B.08.02 - 01 Paving Plan.pdf
PDF 2 MB Posted
- Attached to
- MK AIRBASE CARGO APRON QUALITY ASSURANCE SUPPORT Federal contract opportunity
- Solicitation number
- W912GB23R0051
- Issued by
- Department of the Army European Command
About this file
This paving plan document outlines the schedule and process for repaving the cargo apron at Mihail Kogalniceanu Air Base in Romania under Federal Contract Opportunity W912GB23R0051. The paving will occur over 47 days according to the schedule provided, with various lanes designated as test, pilot, or fill-in lanes. Notes specify requirements such as allowing 7 days of curing before use of equipment on new lanes, provision of surveying and access, and restrictions during paving. The related solicitation seeks quality assurance support from offerors for repaving the cargo apron under the oversight of the Department of the Army European Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.02 - 03 Base Access.pdf | ||
| B.08.02 - 03 Base Access (New Vehicle Template).DOCX | DOCX document | |
| B.08.02 - 01 Contractors Jointing Plan.pdf | ||
| B.08.02 - 01 Combined Drawings.pdf | ||
| B.08.02 - Solicitation W912GB23R0051 - Final.pdf | ||
| B.08.02 - 04 Concrete QA Testing.xlsx | XLSX spreadsheet | |
| B.08.02 - 03 Base Access (MK Airbase, Romania).xlsx | XLSX spreadsheet | |
| B.08.02 - 01 Paving Calendar.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GR2.2
GR1.2
GR2.1
GR1.1
6.005.125.115.116.006.006.006.006.006.006.006.00
5.005.005.006.006.006.006.006.006.006.006.006.005.00
4.
6.
5.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
5.
6.
4.
3.
C-17
C-17
C-17
C-17
24° 25.5°
24° 25.50°
33.00° 40.00°
40.00°
33.00°
31.00°
31.00°
9.15009.150012.20006.1000
9.15009.150012.20006.1000
18.3000
18.3000
24°25.5°
24°25.50°
33.00°40.00°
40.00°33.00°
31.00°
31.00°
4.80 4.80 6.00 6.00 4.88 4.88
22.1440
5.54 5.54 5.54 5.54
3.
78°
R R
R R
R
R R R R R R
RRRRR
R
R
R
R
R
R
R
RR
RR
RR
R
R
R R
R RRR
R
R
R
15.00
3.00
6.00
6.00 3.00
9.00 3.00
Restricted access area 78.00 temporary ramp 5.007.00
6.00 6.006.00 6.006.00 6.006.00 6.006.00 6.006.00 6.006.00 6.006.00 6.006.00 4.994.99 4.98
6.00 3.00
12.99
13.10 3.00
3.00 3.00
6.00 3.00
3.00 3.00
6.00
6.00
3.00
15.00
31.80 0.94
2.26
3.63
4.15
5.24
2.79
2.07
2.83
5.57
3.19 2.21 1.71 1.13
5.59
1.44 8.39
6.16 2.78
6.64
2.27
4.65
4.52
8.80
0.89 4.26
2.62 2.39
3.20
1.14
0.9985
2.32
3.63
5.60
2.86
2.18
3.04
5.59 3.22 2.21 1.71
4.21 2.65
5.320.56
8.341.64
6.32 2.85
6.66
2.37
7.15
3.47
1.99
2.49
1.00
1.00
1.00
1.00
6.00
1.99 0.563.50
2.49
6.
SC2
SC3
SC4
AEL 3.6
AEL 3.8
AEL 3.5
AEL 3.4
AEL 3.3
AEL 3.1
STB.D.8
STB.D.1
STB.D.2
STB.D.3
STB.D.4
STB.D.5
STB.D.6
STB.D.7
AEL 3.2
AEL 3.7
6.
5.
5.
E3 E505
11.2514
6.0000
5.2500
6.0014
6.0014 please provide center line height marks.
Taxiway middle lane will be paved with center-crowned profile
35 34 33 3230 2931
3.8759
5.9988
R R R
R
R R
R
R
R R
R
R
R R
R
R
R
Paving day Paving line No.
1 1 (test line) 2 2 (pilot lane) 3 3 (pilot lane) 4 4 (pilot lane) 5 5 (pilot lane) 6 6 (pilot lane) 7 7 (pilot lane) 8 8 (pilot lane) 9 9 (pilot lane) 10 10 (pilot lane) 11 11 (pilot lane) 12 12 (pilot lane) 13 13 (pilot lane) 14 14 (pilot lane) 15 15, 16 (pilot lanes) 16 17 (fill-in lane) 17 18 (fill-in lane) 18 19 (fill-in lane) 19 20 (fill-in lane)
1)Paving calendar
Notes:
1) Calendar is provided as a sample to demonstrate the that 7 day curing is planned before operation of hauling and paving equipment on newly paved lanes. Real sequence and number of paving days can be adjusted on-site, considering weather, holidays and on-site conditions.
2) Geodetical height marks (surveyed with tachymeter) for each adjacent joint crossing point of the existing pavements (remaining part of the taxiway in the East, as well as existing
Taxiway Foxtrot in the North and South) are required;
3) Free, flat-surfaced and stable adjacent area is required at the start and the end of each paving lane (20m), as well as on both sides of the paving area (1.5m) provided with a minimum bearing capacity of 125 MN/m2 to allow maneuvers of the paver, texture curing machine and concrete delivery transport (>1000 trucks). It is strongly recommended that all the designed structures in this area (asphalt shoulder, gutter, jet blast deflector foundation and high mast foundation) are constructed only after PCC is finished; otherwise, work sequence and details shall be carefully organized and coordinated with A7 BETONS so that the required access for PCC installation is provided; however, damage risks to the previously built structures cannot be excluded.
4) Asphalt layer of the designed asphalt shoulder next to the apron and taxiway must be installed after PCC is finished;
5) Bottom layers of the designed asphalt shoulder next to PCC apron and taxiway should be built so that enough space (50cm wide) for metal formwork installation is left next to the PCC area (which has 48 cm deep thickened edge all around), and the free area must have stabilized base on the same level as the stabilized base under apron and taxiway pavement;
6) No vibrating works are allowed in the closest 100m area to the PCC during PCC installation works and until the required strength of PCC is obtained.
7) The paving plan includes adjusted positions of mooring points to provide the best joint plan. All the adjustions have been done in accordance with UFC and Aircraft Technical Order. In accordance with UFC.
20 21 (fill-in lane) 21 22 (fill-in lane) 22 23 (fill-in lane) 23 24 (fill-in lane) 24 25 (fill-in lane) 25 26 (fill-in lane) 26 27 (fill-in lane) 27 28 (fill-in lane) 28 29 (pilot lane) 29 30 (pilot lane) 30 31 (pilot lane) 34 32 (fill-in lane) 35 33 (fill-in lane) 36 34 (fill-in lane) 37 35 (fill-in lane)
38-43 SP64i rebuild to 5.25m width
44 36 (fill-in lane) 45 37 (fill- in lane) 46 manual placement area 1/2 47 manual placement area 1/2
Paving day Paving line No.
R
Legend
Expansion joint Construction joint (doweled) Contraction joint
Reinforced slabs Test line Pilot line Fill-in line Manual placement area
37 Paving line No.
Cargo apron in Mihail Kogalniceanu air base, Romania
SIA A7 BETONS
Reg.No. LV40103681522
PAVING PLAN
05.2023.
Stefan.CROITORU Arrow
Stefan.CROITORU Typewriter 150 m from runaway center line
Stefan.CROITORU Arrow
Stefan.CROITORU Typewriter
AREA 2
Stefan.CROITORU Typewriter
AREA 1
Stefan.CROITORU Typewriter
FOXTROT
Stefan.CROITORU Typewriter
DELTA
Stefan.CROITORU Arrow
Stefan.CROITORU Arrow
Stefan.CROITORU Arrow
Stefan.CROITORU Typewriter
Stefan.CROITORU Typewriter
Stefan.CROITORU Arrow
Stefan.CROITORU Arrow
Stefan.CROITORU Typewriter
Stefan.CROITORU Arrow
Stefan.CROITORU Callout 14 R N
Stefan.CROITORU Callout
2R SOUTH
Stefan.CROITORU Callout 30 R N
Stefan.CROITORU Callout 30 R S
Stefan.CROITORU Callout 33 R N
Stefan.CROITORU Callout 33 R S
Stefan.CROITORU Callout 29R N
Stefan.CROITORU Callout 29 R S
Stefan.CROITORU Callout 15 R N
Stefan.CROITORU Callout 16 R S
| Sheets and Views |
| PAVING_PLAN_A7_BETONS (2) |
File details come from the government source that posted it. Updated .