Attch_5_Figure_5_TypicalCrossSectionTrailSurfacing_Detail.pdf

PDF 224 KB Posted

Attached to
FAIRBANK TRAIL ADA MAINTENANCE AND IMPROVEMENTS
Solicitation number
140L0624R0039
Issued by

About this file

This document appears to be an attachment depicting a typical cross-section for the Fairbank Trail ADA Maintenance and Improvements project. The cross-section shows a 10-foot vertical clearance and an 8-foot treadwidth with a 2-foot shoulder mowing strip on each side. The trail is intended for multi-use non-motorized travel by pedestrians, equestrians, and bicyclists, and can accommodate UTVs and smaller administrative vehicles.

The related federal contract opportunity is Solicitation Number 140L0624R0039 for the "Fairbank Trail ADA Maintenance and Improvements" project, issued by the Department of the Interior Bureau of Land Management National Office. The solicitation seeks contractors to provide the required maintenance and improvements to the Fairbank Trail.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2', Shoulder Mowing Strip (and Tree Branch Cutting Limits)

Treadwidth Varies See Tread Width on the 109.00 Trail

Segment Table

3:1 SIDE SIDl'E

2% Cross Slope

Decomposed Granite

Typical Cross section:

10 ft. vertical clearance. Access for:

Mult i-Use Non-Motor ized T ravel Route (Pedestr ian, equestr ian and bicyclist) Admin istrative veh icles: UTVand smaller

2'

Shoulder Mowing Strip (and Tree Branch Cutting Limits)

8'

File details come from the government source that posted it. Updated .