B.0 8 Attach 2 PWS UPS-Cooling_Replacement-Upgrade -.pdf
PDF 199 KB Posted
- Attached to
- CS UPS & COOLING SYSTEM
- Solicitation number
- W50S8W25Q0011
- Issued by
-
Department of the Army National Guard
About this file
This Performance Work Statement (PWS) details a project for the 153d Communications Squadron at the Cheyenne Regional Airport in Wyoming. The primary objectives are to remove and replace eight (8) Chilled Water In-Row Cooling Units and replace the UPS system and batteries. Specifically, the project involves removing one PX80 UPS and installing a new PX 100KW Frame (de-rated to 80KW) 208V, 4-Wire Modular UPS populated with 60KW+1 and seven 10KW Power modules. The cooling units will be warranted for one year, and the work will be performed within Building 31A, Room R105. The period of performance is from 04/23/2025 to 04/24/2025, with AT Level I Training required for the contractor. The project aims to maintain mission-ready network devices and ensure maximum uptime in the datacenter by upgrading the power and cooling infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date:
1.1 Scope
1.2 Objectives
1.3 Background
1.4 Place and Performance of Services
Start End
Telework AT Level I Training ATCTS Registration CaC/TASS Application iWatch Training OPSEC Level 1 Training Background Check Information Assurance Training Classified Access TARP Training Combating Trafficking In Person Contractor Travel Joint Travel Regualtion
Performance Work Statement
1.5 Period of Performace
1.6: Quality Assurance: The Government will evaluate the contractor’s performance under this contract in accordance with FAR 52.246-4. This evaluation is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards.
1.7 Check All That Apply (See More Info in 6.0 Additional Information)
1.0 General
1.8 Additional Information
5.1: The contractor shall
Technical Rep Date
Contracting Officer (KO) Date
5.0: Requirements
6.0: Additional Information
2.0: Reserved
3.0: GFP/M/E/S
3.1: Will the Government be furnishing the necessary workspace/equipment/services/utilities for the contractor to perform services outlined in this PWS? If yes, include attachment of GFP/M/E/S.
4.0: CFP/M/E
4.1: Will the Contractor be required to furnish everything required to perform these services as outlined in this PWS? If yes, include attachment of CFP/M/E/S.
| Sheet1 |
| Sheet3 |
| Date1_af_date: 04/26/2025 |
| Date2_af_date: 04/23/2025 |
| Date3_af_date: 04/24/2025 |
| Text4: The contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, other items to include uninstall and install of equipment necessary to complete the work as described in section 5.1 of this PWS. Reports of completed work shall be provided to the Contracting Officer Representative (COR). Work location is 153d Airlift Wing located at the Cheyenne Regional Airport, Cheyenne, WY. |
| Text5: 1. To remove and replace Eight (8) Chilled Water In-Row Cooling Units. |
2. Remove and replace UPS system and batteries Text6: The 153d Communications Squadron(153 CS) is responsible for maintaining mission-ready network devices and ensuring maximum uptime is achieved by devices in the Datacenter. In order to ensure this, an Uninterrupted Power Supply (UPS) system was put into place that will carry the building’s power load until commercial power is restored or a backup generator can provide power to the facility. This UPS system, including required cooling system, is outdated and no longer serviceable. The entire system will needs to be replaced in order to ensure maximum uptime of critical servers, routers, enterprise access points, and network security appliances. Due to the lack of certified UPS technicians, the 153 CS requires professionally trained personnel to assist with replacement, installation, and maintenance of the UPS and Cooling systems.
| Text7: Contractor shall work only in the areas designated by COR. Primary work location shall be within Building 31A. The facility UPS referred to in this document is the APC UPS supporting the 153 AW Datacenter, within Building 31A, Room R105. |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box19: Off |
| Check Box13: Yes |
| Check Box14: Off |
| Check Box20: Off |
| Check Box18: Off |
| Check Box17: Off |
| Check Box16: Off |
| Check Box15: Off |
| Text21: |
| Dropdown22: [No] |
| Dropdown23: [No] |
| Text24: 1. To remove and replace Eight (8) Chilled Water In-Row Cooling Units. Includes re-using PEX-AL-PEX piping and insulation. New couplers will be provided. Cooling Units are warranted for One-Year from time of start up. Cooling Distribution Unit (CDU) to remain in place. |
2. Remove One (1) PX80 UPS and then replace One (1) PX 100KW Frame (de-rated to 80KW) 208V, 4-Wire Modular UPS. The new UPS is populated to 60KW+1 with (7) 10KW Power modules just like the previous. UPS will be wired for a max of 80KW to reuse the same input feed currently installed. Includes Twelve (12) Rows of Battery to allow for 18-Minutes at 60KW Load as well as a 3CB Bypass with output distribution breakers. Output distribution to include (20) 1P20A breakers and the reuse of (3) 3P125A. New UPS requires the feeder breaker into the data center to be provided with a shunt trip breaker upstream. This allows for connection to the existing EPO. (Previous UPS did not require a shunt trip). System is (4) Cabinets total: Bypass/Distribution, UPS, (2) Battery.
| Text25: | |
| 2025-04-16T07:56:51-0600 | |
| ANTHONY.BRENTTON.NICHOLAS.1153311184 |
| Date28_af_date: 4/16/25 |
| Date29_af_date: |
File details come from the government source that posted it. Updated .