AWP_Demonstration_Facility_Slide_Deck.pptx
PPTX presentation 17 MB Posted
- Attached to
- Advanced Water Purification Demonstration Facility State and local contract opportunity
- Solicitation number
- 260131
- Issued by
- Pima County, Tucson City, Arizona
About this file
This is a presentation slide deck prepared by Tucson Water describing an Advanced Water Purification Demonstration Facility project in Tucson, Arizona. The project involves constructing a 2.5 million gallon per day (MGD) facility at the Agua Nueva Water Reclamation Facility that will purify tertiary effluent to drinking water standards in compliance with Arizona Department of Environmental Quality requirements. The facility will serve as both a demonstration center and community engagement hub, featuring three primary construction components: a public tour entrance and visitor center with outdoor courtyard and landscaping; an existing filter building upgraded with advanced treatment equipment including microfiltration/ultrafiltration, reverse osmosis, ultraviolet advanced oxidation process, granular activated carbon treatment, chlorine contact systems, and supporting mechanical and electrical infrastructure; and parking lot and site improvements including grading, asphalt paving, sidewalks, and landscaping. The project is being procured through a Construction Manager at Risk (CMAR) delivery method, with a pre-submittal meeting scheduled for September 30, 2025, via Microsoft Teams and a mandatory on-site visit on October 2, 2025, at 1:00 pm local Arizona time at 2550 W. Sweetwater Drive. Statements of Qualifications are due by October 23, 2025, at 2:00 pm local time. Construction is anticipated to be completed by January 2027, with the facility fully operational by September 2027.
The estimated total construction cost is $10,000,000, with a conceptual design cost of approximately $5.3 million and contingency ranging between $1.6 million and $8 million. The project is funded through a United States Bureau of Reclamation grant secured in 2024. Small Business Enterprise program provisions apply to this contract, with only firms certified by the City of Tucson under Chapter 28, Article XIII of the Tucson Procurement Code eligible to fulfill SBE goals. The facility will utilize pre-packaged pilot skids for major treatment equipment, which may be purchased directly by Tucson Water, potentially generating approximately $350,000 in cost savings. Treatment equipment procurement is expected to take up to one year for delivery.
View the file
Other files for this state and local contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advanced Water Purification Demonstration Facility
Kristen Amante & Stephanie Winick
Thank you for your interest
Agenda
Welcome and Introductions
Project Overview
Project Status
Schedule
Questions?
Introductions
Project Overview – Background Tucson Water has shifted from groundwater reliance to a diverse renewable supply portfolio.
The One Water 2100 Plan prioritizes purifying recycled water to drinking water standards.
Tucson Water received federal funding in 2024 for a 2.5 MGD AWPF at Tres Ríos by 2031.
A pilot Demonstration Facility at Agua Nueva will verify treatment performance, support operator training, and serve as a community engagement center.
Add sewershed map Sewershed Map
Pima County Sewer Shed Map
2.5 MGD AWPF
Demonstration AWPF
Construction Tasks
Public Tour Entrance & Visitor Center
– new entrance, outdoor courtyard, canopy, piping, doors/windows, demolition, remove debris, signage, landscaping and finishes
Existing Filter Building (Demonstration AWPF)
– advanced treatment equipment installation (MF/UF, RO, UV-AOP, chlorine contact, GAC), concrete work, piping, HVAC, electrical, controls, restrooms and kitchenette
Parking Lot & Site Improvements
– site preparation, grading, asphalt, sidewalk, handicap ramp, curb, bumper stops, striping and landscaping
Conceptual design is complete... Rendering^
Treatment Train: RO-based Treatment
RO, etc are Pilot Skids, pre-packaged, won't be made by contractor – some need to be put together. Take up to 1 yr to arrive, hope to purchase in house.
Detailed PFD
Schedule
Construction can begin earlier than date proposed
Thank you! Questions?
image2.png image3.png image4.png image13.svg
.MsftOfcResponsive_Fill_e97132 { fill:#E97132;
image5.svg
.MsftOfcResponsive_Fill_e97132 { image6.png image7.svg
.MsftOfcResponsive_Fill_e97132 { image8.png image9.svg
.MsftOfcResponsive_Fill_e97132 { image10.png image11.svg
.MsftOfcResponsive_Fill_e97132 { image12.png image14.png image15.jpeg image16.png image17.png image18.png image19.svg image20.png image21.svg
.MsftOfcResponsive_Fill_2c71a4 { fill:#2C71A4;
image22.png image23.svg image24.jpeg image25.png image26.png image27.png image28.png image29.png image30.png image31.jpeg image32.png image33.jpeg image34.jpeg image35.jpeg image1.png
File details come from the government source that posted it. Updated .