This document contains eleven Contract Data Requirement Lists (CDRLs) associated with the federal contract opportunity AWSM Zone 1 issued by the Department of the Army Materiel Command TACOM Life Cycle Management Command. The CDRLs require the contractor to submit various technical reports, schedules, meeting minutes, certifications and other deliverables. Key deliverables include a provisioning performance schedule, condition reports, test and inspection results, meeting agendas and minutes, warranties and as-built drawings. Submission dates and review periods vary by CDRL but generally require electronic submission within 5 to 60 days of contract award or key milestones. The CDRLs will provide oversight of tasks related to production scheduling, quality control, testing and vessel acceptance for the federal agency.
DRAFT AWSM CDRLs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MVA_RFI_Rev_01.docx | DOCX document | |
| MVA_QAs.pdf | ||
| Annoucenment_0007_MVA_RFI.pdf | ||
| DRAFT_Maintenance-SLEP_SOW.PDF | ||
| A-WSM_RFI_Z1-0001_Rev_01.docx | DOCX document | |
| A-WSM_Draft_General_Requirements.pdf | ||
| A-WSM_RFI_Z1-0001.pdf | ||
| A-WSM_Draft_General_Requirements_CDRLs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423, FEB 2001
CONTRACT DATA REQUIREMENT LIST, PREVIOUS EDITION MAY BE USED Form Approval OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.:
C. CATEGORY: TDP ____ TM ____ OTHER ____
F. CONTRACTOR:
1. DATA ITEM NO: A001
2. TITLE: Provisioning Performance Schedule
3. SUBTITLE: Schedules
4. AUTHORITY: DI-SESS-81713 5. CONTRACT REFERENCE: See BLK 16
6. REQUIRING OFFICE: WIB and AWS 7. DD250 REQ: N/A
8. APP CODE: A 9. DIST. STATEMENT REQ: D
10. FREQUENCY: As Required 11. AS OF DATE: See BLK 16
12. DATE OF FIRST SUBMISSION: 5 days after contract award
13. DATE OF SUBS. SUBMISSION: every two weeks
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES: 1
DRAFT: 1
FINAL: 1
REG REPRO:
15. TOTAL COPIES: 1
16. REMARKS: Instruction listed in the SOW at the below referenced paragraph numbers:
C.1.10. C.3.2
The Government shall have 14 calendar days after the date of receipt in which to approve or reject the submittals.
The contractor shall have five calendar days after contract award to prepare and submit for approval the practicable project schedule.
The contractor shall provide one electronic copy. (See SOW references for more details)
Production schedules shall be submitted IAW CDRL A001 identified by hull number and title. Example: LSV 1 Production Schedule. Subsequent versions of the production schedule shall add a sequential letter designator. Example:
LSV 1 Production Schedule a.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY:
H: DATE:
I: APPROVED BY:
J: DATE:
CONTRACT DATA REQUIREMENT LIST, PREVIOUS EDITION MAY BE USED Form Approval OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:
B. EXHIBIT: A E. CONTRACT/PR NO.:
C. CATEGORY: TDP ____ TM ____ OTHER ____
F. CONTRACTOR:
1. DATA ITEM NO: A002
2. TITLE: Condition Reports
3. SUBTITLE: CR
4. AUTHORITY: DI-MGMT-81648(T)5. CONTRACT REFERENCE: See BLK 16
6. REQUIRING OFFICE: WIB 7. DD250 REQ: N/A
8. APP CODE: 9. DIST. STATEMENT REQ: D
10. FREQUENCY: As Required 11. AS OF DATE: See BLK 16
12. DATE OF FIRST SUBMISSION: As Required
13. DATE OF SUBS. SUBMISSION: See BLK 16
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES: 1
DRAFT: 1
FINAL: 1
REG REPRO:
15. TOTAL COPIES: 1
16. REMARKS: Instruction listed in the SOW at the below referenced paragraph numbers:
C..1.11.1, C.1.4
Contractor is to use the CFR Form provided by the Government when submitting CFRs to the Government.
The Government shall have 14 calendar days after the date of receipt in which to approve or reject the submittals.
The contractor shall provide one electronic copy. (See SOW references for more details)
All CRs shall be identified by hull number – CR-report number. Example: LSV
1-CR-1.
Attached supporting documents shall use an additional letter as identification. Example: LSV-CR-1a.
Required certifications shall be identified by hull number and title.
Example: LSV 1 Potable Water Certificate.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY:
H: DATE:
I: APPROVED BY:
No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.:
C. CATEGORY: TDP ____ TM ____ OTHER ____
F. CONTRACTOR:
1. DATA ITEM NO: A003
2. TITLE: Report, Record of Meeting Minutes
3. SUBTITLE: Meeting Minutes
4. AUTHORITY: DI-ADMN-81505 5. CONTRACT REFERENCE: See BLK 16
6. REQUIRING OFFICE: WIB 7. DD250 REQ: N/A
8. APP CODE: 9. DIST. STATEMENT REQ: D
10. FREQUENCY: As Required 11. AS OF DATE: See BLK 16
12. DATE OF FIRST SUBMISSION: As Required
13. DATE OF SUBS. SUBMISSION: See BLK 16
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES: 1
DRAFT: 1
FINAL: 1
REG REPRO:
15. TOTAL COPIES: 1
16. REMARKS: Instruction listed in the SOW at the below referenced paragraph numbers:
C.6
Progress Meeting Minutes shall include the follow items:
Safety Quality Control RFIs/CFRs Schedule Modifications Open Discussion Action Items Next Meeting
The Contractor shall submit the meeting minutes via e-mail message no later than three (3) calendar days after the meeting occurs.
The contractor shall provide one electronic copy. See SOW references for more details
G. PREPARED BY:
H: DATE:
I: APPROVED BY:
No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.:
C. CATEGORY: TDP ____ TM ____ OTHER ____
F. CONTRACTOR:
1. DATA ITEM NO: A004
2. TITLE: Inspection and Test Plan
3. SUBTITLE:
4. AUTHORITY: DI-QCIC-81110 5. CONTRACT REFERENCE: C.XX
6. REQUIRING OFFICE: WIB 7. DD250 REQ: N/A
8. APP CODE: 9. DIST. STATEMENT REQ: D
10. FREQUENCY: One 11. AS OF DATE: See BLK 16
12. DATE OF FIRST SUBMISSION: As Required
13. DATE OF SUBS. SUBMISSION: See BLK 16
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES: 1
DRAFT: 1
FINAL: 1
REG REPRO:
15. TOTAL COPIES: 1
16. REMARKS: Instruction listed in the SOW at the below referenced paragraph numbers:
C.6.2.1
A draft shall be reviewed at the Start of Work Meeting (SOWM). Electronic submission is required in a *.pdf format. First submission of the Inspection and Test Plan shall be submitted to the Government no less than 60 calendar days prior to the start of sea trails. The Government has 30 days to review and provide comments to the contractor. The contractor shall submit a final Inspection and Test Plan 20 days prior to start of sea trails. The final Inspection and Test Plan shall incorporate and address all Government comments.
The contractor shall provide one electronic copy. See SOW references for more details
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.:
C. CATEGORY: TDP ____ TM ____ OTHER ____
F. CONTRACTOR:
1. DATA ITEM NO: A005
2. TITLE: Test Schedule
3. SUBTITLE: Vessel Acceptance Test Schedule
4. AUTHORITY: DI-MISC-81614 5. CONTRACT REFERENCE: See BLK 16
6. REQUIRING OFFICE: WIB 7. DD250 REQ: N/A
8. APP CODE: 9. DIST. STATEMENT REQ: D
10. FREQUENCY: As Required 11. AS OF DATE: See BLK 16
12. DATE OF FIRST SUBMISSION: As Required
13. DATE OF SUBS. SUBMISSION: See BLK 16
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES: 1
DRAFT: 1
FINAL: 1
REG REPRO:
15. TOTAL COPIES: 1
16. REMARKS: Instruction listed in the SOW at the below referenced paragraph numbers:
C.1.11.3
Block 12: A draft shall be reviewed at the Start of Work Meeting (SOWM).
Electronic submission is required in a *.pdf format. Final Test Schedule shall be submitted to the Government no less than 20 calendar days prior to the start of sea trails.
Block 13: The document may be modified and a subsequent submission may be required based on the changes to the test schedule. In the event of a test failure requiring re-testing, the contractor shall modify the test schedule to include the re-test and resubmit the schedule.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
J: DATE:
DD FORM 1423, FEB 2001
CONTRACT DATA REQUIREMENT LIST, PREVIOUS EDITION MAY BE USED Form Approval OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.:
C. CATEGORY: TDP ____ TM ____ OTHER ____
F. CONTRACTOR:
1. DATA ITEM NO: A006
2. TITLE: Warranty Information
3. SUBTITLE: Closeout Documents
4. AUTHORITY: DI-SESS-81639A 5. CONTRACT REFERENCE: See BLK 16
6. REQUIRING OFFICE: WIB 7. DD250 REQ: N/A
8. APP CODE: 9. DIST. STATEMENT REQ: D
10. FREQUENCY: As Required 11. AS OF DATE: See BLK 16
12. DATE OF FIRST SUBMISSION: As Required
13. DATE OF SUBS. SUBMISSION: See BLK 16
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES: 1
DRAFT: 1
FINAL: 1
REG REPRO:
15. TOTAL COPIES: 1
16. REMARKS: Instruction listed in the SOW at the below referenced paragraph numbers:
C.2.1.1
The contractor shall provide drawings, O&M Manuals and Warranty information.
The Governrnment shall have 14 calendar days after date of receipt in which to approve or reject the submittals
The contractor shall provide one electronic copy. See SOW references for more details
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.:
C. CATEGORY: TDP ____ TM ____ OTHER ____
F. CONTRACTOR:
1. DATA ITEM NO: A007
2. TITLE: Agenda
3. SUBTITLE: Meeting Agenda
4. AUTHORITY: DI-ADMN-81249A 5. CONTRACT REFERENCE: See BLK 16
6. REQUIRING OFFICE: WIB 7. DD250 REQ: N/A
8. APP CODE: 9. DIST. STATEMENT REQ: D
10. FREQUENCY: As Required 11. AS OF DATE: See BLK 16
12. DATE OF FIRST SUBMISSION: As Required
13. DATE OF SUBS. SUBMISSION: See BLK 16
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES: 1
DRAFT: 1
FINAL: 1
REG REPRO:
15. TOTAL COPIES: 1
16. REMARKS: Instruction listed in the SOW at the below referenced paragraph numbers:
C.6.1.1
Block 12: Agenda shall be submitted within five business days prior to Start of Work Meeting (SOWM).
Block 13: Agendas shall be submitted within five business days prior to any meetings stated in the PWS.
The Government COR will propose changes to the agenda two business day prior to the event. After receipt of comments, the contractor shall address, incorporate and resubmit the Final Version of the agenda and briefing charts NLT a business day prior to the event.
Block 14: Meeting agendas shall be submitted electronically to the COR. The contractor shall notify the Government when data has been submitted. The submission shall be prepared and delivered in an editable Microsoft Office 2007 software suite file format (MS Word, MS Excel, MS PowerPoint, etc.)
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY:
H: DATE:
I: APPROVED BY:
No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.:
C. CATEGORY: TDP ____ TM ____ OTHER ____
F. CONTRACTOR:
1. DATA ITEM NO: A008
2. TITLE: Certification/Data Report
3. SUBTITLE:
4. AUTHORITY: DI-MISC-80678(T)5. CONTRACT REFERENCE: See BLK 16
6. REQUIRING OFFICE: WIB 7. DD250 REQ: N/A
8. APP CODE: 9. DIST. STATEMENT REQ: D
10. FREQUENCY: As Required 11. AS OF DATE: See BLK 16
12. DATE OF FIRST SUBMISSION: As Required
13. DATE OF SUBS. SUBMISSION: See BLK 16
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES: 1
DRAFT: 1
FINAL: 1
REG REPRO:
15. TOTAL COPIES: 1
16. REMARKS: Instruction listed in the SOW at the below referenced paragraph numbers:
C.1.1.1. C.1.11.2
Blocks 10, 12 and 13: The contractor shall deliver the certification/report two days after the completion of the test and inspection.
Stern Anchor Winch Assembly Repairs pull test certificate shall be delivered three days prior to Dock and Sea Trials.
Certificates of inspection shall be delivered upon completion of Fire Suppression System Servicing.
