Solicitation Summary: HVAC Replacement for Shasta and Spring Creek Powerplants

This is a sealed bid Invitation for Bid (IFB) solicitation issued by the U.S. Bureau of Reclamation, Northern California Area Office (NCAO) for the purchase and installation of three new HVAC units to replace existing systems at two federal powerplant facilities. The solicitation number is 140R2026R0011, with an estimated project cost between $25,000 and $100,000. The work involves complete removal and replacement of HVAC equipment at the Shasta Powerplant Control Room (two units) located at 16349 Shasta Dam Boulevard, Shasta Lake City, California, and the Spring Creek Powerplant Computer Room (one unit) located at 11757 Iron Mountain Road, Redding, California. The replacement units will utilize R454B refrigerant, with the Shasta system providing both heating and cooling through inverters and the Spring Creek system providing cooling only. All new equipment must match existing system types and sizes, and the contractor is responsible for removal of old equipment, proper refrigerant reclamation, and safe disposal of materials. Sealed bids are due by 1700 hours on May 26, 2026, with a mandatory 90-calendar-day performance period commencing within 7 calendar days of contract award. The contract is a firm-fixed-price award with no performance or payment bonds required, though alternative payment protections are specified under FAR 52.228-13.

This is a restricted procurement using NAICS code 238220 (HVAC Contractors) with a small business set-aside and an applicable size standard of $19.0 million. An organized site visit is scheduled for May 12, 2026, at 10:00 a.m. at Shasta Dam Visitor Center. Evaluation will follow a lowest-price, technically-acceptable source selection process with award made to the responsible offeror whose proposal is technically acceptable and offers the lowest evaluated price. The contractor must submit proposals containing a technical approach, project schedule, past performance information on similar projects, and a lump-sum firm-fixed-price. Proposals must be submitted via email to Charlesetta Seibure (charlesetta_seibure@ios.doi.gov) by May 26, 2026, with all questions due by May 14, 2026. The contracting officer is Roxana Ahola. Proposals will be evaluated on technical acceptability (pass/fail), past performance (acceptable/neutral/unacceptable), and price reasonableness. The Government intends to award without discussions but reserves the right to conduct clarifications.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 140R2026R0011

HVAC Replacement for Shasta Powerplant Control Room (SH PP) and Spring Creek Powerplant Computer Room (SC PP)

Northern California Area Office (NCAO)

TABLE OF CONTENTS

SECTION A - Solicitation, Offer and Award Form (SF 1449)

SECTION B - Pricing Schedule

SECTION C – Performance Work Statement

SECTION D - Packaging and Marking

SECTION E - Inspection and Acceptance

SECTION F - Deliveries or Performance

SECTION G - Contract Administration Data

SECTION H - Special Contract Requirements

SECTION I - Contract Clauses

SECTION J - List of Documents, Exhibits, and Other Attachments

SECTION K - Representations, Certifications and Other Statements of Offerors

SECTION M - Evaluation Factors for Award

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

140R2026R0011

2. TYPE OF SOLICITATION

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED

05/05/2026

PAGE OF PAGES

1 58

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

7. ISSUED BY CODE R20 8. ADDRESS OFFER TO

Bureau of Reclamation Mid-Pacific Region Regional Office Division of Acquisition Services 2800 Cottage Way, Room E-1815 Sacramento CA 95825-1898

9. FOR

INFORMATION CALL

a. NAME

Charlesetta Seibure

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

9169785456

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

A. HVAC Replacement for Shasta Power Plant (SH PP) and Spring Creek Power Plant (SC PP)

B. Work Site Location: Work is located at 16349 Shasta Dam Boulevard, Shasta Lake City, California.

Spring Creek Power Plant is located at 11757 Iron Mountain Road, Redding, California

C. Site Visit Information: Site Visit information is in Section L of the solicitation, clause 52.236-27.

D. Estimate Price Range: The estimated cost of this project is between $25,000 and $100,000.

E. Set-aside Information: This requirement is a restricted procurement using NAICS 238220 and applicable size standard of $19.0 million.

11. The contractor shall begin performance within 7 calendar days and complete it within 120 calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

12b. CALENDAR DAYS

a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by 1700 (hour) local time 05/26/2026 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than 0 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

Continued...

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY R20 27. PAYMENT WILL BE MADE BY

Bureau of Reclamation Mid-Pacific Region Regional Office Division of Acquisition Services 2800 Cottage Way, Room E-1815 Sacramento CA 95825-1898

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return 0 copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

Roxana Ahola 30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

AMOUNTS

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED

140R2026R0011

PAGES

NAME OF OFFEROR OR CONTRACTOR

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

00010 Installation of three new HVAC units: two for the seventh-floor control room at the Shasta Power Plant (SH PP) and one for the computer room at the Spring Creek Power Plant (SC PP).

Product/Service Code: 4120 Product/Service Description: AIR CONDITIONING

EQUIPMENT

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

140R2026R0011 HVAC Replacement for SH PP and SC PP

Price Schedule B - 1

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

HVAC RPLACEMENT FOR SH PP and SC PP

B.1 WBR 1452.236-85 INSTRUCTION FOR MOBILIZATION MAR 2022

AND PREPARATORY WORK SCHEDULE

LINE ITEM – BUREAU OF RECLAMATION

The contracting officer estimates that the Section B Mobilization and Preparatory Work schedule line item should not exceed 10 percent of the total bid price. Your attention is directed to contract clause WBR 1452.232-81 Payment for Mobilization and Preparatory Work, which reflects how the Government will pay for this line item, including how payment will be made when the price bid for this schedule line item is higher than the percentage stated herein.

(End of provision)

B.2 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(d) Definitions:

(1) CLIN – Contract Line Item Number

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

1 WBR

1452.232

-81

Mobilization and Preparatory Work

For the lump sum of

Price Schedule B - 2

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

2 Phase 1 Install HVAC system at Shasta Powerplant Control Room

For the lump sum of

3 Phase 2 Install HVAC system at Spring Creek Powerplant Computer Room

For the lump sum of

TOTAL FOR PRICE SCHEDULE

END OF SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION C – STATEMENT OF WORK

1.0 INTRODUCTION

1.1 The U.S. Department of Interior, Bureau of Reclamation (BOR) is soliciting proposals for the purchase and installation of three new HVAC units: two serving the Shasta Power Plant (SHPP) seventh floor control room and one serving the Spring Creek Power Plant (SCPP) computer room.

The existing HVAC units shall be completely removed and replaced. Removal includes condenser units, copper tubing, condensate drains and pumps, electrical connections, fan coil units, refrigerant, and controls. Contractor shall take possession of all equipment and materials removed from the buildings.

Replacement of units will utilize R454B refrigerant. The units at SHPP will have inverters to provide heating and cooling to the office spaces. The unit at SCPP will only provide cooling. The replacement HVAC systems are to match the existing system types and sizes. The SHPP system is a water source heat pump. No unit smaller than the existing system will be accepted.

Installation of the new units includes placement, mounting brackets as necessary, refrigerant and any necessary materials to connect to the existing water supply, water drainage, condensation collection systems and ventilation ducts.

Contractor shall be responsible for any lifting or scaffolding necessary to remove the existing air conditioners and place the new air conditioners.

1.2 Shasta Power Plant is located at 16349 Shasta Dam Boulevard, Shasta Lake City, California.

Spring Creek Power Plant is located at 11757 Iron Mountain Road, Redding, California. All access to the sites shall be coordinated with the Contracting Officer Representative (COR).

1.3 Work shall be completed as expeditiously as possible. The office space shall be occupied during the execution of the contract. The Contractor shall coordinate with the Contracting Officer (CO) for job sequencing.

2.0 GENERAL REQUIREMENTS

2.1 The contractor shall provide and install a replacement water source heat pump equivalent to the existing systems.

At SHPP: Replace the existing Canatal International 11WX50VMHSBWX and install a standard control system that displays room temperature in degrees Fahrenheit, clock, heat/cool mode, and a temporary temperature override.

At SCPP: Replace the existing Trane GEHB02411G0210BL and install a standard control system that displays room temperature in degrees Fahrenheit, clock, cool mode, and a temporary temperature override.

2.2 The Contractor shall provide construction personnel, equipment, materials, tools and supervision as needed to complete the services that meet the technical requirements in this Statement of Work (SOW). It is expected that the Contractor shall partner closely with the COR.

2.3 The work shall be executed in a diligent manner in accordance with a negotiated firm fixed price and performance period. The period of performance for the project shall be completed in 90 calendar days from issuance of the Notice-to-Proceed.

2.3 The Contractor shall not be admitted to any structure outside the designated work areas for the project except with permission of the COR.

3.0 GOVERNMENT MATERIAL (GM)

3.1 None.

4.0 ADMINISTRATION

4.1 The Contractor shall not conduct any work that is beyond this SOW and accompanying specifications unless directed in writing by the Contracting Officer (CO). Any work done by the Contractor beyond this SOW and accompanying specifications without direction from the CO will be at the Contractor’s own risk and expense and at no cost to the Department of Interior.

4.2 The Contracting Officer shall provide a Notice to Proceed (NTP) to the Contractor. No work shall be initiated until the NTP is issued by the CO.

4.3 The BOR has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The BOR may perform quality assurance inspections (QAI) and tests during work to confirm the material is installed according to the SOW.

4.4 If any of the Contractor’s services do not conform to the requirements, the COR may require the

Contractor to perform the services again in conformity with the contract requirements. The BOR may, by contractor or otherwise, perform the services and charge the Contractor any cost incurred by the BOR that is directly related to the performance of such service or terminate the contract for default.

5.0 RESPONSIBILITY OF THE CONTRACTOR

5.1 The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all services furnished under this SOW. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in its services.

5.2 The Contractor shall identify a Project Site Manager who shall be responsible for the overall management of the project and shall represent the Contractor on the site during work. The Project Site Manager shall meet the approval of the COR.

5.3 The Project Site Manager shall communicate to the COR all accomplishments, arising concerns and proposed solutions, any proposed change orders, and any other pertinent information required to report the progress of performance.

5.4 The Contractor shall verify all materials provide operational dependability. The Contractor assures the installed Air Conditioning unit shall be easily maintained or replaced with readily available materials and services.

5.5 Any cost associated with services subcontracted by the Contractor shall be borne by and be the complete responsibility of the Contractor under the fixed price of this contract.

5.6 The Contractor is responsible for safety and shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety and similar matters. The Contractor shall promptly report all accidents resulting in lost time, disabling, or fatal injuries to the COR.

6.0 PRE-CONSTRUCTION REQUIREMENTS

6.1 The Contractor shall examine all the documents and visit the site to fully inform themselves of all the conditions and limitations applied to the work and submit a firm fixed price cost proposal for all the work. No subsequent cost allowance will be made to the Contractor for neglect of the existing conditions.

6.2 The Contractor shall provide a statement that the Contractor’s company and all personnel are experienced in installation of air conditioning units similar to type and scope required for the work.

6.3 The Contractor shall provide copies of engineering specifications of the proposed replacement water source heat pumps to the COR for approval a minimum of two weeks prior to procuring the equipment.

7.0 WORK REQUIREMENTS

7.1 Security

A. Contractor Security Requirements

1. Contractor personnel performing work under this contract must be American Citizens at the time of work performance and must maintain the level of security required for the duration of the contract. The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

2. The contract solicitation may delineate any applicable specific Contractor security requirements. The Contractor shall coordinate access for personnel, materials, and equipment with the COR or Onsite Government Representative (OGR) prior to mobilization on site. The OGR will escort Contractor personnel as necessary and will be at the work site any time the Contractor is on site. The COR/OGR will need the names, company names, position of each individual and dates and times each individual is expected on site at least two weeks prior to any work conducted onsite.

B. Site Security

1. Less any preliminary activities (including inspections, and surveys), the Government anticipates about 30 days on site to complete the construction work. At SHPP, the contractor storage and use areas will be the parking stalls south of the automatic gate and along the east side of the drive aisle approaching Shasta Power Plant. AT SCPP, the contractor storage and use areas will be XX. See the attached Figure 1 showing the Contractor Use Areas. Any material stored onsite shall be done at the risk of the Contractor.

7.2 The Contractor shall be responsible for all required materials not provided by the BOR, equipment and personnel to manage, administer, and supervise the project. All workmanship shall be of good quality and performed in a skillful manner as determined by the COR.

7.3 All materials and equipment incorporated into the project shall be new unless noted otherwise.

The Contractor shall transport and safeguard all materials and equipment required for work.

Existing refrigerant must be reclaimed in proper containers. No refrigerant may be evacuated into the atmosphere.

The Contractor is responsible for the proper disposal of units and material removed from the Power Plant building. Equipment and other materials become salvage to the contractor and may not be disposed utilizing BOR waste disposal or recycling services.

7.4 Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation in accordance with the manufacturer’s recommendations. Damaged or defective items shall be replaced. The contractor will be responsible for security of all materials and equipment.

7.5 The Contractor will be provided with a storage and staging area as determined by the COR. The

Contractor shall be responsible for restoring the area to its original condition at the completion of the work. The Contractor shall be responsible for repair of any damage incurred to buildings or pavement as a result of storage activities. The Contractor is responsible for obtaining any additional off compound storage areas as required.

7.6 The Contractor shall provide Personal Protective Equipment (PPE) appropriate for the manner of work undertaken at each stage of the project.

7.7 The Contractor shall perform the work at the site during the Power Plant’s normal workday hours, Monday to Friday, 8:00 am to 4:00 pm, unless agreed upon with the COR.

7.8 Cleanup: The Contractor shall keep the work area, including storage areas, free from accumulations of waste materials at all times and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes. Upon completing construction, the Contractor shall remove all temporary facilities and leave the project site in a clean and orderly condition acceptable to the COR. The Contractor shall not use Power Plant waste disposal facilities including garbage cans, trash piles or dumpsters.

8.0 DELIVERABLE SCHEDULE

8.1 The Contractor shall commence work under this contract promptly, execute the work diligently, and achieve final completion and acceptance including final cleanup of the premises within the period specified.

8.2 Project Completion: Furnish one copy of maintenance and operating information, Contractor’s one year workmanship guarantee and product literature of all items installed.

9.0 PROJECT SECURITY

9.1 The work to be performed under this contract requires that the Contractor, its employees and sub-contractors submit corporate, financial and personnel information for review by the BOR.

Information submitted by the Contractor will not be disclosed beyond the BOR.

10.0 PAYMENTS

10.1 The Contractor shall provide a fixed priced lump sum proposal to the Contracting Officer.

10.2 The Contractor shall submit one copy of all payment invoices, with the appropriate backup documents to the COR. The COR will determine if the invoice is complete and proper as submitted. The COR also will determine if billed services have been satisfactorily performed and if expenses billed are correct. If it is determined that the amount billed is incorrect, the COR will, within seven days, request the Contractor to submit a revised invoice.

10.3 The Contractor shall specifically identify his invoice “Final Invoice.” The Final invoice shall include the remaining payment claimed to be due under the basic contract and all modifications issued, if any. The final invoice shall also have the Contractor’s Release of Claims Certificate attached.

END OF STATEMENT OF WORK

D-1

SECTION D - PACKAGING AND MARKING

There are no clauses in this section.

E-1

SECTION E - INSPECTION AND ACCEPTANCE

Clause Title Date

52.246-12

Inspection of Construction

AUG 1996

F-1

SECTION F - DELIVERIES OR PERFORMANCE

Clause Title Date

52.211-18 Variation in Estimated Quantity APR 1984 52.236-15 Schedules for Construction Contracts (Deviation

JAN 2026)

APR 1984

52.242-14 Suspension of Work APR 1984

FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND APR 1984

COMPLETION OF WORK

The Contractor shall be required to

(a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 120 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

G-1

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 This contract shall be administered by the Pacific Northwest & California Basin Office, 2800 Cottage Way, Sacramento, California 95825-1898.

G.2 WBR 1452.201-80 CONTRACTING OFFICER’S MAY 2018

REPRESENTATIVE’S AUTHORITIES

AND LIMITATIONS -- BUREAU OF

RECLAMATION

a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:

(1) Inspecting and accepting or rejecting work performed under the contract.

(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.

(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.

(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.

(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract;

therefore, the COR does not have the authority to, and may not, issue any technical direction that

(1) Constitutes a direction of additional work outside the Contract requirements;

(2) Constitutes a change as defined in the contract clause entitled “Changes;”

(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;

(4) Changes any of the expressed terms, conditions or specifications of the contract; or

(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.

(d) All technical direction shall be issued in writing by the COR.

(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -

(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under

G-2 the Changes clause of the contract; or

(2) Advise the Contractor that the Government will issue a written change order.

(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”

(End of clause)

G.3 DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS SEP 2011

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

The COR will be named at time of award.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the

COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person

G-3 acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of Clause)

G.4 DOI-AAAP 0028 ELECTRONIC INVOICING AND PAYMENT FEB 2021

REQUIREMENTS – INVOICE PROCESSING

PLATFORM (IPP)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

Concurrent to submitting an invoice in IPP, the contractor shall submit supporting documentation to the contracting officer at sha-mpr-acqconbrinv@usbr.gov. Contractors are cautioned that supporting documentation e-mailed to the contracting officer must not conflict with the IPP submission. Conflicts between the IPP submission and supporting documentation may result in a delay in approval and/or rejection of submitted invoices.

