B-54600 Q and A~1.docx

DOCX document 20 KB Posted

Attached to
EMA - Linear Positioning System for Gamma Calibrators
Solicitation number
27-588IEMA-DIVNU-B-54600
Issued by
St. Clair County, Illinois

About this file

This is a Q&A document for the Illinois Emergency Management Agency's (IEMA) Linear Positioning System for Gamma Calibrators solicitation (27-588IEMA-DIVNU-B-54600). The project involves designing and installing a standalone linear positioning system for the IEMA Occupational Health and Safety Calibration Lab in Springfield, Illinois to enable precise positioning of radiation detection instruments for calibration testing. The system must accommodate two irradiator types (IDNS and JLS models) with X-axis travel of minimum 9 meters and Z-axis vertical travel of 30 centimeters, both achieving 1-millimeter positioning accuracy using stepper-motor drives. The system includes a 50-centimeter x 50-centimeter instrument platform with 100-pound load capacity and a fixed irradiator stand with 250-pound load capacity. Deliverables are due by June 30, 2027, and the vendor must provide onsite installation, acceptance testing, mechanical drawings, and operation and maintenance manuals. The contract term extends from execution through June 30, 2027 with no renewal options.

The Q&A document clarifies that the linear positioning system operates independently of the irradiators and requires no integration with existing laboratory software, safety systems, or Hopewell equipment already present at the facility. The system requires a keyed power switch and emergency stop button for safety, operates on standard 120 VAC/60 Hz power, and must fit through a 48-inch doorway for installation. The vendor must control only X and Z positioning functions, position display, homing, and offset functions; irradiator shutter control, exposure timing, calibration sequences, and data logging are not vendor responsibilities. The irradiator stand mounting surface shall be positioned 48-52 inches above finished floor, and all work must be performed in the United States. The state will handle all radioactive source operation during testing and commissioning activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Linear Positioning System for Gamma Calibrators

27-588IEMA-DIVNU-B-54600

Q & A

Q1. The specifications do not provide sufficient information regarding the location of the sealed radioactive sources within the IDNS and JLS lead shielding. This information is necessary to ensure that both irradiators can be positioned consistently on the stand, with the source location accurately referenced to the X-axis distance scale.

Could the Agency provide the approximate location of the sealed radioactive source within each lead pig, referenced to an identifiable external surface or mounting point?

A1. On the IDNS irradiators, the source is located behind a manually operated 2-inch-thick rotating shutter mounted on an offset bolt. There are 3 irradiators in this series. For the first, source center is located approximately 79.2 mm (3.118 in.) from the exterior front face of the shutter. For the second and third, source center is located approximately 85.7 mm (3.374 in.) from the exterior front face of the shutter. The stand design must provide sufficient clearance to allow full rotation of the shutter about the bolt without interference from the support table or mounting structure.

On the JLS Irradiator, the irradiator consists of a 6-inch-long cylindrical shield with a manually removable shutter plug. The source center is located approximately 87.2 mm (3.433 in.) from the front face of the shield.

Q2. After reviewing the IDNS and JLS lead pig configurations and the IDNS cradle drawing, there appears to be a difference in source centerline elevation between the two irradiators when mounted on the stand.

Would the Agency prefer that a mounting bracket be fabricated for the JLS irradiator to establish the same source centerline elevation as the IDNS irradiator? The bracket could utilize the same 7.25" × 4.5" mounting bolt pattern as the IDNS cradle.

Maintaining a common source centerline elevation would eliminate the need for operators to adjust the Z-axis reference when switching between calibrators, reducing the potential for positioning errors.

A2. The Agency would accept designs with a mounting solution that establishes a common z-axis source centerline elevation for both the IDNS and JLS irradiators, provided it does not compromise stability, alignment accuracy, or operation of either device. The Agency is receptive to a mounting bracket for the JLS irradiator that utilizes the same mounting pattern as the IDNS cradle if the vendor determines this is the most practical design approach.

Q3. After reviewing the IDNS cradle drawing, I did not see provisions for mechanical stops or locating features to ensure that the calibrator is consistently seated in the same position.

The specifications require positioning accuracy of 1 mm. While the positioning system itself may achieve this accuracy, repeatable placement of the irradiators is equally important to maintaining accurate source-to-detector distances.

Would the Agency consider incorporating mechanical stops or other locating features into the cradle to establish a consistent reference position?

A3. Vendors are encouraged to incorporate mechanical stops or locating features into the cradle and mounting design to establish a consistent reference position whenever an irradiator is installed or removed. The specific implementation may be determined by the vendor, provided it supports reliable and repeatable positioning.

Q4. The specifications do not identify where the control station will be physically located.

Will the positioning system be operated locally to the calibrator(s) within the irradiation room, or will the controls need to be located remotely in a separate control room?

If remote operation is required, could the Agency provide the approximate cable run length between the positioning system and the proposed control station?

A4. The control station will be located within the same room as the irradiation range. Remote operation from a separate control room is not required.

Q5. The specifications require safety interlocks but do not define their intended function.

Since the positioning system will operate independently of the calibrators and will not control source exposure or shutter operation, could the Agency clarify what safety interlocks are expected?

A keyed power switch and emergency stop button could be incorporated into the control station to prevent unauthorized operation and immediately stop positioning system movement. Would these features satisfy the Agency's requirements, or are additional interlocks anticipated?

A5. The intended safety interlocks for the Linear Positioning System are limited to preventing unauthorized operation and allowing operators to immediately stop system motion. The Agency requires, at a minimum, a keyed power switch and an emergency stop button located at the control station. No additional interlocks associated with source exposure, shutter operation, or irradiator control are anticipated, as these functions are independent of the positioning system.

Q6.Is this a new standalone positioning system, or must it replace or integrate with an existing Hopewell system? Is there a designated basis-of-design manufacturer/model, and are independently designed systems acceptable?
A6.The agency is seeking a new standalone linear positioning system and does not require integration with any existing system or other legacy equipment. There is no designated manufacturer or model. Vendors may use independently designed systems, provided the solution meets the requirements specified.
Q7.Please confirm whether the vendor controls/software scope is limited to the specified X/Z positioning functions, or also includes irradiator shutter control, exposure timing, calibration sequences, data logging, or integration with existing software.
A7.The vendor controls/software scope is limited to operation of the linear positioning system, including X axis and Z axis positioning, position display, homing, instrument offset functions, and associated safety features. Control of irradiator shutters, exposure timing, calibration sequences, data logging, or integration with existing calibration software is not required as part of this procurement.
Q8.If existing software integration is required, please provide the software details, interface documentation, available licenses, and responsibility for any third-party support or modifications.
A8.Integration with existing software is not required.
Q9.What safety interlocks are required? Please identify any interfaces with the irradiators, room access controls, emergency stops, or existing laboratory safety systems, and clarify each party’s responsibilities.
A9.The linear positioning system is not intended to interface with irradiators, room access controls, or existing laboratory safety systems. The agency requires only a keyed power switch and an emergency stop button located at the control station to prevent unauthorized operation and allow immediate cessation of positioning system motion.
Q10.Can the agency assign a technical engineer or calibration-laboratory representative for a technical meeting and guidance on the operating process and vendor responsibilities?
A10.Following contract award, the Agency will make appropriate technical and calibration laboratory personnel available to the successful vendor for discussion as necessary to support final design, fabrication, installation, and commissioning activities.
Q11.Please provide available room layouts, existing equipment/control drawings, utility requirements, and the required acceptance-testing procedure. Please also confirm who will operate the radiation sources during testing.
A11.The Agency will not provide room layouts as part of the solicitation. General drawings of existing equipment are included in the solicitation documents. The Linear Positioning System shall operate from standard 120 VAC, 60 Hz power. Acceptance testing will be limited to verification that the positioning system meets the functional and performance requirements, including positioning accuracy, travel, and control functions. Operation of irradiators and radioactive sources during any testing or commissioning activities will be performed exclusively by agency personnel.
Q12.Is a site visit or technical walkthrough available before final pricing?
A12.Site visits or technical walkthroughs will not be available as part of the solicitation process.
Q13.Are we removing any existing track where new linear positioning system located?
A13.No existing track or positioning system components will be removed as part of this procurement.
Q14.Is the irradiator manual and placed on stand at specific height?
A14.All associated irradiators are manually operated. The irradiator stand shall have a mounting surface height of approximately 48-52 inches above the finished floor.
Q15.Is this a room with existing safety system?
A15.The linear positioning system will be installed in a room that is already equipped with existing laboratory safety systems. However, no integration between the linear positioning system and those existing safety systems is required as part of this procurement.
Q16.Does a safety interlock system need to be quoted?
A16.For this procurement, the agency's safety requirements are limited to a keyed power switch and an emergency stop button located at the control station to prevent unauthorized operation and allow immediate cessation of positioning system movement. No interlocks with irradiators, source exposure systems, room access controls, or existing laboratory safety systems are required.
Q17.Is this a room where existing Hopewell equipment is located?
A17.Yes, the linear positioning system will be installed in a room that currently contains existing Hopewell equipment.
Q18.Does an alignment system need to be added to quote?
A18.An alignment system is not a required component of this procurement.
Q19.Are we tying into an existing automation package or a new automation package for the Linear positioning system where it is stand alone.
A19.The proposed linear positioning system shall utilize a new, standalone automation and control package. Integration with any existing automation systems, equipment controls, calibration software, or laboratory control systems is not required as part of this procurement.
Q20.What are the radiation specifications for this project?
A20.The linear positioning system itself will have no radiation-producing capability and does not control radioactive sources. However, it will be installed and operated within an existing radiation calibration laboratory and used in conjunction with manually operated portable irradiators containing sealed radioactive sources (Am 241, Cs 137, and Co 60). The positioning system shall be designed to maintain precise, repeatable alignment and distance measurements for radiation calibration activities but is not required to provide source control, exposure control, or radiation safety system integration.
Q21.What is the incoming voltage requirement?
A21.The system shall operate from standard 120 VAC, 60 Hz power. Vendors should assume conventional electrical service and include any power supplies or transformers required for operation of system components.
Q22.Is there a general sketch showing the actuator locations, proximity of the main control panel, and operator interface locations?
A22.There are no irradiator actuators, control panels, or operator interfaces associated with the manually operated irradiators. The only controls involved will be those supplied with the linear positioning system.