AWP_Demonstration_Facility_Slide_Deck.pptx

PPTX presentation 17 MB Posted

Attached to
Advanced Water Purification Demonstration Facility State and local contract opportunity
Solicitation number
260131
Issued by
Pima County, Tucson City, Arizona

About this file

This file is a presentation slide deck for the Advanced Water Purification Demonstration Facility project in Tucson, Arizona, presented by representatives from Tucson Water. The project involves constructing a 2.5 million gallon per day (MGD) advanced water purification facility at the Agua Nueva Water Reclamation Facility site (2550 W. Sweetwater Drive) to purify recycled water to drinking water standards in accordance with Arizona Department of Environmental Quality requirements. The facility will serve as a demonstration site, community engagement center, and operator training hub to verify treatment performance before constructing a full-scale 2.5 MGD facility at Tres Rios by 2031. Construction tasks include building a public tour entrance with visitor center, upgrading the existing filter building with advanced treatment equipment (microfiltration/ultrafiltration, reverse osmosis, UV-advanced oxidation process, chlorine contact, and granular activated carbon), and completing site improvements including parking lot construction, landscaping, and sidewalk installation. The project is seeking a Construction Manager at Risk (CMAR) with Statement of Qualifications due by October 23, 2025, at 2:00 pm local time. A pre-submittal meeting is scheduled for September 30, 2025, via Microsoft Teams, and a mandatory on-site visit is planned for October 2, 2025, at 1:00 pm. Construction is expected to be completed by January 2027, with the facility fully operational by September 2027.

The estimated total construction cost is $10,000,000, with the conceptual design suggesting a project cost of approximately $5.3 million and a contingency range between $1.6 million and $8 million. The project is funded through a United States Bureau of Reclamation (BOR) grant. Potential cost savings of approximately $350,000 may be achieved if Tucson Water purchases major treatment equipment directly, including pre-packaged pilot skids that may take up to one year to arrive. The procurement includes Small Business Enterprise (SBE) program provisions applicable to contracts with estimated construction values of $100,000 or more, with only firms certified by the City of Tucson under Chapter 28, Article XIII of the Tucson Procurement Code eligible to fulfill SBE goals. Contractors may meet SBE requirements through prime contractor participation, subcontractor involvement, or supplier engagement, with specific percentage credits assigned based on the type of involvement.

View the file

Other files for this state and local contract opportunity

Other files attached to Advanced Water Purification Demonstration Facility, newest first.
File Type Posted
Advanced_Water_Purification_Demonstration_Facility.pdf PDF
Advanced_Water_Purification_Demonstration_Facility.pdf PDF
Advanced_Water_Purification_Demonstration_Facility.pdf PDF
Advanced_Water_Purification_Demonstration_Facility.pdf PDF
Advanced_Water_Purification_Demonstration_Facility.pdf PDF
AWP_Demonstration_Facility_Slide_Deck.pptx PPTX presentation
AWP_Demonstration_Facility_Slide_Deck.pptx PPTX presentation
AWP_Demonstration_Facility_Slide_Deck.pptx PPTX presentation
AWP_Demonstration_Facility_Slide_Deck.pptx PPTX presentation
TW_AWP_Conceptual_Design_for_Review_v4.pdf PDF
260131_CommentResponseForm.pdf PDF
TW_AWP_Conceptual_Design_for_Review_v4.pdf PDF
TW_AWP_Conceptual_Design_for_Review_v4.pdf PDF
260131_CommentResponseForm.pdf PDF
260131_CommentResponseForm.pdf PDF
260131_CommentResponseForm.pdf PDF
TW_AWP_Conceptual_Design_for_Review_v4.pdf PDF
260131_CommentResponseForm.pdf PDF
TW_AWP_Conceptual_Design_for_Review_v4.pdf PDF
Offer_and_Acceptance.pdf PDF
SBE_Provisions_Revised_May_2024_Includes_Subcontractor_Modification_Form.docx DOCX document
SBE_Provisions_Revised_May_2024_Includes_Subcontractor_Modification_Form.docx DOCX document
Offer_and_Acceptance.pdf PDF
SBE_Provisions_Revised_May_2024_Includes_Subcontractor_Modification_Form.docx DOCX document
Offer_and_Acceptance.pdf PDF
Offer_and_Acceptance.pdf PDF
SBE_Provisions_Revised_May_2024_Includes_Subcontractor_Modification_Form.docx DOCX document
Offer_and_Acceptance.pdf PDF
SBE_Provisions_Revised_May_2024_Includes_Subcontractor_Modification_Form.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Advanced Water Purification Demonstration Facility

Kristen Amante & Stephanie Winick

Thank you for your interest

Agenda

Welcome and Introductions

Project Overview

Project Status

Schedule

Questions?

Introductions

Project Overview – Background Tucson Water has shifted from groundwater reliance to a diverse renewable supply portfolio.

The One Water 2100 Plan prioritizes purifying recycled water to drinking water standards.

Tucson Water received federal funding in 2024 for a 2.5 MGD AWPF at Tres Ríos by 2031.

A pilot Demonstration Facility at Agua Nueva will verify treatment performance, support operator training, and serve as a community engagement center.

Add sewershed map Sewershed Map

Pima County Sewer Shed Map

2.5 MGD AWPF

Demonstration AWPF

Construction Tasks

Public Tour Entrance & Visitor Center

– new entrance, outdoor courtyard, canopy, piping, doors/windows, demolition, remove debris, signage, landscaping and finishes

Existing Filter Building (Demonstration AWPF)

– advanced treatment equipment installation (MF/UF, RO, UV-AOP, chlorine contact, GAC), concrete work, piping, HVAC, electrical, controls, restrooms and kitchenette

Parking Lot & Site Improvements

– site preparation, grading, asphalt, sidewalk, handicap ramp, curb, bumper stops, striping and landscaping

Conceptual design is complete... Rendering^

Treatment Train: RO-based Treatment

RO, etc are Pilot Skids, pre-packaged, won't be made by contractor – some need to be put together. Take up to 1 yr to arrive, hope to purchase in house.

Detailed PFD

Schedule

Construction can begin earlier than date proposed

Thank you! Questions?

image2.png image3.png image4.png image13.svg

.MsftOfcResponsive_Fill_e97132 { fill:#E97132;

image5.svg

.MsftOfcResponsive_Fill_e97132 { image6.png image7.svg

.MsftOfcResponsive_Fill_e97132 { image8.png image9.svg

.MsftOfcResponsive_Fill_e97132 { image10.png image11.svg

.MsftOfcResponsive_Fill_e97132 { image12.png image14.png image15.jpeg image16.png image17.png image18.png image19.svg image20.png image21.svg

.MsftOfcResponsive_Fill_2c71a4 { fill:#2C71A4;

image22.png image23.svg image24.jpeg image25.png image26.png image27.png image28.png image29.png image30.png image31.jpeg image32.png image33.jpeg image34.jpeg image35.jpeg image1.png

File details come from the government source that posted it. Updated .