Attch B_Drawings 598-22-127 Mixing Valve Anti-Scald 100 BD.pdf

PDF 15 MB Posted

Attached to
SOLICITATION Amendment 0003 | 598-22-127 Mixing Valves for Anti-Scald _NLR/JLM
Solicitation number
36C25625R0095
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/1

/2

:1

:0

A

M C

U s e rs

\t b u d a i\ D o c u m e n ts \P

-0

-V A

L it tl e R o c k -M ix in g V a lv e s

G e n e ra l_ tb u d a i.

rv t

G-001

ENG. PROJECT COVER

1 2SMR

MIXING VALVES FOR

ANTI-SCALD

LITTLE ROCK VA MEDICAL CENTER

2200 FORT ROOTS DR.

NORTH LITTLE ROCK, AR 72114 APRIL 12, 2024

100% BID DOCUMENTS

598-22-12722-099

MIXING VALVES FOR ANTI-SCALD

LITTLE ROCK VA MEDICAL CENTER

2200 FORT ROOTS DR.

NORTH LITTLE ROCK, AR 72114

VA PROJECT #: 598-22-127

WX

JOHN L. McCLELLAN MEMORIAL VETERANS HOSPITAL

4300 WEST 7TH STREET

LITTLE ROCK, AR 72205

LITTLE ROCK VA MEDICAL CENTER

2200 FORT ROOTS DR.

NORTH LITTLE ROCK, AR 72114

BLDG. 190BLDG. 39BLDG. 170BLDG. 1

DRAWING LIST

GENERAL

G-001 ENG. PROJECT COVER 1 2

G-002 ICRA INFORMATION AND DETAILS 2 2

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 113

1.P-100 OVERALL GROUND FLOOR PLAN - BUILDING 1 2 113

1.P-100.A GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK A 3 113

1.P-100.B GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK B 4 113

1.P-100.C GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK C 5 113

1.P-100.D GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK D 6 113

1.P-100.E GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK E 7 113

1.P-100.F GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK F 8 113

1.P-100.6 GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK 6 9 113

1.P-100.7 GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK 7 10 113

1.P-100.8 GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK 8 11 113

1.P-100.9 GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK 9 12 113

1.P-101 OVERALL FIRST FLOOR PLAN - BUILDING 1 13 113

1.P-101.A FIRST FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK A 14 113

1.P-101.B FIRST FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK B 15 113

1.P-101.C FIRST FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK C 16 113

1.P-101.D FIRST FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK D 17 113

1.P-101.E FIRST FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK E 18 113

1.P-101.F FIRST FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK F 19 113

1.P-101.6 FIRST FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK 6 20 113

1.P-101.7 FIRST FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK 7 21 113

1.P-101.8 FIRST FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK 8 22 113

1.P-101.10 FIRST FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK 10 23 113

1.P-102 OVERALL SECOND FLOOR PLAN - BUILDING 1 24 113

1.P-102.A SECOND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK A 25 113

1.P-102.B SECOND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK B 26 113

1.P-102.C SECOND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK C 27 113

1.P-102.D SECOND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK D 28 113

1.P-102.E SECOND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK E 29 113

1.P-102.F SECOND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK F 30 113

1.P-102.6 SECOND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK 6 31 113

1.P-102.7 SECOND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK 7 32 113

1.P-102.8 SECOND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK 8 33 113

1.P-102.10 SECOND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK 10 34 113

1.P-103 OVERALL THIRD FLOOR PLAN - BUILDING 1 35 113

1.P-103.A THIRD FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK A 36 113

1.P-103.B THIRD FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK B 37 113

1.P-103.C THIRD FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK C 38 113

1.P-103.D THIRD FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK D 39 113

1.P-103.E THIRD FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK E 40 113

1.P-104 OVERALL FOURTH FLOOR PLAN - BUILDING 1 41 113

1.P-104.A FOURTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK A 42 113

1.P-104.B FOURTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK B 43 113

1.P-104.C FOURTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK C 44 113

1.P-104.D FOURTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK D 45 113

DRAWING LIST

1.P-104.E FOURTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK E 46 113

1.P-105 OVERALL FIFTH FLOOR PLAN - BUILDING 1 47 113

1.P-105.A FIFTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK A 48 113

1.P-105.B FIFTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK B 49 113

1.P-105.C FIFTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK C 50 113

1.P-105.D FIFTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK D 51 113

1.P-105.E FIFTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK E 52 113

1.P-106 OVERALL SIXTH FLOOR PLAN - BUILDING 1 53 113

1.P-106.A SIXTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK A 54 113

1.P-106.B SIXTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK B 55 113

1.P-106.C SIXTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK C 56 113

1.P-106.D SIXTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK D 57 113

1.P-106.E SIXTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK E 58 113

1.P-107 OVERALL SEVENTH FLOOR PLAN - BUILDING 1 59 113

1.P-107.A SEVENTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK A 60 113

1.P-107.B SEVENTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK B 61 113

1.P-107.C SEVENTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK C 62 113

1.P-107.D SEVENTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK D 63 113

1.P-107.E SEVENTH FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK E 64 113

39.P-100 BASEMENT AND FIRST FLOOR PLUMBING PLANS - BUILDING 39 65 113

170.P-100 GROUND FLOOR PLAN - BUILDING 170 66 113

170.P-100.A GROUND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA A 67 113

170.P-100.B GROUND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA B 68 113

170.P-100.E GROUND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA E 69 113

170.P-100.F GROUND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREAS F, G, N, P 70 113

170.P-100.H GROUND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA H 71 113

170.P-100.J GROUND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA J 72 113

170.P-100.K GROUND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA K 73 113

170.P-100.L GROUND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA L 74 113

170.P-101 FIRST FLOOR PLAN - BUILDING 170 75 113

170.P-101.A FIRST FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREAS A, F, M 76 113

170.P-101.B FIRST FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA B 77 113

170.P-101.C FIRST FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA C 78 113

170.P-101.D FIRST FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA D 79 113

170.P-101.E FIRST FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA E 80 113

170.P-101.G FIRST FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREAS G, N 81 113

170.P-101.H FIRST FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA H 82 113

170.P-101.J FIRST FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA J 83 113

170.P-101.K FIRST FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA K 84 113

170.P-101.L FIRST FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA L 85 113

170.P-102 SECOND FLOOR PLAN - BUILDING 170 86 113

170.P-102.A SECOND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREAS A, F, M 87 113

170.P-102.B SECOND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA B 88 113

170.P-102.C SECOND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA C 89 113

170.P-102.D SECOND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA D 90 113

170.P-102.E SECOND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA E 91 113

170.P-102.G SECOND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREAS G, N 92 113

170.P-102.H SECOND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA H 93 113

170.P-102.J SECOND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA J 94 113

170.P-102.K SECOND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA K 95 113

170.P-102.L SECOND FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA L 96 113

170.P-103 THIRD FLOOR PLAN - BUILDING 170 97 113

170.P-103.A THIRD FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREAS A, F, M 98 113

170.P-103.B THIRD FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA B 99 113

170.P-103.C THIRD FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA C 100 113

170.P-103.D THIRD FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA D 101 113

170.P-103.E THIRD FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA E 102 113

170.P-103.G THIRD FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREAS G, N 103 113

170.P-103.H THIRD FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA H 104 113

170.P-103.J THIRD FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA J 105 113

170.P-103.K THIRD FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA K 106 113

170.P-103.L THIRD FLOOR PARTIAL PLUMBING PLAN - BUILDING 170 - AREA L 107 113

190.P-100 BASEMENT PLUMBING PLAN - BUILDING 190 108 113

190.P-101 FIRST FLOOR PLUMBING PLAN - BUILDING 190 109 113

190.P-102 SECOND FLOOR PLUMBING PLAN - BUILDING 190 110 113

190.P-103 THIRD FLOOR PLUMBING PLAN - BUILDING 190 111 113

P-501 PLUMBING DETAILS 112 113

P-502 PLUMBING DETAILS 113 113

DocuSign Envelope ID: ACA3048E-AEE7-4EFE-A050-165DADD15AD5

4/15/2024

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS

FOR CONSTRUCTION AND RENOVATION

III/IVLOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 IV

IV

IV

III/IV

III/IV

III

III/IV

II

II

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2: MEDIUMGroup 1: LOWEST

- Non-invasive Areas of Clinics such as cardiologu,/echo, nuclear medicine, physical therapy, Radiology/MRI, and Respiratory Therapy

- Research

- MHU DOMs and Inpatient Areas -Laundry Services

- Administrative Areas

- Biomedical

- Conference Rooms

- Engineering

- Environmental Management

- Information Systems

- Library

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4: HIGHESTGroup 3: HIGH

- Emergency Department -Nuclear Medicine -Canteen/ N&FS

- PT- Tank Areas -Lab -Inpatient Areas JLM and CLC

- Operating Room

- Sterile Processing

- Sterile Supply

- SICU/MICU

- PACUs

- Cardiac Catheterization and Angiography Areas

IIII

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

C

LA

S

S

II

During Construction Project

C L-

I C

LA

S

S

II

I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust.

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

- Lodging Areas

- Maintenance

- Medical Information -Office Areas -Outside Construction (unless adjacent to building intake vents)

- Prosthetic Service

- Warehouse

- Interventional Radiology Dialysis

- Oncology

- All Endoscopy Areas (scope storage)

- Pharmacy Admixture

- Chemo Rooms

- Any Area Caring for Immunocompromised (e.g. 6C)

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY

MATS (CHANGED END

OF SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

SELF CONTAINED

HEPA AIR UNIT

CONTRACTOR TO

KEEP SUPPLY DUCTS

RUNNING OR COVER

WHEN NOT RUNNING

TO KEEP DUST OUT

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL

STATION WITH

AUDIO / VISUAL

SELF CONTAINED

HEPA AIR UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

V .I

.F

E X

IS

T

IN

G

W A

L L

V .I

.F

E X

IS

T

IN

G

W A

L L

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR RENOVATION LITTLE ROCK

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H E

IG

H

T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

EXISTING WALL TO REMAIN

EXISTING DOOR TO REMAIN

ICRA LEGEND

PLASTIC SHEET ICRA

BARRIER

ZIPPER DOOR

STICKY MATS

FUNCTIONAL ROOM

CORRIDOR

PLASTIC SHEET ICRA

BARRIER

ZIPPER DOOR

EXISTING DOOR

STICKY MATS

ROOM TO BE SEALED

CLASS III

FUNCTIONAL ROOM

EXISTING DOOR

STICKY MATS

NEG AIR

UNIT

SWINGING DOOR

STICKY MAT

ANTEROOM

CLASS IV

NEG AIR

UNIT

CORRIDOR

ICRA WALL TYPE A

ANTEROOM TO ONLY TAKE

UP LESS THAN HALF THE

WIDTH OF THE CORRIDOR

MANOMETER

MANOMETER

STICKY MATS

FUNCTIONAL ROOM

CORRIDOR

PLASTIC SHEET ICRA

BARRIER

ZIPPER DOOR

EXISTING DOOR

STICKY MATS

ROOM TO BE SEALED

CLASS II

A

TEMPORARY PREFABRICATED

ICRA WALL SYSTEM. BASIS OF

DESIGN: STARC WALL

SYSTEM OR EDGEGUARD

SYSTEM OR EQUAL.

EXISTING CEILING

SYSTEM TO HAVE

INTEGRATED CEILING

SEAL.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:1

:0

A

M C

U s e rs

\t b u d a i\ D o c u m e n ts \P

-0

-V A

L it tl e R o c k -M ix in g V a lv e s

G e n e ra l_ tb u d a i.

rv t

G-002

ICRA INFORMATION AND DETAILS

2 2LBB

MIXING VALVES FOR

ANTI-SCALD

LITTLE ROCK VA MEDICAL CENTER

2200 FORT ROOTS DR.

NORTH LITTLE ROCK, AR 72114 APRIL 12, 2024

100% BID DOCUMENTS

598-22-12722-099

CA

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS REVIEWED THE

DESIGNATION CRITERIA FOR THIS PROJECT. THE COR TO CONFIRM

WITH THE VA ICRA PERSONNEL THE CLASS OF PRECAUTIONS OR

LEVEL OF INFECTION CONTROL ACTIVITIES FOR EACH ROOM TYPE.

HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA

INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM

4MIL) TO SEAL AREA FROM NON-WORK AREA AS LONG AS THE

SPRINKLER SYSTEM IS INTACT AND ACTIVE.

1A. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING

CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT

SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES -

CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO

CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA) AND

TOOL STORAGE AND TIGHT SEALS SHALL BE MAINTAINED AT THE FULL

PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL

BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE

CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION

PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE

SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE

TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A

PERMANENT BARRIER.

AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.

2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER

ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY

OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND

DEBRIS INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND

DEBRIS CONTROL

3. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.

3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT

PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF

DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING

SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE

ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL

DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA

AND MATERIALS.

4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER

CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - A CLEAN

CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED

BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP

AREA.

4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS

WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.

EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN

EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.

DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE

VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH

EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR

MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE

SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED

BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA.

THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE

AREAS WITHOUT PRIOR APPROVAL OF THE COR.

4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE

INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.

4C. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS

SHALL BE COVERED AND PROTECTED PRIOR STARTING EACH

CONSTRUCTION PHASE.

VENTILATION AND ENVIRONMENTAL CONTROLS

5. AIR SYSTEM FLOW: THE COR TO VERIFY AND ACKNOWLEDGE TO

THE CONTRACTOR WHETHER THE CONSTRUCTION AREA USES

FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED

OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR

PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.

5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION

AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS

AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS.

USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE

ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN

INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION

RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST

AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST

SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER

AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO PREVENT

CONTAMINATION OF THE DUCTS.

5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND

INTACT CEILING SHALL BE VERIFIED DAILY.

5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC

AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN

CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS

NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE

CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING

THROUGHOUT THE PROJECT IN THE FREQUENCY AS IDENTIFIED BY

THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND

RELATED AREAS

6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING

SHALL BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE

CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G.,

COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM

SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING

THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED, THE

CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR

CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA.

ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED

THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND

MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL

FROM THE CONSTRUCTION ZONE OR WORK AREA.

6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP

ALL HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED

CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL

CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED

AND APPROVED THE CLEANING.

ICRA NOTES

Scale: 1/4" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: 1/4" = 1'-0"

CROSS SECTION "A"

Scale: 3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE

Scale: 1/4" = 1'-0"

ICRA MOBILE CONTAINMENT CART

A. REMOVE ALL TRASH DAILY FROM THE WORK AREA.

B. THESE DRAWINGS ARE BASED ON FIELD SURVEY AND

EXISTING PLANS. VERIFY ALL FIELD CONDITIONS.

C. COORDINATE WITH VA COR FOR OFF-HOURS

SCHEDULE AND TEMPORARY REROUTING ACCESS

FOR HOSPITAL STAFF AND VISITORS, PRIOR TO

ERECTING TEMPORARY BARRIERS.

D. CONSULT WITH VA SAFETY DEPARTMENT TO

MAINTAIN MINIMUM CLEARANCE IN CORRIDORS AND

HALLWAYS.

E. CONTRACTOR TO VERIFY AND COORDINATE FINAL

AND APPROVED ICRA MEASURES WITH THE VA ICRA

PERSONNEL, PRIOR TO THE COMMENCEMENT OF

CONSTRUCTION ACTIVITY.

F. CONTRACTOR SHALL VISIT ALL AREAS OF WORK,

INCLUDING WALKING THE SITE, MEASURING EXISTING

DIMENSIONS AND OBSERVING EXISTING CONDITIONS

BEFORE BEGINNING WORK ORDERING MATERIALS,

OR STARTING ANY CONSTRUCTION. CONTRACTOR TO

FIELD VERIFY ALL DIMENSIONS OF EXISTING SITE

CONDITION PRIOR TO START OF WORK AND

ORDERING OF MATERIALS.

G. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS

WHENEVER POSSIBLE. SEE DIVISION 1

SPECIFICATIONS.

H. CONTRACTOR TO PROTECT AREA ADJACENT TO THE

DEMOLITION AND NEW CONSTRUCTION WORK TO

PREVENT DAMAGES. IF DAMAGED, REPAIR, PATCH,

REPLACE, OR SAND SMOOTH AND TO MATCH

EXISTING ADJACENT MATERIALS. REPORT ANY AND

ALL DAMAGES TO COR.

I. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY

WHEN DISCREPANCIES TO THE DRAWINGS ARE

FOUND IN THE FIELD.

J. CONTRACTOR TO INSTALL TEMPORARY DIGITAL

MANOMETER TO MONITOR AND ENSURE PRESSURE

LEVEL TO MEET VA GUIDELINE WITHIN

CONSTRUCTION AREA. WITH VA COR PRIOR TO

INSTALLATION.

K. PROTECT AND COVER HVAC DIFFUSERS WITHIN

ROOMS DURING CONSTRUCTION.

L. CONTRACTOR SHALL COVER ALL FURNITURE WITHIN

ROOM WITH PLASTIC, PRIOR TO COMMENCING WORK

IN A SPACE AND REMOVE PRIOR TO POST-

CONSTRUCTION TERMINAL CLEANING.

M. TEMPORARY BARRIERS SHALL BE INSPECTED BY VA

LIFE SAFETY AND ICRA STAFF PRIOR TO START OF

CONSTRUCTION IN SPACE. MAINTAIN NEGATIVE

PRESSURE VENTILATION IN CONSTRUCTION SPACE.

N. DOORS TO CORRIDORS FROM OCCUPIED ROOMS

SHALL NOT BE BLOCKED DURING SHIFTS.

O. USE OF MOBILE CONTAINMENT (ICRA) CART IS

ACCEPTABLE FOR ABOVE CEILING WORK THAT CAN

BE LIMITED TO THE CONTAINMENT OF THE CART.

P. PLASTIC SHEET BARRIERS MAY NOT BE REUSED.

CONTRACTOR SHALL TAKE CARE TO CONTAIN ANY

DUST ON PLASTIC SHEET BARRIERS DURING

REMOVAL AND DISPOSAL.

Q. CONSTRUCTED AND/OR MODULAR ICRA BARRIERS

SHALL BE WIPED CLEAN BEFORE REMOVAL TO AVOID

SPREADING DUST.

R. MINIMUIM 2 WEEKS NOTICE TO COR IS REQUIRED FOR

SYSTEMS SHUTDOWN.

S. COVER SUPPLY/RETURN DIFFUSER ON MULTI-

FIXTURE LOCATIONS.

T. CONTRACTOR TO PROVIDE AN ICRA ACTION PLAN TO

REVIEW W/ COR BEFORE ANY WORK IS DONE.

Scale: No Scale

TYPE ICRA DETAILS

Scale: No Scale

ICRA WALL TYPE

DCWR

DHW

PIPING SYSTEM

NG NATURAL GAS

ST STORM

PD PUMP DISCHARGE

OFD OVERFLOW STORM DRAIN

GW GREASE WASTE

OW OIL WASTE

SAN SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

AW ACID WASTE

N2 NITROGEN

N2O NITROUS OXIDE

MA MEDICAL AIR

O2 OXYGEN

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

OV OIL VENT

AV ACID VENT

NPCW NONPOTABLE COLD WATER

DI DE-IONIZED WATER

SCW SOFTENED COLD WATER

DCW DOMESTIC COLD WATER

RO REVERSE OSMOSIS WATER

DOMESTIC CW RECIRCULATION

DOMESTIC HOT WATER

CO2 CARBON DIOXIDE

DHW 140 DOMESTIC HOT WATER (OTHER TEMP)

PG PROPANE GAS

DHWR DOMESTIC HW RECIRCULATION

NG

ST

PD

OFD

GW

OW

SAN

CD

CA

AW

N2

N2O

MA

O2

WAGD

VAC

CO2

PG

V

OV

AV

HW 140

SCW

NPCW

DI

RO

EXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

NEW PLUMBING EQUIPMENT MARK

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

P-###

EXISTING PLUMBING EQUIPMENT MARKP-###

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CONTROL VALVE

GATE VALVE

GLOBE VALVE

SAFETY RELIEF VALVE

TWO POSITION CONTROL VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

PLUG VALVE

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

CO

PIPE SLOPE ARROW

AV

F

P

T

M

CIRCUIT SETTER

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PASCAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH -

ABSOLUTE

PSIG POUNDS PER SQUARE INCH - GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REFRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

DA DENTAL COMPRESSED AIR

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DV DENTAL VACUUM

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

PLUMBING SYMBOLS PLUMBING SYMBOLS

ANNOTATION SYMBOLS

PLUMBING SYMBOLS & ABBREVIATIONS

ANNOTATION ABBREVIATIONS

MATCH LINE

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH

WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST

MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT

NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING WORK

AND WORK OF OTHER TRADES.