When e-mailing supporting documentation to the contracting officer, the subject line of the email shall be formatted as follows: Contract Number, Invoice Number, Contracting Officer's last name (e.g., 140R2018R00000_Invoice No. 1_Smith). The invoice shall be attached to the email and named using the following format: Contract Number, Contractor Name, Invoice Number, Invoice Amount (e.g., 140R2022R00000_World Test, Inc. - Inv. No.

1 - $5,678).

Invoices shall not include information that would compromise Personally Identifiable Information, such as full social security numbers, dates of birth, etc. The final invoice shall be submitted and will be approved in accordance with payment terms and conditions contained in the contract, after all, if any, settlement actions are complete. The contractor must clearly identify the last payment as the ‘Final Invoice’.

Support documents must include, but are not limited to, the following documents:

Construction Invoice Monthly Certificate of Labor Conformance Subcontractor / Supplier Payment Summary

G-4

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

H-1

SECTION H – SPECIAL CONTRACT REQUIREMENTS

Although the SF 1442 indicates that payment and performance bonds are not required, please refer to Section I, clause FAR 52.228-13, as alternative payment protections are required.

SITE VISIT

An organized site visit has been scheduled for-

Date: May 12, 2026 Time: 10:00 am PD Contact: Amy Holland at aholland@usbr.gov

Participants will meet at:

Location: Shasta Dam Visitor Center Parking Lot (Attachment 6), 16349 Shasta Dam Blvd, Shasta Lake, CA 96019

The registration email must include the following:

• Name of Company

• Number of Participants

• Names of Participants

• Main point of contact

Offerors attending the site visit shall wear hard hat, safety toe boots (no open toe shoes), sturdy attire, safety glasses, and hearing protection.

Deadline for submission of questions is two (2) days after the site visit at 1700 PD.

There are no clauses in this section.

mailto:aholland@usbr.gov

I-1

SECTION I - CONTRACT CLAUSES

FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation: https://www.acquisition.gov/far FAR Overhaul Parts & Agency Deviations - FAR Overhaul - FAR Part Deviation Guidance | Acquisition.GOV Department of the Interior Acquisition Regulation: https://acquisition.gov/diar

FAR Clauses

Title

Date

52.202-1

Definitions

JUN 2020

52.203-3

Gratuities

52.203-5

Covenant Against Contingent Fees

MAY 2014

52.203-7

Anti-Kickback Procedures

52.203-8

Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity

52.203-10

Price or Fee Adjustment for Illegal or Improper Activity

52.203-12

Limitation on Payments to Influence Certain Federal Transactions

52.203-17

Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights

NOV 2023

52.203-19

Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

JAN 2017

52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

MAR 2026

52.204-13 System for Award Management Maintenance OCT 2018

52.204-18 Commercial and Government Entity Code Maintenance AUG 2020

52.204-19 Incorporation by Reference of Representations and Certifications

DEC 2014

52.204-21 Basic Safeguarding of Covered Contractor Information Systems

NOV 2021

I-2

52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment

JAN 2025

52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting with Inverted Domestic

Corporations

NOV 2015

52.215-2 Audit and Records - Negotiation JUN 2020

52.215-8

Order of Precedence - Uniform Contract Format

OCT 1997

52.219-28 Post-Award Small Business Program Representation JAN 2026

52.222-3 Convict Labor JUN 2003

52.222-4

Contract Work Hours and Safety Standards Act- Overtime Compensation

MAY 2018

52.222-6

Construction Wage Rate Requirements

AUG 2018

52.222-7

Withholding of Funds

52.222-8

Payrolls and Basic Records

JUL 2021

52.222-9

Apprentices and Trainees (Deviation Feb 2025)

JUL 2005

52.222-10

Compliance with Copeland Act Requirements

FEB 1988

52.222-11

Subcontracts (Labor Standards)

52.222-12

Contract Termination – Debarment

52.222-13

Compliance with Construction Wage Rate Requirements and Related Regulations

52.222-14

Disputes Concerning Labor Standards

FEB 1988

52.222-15

Certification of Eligibility

52.222-19

Child Labor-Cooperation with Authority and Remedies

JAN 2025

52.222-35

Equal Opportunity for Veterans

52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-50 Combating Trafficking in Persons OCT 2025

52.222-40

Notification of Employee Rights Under the National Labor Relations Act

DEC 2010

52.222-54 Employment Eligibility Verification JAN 2025 52.222-55 Minimum Wages Under Executive Order 14026 JAN 2022 52.222-62 Paid Sick Leave Under Order 13706 JAN 2022 52.222-90 Addressing DEI Discrimination by Federal Contractors

(Deviation APR 2026)

APR 2026

52.223-3 Alt I Hazardous Material Identification and Material Safety

Data (July 1995) – Alternate I

FEB 2021

I-3

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024

52.225-13

Restrictions on Certain Foreign Purchases

FEB 2021

52.226-7

Drug-Free Workplace

MAY 2024

52.226-8

Encouraging Contractor Policies to Ban Text Messaging While Driving

MAY 2024

52.227-1

Authorization and Consent

52.227-2

Notice and Assistance Regarding Patent And Copy Infringement

52.227-4 Patent Indemnity – Construction Contracts DEC 2007

52.228-2 Additional Bond Security OCT 1997

52.228-5 Insurance - Work on a Government Installation JAN 1997

52.228-11 Individual Surety-Pledges of Assets FEB 2021

52.228-12 Prospective Subcontractor Requests for Bonds DEC 2022

52.228-13 Alternate Payment Protections JULY 2000

52.229-3 Federal, State, and Local Taxes FEB 2013

52.203-14 Display of Hotline Poster(s) NOV 2021

52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014

52.232-17 Interest MAY 2014

52.232-23

Assignment of Claims

52.232-27

Prompt Payment for Construction Contracts

JAN 2017

52.232-33

Payment by Electronic Funds Transfer – System for Award Management

OCT 2018

52.232-39

Unenforceability of Unauthorized Obligations

JUN 2013

52.232-40 Providing Accelerated Payment to Small Business Subcontractors

MAR 2023

52.233-1 Alt I

Disputes - Alternate I (DEC 1991)

52.233-3

Protest After Award

AUG 1996

52.233-4

Applicable Law for Breach Of Contract Claim

OCT 2004

52.236-2

Differing Site Conditions (Deviation JAN 2026)

52.236-3

Site Investigation and Conditions Affecting the Work (Deviation JAN 2026)

52.236-5

Material and Workmanship (Deviation JAN 2026)

52.236-6

Superintendence by the Contractor (Deviation JAN 2026)

52.236-7 Permits and Responsibilities (Deviation JAN 2026) NOV 1991 52.236-8 Other Contracts (Deviation JAN 2026) APR 1984

I-4

52.236-9

Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Deviation JAN 2026)

52.236-10

Operations and Storage Areas (Deviation JAN 2026)

52.236-11

Use and Possession Prior to Completion (Deviation JAN 2026)

52.236-12

Cleaning Up (Deviation JAN 2026)

52.236-13 Alt I

Accident Prevention (NOV 1991) – Alternate I (Deviation Jan 2026)

NOV 1991

52.236-14 Availability and Use of Utility Services (Deviation JAN

2026)

52.236-15 Schedules for Construction Contracts JAN 2026 52.236-17 Layout of Work (Deviation JAN 2026) APR 1984

52.236-21 Alt I Specifications and Drawings for Construction (APR 1984) – Alternate I (Deviation JAN 2026)

FEB 1997

52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities

NOV 2024

52.240-90 Security Prohibitions and Exclusions Representations and Certifications

MAR 2026

52.242-13 Bankruptcy JUL 1995 52.243-4 Changes (Deviation SEP 2025) JUN 2007 52.244-6

Subcontracts for Commercial Products and Commercial Services (Deviation Feb 2025)

OCT 2025

52.245-1 Government Property SEP 2021

52.245-9 Use and Charges APR 2012

52.246-21 Warranty of Construction MAR 1994

52.249-2 Termination for Convenience of the Government (Fixed- Price)

APR 2012

52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991

FAR 52.225-9 BUY AMERICAN— CONSTRUCTION MATERIALS OCT 2022

(a) Definitions. As used in this clause—

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

I-5

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

I-6

(ii) A construction material manufactured in the United States, if–

(A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States.

Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives.

The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

I-7

(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

None

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i)The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components.

(1)The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2)For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.

(3)The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.

(B) For domestic construction material that is a critical item or contains critical components.

(1)The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.

I-8

(2)For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.

(3)The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest;

or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

I-9

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and…