The boat davit and associated lifting slings and hardware certificates shall be delivered prior to vessel departing repair facility.
Pull Test Certificates shall be delivered three days after OCCM Davit Inspection, Repairs and Certification pull test.
The potable water tanks safe for human consumption certificate shall be delivered three days prior to Dock and Sea Trials.
The Dead Weight Check Report, Engineers Sounding Tables, and the Trim and Stability Book shall be provided with the Additional Load Line Certificate.
Block 14: The contractor shall submit the Certification/Data electronically to the COR
Test and Inspection Reports and Logs shall be identified by hull number and TI. Example: LSV 1 TI. When the file is too large to transmit and is broken down, additional reports shall add a letter designator. Example: LSV 1 TI a.
G. PREPARED BY:
H: DATE:
I: APPROVED BY:
No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.:
C. CATEGORY: TDP ____ TM ____ OTHER ____
F. CONTRACTOR:
1. DATA ITEM NO: A009
2. TITLE: Safety Certification Program for Drydocking Facilities and Shipbuilding Ways for U.S. Navy Ships
3. SUBTITLE: Dry Dock Certifications
4. AUTHORITY: MIL-STD-1625D(SH)5. CONTRACT REFERENCE: See BLK 16
6. REQUIRING OFFICE: WIB 7. DD250 REQ: N/A
8. APP CODE: 9. DIST. STATEMENT REQ: D
10. FREQUENCY: As Required 11. AS OF DATE: See BLK 16
12. DATE OF FIRST SUBMISSION: As Required
13. DATE OF SUBS. SUBMISSION: See BLK 16
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES: 1
DRAFT: 1
FINAL: 1
REG REPRO:
15. TOTAL COPIES: 1
16. REMARKS: Instruction listed in the SOW at the below referenced paragraph numbers:
C.1.3, C.1.3.1
G. PREPARED BY:
H: DATE:
I: APPROVED BY:
No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.:
C. CATEGORY: TDP ____ TM ____ OTHER ____
F. CONTRACTOR:
1. DATA ITEM NO: A010
2. TITLE: Request for Variance
3. SUBTITLE: RFV
4. AUTHORITY: DI-SESS-81315 5. CONTRACT REFERENCE: See BLK 16
6. REQUIRING OFFICE: AWS 7. DD250 REQ: N/A
8. APP CODE: 9. DIST. STATEMENT REQ: D
10. FREQUENCY: As Required 11. AS OF DATE: See BLK 16
12. DATE OF FIRST SUBMISSION: As Required
13. DATE OF SUBS. SUBMISSION: See BLK 16
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES: 1
DRAFT: 1
FINAL: 1
REG REPRO:
15. TOTAL COPIES: 1
16. REMARKS: Instruction listed in the SOW at the below referenced paragraph numbers:
C.1.7, C.1.11.4
Block 4: the contractor shall provide redlined copies of affected drawings, clearly showing the temporary departure, and shall include supporting data necessary to fully understand the proposed variance, and when applicable, the shipyard CR and invoice with omitted cost information.
Blocks 10, 12 and 13: Government has 3 days to review. Contractor has 3 days to resubmit after Government review.
G. PREPARED BY:
H: DATE:
I: APPROVED BY:
No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.:
C. CATEGORY: TDP ____ TM ____ OTHER ____
F. CONTRACTOR:
1. DATA ITEM NO: A011
2. TITLE: Technical Report-Study/Services
3. SUBTITLE: Paint Process Validation
4. AUTHORITY: DI-MISC-80508B 5. CONTRACT REFERENCE: As required
6. REQUIRING OFFICE: WIB and AWS 7. DD250 REQ: N/A
8. APP CODE: A see blk 16 9. DIST. STATEMENT REQ: D
10. FREQUENCY: As Required 11. AS OF DATE: See BLK 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBS. SUBMISSION: See BLK 16
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES: 1
DRAFT: 1
FINAL: 1
REG REPRO:
15. TOTAL COPIES: 1
16. REMARKS: The task orders will identify when this CDRL is required.
Delivery dates and review cycles will be identified in each task order.
The contractor shall provide one electronic copy. (See Task Order SOW references for more details)
G. PREPARED BY:
H: DATE:
I: APPROVED BY:
File details come from the government source that posted it. Updated .