PLUMBING DEMOLITION GENERAL NOTES

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE

PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT

EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT

MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. AT EACH PLUMBING FIXTURE WITH QUICK CLOSING VALVE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED

ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.

8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE.

SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED OTHERWISE.

9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS.

11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH

EXISTING CONDITIONS.

16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING

SYSTEMS.

17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR 2 WEEK IN ADVANCE AND

CONFIRM 48 HOURS PRIOR.

18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

19. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

20. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

21. SEE DETAILS IN THE P-500 SERIES SHEETS FOR INSTALLATION INFORMATION.

PLUMBING GENERAL NOTES

1. ALL TEMPERING VALVES SHALL HAVE AN ADJUSTABLE SET POINT.

2. FOR FIXTURES NOT LISTED, COORDINATE SET POINT WITH THE COR.

3. SET POINTS SHALL BE AS FOLLOWS:

A. 110 DEGREE F.:

a. LAVATORIES.

b. HAND WASHING SINKS.

c. PATIENT ROOM SINKS.

d. EXAM ROOM SINKS.

e. SHOWERS.

f. TUBS.

B. 120 DEGREES F.:

a. BREAK ROOM SINKS.

b. PHARMACY SINKS.

c. LABORATORY SINKS.

C. 140 DEGREES F.:

a. MASTER DOMESTIC HOT WATER VALVE AT WATER HEATER.

b. KITCHEN PREP SINKS.

c. KITCHEN WAREWASH SINKS.

d. KITCHEN PRE-RINSE SINKS.

e. SPS EQUIPMENT WASH SINKS.

f. LAUNDRY AREA SINKS.

D. FIXTURES WITHOUT TEMPERING VALVES:

a. JANITORIAL MOP SINKS AND MOP BASINS.

b. CLINICAL SINKS.

DOMESTIC HOT WATER TEMPERING VALVE SET POINTS

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:1

:5

A

M C

U s e rs

\t b u d a i\ D o c u m e n ts \P

-0

-V A

L it tl e R o c k -M ix in g V a lv e s

G e n e ra l_ tb u d a i.

rv t

P-001

PLUMBING GENERAL INFORMATION

1 113WLF

MIXING VALVES FOR

ANTI-SCALD

LITTLE ROCK VA MEDICAL CENTER

2200 FORT ROOTS DR.

NORTH LITTLE ROCK, AR 72114 APRIL 12, 2024

100% BID DOCUMENTS

598-22-12722-099

WX

SPECIAL PURPOSE

INDUSTRIAL

OCCUPANCY

BUSINESS

OCCUPANCY

CHASE

A.

T.

C . 2

CRU-1

CONC.

PAD

PIPE

FIRE

SUB H

2000 KVA

1000 KVA

SUB D

SUB C

1000 KVA

SUB B

1500 KVA

(CARBON DIOXIDE)

GAS MANIFOLD

COMPRESSED

ROOF

LADDER

ACCESS

FD

WFWF

VALVE

G A

S

V A

L V

E

VALVE

VALVE

VALVEVALVE VALVE

7 9

D E

A 8

C B

F

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:0

:0

P

M C

U s e rs

\t b u d a i\ D o c u m e n ts

\P

-0

-V

A L it tl e R o c k -M ix in g V a lv e s

J L

M

B ld g tb u d a i.

rv t

1.P-100

OVERALL GROUND FLOOR PLAN -

BUILDING 1

2 113SMH/TB/SMR

MIXING VALVES FOR

ANTI-SCALD

LITTLE ROCK VA MEDICAL CENTER

2200 FORT ROOTS DR.

NORTH LITTLE ROCK, AR 72114 APRIL 12, 2024

100% BID DOCUMENTS

598-22-12722-099

WX

NORTH

0 3015 60

Scale: 1" = 30'-0"

OVERALL GROUND FLOOR PLAN - BUILDING 1

CHASE

A .T

.C . 2

GE101-JLM

POLICE STORAGE

GE108-JLM

JANITOR

GE109-JLM

CART WASH

GA104-JLM

BATHROOM

GA110-JLM

DIRECTOR'S OFFICE

GA109-JLM

DIRECTOR'S OFFICE

GE100B-JLM

OFFICE

GE100A-JLM

OFFICE

GE100C-JLM

ENVIRONMENTAL SRVCS

CG1-JLM

PUBLIC ELEV. LOBBY

GE100D-JLM

STORAGE

CG37B-JLM

CORRIDOR

GA101-JLM

SOILED LINEN

CG5-JLM

SERVICE ELEV. LOBBY

CG2-JLM

CORRIDOR45

GA103A-JLM

VESTIBULE

GA103A-JLM

LOUNGE

GC168-JLM

TRAY CART STORAGE

GA102-JLM

SPVSR BLDG MNGMNT

CG3-JLM

CORRIDOR

GA105-JLM

ELECTRIC

GA107-JLM

TELEPHONE

CG3A-JLM

CORRIDOR

GA106-JLM

SIGNAL

GC189A-JLM

PHARMACY SERVICE

GA108-JLM

TRASH

CG4-JLM

CORRIDOR

GC190-JLM

VAULT

GE107-JLM

SOILED, RECEIVING & DECON AREA

SG1-JLM

STAIR 1

GA104A-JLM

DRSSNG

GE107B-JLM

DECON ANTE

GC189-JLM

PHARMACY SERVICE

GC189B

GC189C

GC188A-JLM

MEDICINE STORAGE

ANTEROOM

I.V. PREP

TMV GC189B

TMV-GC189A

TMV-GA104-1

TMV-GA104-2

TMV-GA104-3

TMV-GA103A

/1 1.P-100.D

.P

-1 .D

/1 1.P-100.E

.P

-1 .E

.P

-1 .B

/1 1.P-100.B/1 1.P-100.C

.P

-1 .C

TMV-GE113

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:0

:5

P

M C

U s e rs

\t b u d a i\ D o c u m e n ts

\P

-0

-V

A L it tl e R o c k -M ix in g V a lv e s

J L

M

B ld g tb u d a i.

rv t

1.P-100.A

GROUND FLOOR PLUMBING PLAN -

BUILDING 1 - BLOCK A

3 113SMH/TB/SMR

MIXING VALVES FOR

ANTI-SCALD

LITTLE ROCK VA MEDICAL CENTER

2200 FORT ROOTS DR.

NORTH LITTLE ROCK, AR 72114 APRIL 12, 2024

100% BID DOCUMENTS

598-22-12722-099

WX

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A

D E

C B

7 9

F

NORTH

0 4 8 16

Scale: 1/8" = 1'-0"

GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK A

PLUMBING THERMOSTATIC MIXING VALVE SCHEDULE

MARK

ROOM

NUMBER DESCRIPTION

HAS

MIXING

VALVE

DETAIL

NUMBER

TAMPER

PROOF

REQUIRED

FIXTURE

CONNECTION REMARKS

GC168 LAVATORY SENSOR OPERATED GOOSENECK FAUCET Yes 12 No 3/8"

TMV-GC189A GC189A LAVATORY SINGLE LEVER FAUCET - WALL HUNG No 10 No 3/8"

TMV GC189B GC189B LAVATORY SINGLE LEVER FAUCET - WALL HUNG No 10 No 3/8"

TMV-GA104-1 GA104 LAVATORY WRIST BLADE FAUCET - WALL HUNG No 1 No 3/8"

TMV-GA104-2 GA104 LAVATORY WRIST BLADE FAUCET - WALL HUNG No 1 No 3/8"

TMV-GA104-3 GA104 LAVATORY WRIST BLADE FAUCET - WALL HUNG No 1 No 3/8"

TMV-GA103A GA103A LAVATORY SINGLE LEVER FAUCET - COUNTER MOUNT No 11 No 3/8"

TMV-GE113 GE113 HAND SINK WITH FOOT PEDALS No 5 No 3/8"

1 THIS FIXTURE DOES NOT REQUIRE A MIXING

VALVE.

2 THIS FIXTURE HAS A MIXING VALVE.

3 PROVIDE HOT WATER SIGN PER DETAIL 19/P502.

GB117-JLM

NPHRLGY LAB. 2

GB118-JLM

BIOMED. LAB.

GB119-JLM

NEPHROLOGY LAB. 3

CG11-JLM

CORRIDOR

GB120-JLM

LABORATORY

GB113-JLM

GRNTLGY RESEARCH LAB. 6

GB104-JLM

GERONTOLOGY RESEARCH LAB. 7

GB129-JLM

MYCOBACTERIOLOGY LAB.

GB127-JLM

OFFICE

GB126-JLM

MYCOBACTERIOLOGY LAB.

GB128-JLM

OFFICE

GB130-JLM

MYCOBACTERIOLOGY LAB.

GB133-JLM

TELEPHONE

GB132-JLM

SIGNAL

GB134-JLM

ELECTRIC

GB137-JLM

RESEARCH OFFICE

GB122-JLM

LABORATORY

GB123-JLM

STORAGE

GE106-JLM

WOMEN'S RR

GB121-JLM

OFFICE

GB114-JLM

STORAGE

GB115-JLM

GERONTOLOGY RSRCH LAB. 7

GB136-JLM

MYCOBACTERIOLOGY LABORATORY

GE102-JLM

POLICE STORAGE

GE101-JLM

POLICE STORAGE

GE104-JLM

WOMEN'S LOUNGE

GE105-JLM

WOMEN'S LOCKERS

GB124-JLM

NEPHROLOGY LABORATORY 1

GB135-JLM

PLMNRY MYCOBCTRLGY LAB.

GB131-JLM

CHEMICAL BIOPHYSICS LAB.

GB139-JLM

CONFERENCE ROOM

GB141-JLM

BIOMED. RSRCH

GB142-JLM

MED RSRCH ADMN

GB140-JLM

MED RESEARCH ADMIN

GB138-JLM

MED RESEARCH ADMIN

GB143A-JLM

MAIL

GB143-JLM

BUDGET ANALYST

GE108-JLM

JANITOR

GB105D-JLM

GB105E-JLM

GB125-JLM

STORAGE

GE107A-JLM

SPD TRAINING ROOM

GE107-JLM

SOILED, RECEIVING & DECON AREA

GE101A-JLM

MEN'S RR

SG3-JLM

STAIR 3

GB125A-JLM

MYCOBCTRLGY LAB. CLEAN RM

GB126A-JLM

STERILIZER

GB123A-JLM

STORAGE

CG10-JLM

CORRIDOR

CG38-JLM

CORRIDOR

CG10B-JLM

CORRIDOR

CG12-JLM

CORRIDOR

CG12B-JLM

CORRIDOR

CG12A-JLM

CORRIDOR

VALVE

VALVE

TMV-GB136-1

TMV-GB124-1

TMV-GB122-1

TMV-GB118

TMV-GB130

TMV-GB117

TMV-GB129

TMV-GB119-1

TMV-GB120-1

TMV-GB113-1

TMV-GB115-1

TMV-GB135

TMV-GB131

TMV-GB126

TMV-GE101A-1

TMV-GE106-1

TMV-GE101A-2

TMV-GE106-2

TMV-GB113-2

TMV-GB113-3

TMV-GB125

TMV-GB115-2

TMV-GB119-2

TMV-GB136-2

TMV-GB136-3

TMV-GB122-2

TMV-GB120-2

TMV-GB120-3

TMV-GB124-2

/1 1.P-100.F

1.P-100.8

.P

-1 .8

/1 1.P-100.E/1 1.P-100.E

.P

-1 .A

/1 1.P-100.A

.P

-1 .C

.P

-1 .C

/1 1.P-100.6

1.P-100.6

/1 1.P-100.F

DCW

DHW

DHWR

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:0

:5

P

M C

U s e rs

\t b u d a i\ D o c u m e n ts

\P

-0

-V

A L it tl e R o c k -M ix in g V a lv e s

J L

M

B ld g tb u d a i.

rv t

1.P-100.B

GROUND FLOOR PLUMBING PLAN -

BUILDING 1 - BLOCK B

4 113SMH/TB/SMR

MIXING VALVES FOR

ANTI-SCALD

LITTLE ROCK VA MEDICAL CENTER

2200 FORT ROOTS DR.

NORTH LITTLE ROCK, AR 72114 APRIL 12, 2024

100% BID DOCUMENTS

598-22-12722-099

WX

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A

D E

C B

7 9

F

NORTH

0 4 8 16

Scale: 1/8" = 1'-0"

GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK B

PLUMBING THERMOSTATIC MIXING VALVE SCHEDULE

MARK

ROOM

NUMBER DESCRIPTION

HAS

MIXING

VALVE

DETAIL

NUMBER

TAMPER

PROOF

REQUIRED

FIXTURE

CONNECTION REMARKS

TMV-GB136-1 GB136 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB124-1 GB124 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB122-1 GB122 LAVATORY - 2 - HANDLE FAUCET - COUNTER MOUNT No 8 No 3/8"

TMV-GB118 GB118 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB130 GB130 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB117 GB117 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB129 GB129 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB119-1 GB119 LAVATORY - 2 - HANDLE FAUCET - COUNTER MOUNT No 8 No 3/8"

TMV-GB120-1 GB120 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB113-1 GB113 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB115-1 GB115 LAVATORY - 2 - HANDLE FAUCET - COUNTER MOUNT No 8 No 3/8"

TMV-GB135 GB135 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB131 GB131 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB126 GB126 LAVATORY - 2 - HANDLE FAUCET - COUNTER MOUNT No 8 No 3/8"

TMV-GE101A-1 GE101A LAVATORY WRIST BLADE FAUCET - WALL HUNG No 1 No 3/8"

TMV-GE106-1 GE106 LAVATORY WRIST BLADE FAUCET - WALL HUNG No 1 No 3/8"

TMV-GE101A-2 GE101A LAVATORY - 2 - HANDLE FAUCET - WALL HUNG No 7 No 3/8"

TMV-GE106-2 GE106 LAVATORY - 2 - HANDLE FAUCET - WALL HUNG No 7 No 3/8"

TMV-GB113-2 GB113 LAVATORY - 2 - HANDLE FAUCET - COUNTER MOUNT No 8 No 3/8"

TMV-GB113-3 GB113 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB125 GB125 LAVATORY - 2 - HANDLE FAUCET - COUNTER MOUNT No 8 No 3/8"

TMV-GB115-2 GB115 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB119-2 GB119 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB136-2 GB136 LAVATORY - 2 - HANDLE FAUCET - COUNTER MOUNT No 8 No 3/8"

TMV-GB136-3 GB136 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB122-2 GB122 SINK - WITH SIDE MOUNTED EYE WASH No 16 No 3/8"

TMV-GB120-2 GB120 LAVATORY - 2 - HANDLE FAUCET - COUNTER MOUNT No 8 No 3/8"

TMV-GB120-3 GB120 LAVATORY - 2 - HANDLE FAUCET - COUNTER MOUNT No 8 No 3/8"

TMV-GB124-2 GB124 LAVATORY - 2 - HANDLE FAUCET - COUNTER MOUNT No 8 No 3/8"

1 THIS FIXTURE DOES NOT REQUIRE A MIXING

VALVE.

2 THIS EMERGENCY SHOWER DOES NOT

REQUIRE A MIXING VALVE.

3 PROVIDE HOT WATER SIGN PER DETAIL 19/P502.

4 MAIN SHUT OFF VALVES. CONTRACTOR

REQUIRED TO FIELD VERIFY EXACT LOCATION

AND COORDINATE WITH VA AT LEAST 2 WEEKS

PRIOR TO SHUTTING DOWN WATER. LOCATION

OF VALVE IS BASED ON INFORMATION

PROVIDED BY VA PLUMBING DRAWINGS.

GC104-JLM

BIOMED. LAB.

CG21-JLM

CORRIDOR

GC105-JLM

LABORATORY

GC126-JLM

JANITOR 317

CG9B-JLM

CORRIDOR

GC124-JLM

REAP ENDCRNLGY LAB.

GC106-JLM

VASCULAR SURGERY RESEARCH

GB102-JLM

RSRCH OFFICE

GB101-JLM

GASTROENTEROLOGY LAB.

GB104-JLM

GERONTOLOGY RESEARCH LAB. 7

GB104A-JLM

GRNTLGY RESEARCH LAB. 2

GB115-JLM

GERONTOLOGY RSRCH LAB. 7

GB103-JLM

GERIATRICS LABORATORY

CG8-JLM

CORRIDOR

GB100-JLM

LABORATORY

GC100-JLM

LABORATORY

GC102-JLM

CENTRIFUGE

GC103-JLM

CHEMISTRY LABORATORY

GC123-JLM

REAP ENDOCRINOLGY LABORATORY

CG9A-JLM

CORRIDOR

GC125-JLM

RESEARCH OFFICE

GC122-JLM

RESEARCH OFFICE

GC121-JLM

CELL RESEARCH LABORATORY

GC117-JLM

VESTIBULE

GC120-JLM

MEN'S RR

GC119-JLM

LOCKERS

GC118-JLM

LOUNGE

GC108-JLM

COMP. ROOM

CG22-JLM

CORRIDOR

GC115-JLM

JANITOR

GC116-JLM

SURGICAL BIO-CHEMICAL

LABORATORY

GC101-JLM

LABORATORY

GC110-JLM

DARK ROOM

CG23-JLM

CORRIDOR

GC107-JLM

DARK ROOM

GC111-JLM

STOR. RM B

GC109-JLM

CULTURE ROOM

GC112-JLM

MICROTOME ROOM B

GC113-JLM

ELECTRON MICROSCOPY PREP. ROOM

GC114-JLM

ELECTRON MICROSCOPY FINISH ROOM

GC133-JLM

MICROTOME ROOM A

GC134-JLM

STOR. ROOM A

CG25-JLM

CORRIDOR

GC131-JLM

ELECTRON MICROSCOPY

GC130-JLM

LEAD TECH. OFFICE

GC135-JLM

HEMATOPOIESIS LABORATORY

CG24-JLM

CORRIDOR

CG26-JLM

CORRIDOR

GC140-JLM

SIGNAL

GC138-JLM

ELECTRIC

GC128-JLM

HEMATOPOIESIS LABORATORY

GC170-JLM

DIETETIC SPVSR OFFICE

GC171-JLM

STORAGE

CG32-JLM

CORRIDOR

GC172-JLM

CONFERENCE

GC174-JLM

JANITOR

GC176-JLM

MEN'S RR

GC175-JLM

MEN'S LOCKER

GC173-JLM

DISHWASHING

GC169-JLM

DIETETIC'S

GC127-JLM

GLASSWARE WASHING & STER.

CG7-JLM

CORRIDOR

GB105D-JLM

SG2-JLM

STAIR 2

GB154A-JLM

DARK ROOM

GC117A-JLM

STORAGE

GC102A-JLM

CENTRIFUGE

V A

L V

E

TMV-GC107

TMV-GC118

TMV-GC120

TMV-GC109

TMV-GC112

TMV-GC121

TMV-GC173

TMV-GC176-1

TMV-GC176-2

TMV-GC127

TMV-GC128-1

TMV-GC128-2

TMV-GC135-1

TMV-GC131

TMV-GC113

TMV-GC133

TMV-GC114

TMV-GC135-2

TMV-GC104

TMV-GC106

TMV-GC124 TMV-GC105

TMV-GC123 TMV-GC103

TMV-GB101-1

TMV-GB100

TMV-GB103-1

TMV-GB103-2

TMV-GB101-2

TMV-GB104A

TMV-GC101-1TMV-GC116-1

TMV-GC101-2

TMV-GC116-2

/1 1.P-100.B

/1 1.P-100.B

/1 1.P-100.A

/1 1.P-100.6

/1 1.P-100.D /1 1.P-100.D

/1 1.P-100.6

.P

-1 .A

DCW

DHW

DHWR

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:0

:0

P

M C

U s e rs

\t b u d a i\ D o c u m e n ts

\P

-0

-V

A L it tl e R o c k -M ix in g V a lv e s

J L

M

B ld g tb u d a i.

rv t

1.P-100.C

GROUND FLOOR PLUMBING PLAN -

BUILDING 1 - BLOCK C

5 113SMH/TB/SMR

MIXING VALVES FOR

ANTI-SCALD

LITTLE ROCK VA MEDICAL CENTER

2200 FORT ROOTS DR.

NORTH LITTLE ROCK, AR 72114 APRIL 12, 2024

100% BID DOCUMENTS

598-22-12722-099

WX

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A

D E

C B

7 9

F

NORTH

0 4 8 16

Scale: 1/8" = 1'-0"

GROUND FLOOR PLUMBING PLAN - BUILDING 1 - BLOCK C

PLUMBING THERMOSTATIC MIXING VALVE SCHEDULE

MARK

ROOM

NUMBER DESCRIPTION

HAS

MIXING

VALVE

DETAIL

NUMBER

TAMPER

PROOF

REQUIRED

FIXTURE

CONNECTION REMARKS

TMV-GC107 GC107 LAVATORY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .