B.08.02 W911KB20R0005 Released Solicitation.pdf

PDF 3 MB Posted

Attached to
Fence-To Fence Environmental Compliance Contract, Various Locations in Alaska and the Pacific Division AOR
Solicitation number
W911KB-20-R-0005
Issued by

View the file

Other files

File Type Posted
DOD Safe Instructions.docx DOCX document
Amendment 0003 - Bid Schedule_F2F_04202020.xlsx XLSX spreadsheet
Amendment 0003 - Contractor Questions and Government Answers.pdf PDF
Amendment 0003 - F2F_Sub-CLIN Structure revised 20 april 2020.xlsx XLSX spreadsheet
W911KB20R0005-0003 SF30 and Conformed Copy.pdf PDF
Amendment 0002 - Schedule B - F2F Bid Schedule.xlsx XLSX spreadsheet
W911KB20R0005-0002 Amendment and Conformed Solicitation.pdf PDF
Amendment 0002 - SCU Operators Manual.pdf PDF
Amendment 0002 - 2017 JBER-R Closed Landfill Annual Report.pdf PDF
Amendment 0002 - JBER Integrated Solid Waste Management Plan (ISWMP) - 22 November 2019.pdf PDF
Amendment 0002 - SF33 Attachment L-1 Past Performance Quality Questionaire (Revised Amendment 0002).docx DOCX document
Amendment 0002 - F2F_Sub-CLIN Structure revised 7 april 2020.xlsx XLSX spreadsheet
Amendment 0002 - Appendix E Brass Deforming Operations_v2 (printed).pdf PDF
Amendment 0002 - JBER OU1 Landfill Fence Information.pdf PDF
Amendment 0002 - Contractor Questions and Government Answers.pdf PDF
W911KB20R0005-0001-Amendment.pdf PDF
B.07.01 Eielson Site Visit HWF Tour.mp4 MP4 file
B.07.01 JBER HW CAA Bldg 4314 Pictures.pdf PDF
B.08.02 Attachemnt J-3 Eielson_GFP_F2F_CEIE Final.pdf PDF
B.08.02 Attachemnt J-2 JBER_GFP_F2F_CEIE Final.pdf PDF
B.08.02 Attachement B-1 CLIN Sub-CLIN Structure.xlsx XLSX spreadsheet
B.08.02 Attachment J-4 QASP_F2F.pdf PDF
B.08.02 Attachment J-1 GFI Table of Contents 2020-01-15.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 20 Apr 2020

X

A X B X C

D

EX

X G F 306 - 308

309 - 330 X H 331 - 339

John.L.McComas@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 339

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W911KB 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

JOHN L MCCOMAS 907-753-2593

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 95

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

96 - 249 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

250 - 251

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 253 - 257 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 258 - 260 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

261 - 304

PART II - CONTRACT CLAUSES

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

20 Mar 2020

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W911KB20R0005

Section A - Solicitation/Contract Form

EXECUTIVE SUMMARY

1. The objective of this contract is to provide Fence-To-Fence Environmental Operations and Services in support of customers serviced by the U.S. Army Corps of Engineers (USACE), Alaska District to include the United States Air Force (USAF) and Air Force Civil Engineer Center (AFCEC). Environmental Services work executed under this Fence-to-Fence contract will include, but are not limited to: Environmental Compliance Support; Air Emissions Inventory (AEI) Data Management; Recordkeeping, Title V; Recordkeeping, Minor and Minor General;

Reporting, Emergency Planning and Community Right-to-Know Act (EPCRA); Installation HAZMAT Management Program Manager (IHMP) Support; Hazardous Waste (HW) Management Support; HW Management Plan Update; Hazardous Waste; Recycling, Integrated Solid Waste; Other Regulated Waste; Pollution Prevention; Sampling, Analysis and Monitoring (SAM); Plan Updates; Environmental Media Inspections; Spill Prevention Control and Countermeasure (SPCC) Recertification / Facility Response Plan (FRP) Resubmission; Oil Discharge Prevention and Contingency Plan (C-Plan); Oil Discharge Prevention and Contingency Plans (ODPCP); Storm water Reports. Examples of specific services include tasks such as operating, maintaining, and optimizing pollution control; characterizing waste streams;

performing environmental monitoring, sampling, and analysis; operating a hazardous waste accumulation site; inspections, and updating existing environmental plans. The single-award task order contract (SATOC) indefinite-delivery contract tool is anticipated to support various environmental services within the USACE Alaska District, to include but not limited to Joint Base Elmendorf-Richardson (JBER), Eielson Air Force Base (EAFB), Clear Air Force Station (CAS) and Pacific Regional Support Center (PRSC) areas of responsibility. Primary performance locations will be within the State of Alaska, but some work may be performed outside of Alaska but within the USACE POD area of responsibility (AOR).

2. A Single Award Task Order Contract (SATOC) will be made from this solicitation, W911KB20R0005. This requirement is being competed as a 100% Total Small Business Set- Aside under the North American Industry Classification System (NAICS) Code 562910, Environmental Remediation Services. The small business size stardard per the SBA Table of Small Business Size Standards is 750 employees. The single award issued under this solicitation is a requirements indefinite delivery contract (IDC) and the maximum limit of the contractor’s obligation to deliver is $35 Million (M).

3. The resultant contract awarded from this solicitation will constitute a Requirements IDC as defined in the Federal Acquisition Regulation (FAR) 16.503. Task orders will be awarded against the IDC will be firm-fixed price (FFP). This solicitation is for a base period of 1-year and four option periods of 1-year for total contract period of performance of 5-years. Per FAR 52.216-19, Order Limitations, a minimum order about of $10,000 and a maximum order amount of $10,000,000 per single order established for this SATOC.

4. The minimum guarantee amount for this SATOC award shall be $10K for the entire contract, including option periods, if exercised.

5. The USACE Alaska District will remain the Procurement Contracting Office and no other agency can make changes to any Indefinite Delivery Contract award or resultant contract.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

EAFB-HW Contract Support

FFP

HW Contract Support PWS Para 2.1.1

NET AMT

0001AA 1 Task EAFB-HW Contract Support

FFP

HW Contract Support PWS Para 2.1.1 (Base Year) FOB: Destination

0001AB 1 Task OPTION EAFB-HW Contract Support

FFP

HW Contract Support PWS Para 2.1.1 (Option Year 1)

0001AC 1 Task OPTION EAFB-HW Contract Support

FFP

HW Contract Support PWS Para 2.1.1 (Option Year 2)

0001AD 1 Task OPTION EAFB-HW Contract Support

FFP

HW Contract Support PWS Para 2.1.1 (Option Year 3)

0001AE 1 Task OPTION EAFB-HW Contract Support

FFP

HW Contract Support PWS Para 2.1.1 (Option Year 4)

JBER-HW Contract Support PWS

HW Contract Support PWS Para 2.1.1

0002AA 1 Task JBER-HW Contract Support PWS

FFP

HW Contract Support PWS Para 2.1.1 (Base Year)

0002AB 1 Task OPTION JBER-HW Contract Support PWS

FFP

HW Contract Support PWS Para 2.1.1 (Option Year 1)

0002AC 1 Task OPTION JBER-HW Contract Support PWS

FFP

HW Contract Support PWS Para 2.1.1 (Option Year 2)

0002AD 1 Task OPTION JBER-HW Contract Support PWS

FFP

HW Contract Support PWS Para 2.1.1 (Option Year 3)

0002AE 1 Task OPTION JBER-HW Contract Support PWS

FFP

HW Contract Support PWS Para 2.1.1 (Option Year 4)

EAFB-IHMP Support

IHMP Support PWS Para 2.1.7

0003AA 1 Task EAFB-IHMP Support

FFP

IHMP Support PWS Para 2.1.7 (Base Year)

0003AB 1 Task OPTION EAFB-IHMP Support

FFP

IHMP Support PWS Para 2.1.7 (Option Year 1)

