Attm 3 - Contract Line Item Schedule.pdf

PDF 222 KB Posted

Attached to
Gathright Dam Water Sampling
Solicitation number
W9123625Q1398
Issued by

About this file

This is a Contract Line Item Schedule (CLIN Schedule) for water sampling services at Gathright Dam in Covington, VA. The schedule outlines a base year and four option years, with each CLIN requiring the contractor to provide all labor, materials, and equipment for water sampling services.

The document includes detailed pricing templates for lab testing and labor rates. The lab pricing section specifies 10 different testing parameters including Iron, Manganese, Total Phosphorus, Orthophosphate, Ammonia, Nitrate, Nitrite, and various coliform tests, with specific sample quantities and frequencies. Iron and Manganese require 16 samples per trip with 16 trips per year (256 samples annually), while other parameters require 6-8 samples per trip with 8 trips per year (48-24 samples annually). The labor rates section requests pricing for Environmental Technician, Laboratory Technician, and Driver/Courier positions across all five years of performance. Bidders must provide detailed quotes including labor, materials, and travel costs to enable a fair and reasonable price determination.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Combined Synopsis – Solicitation No. W9123625Q1398

Gathright Dam Water Sampling Attachment 3: Contract Line Item Schedule

CLIN Description Qty Unit Quote

Base Year Provide all labor, materials, and equipment for Water Sampling Services at Gathright Dam, Covington, VA, in accordance with the Scope of Work.

1 Job __________________

Option Year 1 Provide all labor, materials, and equipment for Water Sampling Services at Gathright Dam, Covington, VA, in accordance with the Scope of Work.

1 Job __________________

Option Year 2 Provide all labor, materials, and equipment for Water Sampling Services at Gathright Dam, Covington, VA, in accordance with the Scope of Work.

1 Job __________________

Option Year 3 Provide all labor, materials, and equipment for Water Sampling Services at Gathright Dam, Covington, VA, in accordance with the Scope of Work.

1 Job __________________

Option Year 4 Provide all labor, materials, and equipment for Water Sampling Services at Gathright Dam, Covington, VA, in accordance with the Scope of Work.

1 Job __________________

Total

Please provide a detailed quote, including labor, materials, travel, etc., in sufficient detail that we may make a fair and reasonable determination.

To aid in price analysis, please complete the following pricing charts and supplement as necessary.

Solicitation No. W9123625Q1398 Gathright Dam Water Sampling

Attachment 3: Contract Line Item Schedule

Lab Pricing

Parameter Price per sample Samples per trip

Trips per year

Samples per year

Total Price per year

1 Iron $ 16 16 256 $ 2 Manganese $ 16 16 256 $ 3 Total Phosporus $ 6 8 48 $ 4 Orthophosphate $ 6 8 48 $ 5 Ammonia $ 6 8 48 $ 6 Nitrate $ 6 8 48 $ 7 Nitrite $ 6 8 48 $ 8 Total Coliforms $ 3 8 24 $ 9 Fecal Coliforms $ 3 8 24 $

10 Fecal Streptococci $ 3 8 24 $

Total $

Labor Rates

Occupational Listing Labor Rate, Base Year

Labor Rate, Option Year 1

Labor Rate, Option Year 2

Labor Rate, Option Year 3

Labor Rate, Option Year 4

Environmental Technician $ $ $ $ $

Laboratory Technician $ $ $ $ $

Driver / Courier $ $ $ $ $

File details come from the government source that posted it. Updated .