Attch_11_Limitations_on_Subcontracting_Breakout.xlsx

XLSX spreadsheet 91 KB Posted

Attached to
NWO DISTRICT HVAC IMPROVEMENTS
Solicitation number
140L0624R0041
Issued by

About this file

This document is an Excel attachment titled "Limitations on Subcontracting Breakout" related to Solicitation Number 140L0624R0041 for HVAC System Improvements for the Northwest Oregon District Office. The solicitation is a Total Small Business set-aside with a 90-day performance period. The required self-performance percentage is 25%. The attachment provides a template for the contractor to break out the total proposed amount into material costs, self-performed labor, small business subcontractor labor, and large business subcontractor labor. The contractor must demonstrate compliance with the limitations on subcontracting by ensuring the total labor cost minus the amount paid to large business subcontractors is greater than or equal to the required 25% self-performance percentage.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)

Solicitation Number140L0624R0041 - Northwest Oregon District Office HVAC System Improvements
Type of Set AsideTotal Small Business
Performance Period90 Days After NTP
Required Self-Performance25%

(A) Total Amount Proposed*

(B) Total Material Cost

(C) Self Performed Labor

(D) Small Business Subcontractor (SSS) Labor
Total Amount Paid to [Insert First SSS Name]
Total Amount Paid to [Insert Second SSS Name]
Total Amount Paid to [Insert Third SSS Name]
Total Amount Paid to [Insert Fourth SSS Name]
Total Amount Paid to [Insert Fifth SSS Name]
Total Amount Paid to [Insert Sixth SSS Name]
Total Amount Paid to SSS Companies$0.00
(E) Large Business Subcontractor (LBS) Labor
Total Amount Paid to [Insert First LBS Name]
Total Amount Paid to [Insert Second LBS Name]
Total Amount Paid to [Insert Third LBS Name]
Total Amount Paid to [Insert Fourth LBS Name]
Total Amount Paid to [Insert Fifth LBS Name]
Total Amount Paid to [Insert Sixth LBS Name]
Total Amount Paid to LBS Companies$0.00

(F) Total Labor Cost $0.00

(G) Limitation on Subcontracting Percentage*
(Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor CostERROR:#DIV/0!
*Note 1: (A) = (B) + (F)
*Note 2: To be compliant, limitation percentage must be greater than the required self-performance percentage.

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .