AWOS Reference Drawings.pdf

PDF 3 MB Posted

Attached to
New York, NY -JRB AWOS Structural Analysis -
Solicitation number
6973GH-26-Q-00094
Issued by

About this file

This document is an as-built drawing set for an Automated Weather Observing System (AWOS) installed at the Downtown Manhattan Heliport in New York, dated November 16, 2019. The project was completed under Federal Aviation Administration (FAA) oversight through the Department of Transportation's Technical Operations Eastern Service Area. The drawing set includes comprehensive engineering documentation with eleven sheets covering general layouts, cross-sections, service platform steel framing plans and sections, wiring diagrams, block diagrams, equipment rack layouts, and terminal building floor plans.

The AWOS installation consists of an outdoor sensor platform on the heliport pier and an indoor equipment rack housed in the terminal building's third floor HVAC and telecom room. Key components include a visibility sensor, ceilometer, temperature/relative humidity sensor, rain gauge, sonic wind sensor with bird spikes, lightning rod, obstruction lights, and a VHF antenna operating at 128.1750 MHz with 2.5W output. The indoor equipment rack contains a Central Data Platform (CDP), industrial computer, Uninterruptible Power Supply (UPS), monitor/keyboard tray, audio distribution amplifier, and storage drawer. The platform utilizes steel framing constructed to specifications detailed in the drawings, with design loads of 30 PSF wind load and 20 PSF live load. Power is supplied from Power Panel 3B, Circuit 4, located in the building's third floor electrical room, with data and communication lines running between the outdoor platform and indoor CDP rack.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NY

ON

LD

A

S

B U

IL

T j r b d a w o s g .d g n

ENGINEERING SERVICES

TERMINAL

AWOS

COVER SHEET AND DRAWING INDEX

DOWNTOWN MANHATTAN HELIPORT

AUTOMATED WEATHER OBSERVING SYSTEM

NY HELIPORT

PROJECT ENGINEER MGR: ENGINEERING - CENTER B

JRB-D-AWOS-G001

LD 1304690AS-BUILT11/16/2019

DRAWING PRODUCED ON AEA RO MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

09/09/2016 1304690 jr b -d -a w o s -g

.d g n

/0

/2

:3

:0

A

M P lo tt e d b y S

R V

C -C

A E

G -E

D M

S -C

O O

R D

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

E D

M

IS

S

U E

D

F O

R

DT#15860

NEW YORK, N.Y.

DOWNTOWN MANHATTAN HELIPORT

AUTOMATED WEATHER OBSERVING SYSTEM

AWOS

A

T OF TRANSPO

R T A T

IO

N

M E R

IC

OF

STATES

U N

IT

E D

D E P A

R

TM

EN

AVIA

T

I O

N

L A

R

E D

E F

TRAT

IO

N

SI

NI

M

D A

LOCATION PLAN

SUPERSEDED BY DRAWING JRB-D-AWOS-G001, DATED 09/09/16

DRAWING AEA-D-31531-01, REVISION , DATED 12/18/91,

DRAWING NO. DRAWING TITLE

DRAWING INDEX

JRB-D-AWOS-Q003

JRB-D-AWOS-Q002

JRB-D-AWOS-Q001

JRB-D-AWOS-S002

JRB-D-AWOS-S001

JRB-D-AWOS-E002

JRB-D-AWOS-E001

JRB-D-AWOS-C002

JRB-D-AWOS-C001

JRB-D-AWOS-A001

JRB-D-AWOS-G001

TERMINAL BLDG 3RD FLOOR EQUIPMENT LAYOUT

BLOCK DIAGRAM AND RACK LAYOUT

ARTIST'S RENDERING

SERVICE PLATFORM - STEEL FRAMING SECTIONS

SERVICE PLATFORM - STEEL FRAMING PLAN

ELECTRICAL DETAILS

WIRING DIAGRAM

SERVICE PLATFORM - LAYOUT

CROSS SECTION

GENERAL LAYOUT

COVER SHEET AND DRAWING INDEX

AS

YD 04/27/2017 1304690

S -B

U

IL

T

BLOCK DIAGRAM AND RACK LAYOUT

JRB-D-AWOS-Q002

b -d -a w o s -q

.d g n

DT#18407

RAIN GAUGE

BIRD SPIKES

SENSOR WITH

SONIC WIND SENSOR

LIGHTNING ROD

OBSTRUCTION LIGHT

SENSOR

VISIBILITY

CEILOMETER

ENCLOSURE

UPS

SENSOR

RELATIVE HUMIDITY

TEMPERATURE/

AC

PWR PWR

DC

MOTOROLA

AMPLIFIER

AUDIO DISTRIBUTION

MONITOR/KEYBOARD TRAY

INDUSTRIAL COMPUTER

UPS

STORAGE DRAWER

RIGHT SIDE TO BE ADDED)

(EQUIPMENT LABELED ON

LINES

DATA & COMM.

LINES

DATA & COMM.

CDP RACK

INSIDE TERMINAL BUILDING

HARRIS

FTI EQ.

FTI-H-W-037419

TO ADAS CKT #

DCP

ENCLOSURE

FIBERGLASS ENCLOSURE

VIDEO DISPLAY UNIT

OPERATION INTERFACE

OPERATION ROOM

ANTENNA RF CABLE

2.5W

128.1750 MHz

VHF ANTENNA

E D

M

IS

S

U E

D F

O R

:PIER

AWOS-C CDP RACK

jr b -d -a w o s -q

.d g n

/0

/2

:3

:1

A

M P lo tt e d b y S

R V

C -C

A E

G -E

D M

S -C

O O

R D

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

AS

LD 10/25/2019 1304690

S -B

U

IL

T

TERMINAL BLDG 3RD FLOOR EQUIPMENT LAYOUT

DOWNTOWN MANHATTAN HELIPORT

JRB-D-AWOS-Q003

b -d -a w o s -q

.d g n b -d -a w o s -q

.d g n

/0

/2

:3

:1

A

M P lo tt e d b y S

R V

C -C

A E

G -E

D M

S -C

O O

R D

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

DT#18407

CDP

PANEL 3A

POWER

BOILER ROOM

PANEL 3B

POWER

POWER PANEL 3B CIRCUIT 4 FOR CDP RACK.

OUTSIDE RAILING

DOOR TO

OUTSIDE ROOF

DOOR TO

AWOS-RACK

NOTE:

THIRD FLOOR OR ATIC ROOM

NOT TO SCALE

E D

M

IS

S

U E

D F

O R

BACK OF BUILDING TOWARD PIER

HVAC AND TELECOM ROOM

jrb-d-awos-g001.pdf
jrb-d-awos-g001
jrb-d-awos-q002.pdf
jrb-d-awos-q002
jrb-d-awos-q003.pdf
jrb-d-awos-q003

File details come from the government source that posted it. Updated .