0003AC 1 Task OPTION EAFB-IHMP Support

FFP

IHMP Support PWS Para 2.1.7 (Option Year 2)

0003AD 1 Task OPTION EAFB-IHMP Support

FFP

IHMP Support PWS Para 2.1.7 (Option Year 3)

0003AE 1 Task OPTION EAFB-IHMP Support

FFP

IHMP Support PWS Para 2.1.7 (Option Year 4)

JBER-IHMP Support

0004AA 1 Task JBER-IHMP Support

FFP

IHMP Support PWS Para 2.1.7 (Base Year)

0004AB 1 Task OPTION JBER-IHMP Support

FFP

IHMP Support PWS Para 2.1.7 (Option Year 1)

0004AC 1 Task OPTION JBER-IHMP Support

FFP

IHMP Support PWS Para 2.1.7 (Option Year 2)

0004AD 1 Task OPTION JBER-IHMP Support

FFP

IHMP Support PWS Para 2.1.7 (Option Year 3)

0004AE 1 Task OPTION JBER-IHMP Support

FFP

IHMP Support PWS Para 2.1.7 (Option Year 4)

EAFB-IHMP Support, Supplies

IHMP Support, Supplies PWS Para 2.1.9

0005AA 1 Task EAFB-IHMP Support, Supplies

FFP

IHMP Support, Supplies PWS Para 2.1.9 (Base Year)

0005AB 1 Task OPTION EAFB-IHMP Support, Supplies

FFP

IHMP Support, Supplies PWS Para 2.1.9 (Option Year 1)

0005AC 1 Task OPTION EAFB-IHMP Support, Supplies

FFP

IHMP Support, Supplies PWS Para 2.1.9 (Option Year 2)

0005AD 1 Task OPTION EAFB-IHMP Support, Supplies

FFP

IHMP Support, Supplies PWS Para 2.1.9 (Option Year 3)

0005AE 1 Task OPTION EAFB-IHMP Support, Supplies

FFP

IHMP Support, Supplies PWS Para 2.1.9 (Option Year 4)

JBER-IHMP Support, Supplies

IHMP Support, Supplies PWS Para 2.1.9

0006AA 1 Task JBER-IHMP Support, Supplies

FFP

IHMP Support, Supplies PWS Para 2.1.9 (Base Year)

0006AB 1 Task OPTION JBER-IHMP Support, Supplies

FFP

IHMP Support, Supplies PWS Para 2.1.9 (Option Year 1)

0006AC 1 Task OPTION JBER-IHMP Support, Supplies

FFP

IHMP Support, Supplies PWS Para 2.1.9 (Option Year 2)

0006AD 1 Task OPTION JBER-IHMP Support, Supplies

FFP

IHMP Support, Supplies PWS Para 2.1.9 (Option Year 3)

0006AE 1 Task OPTION JBER-IHMP Support, Supplies

FFP

IHMP Support, Supplies PWS Para 2.1.9 (Option Year 4)

JBER-Inventory, AEI Data Management

Inventory, AEI Data Management PWS Para 2.1.10

0007AA 1 Task JBER-Inventory, AEI Data Management

FFP

Inventory, AEI Data Management PWS Para 2.1.10 (Base Year)

0007AB 1 Task OPTION JBER-Inventory, AEI Data Management

FFP

Inventory, AEI Data Management PWS Para 2.1.10 (Option Year 3)

0008 1 Task JBER-Plan Update, SPCC

FFP

Plan Update, SPCC Recertification/FRP Resubmission (Major Update) PWS Para

2.1.34 (Base Year)

0009 1 Task JBER-Plan Update, Other, Oil Discharge

FFP

Plan Update, Other, Oil Discharge Contingency Plan PWS Para 2.1.34 (Base Year)

0010 1 Task CAS-Plan Update,SPCC Recert/FRP Resubmit

FFP

Plan Update, SPCC Recertification/FRP Resubmission (Major Update) PWS Para

2.1.34 (Base Year)

0011 1 Task JBER-Plan Update, SWMP

FFP

Plan Update, SWMP PWS Para 2.1.25.2.2 (Base Year)

0012 1 Task EAFB-Plan Update, SWMP

FFP

Plan Update, SWMP PWS Para (Base Year)

EAFB-Recycling, Hazardous Waste

Recycling, Hazardous Waste PWS Para 2.1.3.1

0013AA 1 Task EAFB-Recycling, Hazardous Waste

FFP

Recycling, Hazardous Waste PWS Para 2.1.3.1 (Base Year)

0013AB 1 Task OPTION EAFB-Recycling, Hazardous Waste

FFP

Recycling, Hazardous Waste PWS Para 2.1.3.1 (Option Year 1)

0013AC 1 Task OPTION EAFB-Recycling, Hazardous Waste

FFP

Recycling, Hazardous Waste PWS Para 2.1.3.1 (Option Year 2)

0013AD 1 Task OPTION EAFB-Recycling, Hazardous Waste

FFP

Recycling, Hazardous Waste PWS Para 2.1.3.1 (Option Year 3)

0013AE 1 Task OPTION EAFB-Recycling, Hazardous Waste

FFP

Recycling, Hazardous Waste PWS Para 2.1.3.1 (Option Year 4)

JBER-Recycling, Hazardous Waste

Recycling, Hazardous Waste PWS Para 2.1.3.1

0014AA 1 Task JBER-Recycling, Hazardous Waste

FFP

Recycling, Hazardous Waste PWS Para 2.1.3.1 (Base Year)

0014AB 1 Task OPTION JBER-Recycling, Hazardous Waste

FFP

Recycling, Hazardous Waste PWS Para 2.1.3.1 (Option Year 1)

0014AC 1 Task OPTION JBER-Recycling, Hazardous Waste

FFP

Recycling, Hazardous Waste PWS Para 2.1.3.1 (Option Year 2)

0014AD 1 Task OPTION JBER-Recycling, Hazardous Waste

FFP

Recycling, Hazardous Waste PWS Para 2.1.3.1 (Option Year 3)

0014AE 1 Task OPTION JBER-Recycling, Hazardous Waste

FFP

Recycling, Hazardous Waste PWS Para 2.1.3.1 (Option Year 4)

EAFB-Recycling, Other Regulated

Recycling, Other Regulated PWS Para 2.1.3.2

0015AA 1 Task EAFB-Recycling, Other Regulated

FFP

Recycling, Other Regulated PWS Para 2.1.3.2 (Base Year)

0015AB 1 Task OPTION EAFB-Recycling, Other Regulated

FFP

Recycling, Other Regulated PWS Para 2.1.3.2 (Option Year 1)

0015AC 1 Task OPTION EAFB-Recycling, Other Regulated

FFP

Recycling, Other Regulated PWS Para 2.1.3.2 (Option Year 2)

0015AD 1 Task OPTION EAFB-Recycling, Other Regulated

FFP

Recycling, Other Regulated PWS Para 2.1.3.2 (Option Year 3)

0015AE 1 Task OPTION EAFB-Recycling, Other Regulated

FFP

Recycling, Other Regulated PWS Para 2.1.3.2 (Option Year 4)

JBER-Recycling, Other Regulated

Recycling, Other Regulated PWS Para 2.1.3.2

0016AA 1 Task JBER-Recycling, Other Regulated

FFP

Recycling, Other Regulated PWS Para 2.1.3.2 (Base Year)

0016AB 1 Task OPTION JBER-Recycling, Other Regulated

FFP

Recycling, Other Regulated PWS Para 2.1.3.2 (Option Year 1)

0016AC 1 Task OPTION JBER-Recycling, Other Regulated

FFP

Recycling, Other Regulated PWS Para 2.1.3.2 (Option Year 2)

0016AD 1 Task OPTION JBER-Recycling, Other Regulated

FFP

Recycling, Other Regulated PWS Para 2.1.3.2 (Option Year 3)

0016AE 1 Task OPTION JBER-Recycling, Other Regulated

FFP

Recycling, Other Regulated PWS Para 2.1.3.2 (Option Year 4)

EAFB-Reports, HW

Reports, HW PWS Para 2.1.4

0017AA 1 Task EAFB-Reports, HW

FFP

Reports, HW PWS Para 2.1.4 (Base Year)

0017AB 1 Task OPTION EAFB-Reports, HW

FFP

Reports, HW PWS Para 2.1.4 (Option Year 1)

0017AC 1 Task OPTION EAFB-Reports, HW

FFP

Reports, HW PWS Para 2.1.4 (Option Year 2)

0017AD 1 Task OPTION EAFB-Reports, HW

FFP

Reports, HW PWS Para 2.1.4 (Option Year 3)

0017AE 1 Task OPTION EAFB-Reports, HW

FFP

Reports, HW PWS Para 2.1.4 (Option Year 4)

JBER-Reports, HW

Reports, HW PWS Para 2.1.4

0018AA 1 Task JBER-Reports, HW

FFP

Reports, HW PWS Para 2.1.4 (Base Year)

0018AB 1 Task OPTION JBER-Reports, HW

FFP

Reports, HW PWS Para 2.1.4 (Option Year 1)

0018AC 1 Task OPTION JBER-Reports, HW

FFP

Reports, HW PWS Para 2.1.4 (Option Year 2)

0018AD 1 Task OPTION JBER-Reports, HW

FFP

Reports, HW PWS Para 2.1.4 (Option Year 3)

0018AE 1 Task OPTION JBER-Reports, HW

FFP

Reports, HW PWS Para 2.1.4 (Option Year 4)

JBER-SAM, Permitted Landfill, OU1

SAM, Permitted Landfill, OU1 PWS Para 2.1.17.9.3

0019AA 1 Task JBER-SAM, Permitted Landfill, OU1

FFP

SAM, Permitted Landfill, OU1 PWS Para 2.1.17.9.3 (Base Year)

0019AB 1 Task OPTION JBER-SAM, Permitted Landfill, OU1

FFP

SAM, Permitted Landfill, OU1 PWS Para 2.1.17.9.3 (Option Year 1)

0019AC 1 Task OPTION JBER-SAM, Permitted Landfill, OU1

FFP

SAM, Permitted Landfill, OU1 PWS Para 2.1.17.9.3 (Option Year 2)

0019AD 1 Task OPTION JBER-SAM, Permitted Landfill, OU1

FFP

SAM, Permitted Landfill, OU1 PWS Para 2.1.17.9.3 (Option Year 3)

0019AE 1 Task OPTION JBER-SAM, Permitted Landfill, OU1

FFP

SAM, Permitted Landfill, OU1 PWS Para 2.1.17.9.3 (Option Year 4)

JBER-SAM, Toxics

SAM, Toxics, PWS Para 2.1.22

0020AA 1 Task JBER-SAM, Toxics

FFP

SAM, Toxics, PWS Para 2.1.22 (Base Year)

0020AB 1 Task OPTION JBER-SAM, Toxics

FFP

SAM, Toxics, PWS Para 2.1.22 (Option Year 1)

0020AC 1 Task OPTION JBER-SAM, Toxics

FFP

SAM, Toxics, PWS Para 2.1.22 (Option Year 2)

0020AD 1 Task OPTION JBER-SAM, Toxics

FFP

SAM, Toxics, PWS Para 2.1.22 (Option Year 3)

0020AE 1 Task OPTION JBER-SAM, Toxics

FFP

SAM, Toxics, PWS Para 2.1.22 (Option Year 4)

EAFB-SAM, Waste Characterization

SAM, Waste Characterization, PWS Para 2.1.23

0021AA 1 Task EAFB-SAM, Waste Characterization

FFP

SAM, Waste Characterization, PWS Para 2.1.23 (Base Year)

0021AB 1 Task OPTION EAFB-SAM, Waste Characterization

FFP

SAM, Waste Characterization, PWS Para 2.1.23 (Option Year 1)

0021AC 1 Task OPTION EAFB-SAM, Waste Characterization

FFP

SAM, Waste Characterization, PWS Para 2.1.23 (Option Year 2)

0021AD 1 Task OPTION EAFB-SAM, Waste Characterization

FFP

SAM, Waste Characterization, PWS Para 2.1.23 (Option Year 3)

0021AE 1 Task OPTION EAFB-SAM, Waste Characterization

FFP

SAM, Waste Characterization, PWS Para 2.1.23 (Option Year 4)

JBER-SAM, Waste Characterization

SAM, Waste Characterization, PWS Para 2.1.23

0022AA 1 Task JBER-SAM, Waste Characterization

FFP

SAM, Waste Characterization, PWS Para 2.1.23 (Base Year)

0022AB 1 Task OPTION JBER-SAM, Waste Characterization

FFP

SAM, Waste Characterization, PWS Para 2.1.23 (Option Year 1)

0022AC 1 Task OPTION JBER-SAM, Waste Characterization

FFP

SAM, Waste Characterization, PWS Para 2.1.23 (Option Year 2)

0022AD 1 Task OPTION JBER-SAM, Waste Characterization

FFP

SAM, Waste Characterization, PWS Para 2.1.23 (Option Year 3)

0022AE 1 Task OPTION JBER-SAM, Waste Characterization

FFP

SAM, Waste Characterization, PWS Para 2.1.23 (Option Year 4)

EAFB-Supplies, HW

Supplies, HW PWS Para 2.1.5

0023AA 1 Task EAFB-Supplies, HW

FFP

Supplies, HW PWS Para 2.1.5 (Base Year)

0023AB 1 Task OPTION EAFB-Supplies, HW

FFP

Supplies, HW PWS Para 2.1.5 (Option Year 1)

0023AC 1 Task OPTION EAFB-Supplies, HW

FFP

Supplies, HW PWS Para 2.1.5 (Option Year 2)

0023AD 1 Task OPTION EAFB-Supplies, HW

FFP

Supplies, HW PWS Para 2.1.5 (Option Year 3)

0023AE 1 Task OPTION EAFB-Supplies, HW

FFP

Supplies, HW PWS Para 2.1.5 (Option Year 4)

JBER-Suppliesw, HW

Supplies, HW PWS Para 2.1.5

0024AA 1 Task JBER-Suppliesw, HW

FFP

Supplies, HW PWS Para 2.1.5 (Base Year)

0024AB 1 Task OPTION JBER-Suppliesw, HW

FFP

Supplies, HW PWS Para 2.1.5 (Option Year 1)

0024AC 1 Task OPTION JBER-Suppliesw, HW

FFP

Supplies, HW PWS Para 2.1.5 (Option Year 2)

0024AD 1 Task OPTION JBER-Suppliesw, HW

FFP

Supplies, HW PWS Para 2.1.5 (Option Year 3)

0024AE 1 Task OPTION JBER-Suppliesw, HW

FFP

Supplies, HW PWS Para 2.1.5 (Option Year 4)

OPTION 611th-IHMP Support

0025AA 1 Task OPTION 611th-IHMP Support

FFP

0025AB 1 Task OPTION 611th-IHMP Support

FFP

0025AC 1 Task OPTION 611th-IHMP Support

FFP

0025AD 1 Task OPTION 611th-IHMP Support

FFP

OPTION EAFB-Inventory, AEI Data Mgt

Inventory, AEI Data Mgt PWS Para 2.1.10

0026AA 1 Task OPTION EAFB-Inventory, AEI Data Mgt

FFP

Inventory, AEI Data Mgt PWS Para 2.1.10 (Option Year 1)

0026AB 1 Task OPTION EAFB-Inventory, AEI Data Mgt

FFP

Inventory, AEI Data Mgt PWS Para 2.1.10 (Option year 4)

0027 1 Task OPTION CAS-Permit Renewal Air, Title V

FFP

Permit Renewal Air, Title V PWS Para 2.1.11.1 (Option Year 1)

0028 1 Task OPTION EAFB-Permit Renewal Air, Title V w/CAM

FFP

Permit Renewal Air, Title V with CAM Plan PWS Para 2.1.11.1 (Option Year 1)

0029 1 Task OPTION EAFB-Permit Renewal Air, Landfill, Asbes

FFP

Permit Renewal Air, Landfill, Asbestos PWS Para 2.1.26.1 (Option Year 1)

0030 1 Task OPTION CAS-Permit Renewal, NPDES

FFP

Permit Renewal, NPDES PWS Para 2.1.24.1.3, 2.1.24.1.3.1 (Option Year 1)

0031 1 Task OPTION EAFB-Plan Update-SPCC Recert/FRP Resub

FFP

Plan Update, SPCC Recertification/FRP Resubmission EAFB Range (Major Update) PWS Para 2.1.34 (Option Year 1)

OPTION JBER-Plan Update, SPCC Recert/FRP Resub

FFP

Plan Update, SPCC Recertification/FRP Resubmission (Minor Update) PWS Para 2.1.33

0032AA 1 Task OPTION JBER-Plan Update, SPCC Recert/FRP Resub

FFP

Plan Update, SPCC Recertification/FRP Resubmission (Minor Update) PWS Para

2.1.33 (Option Year 1)

0032AB 1 Task OPTION JBER-Plan Update, SPCC Recert/FRP Resub

FFP

Plan Update, SPCC Recertification/FRP Resubmission (Minor Update) PWS Para

2.1.33 (Option Year 2)

0032AC 1 Task OPTION JBER-Plan Update, SPCC Recert/FRP Resub

FFP

Plan Update, SPCC Recertification/FRP Resubmission (Minor Update) PWS Para

2.1.33 (Option Year 3)

0032AD 1 Task OPTION JBER-Plan Update, SPCC Recert/FRP Resub

FFP

Plan Update, SPCC Recertification/FRP Resubmission (Minor Update) PWS Para

2.1.33 (Option Year 4)

0033 1 Task OPTION EAFB-Plan Update/Water Sampling/Monitor

FFP

Plan Update, Water Sampling, Monitoring PWS Para 2.1.25.2.3 (Option Year 1)

OPTION 611th-Reporting, EPCRA

Reporting, EPCRA PWS Para 2.1.8

0034AA 1 Task OPTION 611th-Reporting, EPCRA

FFP

Reporting, EPCRA PWS Para 2.1.8 (Option Year 1)

0034AB 1 Task OPTION 611th-Reporting, EPCRA

FFP

Reporting, EPCRA PWS Para 2.1.8 (Option Year 2)

0034AC 1 Task OPTION 611th-Reporting, EPCRA

FFP

Reporting, EPCRA PWS Para 2.1.8 (Option Year 3)

0034AD 1 Task OPTION 611th-Reporting, EPCRA

FFP

Reporting, EPCRA PWS Para 2.1.8 (Option Year 4)

OPTION JBER-Reports, NPDES

Reports, NPDES PWS Para 2.1.25.3

0035AA 1 Task OPTION JBER-Reports, NPDES

FFP

Reports, NPDES PWS Para 2.1.25.3 (Option Year 1)

0035AB 1 Task OPTION JBER-Reports, NPDES

FFP

Reports, NPDES PWS Para 2.1.25.3 (Option Year 2)

0035AC 1 Task OPTION JBER-Reports, NPDES

FFP

Reports, NPDES PWS Para 2.1.25.3 (Option Year 3)

0035AD 1 Task OPTION JBER-Reports, NPDES

FFP

Reports, NPDES PWS Para 2.1.25.3 (Option Year 4)

OPTION EAFB-SAM,NPDES/Other Waste Water

SAM,NPDES/Other Waste Water PWS Para 2.1.17.8

0036AA 1 Task OPTION EAFB-SAM,NPDES/Other Waste Water

FFP

SAM,NPDES/Other Waste Water PWS Para 2.1.17.8 (Option Year 1)

0036AB 1 Task OPTION EAFB-SAM,NPDES/Other Waste Water

FFP

SAM,NPDES/Other Waste Water PWS Para 2.1.17.8 (Option Year 2)

0036AC 1 Task OPTION EAFB-SAM,NPDES/Other Waste Water

FFP

SAM,NPDES/Other Waste Water PWS Para 2.1.17.8 (Option Year 3)

0036AD 1 Task OPTION EAFB-SAM,NPDES/Other Waste Water

FFP

SAM,NPDES/Other Waste Water PWS Para 2.1.17.8 (Option Year 4)

OPTION JBER-SAM,NPDES/Other Waste Water

0037AA 1 Task OPTION JBER-SAM,NPDES/Other Waste Water

FFP

SAM,NPDES/Other Waste Water PWS Para 2.1.17.8 (Option Year 1)

0037AB 1 Task OPTION JBER-SAM,NPDES/Other Waste Water

FFP

SAM,NPDES/Other Waste Water PWS Para 2.1.17.8 (Option Year 2)

0037AC 1 Task OPTION JBER-SAM,NPDES/Other Waste Water

FFP

SAM,NPDES/Other Waste Water PWS Para 2.1.17.8 (Option Year 3)

0037AD 1 Task OPTION JBER-SAM,NPDES/Other Waste Water

FFP

SAM,NPDES/Other Waste Water PWS Para 2.1.17.8 (Option Year 4)

OPTION JBER-SAM, Permitted Landfill

SAM, Permitted Landfill PWS Para 2.1.17.9,2.1.17.9.2

0038AA 1 Task OPTION JBER-SAM, Permitted Landfill

FFP

SAM, Permitted Landfill PWS Para 2.1.17.9,2.1.17.9.2 (Option Year 1)

0038AB 1 Task OPTION JBER-SAM, Permitted Landfill

FFP

SAM, Permitted Landfill PWS Para 2.1.17.9,2.1.17.9.2 (Option Year 2)

0038AC 1 Task OPTION JBER-SAM, Permitted Landfill

FFP

SAM, Permitted Landfill PWS Para 2.1.17.9,2.1.17.9.2 (Option Year 3)

0038AD 1 Task OPTION JBER-SAM, Permitted Landfill

FFP

SAM, Permitted Landfill PWS Para 2.1.17.9,2.1.17.9.2 (Option Year 4)

OPTION EAFB-SAM, Storm Water

SAM, Storm Water PWS Para 2.1.18

0039AA 1 Task OPTION EAFB-SAM, Storm Water

FFP

SAM, Storm Water PWS Para 2.1.18 (Option Year 1)

0039AB 1 Task OPTION EAFB-SAM, Storm Water

FFP

SAM, Storm Water PWS Para 2.1.18 (Option Year 2)

0039AC 1 Task OPTION EAFB-SAM, Storm Water

FFP

SAM, Storm Water PWS Para 2.1.18 (Option Year 3)

0039AD 1 Task OPTION EAFB-SAM, Storm Water

FFP

SAM, Storm Water PWS Para 2.1.18 (Option Year 4)

OPTION JBER-SAM, Storm Water, MS4

SAM, Storm Water, MS4 PWS Para 2.1.19

0040AA 1 Task OPTION JBER-SAM, Storm Water, MS4

FFP

SAM, Storm Water, MS4 PWS Para 2.1.19 (Option Year 1)

0040AB 1 Task OPTION JBER-SAM, Storm Water, MS4

FFP

SAM, Storm Water, MS4 PWS Para 2.1.19 (Option Year 2)

0040AC 1 Task OPTION JBER-SAM, Storm Water, MS4

FFP

SAM, Storm Water, MS4 PWS Para 2.1.19 (Option Year 3)

0040AD 1 Task OPTION JBER-SAM, Storm Water, MS4

FFP

SAM, Storm Water, MS4 PWS Para 2.1.19 (Option Year 4)

OPTION JBER-SAM, Storm Water, MSGP

SAM, Storm Water, MSGP PWS Para 2.1.20

0041AA 1 Task OPTION JBER-SAM, Storm Water, MSGP

FFP

SAM, Storm Water, MSGP PWS Para 2.1.20 (Option Year 1)

0041AB 1 Task OPTION JBER-SAM, Storm Water, MSGP

FFP

SAM, Storm Water, MSGP PWS Para 2.1.20 (Option Year 2)

0041AC 1 Task OPTION JBER-SAM, Storm Water, MSGP

FFP

SAM, Storm Water, MSGP PWS Para 2.1.20 (Option Year 3)

0041AD 1 Task OPTION JBER-SAM, Storm Water, MSGP

FFP

SAM, Storm Water, MSGP PWS Para 2.1.20 (Option Year 4)

0042 1 Task OPTION 611th-Assessment Air

FFP

Assessment Air PWS Para 2.1.15 (Option Year 2)

0043 1 Task OPTION EAFB-Assessment Air

FFP

0044 1 Task OPTION JBER-Assessment Air

FFP

0045 1 Task OPTION EAFB-Permit Renewal, NPDES, CHPP Thermal

FFP

Permit Renewal, NPDES, CHPP Thermal Discharge (EAFB) PWS Para 2.1.24.1.3 (Option Year 2)

OPTION 611th-Recordkeeping, Air

Recordkeeping, Air PWS Para 2.1.12

0046AA 1 Task OPTION 611th-Recordkeeping, Air

FFP

Recordkeeping, Air PWS Para 2.1.12 (Option Year 2)

0046AB 1 Task OPTION 611th-Recordkeeping, Air

FFP

Recordkeeping, Air PWS Para 2.1.12 (Option Year 3)

0046AC 1 Task OPTION 611th-Recordkeeping, Air

FFP

Recordkeeping, Air PWS Para 2.1.12 (Option Year 4)

OPTION EAFB-Recordkeeping, Air

0047AA 1 Task OPTION EAFB-Recordkeeping, Air

FFP

0047AB 1 Task OPTION EAFB-Recordkeeping, Air

FFP

0047AC 1 Task OPTION EAFB-Recordkeeping, Air

FFP

OPTION JBER-Recordkeeping, Air

0048AA 1 Task OPTION JBER-Recordkeeping, Air

FFP

0048AB 1 Task OPTION JBER-Recordkeeping, Air

FFP

0048AC 1 Task OPTION JBER-Recordkeeping, Air

FFP

OPTION EAFB-Recordkeeping, Air, Greenhouse Gas

Recordkeeping, Air, Greenhouse Gas Rule Compliance PWS Para 2.1.14

0049AA 1 Task OPTION EAFB-Recordkeeping, Air, Greenhouse Gas

FFP

Recordkeeping, Air, Greenhouse Gas Rule Compliance PWS Para 2.1.14 (Option Year 2)

0049AB 1 Task OPTION EAFB-Recordkeeping, Air, Greenhouse Gas

FFP

Recordkeeping, Air, Greenhouse Gas Rule Compliance PWS Para 2.1.14 (Option Year 3)

0049AC 1 Task OPTION EAFB-Recordkeeping, Air, Greenhouse Gas

FFP

Recordkeeping, Air, Greenhouse Gas Rule Compliance PWS Para 2.1.14 (Option Year 4)

OPTION EAFB-Recordkeeping, Records Review

Recordkeeping, Records Review PWS Para 2.1.13

0050AA 1 Task OPTION EAFB-Recordkeeping, Records Review

FFP

Recordkeeping, Records Review PWS Para 2.1.13 (Option Year 2)

0050AB 1 Task OPTION EAFB-Recordkeeping, Records Review

FFP

Recordkeeping, Records Review PWS Para 2.1.13 (Option Year 3)

0050AC 1 Task OPTION EAFB-Recordkeeping, Records Review

FFP

Recordkeeping, Records Review PWS Para 2.1.13 (Option Year 4)

OPTION EAFB-Reporting, EPCRA

0051AA 1 Task OPTION EAFB-Reporting, EPCRA

FFP

0051AB 1 Task OPTION EAFB-Reporting, EPCRA

FFP

0051AC 1 Task OPTION EAFB-Reporting, EPCRA

FFP

OPTION JBER-Reporting, EPCRA

0052AA 1 Task OPTION JBER-Reporting, EPCRA

FFP

0052AB 1 Task OPTION JBER-Reporting, EPCRA

FFP

0052AC 1 Task OPTION JBER-Reporting, EPCRA

FFP

OPTION EAFB-SAM, Air, Particulate Matter, Test

FFP

SAM, Air, Particulate Matter, Testing Bin Vent Filters 1-6 PWS Para 2.1.17.4

0053AA 1 Task OPTION EAFB-SAM, Air, Particulate Matter, Test

FFP

0053AB 1 Task OPTION EAFB-SAM, Air, Particulate Matter, Test

FFP

OPTION EAFB-SAM, Air, Relative Accuracy Test

SAM, Air, Relative Accuracy Test Audit CHPP Boilers CEMS PWS Para 2.1.17.5

0054AA 1 Task OPTION EAFB-SAM, Air, Relative Accuracy Test

FFP

SAM, Air, Relative Accuracy Test Audit CHPP Boilers CEMS PWS Para 2.1.17.5

0054AB 1 Task OPTION EAFB-SAM, Air, Relative Accuracy Test

FFP

SAM, Air, Relative Accuracy Test Audit CHPP Boilers CEMS PWS Para 2.1.17.5 (Option Year 3)

0054AC 1 Task OPTION EAFB-SAM, Air, Relative Accuracy Test

FFP

SAM, Air, Relative Accuracy Test Audit CHPP Boilers CEMS PWS Para 2.1.17.5 (Option Year 4)

0055 1 Task OPTION EAFB-SAM, AIR, Source Test CHPP Onans

FFP

SAM, AIR, Source Test CHPP Onans, 40 CFR 63 , Subpart ZZZZ PWS Para

2.1.17.6 (Option Year 2)

0056 1 Task OPTION 611th-Inventory, AEI Data Mgt

FFP

Inventory, AEI Data Mgt PWS Para 2.1.10 (Option Year 3)

0057 1 Task OPTION EAFB-Permit Renewal, Landfill, Biosolids

FFP

Permit Renewal, Landfill, Biosolids PWS Para 2.1.26.1 (Option Year 3)

OPTION 611th-Plan Update, SPCC Recert/FRP Resub

FFP

Plan Update, SPCC Recertification/FRP Resubmission (Major Update) PWS Para 2.1.34

0058AA 1 Task OPTION 611th-Plan Update, SPCC Recert/FRP Resub

FFP

Plan Update, SPCC Recertification/FRP Resubmission (Major Update) Kokee, EAS, KSA PWS Para 2.1.34 (Option Year 3)

0058AB 1 Task OPTION 611th-Plan Update, SPCC Recert/FRP Resub

FFP

Plan Update, SPCC Recertification/FRP Resubmission (Major Update) WIA PWS Para 2.1.34 (Option Year 4)

0059 1 Task OPTION JBER-Recordkeeping, Air, Greenhouse Gas

FFP

Recordkeeping, Air, Greenhouse Gas Rule Compliance PWS Para 2.1.14 (Option

0060 1 Task OPTION EAFB-SAM, Air, CHPP Boiler MACT Testing

FFP

SAM, Air, CHPP Boiler MACT Testing (Existing Boilers 1-4 CO) PWS Para

2.1.17.3 (Option Year 3)

0061 1 Task OPTION EAFB-SAM, Air,NOx Source Testing

FFP

SAM, Air,NOx Source Testing CHPP Onan Engines PWS Para 2.1.17.7 (Option

0062 1 Task OPTION 611th-Permit Renewal, Air, Title V

FFP

Permit Renewal, Air, Title V PWS Para 2.1.11.1 (Option Year 4)

0063 1 Task OPTION JBER-Permit Renewal, Air, Title V

FFP

Permit Renewal, Air, Title V PWS Para 2.1.11.1 (Option Year 4)

0064 1 Task OPTION EAFB-Permit Renewal, Landfill-Quary Hill

FFP

Permit Renewal, Landfill, Quary Hill PWS Para 2.1.26.1 (Option Year 4)

0065 1 Task OPTION EAFB=Permit Renewal, NPDES, MSGP

FFP

Permit Renewal, NPDES, MSGP PWS Para 2.1.24.1.1.4 (Option Year 4)

0066 1 Task OPTION EAFB-Plan Update, SPCC Recert/FRP Resub

FFP

Plan Update, SPCC Recertification/FRP Resubmission (Major Update) EAFB Main Base PWS Para 2.1.34 (Option Year 4)

0067 1 Task OPTION JBER-Plan Update, SWPPP

FFP

Plan Update, SWPPP PWS Para 2.1.25.2.1 (Option Year 4)

0068 1 Task OPTION 611th-SAM, Air

FFP

SAM, Air PWS Para 2.1.17.1 (Option Year 4)

0069 1 Task OPTION EAFB-SAM, Air, Particulate Matter Source

FFP

SAM, Air, Particulate Matter Source Testing for CHPP Boilers PWS Para 2.1.17.2 (Option Year 4)

0070 1 Task OPTION EAFB-SAM, Permitted Landfills

FFP

SAM, Permitted Landfills PWS Para 2.1.17.9, 2.1.17.9.1 (Option Year 4)

0071 5 Task OPTION 611th-Assessment Air

FFP

Assessment Air PWS Para 2.1.15.1

0072 5 Task OPTION 611th-Assessment Air

FFP

Assessment Air PWS Para 2.1.15.2

0073 5 Task OPTION 611th-Inventory, AEI Data Management

FFP

Inventory, AEI Data Management PWS Para 2.1.0

0074 5 Task OPTION EAFB-Plan Update, Air, Fugitive Dust

FFP

Plan Update, Air, Fugitive Dust PWS Para 2.1.16.1

0075 5 Task OPTION 611th-Plan Update, HW Mgt

FFP

Plan Update, HW Mgt PWS Para 2.1.6

0076 5 Task OPTION EAFB-Plan Update, HW Mgt

FFP

Plan Update, HW Mgt PWS Para 2.1.6

0077 5 Task OPTION JBER-Plan Update, HW Mgt, TSDF

FFP

Plan Update, HW Mgt, TSDF PWS Para 2.1.6

0078 5 Task OPTION EAFB-Plan Update, Other, CHPP, QAPP/SAPt

FFP

Plan Update, Other, CHPP, QAPP/SAPt PWS Para 2.1.25.2.4

0079 5 Task OPTION EAFB-Plan Update, Other, Water Treatment

FFP

Plan Update, Other, Water Treatment QAPP/SAP PWS Para 2.1.25.2.5

0080 5 Task OPTION 611th-Plan Update, Solid Waste/QRP

FFP

Plan Update, Solid Waste/QRP Business PWS Para 2.1.27

0081 5 Task OPTION EAFB-Plan Update, Solid Waste/QRP

FFP

0082 5 Task OPTION JBER-Plan Update, Solid Waste/QRP

FFP

0083 5 Task OPTION JBER-Permit Renewal, NPDES

FFP

Permit Renewal, NPDES PWS Para 2.1.24.1.1.1

0084 5 Task OPTION JBER-Permit Renewal, NPDES, AWWU

FFP

Permit Renewal, NPDES, AWWU PWS Para 2.1.24.1.1.2

0085 5 Task OPTION EAFB-Permit Renewal, NPDES , Water Treat

FFP

Permit Renewal, NPDES , Water Treatment Plant PWS Para 2.1.24.1.1.5

0086 5 Task OPTION JBER-QRP Expended Small Arms Cartridge

FFP

QRP Expended Small Arms Cartridge Cases PWS Para 2.1.28.1

0087 5 Task OPTION JBER-Qualified Recycling Program

FFP

Qualified Recycling Program PWS Para 2.1.28

0088 5 Task OPTION EAS-Recordkeeping, Air, Greenhouse Gas

FFP

Recordkeeping, Air, Greenhouse Gas Rule Compliance PWS Para 2.1.14

0089 5 Task OPTION EAFB-Record Keeping, Air, Records Review

FFP

Record Keeping, Air, Records Review PWS Para 2.1.13

0090 5 Task OPTION EAFB-Recordkeeping, Other, Environmental

FFP

Recordkeeping, Other, Environmental Compliance PWS Para 2.1.36

0091 5 Task OPTION JBER-Reports, NPDES

FFP

Reports, NPDES PWS Para 2.1.25.3

0092 5 Task OPTION EAS-SAM, Air--Additional EAS NOx Testing

FFP

SAM, Air (Additional EAS NOx Testing)PWS Para 2.1.17.1.1

0093 5 Task OPTION EAFB-SAM, Air (Additional Mob/Demob)

FFP

SAM, Air (EAFB, Additional Mobilization and Demobilization) PWS Para 2.1.17.7.1

0094 5 Task OPTION EAFB-SAM, Air, Boiler MACT Testing

FFP

SAM, Air, Boiler MACT Testing (Triennial TESTS PM) (EAFB, Additional Boiler Test) PWS Para 2.1.17.2.1

0095 5 Task OPTION EAFB-SAM, Air, Relative Accuracy Test Au

FFP

SAM, Air, Relative Accuracy Test Audit CHPP Boilers CEMS PWS Para 2.1.17.5.1

0096 5 Task OPTION EAFB-SAM, Air, NOx Source Testing CHPP

FFP

SAM, Air, NOx Source Testing CHPP Onan Engines PWS Para 2.1.17.7

0097 5 Task OPTION JBER-SAM,NPDES/Other Waste Water

FFP

0098 5 Task OPTION JBER-SAM, NPDES/Other Waste Water, PFAS

FFP

SAM, NPDES / Other Waste Water, PFAS Testing PWS Para 2.1.17.8.1

0099 5 Task OPTION JBER-SAM, Permitted Landfills(Fence/Cap)

FFP

SAM, Permitted Landfills (JBER, Fence and Cap Maintenance) PWS Para 2.1.17.9.2.1

0100 5 Task OPTION JBER-SAM, Permitted Landfills,OU1

FFP

SAM, Permitted Landfills, OU1 (JBER, Fence and Cap Maintenance) PWS Para 2.1.17.9.3.3

0101 5 Task OPTION JBER-SAM, Permitted Landfills, OU1

FFP

SAM, Permitted Landfills, OU1 (JBER, Monitoring Well Abandonment) PWS Para 2.1.17.9.3.2

0102 5 Task OPTION JBER-SAM, Permitted Landfills, OU1

FFP

SAM, Permitted Landfills, OU1 (JBER, Monitoring Well Replacement /Installation) PWS Para 2.1.17.9.3.1

0103 5 Task OPTION JBER-SAM, Storm Water, MS4

FFP

SAM, Storm Water, MS4 PWS Para 2.1.19

0104 5 Task OPTION JBER-SAM, Storm Water, MS4(Green Infra)

FFP

SAM, Storm Water, MS4 (JBER, Green Infrastructure) PWS Para 2.1.19.1

0105 5 Task OPTION JBER-SAM, Storm Water, MS4 (Storm Water)

FFP

SAM, Storm Water, MS4 (JBER, Storm Water Impacts) PWS Para 2.1.19.2

0106 5 Task OPTION JBER-SAM, Storm Water, MSGP

FFP

SAM, Storm Water, MSGP PWS Para 2.1.20

0107 5 Task OPTION JBER-SAM, Storm Water, MSGP, Benchmark

FFP

SAM, Storm Water, MSGP, Benchmark Sampling PWS Para 2.1.21

0108 5 Task OPTION EAFB-Spill Response

FFP

Spill Response PWS Para 2.1.30

0109 5 Task OPTION JBER-Spill Response

FFP

Spill Response PWS Para 2.1.30

0110 5 Task OPTION EAFB-Spill Response, On Call Contractor

FFP

Spill Response, On Call Contractor PWS Para 2.1.29

0111 5 Task OPTION JBER-Spill Response, On Call Contractor

FFP

Spill Response, On Call Contractor PWS Para 2.1.29

0112 5 Task OPTION EAFB-Spill Telephone

FFP

Spill Telephone PWS Para 2.1.32

0113 5 Task OPTION JBER-Spill Telephone

FFP

Spill Telephone PWS Para 2.1.32

0114 5 Task OPTION EAFB-Supplies, Spill Response

FFP

Supplies, Spill Response PWS Para 2.1.31

0115 5 Task OPTION JBER-Supplies, Spill Response

FFP

Supplies, Spill Response PWS Para 2.1.31

0116 5 Task OPTION EAFB-Survey, Storm Water Permit

FFP

Survey, Storm Water Permit Compliance PWS Para 2.1.25.1.1

CONTRACTING OFFICER STATEMENT

Only a warranted Contracting Officer (either a Contracting Officer or an Administrative Contracting Officer (ACO)), acting within their appointed limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed with the change and shall immediately notify the Contracting Officer. Proceeding with any work not authorized by the Contracting Officer will be at the Contractor's own risk.

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

ALASKA

AIR FORCE

FENCE-TO-FENCE

PERFORMANCE WORK STATEMENT

DIRECTIONS:

This document should be considered along with all government furnished information (e.g.

plans, permits, previous reports, etc.) by the Contractor when developing their proposal.

Revised 10 March 2020

Table of Contents

1.0 GENERAL REQUIREMENTS

1.1 APPLICABLE DOCUMENTS

1.1.1 ADMINISTRATIVE AND MANAGERIAL REQUIREMENTS

1.1.2 Work Site Requirements

1.1.3 MANAGEMENT, PLANNING, AND REPORTING REQUIREMENTS

1.1.4 PROJECT ADMINISTRATION

1.1.5 PERFORMANCE REQUIREMENT SUMMARY

1.1.6 MISCELLANEOUS

1.1.7 PERIOD OF PERFORMANCE AND CONTRACT TERMS

1.1.8 GOVERNMENT POINTS OF CONTACT (POC)

2.0 SCOPE

2.1 HAZARDOUS WASTE MANAGEMENT

2.1.1 HW Contract Support

2.1.2 HW Permits

2.1.3 Recycling

2.1.4 Reports, HW

2.1.5 Supplies, HW

2.1.6 OPTIONAL: Plan Update, HW Management Plan

2.2 HAZARDOUS MATERIAL MANAGEMENT

2.1.7 Installation Hazardous Materials Program (IHMP) Support

2.1.8 Reporting, EPCRA

2.1.9 Supplies, IHMP

2.3 AIR QUALITY

2.1.10 Inventory, Air Emissions Inventory (AEI) Data Management

2.1.11 Air Permits 149

2.1.12 Recordkeeping, Air

2.1.13 Recordkeeping, Air, Records Review (EAFB, FY2021 only)

2.1.14 Recordkeeping, Air, Greenhouse Gas Rule Compliance

2.1.15 Assessment, Air

2.1.16 Plan Updates, Air

2.4 SAMPLING, TESTING, ANALYSIS, AND MONITORING

2.1.17 Sampling and Monitoring

2.1.18 SAM, Storm Water

2.1.19 SAM, Storm Water, MS4 (JBER)

2.1.20 SAM, Storm Water, MSGP (JBER)

2.1.21 OPTIONAL: SAM, Storm Water, MSGP, Benchmark Sampling (JBER)

2.1.22 SAM, Toxics

2.1.23 SAM, Waste Characterization

2.5 WASTE WATER AND STORM WATER

2.1.24 Waste Water

2.1.25 Storm Water

2.6 SOLID WASTE MANAGEMENT

2.1.26 Permits, Solid Waste

2.1.27 OPTIONAL: Plan Update, Solid Waste/QRP Business

2.7 POLLUTION PREVENTION (P2)

2.1.28 OPTIONAL: Qualified Recycling Program (JBER, base funded)

2.8 PETROLEUM, OIL, AND LUBRICANTS MANAGEMENT

2.1.29 OPTIONAL: Spill Response, On Call Contractor

2.1.30 OPTIONAL: Spill Response (Base Funded)

2.1.31 OPTIONAL: Supplies, Spill Response

2.1.32 OPTIONAL: Spill Telephone (Base Funded)

2.1.33 Plan Update, SPCC Recertification/FRP Resubmission (Minor Update)

2.1.34 Plan Update, SPCC Recertification/FRP Resubmission (Major Update)

2.9 STORAGE TANK ENVIRONMENTAL COMPLIANCE

2.1.35 Permits, Storage Tanks

2.1.36 Recordkeeping, Other, Environmental Compliance (EAFB)

2.10 F2F Qualifications / Experience

3.0 SUMMARY OF REQUIREMENTS

Table of Figures Table 1. Performance Requirements Summary Table 2. 611th Sites Table 3. Summary of Hazardous Waste Operations Table 4. 90-DAY HAZWASTE – Industrial Recycling Processes Table 5. Government Furnished Equipment (GFE) for CAA/ HWF Table 6. Summary of Hazardous and Regulated Waste Table 7. HW Permits Table 8. Hazardous Waste Supplies at JBER and EAFB Table 9. IHMP Supplies Table 10. Air Quality Background for JBER Table 11. Air Quality Background for EAFB Table 12. Air Quality Background for CAS Table 13. Air Quality Background for 611th Table 14. AEI Background for JBER Table 15. AEI Background for EAFB Table 16. AEI Background for 611th (EAS, WIA, KSA, LRRS) Table 17. EAFB Periodic Reports Table 18. JBER Periodic Reports Table 19. Air Sampling Requirements for EAFB and EAS Table 20. EAFB Coal Bin Vent Filters Testing Methods Table 21. EAFB Coal Bin Vent Filters Applicable Permit Conditions Table 22. EAFB RATA Compliance Limits Table 23. Subpart ZZZZ of Part 63—Requirements for Existing Stationary RICE Located at Area Sources of HAP Emissions Table 24. Subpart ZZZZ of Part 63—Subsequent Performance Tests Table 25. Subpart ZZZZ of Part 63—Requirements for Performance Tests Table 26. Waste Water and Storm Water Permits Table 27. EAFB Quarry Hill Inert Waste Monofill Sampling Table 28. JBER-Richardson Landfill Groundwater Monitoring Wells Table 29. JBER-Richardson Landfill Groundwater Detection Parameters and Analytical Methods Table 30. JBER-Richardson Landfill Monitoring Gas Probes Table 31. Waste Characterization Background for JBER and EAFB Table 32. Sampling for Waste Characterization at JBER and EAFB

Table 33. ODPCP Applicable AAC Regulations Table 34. Summary of Basic Requirements Table 35. Summary of Optional Requirements

1.0 GENERAL REQUIREMENTS

The scope of this environmental operations and services contract is to provide environmental compliance support activities necessary to support United States Air Force (USAF) and AFCEC environmental mission requirements. Activities include but are not limited to: Environmental Compliance Support; Air Emissions Inventory (AEI) Data Management; Recordkeeping, Title V; Recordkeeping, Minor and Minor General; Reporting, Emergency Planning and Community Right-to-Know Act (EPCRA); Installation HAZMAT Management Program Manager (IHMP) Support; Hazardous Waste (HW) Management Support; HW Management Plan Update;

Hazardous Waste; Recycling, Integrated Solid Waste; Other Regulated Waste; Pollution Prevention; Sampling, Analysis and Monitoring (SAM); Plan Updates; Environmental Media Inspections; Spill Prevention Control and Countermeasure (SPCC) Recertification / Facility Response Plan (FRP) Resubmission; Oil Discharge Prevention and Contingency Plan (C-Plan);

Oil Discharge Prevention and Contingency Plans (ODPCP); Storm water Reports. Examples of specific services include tasks such as operating, maintaining, and optimizing pollution control;

characterizig waste streams; performing environmental monitoring, sampling, and analysis;

operating a hazardous waste accumulation site; inspections, and updating existing environmental plans.

The Contractor shall provide all personnel, services, equipment, tools, materials, vehicles, and other requirements necessary for, or incidental to, the performance of work described herein;

assure any and all program and/or project related costing information (regardless of its stage in development) is secured, as directed by the Contracting Officer (KO); and be responsible for safeguarding proprietary and other sensitive information. The Contractor shall comply with applicable federal, state, and local laws, regulations, and guidance; and perform all work in accordance with these requirements and any applicable agreements. The Contractor shall furnish sufficient technical, supervisory, and administrative personnel at all times to ensure the work is executed in accordance with contract requirements. Professional level skills and management practices are required in the performance of this contract. Accordingly, the Contractor shall establish an effective quality control and health and safety program to assure that the end product meets professional standards and complies with the contract requirements. Personnel performing work under the contract shall possess training, certification(s) and experience commensurate with the work they will perform and level of responsibility they will exercise. The Contractor shall be immediately capable of addressing and interpreting all aspects of environmental law and regulation.

Introduction

This Performance Work Statement (PWS) defines the scope of a full range of environmental operations and services activities necessary to meet USAF installation, Air Force Civil Engineer Center (AFCEC), and USACE requirements. This contract is performance-based, to the maximum extent practicable, in accordance with (IAW) Federal Acquisition Regulations (FAR) Subpart 37.6.

This PWS encompasses the full range of methods, technologies, and supporting activities necessary to conduct environmental operations and services efforts to address fence-to-fence environmental compliance needs at USAF installations in accordance with technical and regulatory requirements. Fence-to-fence includes environmental compliance projects for each installation as defined in the PWS. Requirements shall be carried out in accordance with technical and regulatory requirements.

Policy and Requirements Statement

It is the policy of the USAF and USACE to use innovative and sustainable approaches to environmental management and technology to accomplish its mission. Sustainable projects do not deplete resources, cause environmental degradation or impact to human health and may reduce the burden of compliance for the USAF. The Contractor shall incorporate pollution prevention and sustainability initiatives into all aspects of this contract. The Contractor shall operate in a manner that promotes energy management to include energy efficiency, use of renewable energy, and water conservation. The Contractor shall comply with each installation’s Environmental Management System (EMS).

The Contractor shall function as an integral team member in support of the USACE USAF mission to include sharing of information with other contractors, and cooperation with communities, regulators, and other government entities.

Requirements include efficient management of this contract including, but not limited to, the submission of accurate, on-time, quality deliverables and timely identification and solution of impediments to successful project execution. Technical requirements include, but are not limited to, early involvement in the process to allow for the development of the most cost-effective and technically sound approach or solution. USACE will rely on the Contractor’s expertise in recognizing and addressing problematic issues for the successful execution of this contract.

The Contractor shall perform all work in accordance with all current federal, state, and local statutes and regulations, Executive Orders, DoD/USAF policies, and installation requirements, including installation Activity Management Plans (AMPs) and Environmental Action Plans (EAPs) Integrated Cultural Resources Management Plans (ICRMPs), Integrated Natural Resources Management Plans (INRMPs), and Integrated Pest Management Plans (IPMPs). The Contractor shall be immediately capable of understanding and addressing environmental laws and regulations as they pertain to work performed under this contract.

Continuation of Essential DoD Contractor Services during Crisis

The performance of these services is not expected to be mission essential during time of National and/or Natural crisis. Should a crisis be declared, the KO or his/her representative will verbally advise the Contractor of the revised requirements, followed by written directions.

1.1 APPLICABLE DOCUMENTS

General

The Contractor shall perform all work in accordance with current federal, state, and local statutes and regulations, Executive Orders, DoD/USAF policies and Instructions, and installation requirements, including installation Activity Management Plans (AMPs) and Environmental Action Plans (EAPs). The Contractor shall be immediately capable of understanding and addressing environmental laws and regulations as they pertain to work performed under this contract.

Such laws and regulations include all current applicable federal, state, and local environmental laws, statutes, and regulations, as applied to the installation through appropriate Executive Orders, Air Force/Military instructions, manuals, handbooks, regulations, guidance, and policy letters, Air Force Instruction (AFI) 32-7001, Environmental Management23 Aug 2019); and applicable industry codes and standards to include, but not be limited to, American Petroleum Institute (API) Codes, National Association of Corrosion Engineers (NACE), National Fire Protection Agency (NFPA), Steel Structures and Painting Counsel (SSPC), National Electrical Code (NEC), Uniform Fire Code (UFC), International Building Code (IBC), and Department of Defense (DoD) Explosive Safety Board Guidance Technical Paper 18, including all changes and amendments in effect on the date of issuance of this contract. In addition, the Contractor shall refer to the current versions of the DoD Policy and Guidelines for Acquisitions Involving Environmental Sampling or Testing.

The Contractor shall be responsible for identifying and complying with all current applicable requirements as they pertain to the project requirements.

Compliance with all Federal Acquisition Regulation Provisions

The Contractor shall comply with all FAR provisions and/or clauses.

The Contractor shall immediately report any potential or actual conflicts between applicable federal, state, and/or local environmental laws or statutes; applicable Executive Order requirements; provisions of AFI 32-7001, Environmental Management; or any other applicable requirement or AFI with the cited FAR provisions.

1.1.1 ADMINISTRATIVE AND MANAGERIAL REQUIREMENTS

The Contractor shall perform management and planning functions and performance measurement during the course of this effort as specified in this contract.

1.1.1.1 Coordination with Government Offices

Regulatory Interface

The Contractor shall assist in the application of general and site-specific regulatory requirements that pertain to assigned USACE projects and maintain currency with changing DoD regulations and federal, state, and local statutes and regulations. The Contractor is not an employee of the government and shall not represent the government in an official or unofficial capacity without the express prior written permission from the KO. This notwithstanding, in the event that any regulatory representative approaches the Contractor with a stated intent to inspect the activities of the Contractor without the previous direction of the KO, the Contractor shall respectfully inform the regulatory representative that the inspection must be delayed until the KO is properly notified and a duly appointed USACE Contracting Officer Representative (COR) is present or other direction is issued by the KO.

Document Preparation

Any document preparation accomplished by the Contractor that has legal consequence to USACE or USAF shall be submitted through the USACE COR for appropriate component approval before submission to any regulatory authority external to the USACE or USAF. In addition, the Contractor will always include the relevant USAF media PM for input and approval prior to any document submission.

Documents of legal consequence include, but are not limited to:

Any document requiring affirmative certification by an USAF official that the contents of the document are true and correct to the best of his or her knowledge (e.g., Resource Conservation and Recovery Act [RCRA] permit applications);

Any document that could lead to civil, administrative or criminal sanctions against the USAF if the information is determined to be incorrect, misleading, or inaccurate; or

Any document providing information about internal USAF operations being requested by an external agency as part of an investigation or inquiry.

Reporting Noncompliance The Contractor shall immediately report any noncompliance with applicable federal, state, or local environmental laws, or nonconformance with AFIs, as applied through the EMS, to the appropriate Air

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .