Attch-3 Material Approval Submittal.pdf

PDF 81 KB Posted

Attached to
Roof Installation Requirement W91QF4-26-B-A002
Solicitation number
IFB_W91QF426IFB002_Roof
Issued by

About this file

This is the AF IMT 3000 Material Approval Submittal form, a U.S. Air Force template used by contractors to submit materials for government approval during contract performance. The form (OMB No. 9000-0062, expiring May 31, 2005) allows contractors to present shop drawings, equipment data, manufacturer's literature, certificates, and material samples for review and approval in accordance with contract specifications. Contractors must submit the form in four copies, signed and addressed to the contracting officer, with clearly tabbed and numbered attachments corresponding to specific items.

The form requires contractors to certify that submitted materials comply with all contract specifications and includes sections for government evaluation by the Base Civil Engineering Officer and AF Contracting Office. Submissions must be numbered consecutively by contract and identified as either new or resubmittal, with previous submission numbers referenced when applicable. Government approval officials can recommend approval, disapproval, or request resubmittal within a specified timeframe. The form includes a comments section for detailed feedback, and only submissions signed by the contracting officer are considered valid. Contractors must clearly identify materials by specification section, paragraph number, drawing number, type, model number, catalog number, and manufacturer information to ensure proper evaluation for incorporation into contract work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Evaluation and Action

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

Form Approved OMB No 9000-0062 Expires May 31, 2005

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC 20330-1060.

TO: (Contracting Officer) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM SPECIFICATION SECTION/ DESCRIPTION OF MATERIAL AP-

PROVED

DISAP-

PROVED

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (AF Contracting Office)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (Contractor)

DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST

APPROVED

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.

NO. PARA NO./DRAWING NO. (Include Type, Model Number, Catalog Number, Mfg., etc.)

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)

TO Contracting Officer:
FROM Contractor:
YYYYMMDD DATE:
CONTRACT NUMBER:
SUBMISSION NUMBER:
Check Box1: Yes
RESUBMITTAL: Off
Check Box2: Off
PREVIOUS SUBMISSION NUMBER:
PROJECT NUMBER:
ITEM NORow1: 1
SPECIFICATION SECTION PARA NODRAWING NORow1:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow1:
Check Box3: Off
Check Box4: Off
Check Box5: Off
INITIAL:
ITEM NORow2:
SPECIFICATION SECTION PARA NODRAWING NORow2:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow2:
Check Box6: Off
Check Box7: Off
Check Box8: Off
INITIAL_2:
ITEM NORow3:
SPECIFICATION SECTION PARA NODRAWING NORow3:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow3:
Check Box9: Off
Check Box10: Off
Check Box11: Off
INITIAL_3:
ITEM NORow4:
SPECIFICATION SECTION PARA NODRAWING NORow4:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow4:
Check Box12: Off
Check Box13: Off
Check Box14: Off
INITIAL_4:
ITEM NORow5:
SPECIFICATION SECTION PARA NODRAWING NORow5:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow5:
Check Box15: Off
Check Box16: Off
Check Box17: Off
INITIAL_5:
ITEM NORow6:
SPECIFICATION SECTION PARA NODRAWING NORow6:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow6:
Check Box18: Off
Check Box19: Off
Check Box20: Off
INITIAL_6:
ITEM NORow7:
SPECIFICATION SECTION PARA NODRAWING NORow7:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow7:
Check Box21: Off
Check Box22: Off
Check Box23: Off
INITIAL_7:
ITEM NORow8:
SPECIFICATION SECTION PARA NODRAWING NORow8:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow8:
Check Box24: Off
Check Box25: Off
Check Box26: Off
INITIAL_8:
ITEM NORow9:
SPECIFICATION SECTION PARA NODRAWING NORow9:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow9:
Check Box27: Off
Check Box28: Off
Check Box29: Off
INITIAL_9:
ITEM NORow10:
SPECIFICATION SECTION PARA NODRAWING NORow10:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow10:
Check Box30: Off
Check Box31: Off
Check Box32: Off
INITIAL_10:
ITEM NORow11:
SPECIFICATION SECTION PARA NODRAWING NORow11:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow11:
Check Box33: Off
Check Box34: Off
Check Box35: Off
INITIAL_11:
YYYYMMDD DATE_2:
TYPE OR PRINT NAME AND TITLE:
TO Base Civil Engineering Officer:
For Evaluation and Action:
YYYYMMDD DATE_3:
TYPE OR PRINT NAME AND GRADE:
TO AF Contracting Office:
YYYYMMDD DATE_4:
TYPE OR PRINT NAME AND GRADE_2:
TO Contractor:
Check Box38: Off
Check Box39: Off
RESUBMITTAL ON DISAPPROVED ITEMS WITHIN:
YYYYMMDD DATE_5:
TYPE OR PRINT NAME AND GRADE_3:
Check Box36: Off
Check Box37: Off
COMMENTS Number to correspond with applicable Item Number on reverseRow1:
COMMENTS Number to correspond with applicable Item Number on reverseRow2:
COMMENTS Number to correspond with applicable Item Number on reverseRow3:
COMMENTS Number to correspond with applicable Item Number on reverseRow4:
COMMENTS Number to correspond with applicable Item Number on reverseRow5:
COMMENTS Number to correspond with applicable Item Number on reverseRow6:
COMMENTS Number to correspond with applicable Item Number on reverseRow7:
COMMENTS Number to correspond with applicable Item Number on reverseRow8:
COMMENTS Number to correspond with applicable Item Number on reverseRow9:
COMMENTS Number to correspond with applicable Item Number on reverseRow10:
COMMENTS Number to correspond with applicable Item Number on reverseRow11:
COMMENTS Number to correspond with applicable Item Number on reverseRow12:
COMMENTS Number to correspond with applicable Item Number on reverseRow13:
COMMENTS Number to correspond with applicable Item Number on reverseRow14:
COMMENTS Number to correspond with applicable Item Number on reverseRow15:
COMMENTS Number to correspond with applicable Item Number on reverseRow16:
COMMENTS Number to correspond with applicable Item Number on reverseRow17:
COMMENTS Number to correspond with applicable Item Number on reverseRow18:
COMMENTS Number to correspond with applicable Item Number on reverseRow19:
COMMENTS Number to correspond with applicable Item Number on reverseRow20:

File details come from the government source that posted it. Updated .