B.08.02 - 04 Concrete QA Testing.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
MK AIRBASE CARGO APRON QUALITY ASSURANCE SUPPORT Federal contract opportunity
Solicitation number
W912GB23R0051
Issued by
Department of the Army European Command

About this file

This document outlines quality assurance testing requirements for a concrete paving project. It specifies various tests to be performed on materials and workmanship at different stages of the project, including tests for aggregate gradations, air content, slump, concrete temperature, flexural strength, compressive strength, surface smoothness, curing, edge slump, and dowel alignment. It estimates the quantity of each type of test and provides notes on timing, responsibilities, and costs. The related federal contract opportunity is for quality assurance support on a cargo apron project at a military airbase in Europe to be awarded by the Department of the Army European Command. It involves providing oversight and testing for concrete work as outlined in the QA testing document.

View the file

Other files for this federal contract opportunity

Other files attached to MK AIRBASE CARGO APRON QUALITY ASSURANCE SUPPORT, newest first.
File Type Posted
B.08.02 - 01 Combined Drawings.pdf PDF
B.08.02 - 01 Paving Plan.pdf PDF
B.08.02 - Solicitation W912GB23R0051 - Final.pdf PDF
B.08.02 - 03 Base Access.pdf PDF
B.08.02 - 03 Base Access (New Vehicle Template).DOCX DOCX document
B.08.02 - 01 Contractors Jointing Plan.pdf PDF
B.08.02 - 03 Base Access (MK Airbase, Romania).xlsx XLSX spreadsheet
B.08.02 - 01 Paving Calendar.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 TEST METHOD TEST PROCEDURE QA REQUIRED TESTING ESTIMATED QUANTITY Testing Results Required Notes

SREN933-1GRADATIONS2 PER PAVING DAY24 TOTAL7 Calendar days after individual Pilot Lane, Fill-in Lane or Odd Shaped Slab placementFine & Coarse Agg sample at belt / and Onsite COST PER TEST. KTR CAN SPLIT THESE SAMPLES AND PROVIDE TO QA FOR TESTING
SREN12350, EN12350-7AIR CONTENTEACH TIME A SPECIMEN IS FORMED PLUS 1 RANDOM24 TOTAL24 hours after each testCOST PER DAY ON PAVING DAY
SREN12390-1SLUMPEACH TIME A SPECIMEN IS FORMED PLUS 2 RANDOMVISUAL; to be performed when QC is performing tests24 hours after each testCOST PER PAVING DAY / IF QA IS ONSITE, OVERSEE KTR TESTING. NOT REQUIRED TO HAVE OWN EQUIPMENT
SREN12390-1CONCRETE TEMPEACH TIME A SPECIMEN IS FORMEDVISUAL; to be performed when QC is performing tests24 hours after each testCOST PER PAVING DAY / IF QA IS ONSITE, OVERSEE KTR TESTING. NOT REQUIRED TO HAVE OWN EQUIPMENT
SREN12390-1, NE014, NE012, EN 12390-5FLEXURAL STRENGTH (BEAMS)6 PER LANE OR SLAB (LOT)72 TOTAL; 6 for Test Section, 30 for Pilot Lanes, 24 for Fill in Lanes, 12 for Odd Shaped Slabs3 Beams at 14 & 3 Beams at 28 DaysKTR TO BREAK BEAMS AT 14 AND 28 DAYS FOR FLEXURAL STRENGTH / COST PER TEST
EN 12390-6COMPRESSIVE STRENGTH (CORES)2 PER LANE OR SLAB (LOT)24 TOTAL72 Hours after provided cores from KTRCOST PER TEST
STRAIGHT EDGE METHOD PARA. 2.1.1.3.1SMOOTHNESS15M INTERVALS PERPENDICULAR TO CL PER LANE1 Test Section, 5 Pilot Lanes; 4 Fill in Lanes, 2 Odd Shaped Slabs48 hours after each individual Pilot Lane, Fill-in Lane or Odd Shaped Slab placementCOST PER DAY ON NON-PAVING DAY
PARA. 3.7.2CURINGVisual1 Test Section, 5 Pilot Lanes; 4 Fill in Lanes, 2 Odd Shaped Slabs24 hours after each individual Pilot Lane, Fill-in Lane or Odd Shaped Slab placementVERIFY KTR CALIBRATES CURING MACHINE, REAPPLIES AS NECESSARY, & CHECKS CURING APPLICATION RATE
EDGE SLUMP1.5 TO 3.0 M SPACING1 Test Section, 5 Pilot Lanes; 4 Fill in Lanes, 2 Odd Shaped Slabs48 hours after each individual Pilot Lane, Fill-in Lane or Odd Shaped Slab placementCOST PER DAY ON NON-PAVING DAY
PARA 2.1.2.2 JOINT FACE DEFORMATIONJOINT FACE: A. OFFSET FROM STRAIGHTEDGE APPLIED LONGITUDINALLY TO PAVEMENT SURFACE B. OFFSET FROM STRAIGHTEDGE APPLIED TOP TO BOTTOM AGAINST THE JOINT FACE C. OFFSET FROM STRAIGHTEDGE APPLIED TOP TO BOTTOM AGAINST THE JOINT FACE D. ABRUPT OFFSET IN ANY DIRECTION E. OFFSET OF JOINT FACE FROM TRUE VERTICAL1.5 TO 3.0 M SPACING

tc={B3CDD99C-79FE-450C-99E4-37B3C62BC116}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Quantity seems excessive.1 Test Section, 5 Pilot Lanes; 4 Fill in Lanes, 2 Odd Shaped Slabs48 hours after each individual Pilot Lane, Fill-in Lane or Odd Shaped Slab placementCOST PER DAY ON NON-PAVING DAY
PARA. 3.5.8DOWEL ALIGNMENTALL DOWELS1 Test Section, 5 Pilot Lanes; 4 Fill in Lanes, 2 Odd Shaped Slabs48 hours prior to each individual Pilot Lane, Fill-in Lane or Odd Shaped Slab placement.COST PER DAY ON NON-PAVING DAY