVATION LIMITS CAN BE MODIFIED WITH ENGINEERED SOLUTIONS TO PREVENT SLAB JACKING DAMAGE, AND/OR SAFE FOOTING EXCAVATIONS SET BACKS FROM APPLIED
LOADING.
F. SHORING SYSTEMS SHALL BE DESIGNED TO BE SAFE DURING AN ASCE 7 SEISMIC EVENT LOADING, OF THE SHORED BEAMS THAT RESIST BOTH GRAVITY AND LATERAL LOADING G. NEW HOLES DRILLED IN EXISTING BEAM FLANGES REQUIRE FIELD WELDED IN NEW STIFFNER PLATES AND BOTTOM FLANGE SLOTTED BEARING PLATE SHIM WELDED IN PLACE, TO REMAIN
IN PLACE AFTER SHORING SYSTEM REMOVED.
H. SHORING SYSTEMS AT PERMANT REPAIR LOCATIONS, HOLES DRILLED IN EXISTING BEAM FLANGES FOR TEMP. SHORING SYSTEMS SHALL ALIGN WITH PERMANENT FABRICATED STEEL
COLUMNS OR STEEL CORBEL BOLT FASTENING DETAILING. PREVENT ADDITIONAL BEAM HOLES, IN PERMANT REPAIRS, THAT ARE NOT SHOWN IN REPAIR DETAILS.
2. ADDITION OF STRUCTURAL STEEL CORBELS, AND/OR OF NEW STEEL COLUMN REPAIR OPTIONS UNDER THE BASE BID, REQUIRE SHORING SYSTEMS TO BE INSTALLED. EXISTING ANCHORS NEED TO BE CHIPPED OUT OF CONCRETE COLUMNS WITH SMALL CHIPPING HAMMER, FOR FLAT, NON- FRACTUREED SOUND CONCRETE BEARING SURFACE JUST BELOW ANCHOR DEPTHS FOR NEW CONCRETE POURING OF TOP OF COLUMNS. EXISTING BEAM FLANGES STANDARD HOLES NEED TO BE MAG DRILLED TO 1.5" LONG SMOOTH, CLEAN SLOTTED CONNECTIONS WITH ANCHORS CENTERED IN SLOTS WHEN CAST IN PLACE ON GREASED BEARING PLATES. PROVIDE NEW BASE PLATES, AND ANCHORS IN KIND WITH GREASED CONTACT SURFACES TO UNDERSIDE OF BEAM
FLANGE.
3. EXISTING TOPS OF CONCRETE COLUMN DAMAGE IS FROM THERMAL EXPANSION OF LONG SPANNING W-MEMBER ROOF FRAMING CONTINIOUS FROM WALL TO WALL BETWEEN INTERMEDIATE COLUMNS. FIELD OPSERVATIONS IDENTIFIED HEADED BOLT ANCHORS WHERE WELDED TO TOP OF COLUMN BASE PLATES ON UNDERSIDE, AND EXTEND THROUGH STANDARD AISC HOLES NOT ALLOWING STRAIN RELIEF ON RIGID CONCRETE COLUMNS. TOP CONC. COL. DAMAGE IS SUSPECTED TO BE FROM THERMAL CONTRACTION FROM STRESS/STRAIN RELATIONSHIPS, AND RESULTING IN ANCHOR SIDE FACE BLOW OUT PER ACI 318 WITH MINIMAL (1) #2 CONFINEMENT BAR IN ANCHOR DEPTH. REPAIRS ARE FOR PREVENTION OF ASCE 7 SEISMIC BEAM TO WALL SEPERATION.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
R :\d
2\
Tr ac y D
LA
W ar eh ou se
R ep ai rs
_S tru ct ur al .rv t 6/
3/
:3 3:
P
M
S-001
ST
R
U C
TU
R
AL
N
O
TE
S
AN
D D
ES
IG
N L
O
AD
S
TR
AC
Y
AR
M Y
D
EP
O T, T R
AC
Y
C
AL
IF
O
R N
IA
SA
C R
AM
EN
TO
D
IS
TR
IC
T
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
A.
J
O H
N
SO
N
A.
J
O H
N
SO
N
/S / M
. O N
IN
ES
A.
J
O H
N
SO
N
JU
N
E 3, S-
SP
EC
N
O
D
ES
IG
N
F
IL
E N
O
0%
D
ES
IG
N
W
AR
EH
O
U
SE
ST
R
U C
TU
R
AL
R
EP
AI
R S
N /A
REINF. CONC. COLUMN REPAIR SPECIFICATIONS:
THIS SPECIFICATION DESCRIBES THE GROUTING OF PORTIONS OF EXISTING COLUMN(S) CHIPPED OUT AROUND SPALL DAMAGED ANCHORS TO BE REPAIRED PER STRUCTURAL DRAWINGS, AND BASEPLATE GROUTING WITH A 100% SOLIDS, MOISTURE TOLERANT, NON-SHRINK, EPOXY GROUT.
EPOXY GROUT SHALL BE A THREE-COMPONENT PRODUCT, FLOWABLE MIX AND DELIVERED IN ACCORDANCE WITH MANUFACTURED SPECIFICATION. MIXING AND PLACEMENT SHALL BE IN ACCORDANCE WITH MANUFACTURE SPECIFICATIONS.
QUALITY ASSURANCE:
A. MANUFACTURING QUALIFICATIONS: THE MANUFACTURER OF THE SPECIFIED PRODUCT SHALL BE ISO 9001/9002 CERTIFIED AND HAVE IN EXISTENCE A RECOGNIZED ONGOING QUALITY ASSURANCE PROGRAM INDEPENDENTLY AUDITED ON A REGULAR BASIS.
B. CONTRACTOR QUALIFICATIONS: CONTRACTOR SHALL BE QUALIFIED IN THE FIELD OF CONCRETE REPAIR AND PROTECTION WITH A SUCCESSFUL TRACK RECORD OF 5 YEARS OR MORE. CONTRACTOR SHALL MAINTAIN QUALIFIED PERSONNEL WHO HAVE RECEIVED PRODUCT TRAINING BY A
MANUFACTURER'S REPRESENTATIVE.
C. INSTALL MATERIALS: IN ACCORDANCE WITH ALL SAFETY AND WEATHER CONDITIONS REQUIRED BY THE MANUFACTURERS INSTALLATION CUT SHEETS, OR AS MODIFIED BY APPLICABLE RULES AND REGULATIONS OF LOCAL, STATE AND FEDERAL AUTHORITIES HAVING JURISDICTION.
CONSULT MATERIAL SAFETY DATA SHEETS FOR COMPLETE HANDLING RECOMMENDATIONS.
DELIVERY, STORAGE, AND HANDLING:
A. ALL MATERIALS MUST BE DELIVERED IN ORIGINAL, UNOPENED CONTAINERS WITH THE MANUFACTURER'S NAME, LABELS, PRODUCT IDENTIFICATION, AND BATCH NUMBERS. DAMAGED MATERIAL MUST BE REMOVED FROM THE SITE IMMEDIATELY.
B. STORE ALL MATERIALS OFF THE GROUND AND PROTECT FROM RAIN, FREEZING OR EXCESSIVE HEAT UNTIL READY FOR USE.
C. CONDITION THE SPECIFIED PRODUCT AS RECOMMENDED BY THE MANUFACTURER.
POURING CONDITIONS:
A. ENVIRONMENTAL CONDITIONS: DO NOT APPLY MATERIAL IF IT IS RAINING OR SNOWING OR IF SUCH CONDITIONS APPEAR TO BE IMMINENT. MINIMUM APPLICATION TEMPERATURE 40ºF (5ºC) AND RISING.
B. PROTECTION: PRECAUTIONS SHOULD BE TAKEN TO AVOID DAMAGE TO ANY SURFACE NEAR THE WORK ZONE DUE TO MIXING AND HANDLING OF THE SPECIFIED PRODUCT. 1.05 SUBMITTALS A. SUBMIT TWO COPIES OF MANUFACTURER'S LITERATURE, TO INCLUDE: PRODUCT DATA SHEETS, AND APPROPRIATE MATERIAL SAFETY DATA SHEETS (MSDS).
PART 2 – PRODUCTS:
CONTRACTOR SHALL USE PRE-BAGGED GROUT AND EPOXY 2 PART PRODUCTS SHALL BE ENGINEERED PRODUCT SYSTEMS FROM THE SAME MANUFACTURE WITH SPECIFIED MIX RATIOS PER SUBMITTED MANUFACTURE SPECIFICATIONS MEETING THE SPECIFICATIONS HERE-IN. SUCH AS
SIKADUR 42 SYSTEM, OR EQUAL PRODUCT MEETING THE SPECIFICATIONS HERE-IN.
EPOXY RESIN ADHESIVE BINDER:
A. COMPONENT “A” SHALL BE A MODIFIED EPOXY RESIN OF THE EPICHLOROHYDRIN BISPHENOL A TYPE CONTAINING SUITABLE VISCOSITY CONTROL AGENTS. IT SHALL NOT CONTAIN BUTYL GLYCIDYL ETHER.
B. COMPONENT “B” SHALL BE PRIMARILY A REACTION PRODUCT OF A SELECTED AMINE BLEND WITH EPOXY RESIN OF THE EPICHLOROHYDRIN BISPHENOL A TYPE CONTAINING SUITABLE VISCOSITY CONTROL AGENTS AND ACCELERATORS.
C. COMPONENT “C” SHALL BE A BLEND OF SILICA SANDS AND PIGMENTS.
D. THE MATERIAL SHALL BE SUPPLIED IN FACTORY PROPORTIONED KITS OF 0.5 CU FT. AND 1.0 CU FT, WITH SUBMITTED FOR GOVERNMENT APPROVAL MANFACTURE CUT SHEETS. ALL PRODUCTS OF THE COMPLETE MIX DESIGN SYSTEM, SHALL BE FROM THE SAME MANUFACTURE WITH
COMPATABLE PRODUCTS. THE SYSTEM SHALL NOT CONTAIN ASBESTOS.
PERFORMANCE CRITERIA:
A. TYPICAL PROPERTIES OF THE MIXED EPOXY RESIN GROUT:
1. WORKING LIFE: 90 MINUTES
2. EFFECTIVE BEARING AREA: > 95%
3. CONSISTENCY: FLOWABLE
4. COLOR: CONCRETE GRAY
B. TYPICAL PROPERTIES OF THE CURED EPOXY RESIN GROUT (MATERIAL AND CURING CONDITIONS AT 73° F AND 50% RELATIVE HUMIDITY):
1. COMPRESSIVE PROPERTIES (ASTM C 579, METHOD B), MIN. CONTRACTORS HIRED QUALITY CONTROL MANAGER IS TO COLLECT THREE (3) MINIMUM 2"X2" GROUT CUBE SAMPLES FROM EACH BATCH OF EPOXY GROUT MIXED ONSITE, AND THREE (3) MINIMUM CUBES PER EACH COLUMN PATCH REPAIR. THE SURFACE SHALL BE CLEAN AND DUST FREE PRIOR TO COLUMN REPAIRS WITH PLACEMENT OF GROUT.
A. COMPRESSIVE STRENGTH AT 7 DAYS: 6,000 PSI
B. COMPRESSIVE STRENGTH AT 28 DAYS: 8,000 PSI
D. COMPRESSIVE CREEP (ASTM C-1181, 600 PSI AT 140˚F) 1 DAY 0.0108 IN/IN 28 DAY 0.0133 IN/IN
2. TENSILE PROPERTIES (ASTM C-307) AT 7 DAYS, MIN
A. TENSILE STRENGTH: 2,300 PSI (15.8 MPA)
3. FLEXURAL PROPERTIES (ASTM C-580) AT 7 DAYS, MIN.
A. FLEXURAL STRENGTH (MODULUS OF RUPTURE): 4,000 PSI (27.6 MPA)
B. TANGENT MODULUS OF ELASTICITY IN BENDING: 1,300,000 PSI (8,963 MPA)
4. SHEAR STRENGTH (ASTM D-732) AT 14 DAYS: 4,100 PSI (28.2 MPA)
5. WATER ABSOPRTION (ASTM C-413), 7 DAY (2-HOUR BOIL) 0.04%
6. BOND STRENGTH (ASTM C-882, MODIFIED), 7 DAY, MIN. BOND STRENGTH TO CONCRETE: 4,200 PSI (29.0 MPA), BOND STRENGTH TO STEEL: 3,800 PSI (26.2 MPA)
7. COEFFICIENT OF THERMAL EXPANSION (ASTM C-531) 24.5 X 10-6 IN/IN/˚F
8. THERMAL COMPATABILITY (ASTM C-884), PASSES TEST
9. PEAK EXOTHERM (ASTM D2471), CU FT./MASS 118˚F.
PART 3 - EXECUTION
SHORING SYSTEM:
SEE SHORING SYSTEM GENERAL NOTES. SHORING SYSTEM SHALL BE IN PLACE PRIOR TO CHIPPING OPERATIONS OR DEMO OF FOOTINGS.
SURFACE PREPARATION:
A. CHIPPING SHALL BE PERFORMED WITH MIN. SIZED CHIPPING HAMMER AROUND TOPS OF DAMAGE CONCRETE ANCHORS TO JUST BELOW A FLAT CHIPPED OUT PLANE JUST BELOW ANCHOR DEPTH.
REPLACE STEEL BASE PLATE AND ANCHORS IN KIND AFTER CUTTING AISC 16 SHORT SLOTTED 1.5" LONG CONNECTION IN EXISTING BEAM FLANGES, WITH NEW ANCHOR CENTERED IN SLOT.
THE CHIPPED OUT SUBSTRATE, BEARING PLATES, ANCHORS, AND BASEPLATE CONTACT AREA MUST BE CLEAN SOUND AND FREE OF STANDING WATER. REMOVE DUST, LAITANCE, OILS, GREASE, CURING COMPOUNDS, WAXES, IMPRENATIONS, FOREIGN PARTICLES, COATINGS AND DISINTEGRATED MATERIALS BY MECHANICAL MEANS (I.E. SANDBLASTING, BUSH HAMMERING). SANDBLAST METAL BASEPLATES TO A COMMERCIAL WHITE FINISH FOR MAXIMUM ADHESION. APPLY GROUT IMMEDIATELY AFTER APPROPRIATE STEEL STRUCTURAL REPAIR DETAIL HAS BEEN BOLTED INTO PLACE, TO PREVENT REOXIDIZING OF CLEANED MATERIALS AND CONFINEMENT CONTAINMENT OF GROUT. CONCRETE SUBSTRATE SHALL HAVE REACHED ITS DESIRED STRENGTH (MINIMUM, 3,000 PSI) AND MUST BE DIMENSIONALLY STABLE.
B. WHERE REINFORCING STEEL WITH ACTIVE CORROSION IS ENCOUNTERED, SANDBLAST THE STEEL TO A WHITE METAL FINISH TO REMOVE ALL CONTAMINANTS AND RUST.
MIXING AND APPLICATION:
A. MIXING THE EPOXY RESIN GROUT: POUR THE ENTIRE CONTENTS OF COMPONENTS ‘A’ AND ‘B’ INTO AN APPROPRIATE MIXING VESSEL (E.G 5-GAL BUCKET) AND MIX FOR 30 SECONDS WITH A 1/2 IN. JIFFY MIXING PADDLE (5 IN. BLADE DIAMETER) ON A SLOW-SPEED (400-600 RPM) 3/4 IN. DRIVE DRILL, TAKING CARE NOT TO ENTRAIN AIR DURING MIXING. IT IS CRITICAL TO THE PERFORMANCE OF THE GROUT THAT THERE BE NO APPRECIABLE AIR BUBBLES IN THE RESIN. SLOWLY ADD THE ENTIRE CONTENTS OF COMPONENT ‘C’ AND MIX UNTIL UNIFORMLY BLENDED (APPROX. 5 MINUTES).
B. FORMING: THE FLOWABLE CONSITENCY OF THE EPOXY GROUT SYSTEM REQUIRES THE USE OF FORMS TO CONTAIN THE MATERIAL AROUND THE BASEPLATES AND AT TOPS OF COLUMNS TO BE REPAIRED. IN ORDER TO PREVENT LEAKAGE, COMPLETELY SEAL ALL FORMS. APPLY POLYETHYLENE FILM OR WAX TO ALL FORMS TO PREVENT ADHESION OF THE GROUT. PREPARE FORM WORK TO MAIANTAIN A 2 INCH (50MM) LIQUID HEAD TO FACILITATE PLACEMENT. A GROUT BOX THAT CAN BE ATTACHED TO THE FORM WILL ENHANCE THE FLOWABILITY. PROJECTED ANCHOR BOLTS SHOULD BE WRAPPED WITH NEOPRENE FOAM RUBBER (OR SIMILAR) TO PREVENT THE GROUT FORM ADHERING TO THE BOLTS. THE USE OF EXPANSION JOINTS IS RECOMMENDED ON LARGE POURS TO MINIMIZE THE POTENTIAL FOR CRACKING IN THE EPOXY GROUT (MINIMUM
3-4 FT. SPACING IN EACH DIRECTION.
C. POUR THE MIXED GROUT INTO THE PREPARED FORMS FROM ONE SIDE ONLY TO ELIMINATE AIR ENTRAPMENT. BASEPLATE SHOULD HAVE VENT HOLE AROUND PERIPHERY TO PREVENT AIR POCKETS FOR DEVELOPING. MAINTAIN THE LIQUID HEAD TO ENSURE INTIMATE CONTACT WITH THE BASEPLATE. PLUNGERS MAY BE USED TO EASE PLACEMENT. PLACE SUFFICIENT EPOXY GROUT INTO THE FORMS TO RISE SLIGHTLY ABOVE THE UNDERSIDE OF THE BASEPLATE. GROUT DEPTH OF 1 INCH (25 MM) MINIMUM REQUIRED.
D. ADHERE TO ALL LIMITATIONS AND CAUTIONS FOR THE EPOXY RESIN GROUT IN THE MANUFACTURERS CURRENT PRINTED LITERATURE.
CLEANING:
A. THE UNCURED EPOXY RESIN GROUT CAN BE CLEANED FROM TOOLS WITH AN APPROVED SOLVENT. THE CURED EPOXY RESIN GROUT CAN ONLY BE REMOVED MECHANICALLY.
B. LEAVE FINISHED WORK AND WORK AREA IN A NEAT, CLEAN CONDITION WITHOUT EVIDENCE OF SPILLOVERS ONTO ADJACENT AREAS.
EPOXY GROUT SPECIFICATIONS
MATERIAL PROPERTIES:
CONCRETE: W/C RATIO NOT TO EXCEED 0.45
FOOTINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . f'c = 4500 PSI SLAB-ON-GRADE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . f'c = 4000 PSI COLUMN REPAIR & BASE PLATES. . . . . . . . . . . . . . . . . (SEE EPOXY GROUT SPECS.)
CONCRETE FOR FOOTINGS AND SLABS:
CONCRETE SHALL BE BATCHED AND DELIVERED IN ACCORDANCE WITH (IAW) THE
REQUIREMENTS OF ASTM C 94. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE
STRENGTH IAW MATERIAL PROPERTIES TABLE, SLUMP BETWEEN 2 AND 5 INCHES, AN AIR
CONTENT OF 5 +/- 1.5%, A MAXIMUM NOMINAL SIZE COARSE AGGREGATE OF 1-1/2 INCH, IN
ACCORDANCE WITH ACI 304R, AND A MAXIMUM WATER CEMENT RATIO OF 0.45, AND SHALL
CONTAIN 20 PERCENT POZZOLANIC MATERIALS.
CONCRETE CURE TIME:
STRUCTURAL FOOTINGS TO HAVE (100%)*(F'c = 4500 PSI) CURE STRENGTH DEMONSTRATED
BY STRENGTH CYLINDER TESTS PRIOR TO APPLYING LOADING ONTO NEW FOOTINGS.
ACCELERATOR ADDATIVES PERMITTED WITH APPROVED MIX DESIGN, AND PLACEMENT
PLAN.
CONCRETE SLUMP: BETWEEN 2 AND 5 INCHES, W/C RATIO NOT TO EXCEED 0.45
CONCRETE & EPOXY GROUT TESTING
SAMPLES FOR COMPRESSIVE STRENGTH, AIR CONTENT, SLUMP, AND UNIT WEIGHT SHALL
BE OBTAINED AND TESTED EVERY SHIFT IAW ASTM C 31, ASTM C 39, ASTM C 231, ASTM C
143, AND ASTM C 138. THREE (3) SPECIMENS FOR STRENGTH WILL BE FABRICATED EVERY
SHIFT. ONE (1) WILL BE TESTED AT SEVEN (7) DAYS FOR INFORMATION AND TWO (2) WILL
BE TESTED AT TWENTY-EIGHT (28) DAYS FOR ACCEPTANCE.
THREE (3) 6" DIAMETERx12" LENGTH CYLINDERS MINIMUM FOR EACH TRUCK OF
CONCRETE PLACED EACH DAY FOR EACH 10 CY OF CONCRETE OR
EACH NEW FTG OR TOP OF COLUMN GROUT POURED, WHICHEVER IS LESS. CONCRETE OR
EPOXY GROUT USED FOR TESTS SHALL BE REPRESENTATIVE OF
CONCRETE ACTUALLY PLACED. TEST ONE CYLINDER AT 7 DAYS
AND TWO AT 28 DAYS. ADDITIONAL CONCRETE TEST CYLINDERS SHALL BE ADDED AS
DEAMED NECESSARY BY THE CONTRACTORS QUALITY CONTROL MANAGER TO PROVIDE
SUFFICIENT TESTING OF CONCRETE AND GROUT STRENGTHS ABOVE MINIMUM CYLENDERS
QUANTITIES.
PRODUCTS
A. CEMENT - ASTM C150 , TYPE II
B. COURSE AGGREGATE - ASTM C33 (NORMAL WEIGHT)
C. FINE AGGREGATE - ASTM C33
D. WATER - SHALL BE POTABLE WATER
E. ADMIXTURES - ASTM C260 AIR ENTRAINMENT ASTM C618
POZZOLAN & FLY ASH ASTM C494 WATER REDUCING, RETARDING,
ACCELERATION
REINFORCING STEEL
A. REBAR - NEW BILLET STEEL CONFORMING TO ASTM
A615/A615M, GRADE 60. WELDED REBAR: LOW ALLOW STEEL CONFORMING TO ASTM A706,
GRADE 60.
B. WELDED WIRE FABRIC - CONFORM TO ASTM A185
CONCRETE SPECIFICATIONS:
EXECUTION
A. CONCRETE SHALL BE MEASURED, MIXED AND TRANSPORTED
PER ACI 304. CONCRETE SHALL BE BATCHED AND DELIVERED IN ACCORDANCE THE
REQUIREMENTS OF ASTM C 94
B. MAX TEMPERATURE - 90 DEGREES F.
C. MAX TIME IN MIXER - 90 MINUTES
D. CURING SHALL BE PER ACI 308
E. TESTING PER ACI C31 AND SPECIAL INSPECTION NOTES
F. PROVIDE 3/4 CHAMFERS AT ALL EXPOSED CORNERS
G. SPACING OF CONTRACTION JOINTS AND CONSTRUCTION
JOINTS IN SLAB ON GRADE SHALL BE 20 FEET, MAX.
H. WELDING OF REINFORCING SHALL BE PER AWS D1.4.
I. DEVELOPMENT LENGTH OF STRAIGHT AND HOOKED BARS
SHALL BE PER ACI 318.
J. BAR LAPS, CLASS C LAPS UNLESS OTHERWISE NOTED. LAPS
SHALL BE PER ACI 318.
K. DETAILING SHALL BE PER ACI 315
CONCRETE SPECIFICATIONS US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
R :\d
2\
Tr ac y D
LA
W ar eh ou se
R ep ai rs
_S tru ct ur al .rv t 6/
3/
:3 3:
P
M
S-002
SP
EC
IF
IC
AT
IO
N S
TR
AC
Y
AR
M Y
D
EP
O T, T R
AC
Y
C
AL
IF
O
R N
IA
SA
C R
AM
EN
TO
D
IS
TR
IC
T
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
A.
J
O H
N
SO
N
A.
J
O H
N
SO
N
/S / M
. O N
IN
ES
M . O
N
IN
ES
JU
N
E 3, S-
SP
EC
N
O
D
ES
IG
N
F
IL
E N
O
0%
D
ES
IG
N
W
AR
EH
O
U
SE
ST
R
U C
TU
R
AL
R
EP
AI
R S
REQUIRED SPECIAL INSPECTIONS AND TESTS OF SOILS - TABLE 1705.6
1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE
TO ACHIVE THE DESIGN BEARING CAPACITY.
2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE
REACHED PROPER MATERIAL.
3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL
MATERIALS.
4. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES
DURING PLACEMENT AND COMPACTION OF COMPACTED FILL.
5. PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND
VERIFY THAT SITE HAS BEEN PREPARED PROPERLY.
INSPECTION REQUIRED CONTINUOUS PERIODIC
REFERENCED
STANDARD
REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION - IBC TABLE 1705.3
1. INSPECT REINFORCEMENT, INCLUDING PRESTRESSING TENDONS, AND
VERIFY PLACEMENT.
A. CERTIFIED MILL TEST REPORTS PROVIDED WITH EACH SHIPMENT
OF REINFORCING STEEL.
IBC 1908.4, ACI 318: CH. 20,
25.2, 25.3, 26.6.1 - 26.6.3
2. REINFORCING BAR WELDING:
A. VERIFY WELDABILITY OF REINF. BARS OTHER THAN ASTM A706
B. INSPECT SINGLE PASS FILLET WELDS, MAX. 5/16"
C. INSPECT ALL OTHER WELDS
AWS D1.4, ACI 318: 26.6.4
3. INSPECT ANCHORS AND EMBEDMENTS CAST IN CONCRETE. ACI 318: 17.8.2
4. INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE
MEMBERS:
A. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR
UPWARDLY INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSIONED
LOADS.
B. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT
DEFINED IN 4A.
ACI 318: 17.8.2
MANUFACTURER'S ICC
REPORT
5. VERIFY USE OF REQUIRED DESIGN MIX. IBC: 1904.1, 1904.2, 1908.2,
1908.3
ACI 318: CH. 19, 26.4.3,
26.4.4
6. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR
STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, AND
DETERMINE THE TEMPERATURE OF THE CONCRETE.
IBC 1908.10, ASTM C172,
ASTM C31
ACI 318: 26.5, 26.12
7. INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR
PROPER APPLICATION TECHNIQUES.
IBC: 1908.6, 1908.7, 1908.8
ACI 318: 26.5
8. VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE
AND TECHNIQUES.
IBC 1908.9, ACI 318: 26.5.3 -
26.5.5
9. INSPECT PRESTRESSED CONCRETE FOR:
A. APPLICATION OF PRESTRESSING FORCES
B. GROUTING OF BONDED PRESTRESSING TENDONS
ACI 318: 26.10
10. INSPECT ERECTION OF PRECAST CONCRETE MEMBERS. ACI 318: 26.9
11. VERIFY IN-SITU CONCRETE STRENGTH, PRIOR TO STRESSING
OF TENDONS IN POST-TENSIONED CONCRETE AND PRIOR TO
REMOVAL OF SHORES AND FORMS FROM BEAMS AND
STRUCTURAL SLABS.
ACI 318: 26.11.2
12. INSPECT FORMWORK FOR SHAPE, LOCATION AND
DIMENSION OF THE CONCRETE MEMEBER BEING FORMED. ACI 318: 26.11.1.2(B)
REQUIRED SPECIAL INSPECTIONS AND TESTS STRUCTURAL STEEL - IBC 1705.2
INSPECTION REQUIRED
1. VERIFY FABRICATOR CERTIFICATION. IBC 1704.2.5.1
4. INSPECTION TASKS PRIOR TO WELDING:
A. WELDING PROCEDURE SPECIFICATIONS AVAILABLE
B. MANUFACTURER CERTIFICATIONS FOR WELDING
CONSUMABLES AVAILABLE
C. MATERIAL IDENTIFICATION (TYPE/GRADE)
D. WELDER IDENTIFICATION SYSTEM
E. FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY)
F. FIT-UP OF GROOVE CJP WELDS OF HSS, T-, Y- AND K-
JOINTS WITHOUT BACKING
G. CONFIGURATION OF FINISH ACCESS HOLES
H. FIT-UP OF FILLET WELDS
AISC 341: J6.1
AISC 360: N5.4-1
AWS D1.1
5. INSPECTION TASKS DURING WELDING:
A. USE OF QUALIFIED WELDERS
B. CONTROL AND HANDLING OF WELDING CONSUMABLES
C. NO WELDING OVER CRACKED TACK WELDS
D. ENVIRONMENTAL CONDITIONS
E. WPS FOLLOWED
F. WELDING TECHNIQUES
G. PLACEMENT AND INSTALL OF STEEL HEADED STUD ANCHORS
AISC 341: J6.1
AISC 360: N5.4-2
AWS D1.1
6. INSPECTION TASKS AFTER WELDING:
A. WELDS CLEANED
B. SIZE, LENGTH AND LOCATION OF WELDS
C. WELDS MEET VISUAL ACCEPTANCE CRITERIA
D. ARC STRIKES
E. K-AREA
F. BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED)
G. REPAIR ACTIVITIES
H. DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT
OR MEMBER
I. NO PROHIBITED WELDS HAVE BEEN ADDED WITHOUT THE
APPROVAL OF THE EOR
AISC 341: J6.1
AISC 360: N5.4-3
AWS D1.1
7. INSPECTION TASKS PRIOR TO HIGH-STRENGTH BOLTING:
A. MANUFACTURER'S CERTIFICATION AVAILABLE FOR FASTENER
MATERIALS
B. FASTENERS MARKED IN ACCORDANCE WITH ASTM
REQUIREMENTS
C. PROPER FASTENERS SELECTED FOR THE JOINT DETAIL
(GRADE, TYPE, BOLT LENGTH IF THREADS ARE TO BE EXCLUDED FROM
SHEAR PLANE)
D. PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL
E. CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE
FAYING SURFACE CONDITION AND HOLE PREPARATION, IF SPECIFIED,
MEET APPLICABLE REQUIREMENTS
F. PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION
PERSONNEL OBSERVED AND DOCUMENTED FOR FASTENER ASSEMBLIES
AND METHODS USED
G. PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS
AND OTHER FASTENER COMPONENTS
AISC 341: J7
AISC 360: N5.6-1
8. INSPECTION TASKS DURING HIGH STRENGTH BOLTING:
A. FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN
ALL HOLES AND WASHERS (IF REQUIRED) ARE POSITIONED AS
REQUIRED
B. JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO
THE PRE-TENSIONING OPERATION
C. FASTENER COMPONENT NOT TURNED BY THE WRENCH
PREVENTED FROM ROTATING
D. FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE
RCSC SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE
MOST RIGID POINT TOWARD THE FREE EDGES
9. DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS AISC 360: N5.6-3
2. MATERIAL VERIFICATION OF CORRECT STRUCTURAL STEEL MATERIAL ASTM SPECIFICATION
3. INSPECTION OF WELDING:
A. SINGLE PASS FILLET
B. COMPLETE AND PARTIAL PENETRATION GROOVE WELDS,
MULTI-PASS FILLET, SINGLE PASS FILLET OVER 5/16 INCH
AISC 341: J6.1
AISC 360: N5.4
AWS D1.1
3. REVIEW OF MATERIAL TEST REPORTS AND CERTIFICATIONS FOR
COMPLIANCE WITH CONSTRUCTION DOCUMENTS.
AISC 360: N3.2, N5.2
REQUIRED SPECIAL INSPECTIONS WOOD CONSTRUCTION - IBC 1705.5
1. ROOF DIAPHRAGMS
A. WOOD STRUCTURAL PANEL SHEATHING RATING AND
THICKNESS ACCORDING TO THE CONSTRUCTION DOCUMENTS
B. NAILING SPACING
2. HIGH LOAD ROOF DIAPHRAGMS
A. FRAMING MEMBER NOMINAL SIZE AT ADJOINING PANEL EDGES
B. NAILING NUMBER OF FASTENER LINES, SPACING BETWEEN
FASTENERS, AND DIAMETER AND LENGTH, EDGE MARGINS
IBC 1705.5.1
3. FIELD GLUING OPERATIONS OF ELEMENTS OF THE LATERAL FORCE
RESISTING SYSTEM.
4. NAILING, BOLTING, ANCHORING AND OTHER FASTENING OF
ELEMENTS OF THE LATERAL FORCE RESISTING SYSTEM INCLUDING
SHEAR WALLS, DRAG STRUTS, BRACES AND HOLD DOWNS WHERE
FASTENTER SPACING IS 4 INCHES OR LESS ON CENTER.
IBC: 1705.11.1, 1705.12,
1705.12.2
IBC: 1705.11.1, 1705.12,
1705.12.2
5. PLATE CONNECTED WOOD TRUSSES
A. VERIFY, WHERE OVERALL HEIGHTS OF 60 INCHES OR
GREATER, INSTALLATION OF PERMANENT INDIVIDUAL TRUSS MEMBER
RESTRAINT/BRACING IN ACCORDANCE WITH THE APPROVED TRUSS
SUBMITTAL
B. VERIFY DURING CONSTRUCTION, WHERE CLEAR SPAN IS 60
FEET OR GREATER, TEMPORARY INSTALLATION RESTRAINT/BRACING
INSTALLED IN ACCORDANCE WITH APPROVED TRUSS SUBMITTAL
IBC: 1705.5.2
REQUIRED SPECIAL INSPECTIONS COLD-FORMED STEEL LIGHT-FRAME CONSTRUCTION
1. WELDING OPERATIONS OF ELEMENTS OF THE LATERAL FORCE
RESISTING SYSTEM.
2. SCREW ATTACHEMNT, BOLTING, ANCHORING AND OTHER FASTENING
OF ELEMENTS OF THE LATERAL FORCE RESISTING SYSTEM INCLUDING
SHEAR WALLS, BRACES, DIAPHRAGMS, DRAG STRUTS, COLLECTORS,
AND HOLD DOWNS WHERE FASTENTER SPACING IS 4 INCHES OR LESS
ON CENTER.
IBC: 1705.11.2, 1705.12.3
FREQUENCY
CONTINUOUS PERIODIC
REFERENCED
STANDARD
FREQUENCY
AISC 341: J7
AISC 360: N5.6-2
SPECIAL INSPECTIONS
1. STRUCTURES HAVE BEEN DESIGNED WITH MATERIALS THAT REQUIRE SPECIAL INSPECTION AND/OR MATERIAL TESTING.
2. SPECIAL INSPECTIONS ARE CONDUCTED IN ACCORDANCE WITH 2018 IBC CHAPTER 17 BY A CERTIFIED SPECIAL INSPECTOR AND ESTABLISHED INSPECTION AGENCY LICENSED TO PERFROM THE INSPECTION IN THE JURISDICTION WORK IS TO BE
COMPLETED.
3. THE TESTING AGENCY WILL PROVIDE COPIES OF ALL STRUCTURAL TESTING AND INSPECTION REPORTS DIRECTLY TO THE
GOVERNMENT.
4. CONTRACTOR RESPONSIBILITIES ARE OUTLINED IN IBC SECTION 1704.4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATION OF SPECIAL INSPECTION WITH PROJECT SCHEDULE.
5. INSPECTIONS ARE PERFORMED IN ACCORDANCE WITH THE BREAKDOWNS OF MATERIAL SUBSETS REFERENCED IN 2018 IBC TABLES, AND PER THE REFERENCED DESIGN STANDARDS. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION PERTAINING TO THIS PROJECT. SPECIAL INSPECTOR DUTIES AND RESPONSIBILITIES ARE OUTLINED IN IBC SECTION 1704.2 AND 1704.3.
A. STEEL CONSTRUCTION IN ACCORDANCE WITH AISC 360 CHAPTER N, AISC 341 AND IBC SECTION 1705.2.
B. CONCRETE CONSTRUCTION IN ACCORDANCE WITH IBC TABLE 1705.3.
C. LEVEL 2 CMU IN ACCORDANCE WITH IBC SECTION 1705.4.
D. WOOD CONSTRUCTION IN ACCORDANCE WITH IBC SECTION 1705.5.
E. SOILS IN ACCORDANCE WITH IBC TABLE 1705.6.
6. PREFABRICATED WORK MUST BE PERFORMED BY AN APPROVED FABRICATOR, LICENSED IN ACCORDANCE WITH THE
GOVERNING AGENCY. SEE IBC SECTION 1704.2.5.
7. INSPECTION OF POST INSTALLED CONCRETE ANCHORS, INCLUDING EPOXY AND ADHESIVE GROUTED SHALL INCLUDE ALL PROVISIONS OF THE MANUFACTURERS ICC REPORT INCLUDING VISIAL VERIFICATION OF INSTALLATION PROCEDURES, HOLD DRILLED DEPTH, SPACING, EDGE DISTANCE, CLEANDING, CONCRETE CURING AGE, AND TEMPERATURE. ANCHORS MUST BE
INSTALLED ONLY BY QUALIFIED PERSONNEL.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
R :\d
2\
Tr ac y D
LA
W ar eh ou se
R ep ai rs
_S tru ct ur al .rv t 6/
3/
:3 3:
P
M
S-003
SP
EC
IA
L
IN
SP
EC
TI
O N
S
TR
AC
Y
AR
M Y
D
EP
O T, T R
AC
Y
C
AL
IF
O
R N
IA
SA
C R
AM
EN
TO
D
IS
TR
IC
T
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
A.
J
O H
N
SO
N
A.
J
O H
N
SO
N
/S / M
. O N
IN
ES
M . O
N
IN
ES
JU
N
E 3, S-
SP
EC
N
O
D
ES
IG
N
F
IL
E N
O
0%
D
ES
IG
N
W
AR
EH
O
U
SE
ST
R
U C
TU
R
AL
R
EP
AI
R S
N /A
CONCRETE TESTING:
THREE CYLINDERS FOR EACH TRUCK OF CONCRETE PLACED EACH DAY FOR EACH 10 CY OF CONCRETE OR EACH NEW FTG OR TOP OF COLUMN GROUT POURED, WHICHEVER IS LESS. CONCRETE USED FOR TESTS SHALL BE
REPRESENTATIVE OF CONCRETE ACTUALLY PLACED. TEST ONE CYLINDER AT 7 DAYS
AND TWO AT 28 DAYS
DAMAGED SPALLED COLUMN
SECTION 5 SECTION 4 SECTION 3
S-502
S-502
DAMAGED SPALLED COLUMN
S-502
DAMAGED SPALLED COLUMN
DAMAGED SPALLED COLUMN
S-502
S-502
S-503
Sim
S-504
Sim
DAMAGED SPALLED COLUMN
DAMAGED SPALLED COLUMN
S-502
S-503
Sim
S-504
Sim
S-502
S-502
S-503
Sim
S-504
Sim
S-502
S-502
S-502
S-503
Sim
S-504
Sim
S-502
S-502
S-502
S-503
Sim
S-504
Sim
____________________________________________________1
S-502
S-502
S-503
Sim
S-504
Sim
PLAN
N
O R
TH
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
R :\d
2\
Tr ac y D
LA
W ar eh ou se
R ep ai rs
_S tru ct ur al .rv t 6/
3/
:3 3:
P
M
S-101
FO
U
N D
AT
IO
N P
LA
N
S O
U
TH
H
AL
F
TR
AC
Y
AR
M Y
D
EP
O T, T R
AC
Y
C
AL
IF
O
R N
IA
SA
C R
AM
EN
TO
D
IS
TR
IC
T
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
A.
J
O H
N
SO
N
A.
J
O H
N
SO
N
/S / M
. O N
IN
ES
M . O
N
IN
ES
JU
N
E 3, S-
SP
EC
N
O
D
ES
IG
N
F
IL
E N
O
0%
D
ES
IG
N
W
AR
EH
O
U
SE
ST
R
U C
TU
R
AL
R
EP
AI
R S
DAMAGED SPALLED COLUMN
SECTION 2 SECTION 1SECTION 3
DAMAGED SPALLED COLUMN
S-502
S-502
S-502
S-503
Sim
S-504
Sim
S-502
S-502
S-502
S-503
Sim
S-504
Sim
PLAN
N
O R
TH
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
R :\d
2\
Tr ac y D
LA
W ar eh ou se
R ep ai rs
_S tru ct ur al .rv t 6/
3/
:3 3:
P
M
S-102
FO
U
N D
AT
IO
N P
LA
N
N O
R
TH
H
AL
F
TR
AC
Y
AR
M Y
D
EP
O T, T R
AC
Y
C
AL
IF
O
R N
IA
SA
C R
AM
EN
TO
D
IS
TR
IC
T
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
A.
J
O H
N
SO
N
A.
J
O H
N
SO
N
M . O
N
IN
ES
JU
N
E 3, S-
SP
EC
N
O
D
ES
IG
N
F
IL
E N
O
0%
D
ES
IG
N
W
AR
EH
O
U
SE
ST
R
U C
TU
R
AL
R
EP
AI
R S
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
R :\d
2\
Tr ac y D
LA
W ar eh ou se
R ep ai rs
_S tru ct ur al .rv t 6/
3/
:3 3:
P
M
S-103
SO
U
TH
R
O O
F
FR
AM
IN
G P
LA
N
TR
AC
Y
AR
M Y
D
EP
O T, T R
AC
Y
C
AL
IF
O
R N
IA
SA
C R
AM
EN
TO
D
IS
TR
IC
T
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
A.
J
O H
N
SO
N
A.
J
O H
N
SO
N
/S / M
. O N
IN
ES
M . O
N
IN
ES
JU
N
E 3, S-
SP
EC
N
O
D
ES
IG
N
F
IL
E N
O
0%
D
ES
IG
N
W
AR
EH
O
U
SE
ST
R
U C
TU
R
AL
R
EP
AI
R S
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
R :\d
2\
Tr ac y D
LA
W ar eh ou se
R ep ai rs
_S tru ct ur al .rv t 6/
3/
:3 3:
P
M
S-104
N O
R
TH
R O
O F
FR
AM
IN
G
P
LA
N
TR
AC
Y
AR
M Y
D
EP
O T, T R
AC
Y
C
AL
IF
O
R N
IA
SA
C R
AM
EN
TO
D
IS
TR
IC
T
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
A.
J
O H
N
SO
N
A.
J
O H
N
SO
N
/S / M
. O N
IN
ES
M . O
N
IN
ES
JU
N
E 3, S-
SP
EC
N
O
D
ES
IG
N
F
IL
E N
O
0%
D
ES
IG
N
W
AR
EH
O
U
SE
ST
R
U C
TU
R
AL
R
EP
AI
R S
S-502
(E) 2" DRYPACK
MORTAR
GRID
3/16
(E) WF-
BEAM3/16
(E) DAMAGED
CONCRETE
WALL COLUMN
(E) 7" SLAB WITH #3 AT
12" O.C. PER ASBUILTS
PROTECT (E)
CONC. WALL.
(N) 3/8" PLT
(E) ANGLE CLIP &
ANCHORS TO
REMAIN
3/4" THK X GR. 50 PLT W/ (4) 13/16" WIDE
SHORT SLOTTED HOLES IN BEARING
PLATE, FIELD DRILL BEAM WEB FOR
SLOTTED BOLT HOLES ALIGNED
WIRE BRUSH TO BARE
METAL PRIOR TO WELDING.
PRIME AND PAINT TO
MATCH AFTER WELDED.
(N) (4 QTNY) 3/4" A490 THRU BOLTS AT
1 1/2" MIN. EDGE DIST. EA. WAY TYP.
COL. FTG
S-501
(E) FTG
RELOCATE (E)
UTILITIES OFF OF
CONC. COL. IN
WAY OF (N)
STEEL COL.
(N) HP8X36 COL. TIGHT
TO CONC. COL. FACE
(E) STEEL METAL
ROOF DECK
(E)
OWJ.
(E)
OWJ.
3/16
(E)
OWJ.
TOP FTG
-2'-0"
BOT. GIRDER BM
VARIES. 20'-6"
APROX. NEAR
WALL BY DIST.
LASOR. FIELD
VERIFY.
BOT. BM
VARIES: (BM
SLOPES WITH
ROOF DECK PITCH
SEE ASBUILTS
BOT. DECK
VARIES.
PROTECT (E) SLAB
BARS HOOKED INTO
WALL PANELS PER
ASBUILTS
PROTECT (E)
CONC. COL. WITH
#9 VERTS, AND #
2 STIRUPS AT 12"
8"
2' - 0" 3/4"
VARIES: APROX. 7" TO 9-1/2" BY BM SIZE & LOCATION.
S-503
Sim
(6) 3/8" TYP.
GUSSET
COPE COL FOR SLOPED BEARING PLATE.
(E ) M
IL
LE
D P
LT
(N) 3/8 THK BOX IN PLTS
3"
1"
1/
2"
7 3/8"
(N) 3/8
THK BOX
IN PLTS
TOP SLAB 0'-0"
5 5/8" 5 5/8"
2 13/16" 1 1/2" 1 3/4"
3/ 8" 1/2"
1' - 2"
5"
PLT
3/4"
1'
9"
1' - 2" 3/16
HP TO PLT
2" 2"
2"
(N) (5 QTNY) 3/4" X 0'-5"
MIN. EMBED HILTI EXP
ANCHOR OR EQUAL
HAMMER INTO CLEAN
TIGHT DRILLED
HOLES.
PLAN VIEW
8"
1/
8"
3/16
GUSSET,
TYP.
(N) 3/8 THK BOX IN
PLTS W/ SQ GROVE
WELDS BURNED IN
FLUSH TO PLTS EDGE
3/16
BOT. PLTS
8-1/2"
HEIGHT
4' - 0"
4'
0"
TEMP. SHORING AT WALL PHASE 1, LIFE SAFETY SHORING.
TEMP SHORING COL. CAN BE USED AS PRODUCTION
PERMANENT REPAIR, WITH ADDITION OF FTG AND CAST-IN-
PLACE ANCHORS PER 3/S-503 ON TEMP SHORING BASE PLT AS
SHOWN, TO HAVE PRODUCTION PERMANENT REPAIR
INSTALLED S-503 OR S-504 WITHIN 5 YEARS MAX.
PHASE 2 SAW CUT SLAB EXTENTS NOT PERMITTED WITHOUT S-502
INTERMEDIATE SHORING COL. IN PLACE, OR OTHER ENGINEERED
SHORING DESIGNED BY OTHERS AND SUBMITTED FOR GOV. APPROV.
OR BEVEL
GROVE WELD
PLT BEYOND SHOWN OFF
SET FOR CLARITY
3/16
FLUSH
(E) CONC.
WALL COL.
SEE ASBUILTS
COL. LOADED SLAB
PROTECTED ZONE
2"
3/
" M
AX
S Q
G R
O V E
R O
O T
G
AP
M
IN
1/
8"
1/8"
MIN.
1/8"
IF
/8 " G
AP
/3
2" 3/
8"
IF 1/8" GAP EA. SIDE
6 7/8"
3/ 8"
OR SQ GROVE
WELD BURNED
IN HOT
3/ 8"
1/8" TO 3/16"
1/ 8"
1/8" 1/8"
4"
3/16
HP TO PLT
3/4 GRADE 50 BEARING SHIM
PLATE SHIP LOOSE, SHOP
DRILL 13/16" WIDE (1/16"
LARGER THAN BOLT DIA.) BY
1-1/2" SHORT SLOTTED
HOLES WITH 1-1/2" MIN EDGE
DISTANCE EA. WAY TYP.
BEAM ABOVE
8"
8 1/8"
9 1/2"
3"
1/
2"
1/ 2"
1/ 2"
FIELD DRILL BEAM
WEB FOR SHORT
SLOTTED HOLES
HOLES. USE SHIM
PLT. AS TEMPLATE.
TORCH OR PLASMA
CUTTER, NOT
PERMITTED
1/
2"
1/ 2"
C L
1 3/4" 1 3/4"
1'
1/
2"
1/
3 7/8"
3 7/8" 3/16 8
WELD SHIM TO
BMSL
O
TT
ED
H
O
LE
1/
2"
3/ 4"
3/ 4"
TO
P
C O
L.
P
LT
1'
4"
M
IN
. T
YP
SL
O
T
ED
G E
C O
VE
R
3/
4" M
IN
. T
O W
EL
D
ED
P
LT
E
N D
H O
LE
E
D G
E C
LR
3/
4"
3/
4"
2"
M
IN
3/
4"
3/16
/3 2"
1/
2"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
R :\d
2\
Tr ac y D
LA
W ar eh ou se
R ep ai rs
_S tru ct ur al .rv t 6/
3/
:3 3:
P
M
S-501
TE
M
P.
C
O L.
R
EP
AI
R
S H
O R
IN
G
TR
AC
Y
AR
M Y
D
EP
O T, T R
AC
Y
C
AL
IF
O
R N
IA
SA
C R
AM
EN
TO
D
IS
TR
IC
T
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
A.
J
O H
N
SO
N
A.
J
O H
N
SO
N
/S / M
. O N
IN
ES
M . O
N
IN
ES
JU
N
E 3, S-
SP
EC
N
O
D
ES
IG
N
F
IL
E N
O
0%
D
ES
IG
N
W
AR
EH
O
U
SE
ST
R
U C
TU
R
AL
R
EP
AI
R S
N /A
1/2" = 1'-0"S-501
1 TYP. TEMP. SHORING COLUMN AT WALL
1 1/2" = 1'-0"S-501
2 BASE PLT. BOT COL. TEMP SHORING AT WALL
1 1/2" = 1'-0"S-501
BEARING PLT. TOP COL. AT WALL TEMP
SHORING
(E) WF-BEAM
(E) 7" SLAB WITH #3 AT
12" O.C. PER ASBUILTS
DO NOT EXCAVATE DEEPER THAN
EXISTING FTG.
3/4" THK X GR. 50 BEARING PLATE,
FIELD DRILL BEAM FLANGE FOR STD
BOLT HOLES
(N) (4 QTNY) 3/4" A490 THRU BOLTS AT
1 1/2" MIN. EDGE DIST. EA. WAY TYP.
TEMP. SHORING SYSTEM
REQUIRED PRIOR TO DEMO,
OR EXCAVATION OF (N) FTG.
3/4" THICK X 2'-0" X 2'-0" MIN. BEARING
PLATE ON SLAB.
(N) 3/8" PLT
EA. SIDE TYP.
3/16
3/16 8
WELD SHIM TO
BM
(N) HP8X36 TEMP.
SHORING COL.
3/16
3/16
SHOP WELD
BOT. GIRDER BM
VARIES.
CONTRACTOR TO
VERIFY AND
COORDINATE WITH
STEEL
FABRICATOR.
FIELD DRILL BEAM WEB FOR
STD BOLT HOLES. TORCH OR
PLASMA CUTTER, NOT
PERMITTED
1"
TYP.
1 1/2"
1 1/2"
TYP.
1 1/2" 1"
M
IN
. C U
T
PL
T
SL
O
PE
1' - 4 1/2"
VAR
IES
2' - 0"
3/4"
TEMP. SHORING COL.
AT DAMAGED CONC.
COL. LOCATIONS PER
PLAN
1/
2"
3"
1"
1"
3/8" PLT
TYP.
GUSSET
W
IT
H F
AB
R
IC
AT
O R
F O
R T
IG
H
T
FI
T.
SL
O
PE
D
S H
IM
W
EL
D
ED
T
O B
EA
M
C O
N
TR
AC
TO
R T
O V
ER
IF
Y
C O
O R
D
IN
AT
E
5" M
IN
(N) 3/8 THK BOX IN
PLTS EA. SIDE
EXCAVATION LIMITS1
1' - 6"
4'-0" MIN
SAW CUT (E) 7" SLAB
WITH #3 AT 12" O.C. PER
ASBUILTS
UNDERMINED SLABS
BACKFILLED WITH
CONCRETE.
EXCAVATION.
SEE S-001 MATERIAL PROPERTIES, GENERAL
NOTES, AND STEEL NOTES:
CONTRACTOR TO VERIFY ALL DIMENSIONS AND
COORDINATE WITH STEEL FABRICATOR.
SEE DEFFERED STEEL FABRICATION SUBMITAL
NOTES.
INSURE BEARING PLATE DRILLED SLOTTED
HOLES ALIGN WITH W-MEMBER FLANGE
DRILLED STD HOLES WITH ALIGNED SMOOTH
CLEAN EDGES. GREASE BOLTS, CONTACT
SURFACES BETWEEN PLTS, AND TIGHTEN
BOLTS IN MIDDLE OF FABRICATED SLOTTED
BOLT HOLES TO ALLOW FOR THERMAL
EXPANSION.
TOP SLAB 0'-0"
S-502
S-502
GRADE 50, 1/2" THK X 8 1/2" X
7 1/2" FACE PLATE EA. SIDE
TYP.
3/4"
3/4"
3/16
3/4 GRADE 50
BEARING SHIM
PLATE SHIP
LOOSE, SHOP
DRILL 13/16"
WIDE BY 1-1/2"
SHORT SLOTTED
HOLES WITH
1-1/2" MIN EDGE
DISTANCE EA.
WAY TYP.
BEAM ABOVE
8"
8 1/8"
9 1/2"
3"
1/
2"
1/ 2"
1/ 2"
FIELD DRILL BEAM
WEB FOR SHORT
SLOTTED HOLES
HOLES. USE SHIM
PLT. AS TEMPLATE.
TORCH OR PLASMA
CUTTER, NOT
PERMITTED
1/
2"
1/ 2"
C L
1 3/4" 1 3/4"
PL
T
(S
H
IM
1'
6"
SH
IM
P
LT
1'
6"
1/
3 7/8"
3 7/8"
1/
2"
1/ 2"
G U
S S
ET
3"
3/16 8
WELD SHIM TO
BMSL
O
TT
ED
H
O
LE
1/
2"
3/ 4"
3/ 4"
TO
P
C O
L.
P
LT
BE
AR
IN
G
P
LT
'-4
/2
GRADE 50, 1/2" THK X 8 1/2" X
7 1/2" FACE PLATE EA. SIDE
TYP.
TO
E
D G
E P L
T.
M
IN
C
O
VE
R
SL
O
T
ED
G E
1/
2"
1/ 4"
1/
4"
1/
2"
3/ 4"
3/ 4"
1/
2"
3/ 4"
3/ 4"
PL
T
1'
1/
2"
2'
0"
2' - 0" 3/16
HP TO PLT
2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .