Attch1_SPEC CT Site Prep_Specs.pdf

PDF 305 KB Posted

Attached to
Y1DA-660-CSI-109 SPEC CT Site Prep Federal contract opportunity
Solicitation number
36C25920Q0432
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA-660-CSI-109 SPEC CT Site Prep, newest first.
File Type Posted
Attch2_SIGN IN SHEET CT-Sit Prep.pdf PDF
Attch3_RFIs_SPEC CT Site Prep.pdf PDF
Attch1_CT Site Prep _Site Visit Doc.pdf PDF
Attch4_PN 660-CSI-109 100PCT Stamped - Specifications.docx DOCX document
Amendment0001_36C25920Q0432 0001.docx DOCX document
Attch2_SPEC CT Site Prep_Drawings.pdf PDF
36C25920Q0432_1_SOLICITATION.docx DOCX document
Attch4_Calculation Worksheet for Self-Performed and Subcontracted Work.docx DOCX document
Attch3_Past Performance Questionnaire.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: February 26, 2020 Re: QA for Spec CT, Project #660-CSI-109

Questions from the set QA review:

Sheet GI002- General Information

1. Note 13 – Why do we have the bidding purposes clause on that note – it doesn’t seem applicable.

2. Note 20 – Please clarify what is meant when it says, “must be centered in the wall” centered which way?

Sheet AD101-Demolition Floor Plan

1. VA to coordinate the removal of the existing scanner and existing control equipment.

Sheet AD201-Demolition Reflected Ceiling Plan

No Comments

Sheet A-101-Floor Plan

1. VA to coordinate the instillation of the CT Scan.

2. The finishes are not called out on the Floor Plan and on the millwork.

3. Privacy Curtain provided by the VA.

4. VA to provide patient lift and track.

Sheet A-201-Reflected Ceiling Plan

1. VA to coordinate the addition of the patient lift system after the work on the ceiling is completed.

Sheet A-301-Floor and Wall Finish Plan

1. Stainless steel mounted plates provided by the VA

Sheet P-101-Plumbing Plan

1. There isn’t a plumbing schedule because there are no changes to the existing plumbing.

Sheet M-001-Mechanical Abbreviations and General Notes

No Comments

Sheet M-002-Mechanical Symbols and Legends

No Comments

Sheet MP101-Mechanical Piping Plans

No Comments

Sheet E-001-Symboles & Abbreviations

No Comments

Sheet ED101-Demolition Plan

1. The call outs are too light to see what they are referencing.

Sheet ED102-Electrical Demo Lighting Plan

No Comments

Sheet EL101-Electrical Lighting Plan

No Comments

Sheet EP101-Power Plans

1. The call outs are too light to see what they are referencing.

Sheet E-501-Electrical Details

No Comments

Sheet E-502-Electrical Details

No Comments

Sheet E-503-Electrical Seismic Details

No Comments

Sheet E-504-Electrical Seismic Details

No Comments

Sheet E-601-One-Line Diagrams & Phase Diagrams

No Comments

Sheet E-602-Electrical Schedules

No Comments

Sheet E-603-Electrical Schedules

1. Fix the text overlap in Schedule MP

Overall Comments: There are no finishes called out on this set of plans. There needs to be finishes that are required with the bid set to insure a proper bid.