Attch4_Calculation Worksheet for Self-Performed and Subcontracted Work.docx

DOCX document 18 KB Posted

Attached to
Y1DA-660-CSI-109 SPEC CT Site Prep Federal contract opportunity
Solicitation number
36C25920Q0432
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA-660-CSI-109 SPEC CT Site Prep, newest first.
File Type Posted
Attch4_PN 660-CSI-109 100PCT Stamped - Specifications.docx DOCX document
Amendment0001_36C25920Q0432 0001.docx DOCX document
Attch3_RFIs_SPEC CT Site Prep.pdf PDF
Attch1_CT Site Prep _Site Visit Doc.pdf PDF
Attch2_SIGN IN SHEET CT-Sit Prep.pdf PDF
Attch2_SPEC CT Site Prep_Drawings.pdf PDF
Attch3_Past Performance Questionnaire.docx DOCX document
Attch1_SPEC CT Site Prep_Specs.pdf PDF
36C25920Q0432_1_SOLICITATION.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK

Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division and name
SDVOSB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs

Division 01

$
$

Division 02

$
$

Division 03

$
$

(Add additional lines as necessary for each Division applicable to this project)

$
$
$
$
Sub Total (Personnel Costs, Material/Equipment Costs)
$
Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $_________________

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________

3. Remainder is ‘Total amount of work to be self-performed under the

Contract’:$__________________
4. Self-performed work = Line 3/Line 1 x 100 =__________%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

___________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .