Attch 1 - Drawings - Final Turnover Submittal 2023.03.31.pdf
PDF 37 MB Posted
- Attached to
- Air Handler Unit replacement - Wapato, WA Federal contract opportunity
- Solicitation number
- 12905B24R0019
About this file
This document appears to be Attachment 1 - Drawings - Final Turnover Submittal related to a federal contract opportunity for the replacement of four roof-top air handler units at the USDA ARS Temperate Tree Fruit and Vegetation Research facility in Wapato, Washington. The key details include:
The solicitation number is 12905B24R0019 and the work consists of furnishing all labor, materials, and equipment to replace the air handler units and perform incidental related work. An organized site visit is scheduled for October 22, 2024 at 10:00 AM Pacific Time, and interested parties must pre-register by emailing the provided POC emails no later than October 21, 2024. The federal agency involved is the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Pacific West Area.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_12905B24R0019_Amd_0002.pdf | ||
| AMEND 2 - 12905B24R0019 - RFI Log.pdf | ||
| AMEND 2 - RFP 12905B24R0019- Air Handler replacement.pdf | ||
| Amend 1 -Pre-Proposal Site Visit - Sign In Sheet.pdf | ||
| Sol_12905B24R0019_Amd_0001.pdf | ||
| Attch 6 - RFI FORM.pdf | ||
| Attch 3 - ARS-371 - CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE.pdf | ||
| Attch 2 - Final Turnover Submittal_Spec Manual_2023.03.31 rv6.1.24.pdf | ||
| Attch 7 -WA20240119 Rev1 09-06-2024.pdf | ||
| Attch 5 - Past Performance Questionnaire (PPQ).doc | DOC document | |
| Attch 4 - ARS-372 - CONTRACTORS REQUEST FOR PAYMENT TRANSMITTAL.pdf | ||
| 12905B24R0019.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECTURAL SHEET INDEX
SHEET NUMBER SHEET NAME
G-000 COVER SHEET
AD-101 DEMO PLAN
A-101 MONITOR LEVEL PLAN
A-110 ROOF PLAN
AD-102 DEMO RCP
A-105 LEVEL 01 RCP
ELECTRICAL SHEET INDEX
SHEET NUMBER SHEET NAME
E-001 SYMBOLS LEGENDS, ABBREVIATIONS AND SHEET INDEX
ED-102 ELECTRICAL ROOF PLAN - DEMO
E-102 ELECTRICAL ROOF PLAN
E-401 ELECTRICAL - ENLARGED PLAN
E-601
E-701
ONE-LINE DIAGRAM
PANEL SCHEDULES
STRUCTURAL SHEET INDEX
SHEET NUMBER SHEET NAME
S-101 ROOF FRAMING PLAN AND DETAILS
MECHANICAL SHEET INDEX
SHEET NUMBER SHEET NAME
M-001 MECHANICAL NOTES LEGENDS AND ABBREVIATIONS
M-002 MECHANICAL SITE PLAN
MD-101 MECHANICAL DEMOLITION ROOF PLAN
MD-401 MECHANICAL LARGE SCALE DEMO PLAN
MD-402 MECHANICAL LARGE SCALE DEMO PLAN
MD-403 MECHANICAL LARGE SCALE DEMO PLAN
MD-404 MECHANICAL LARGE SCALE DEMO PLAN
M-101 OVERALL MECHANICAL ROOF PLAN
M-401 MECHANICAL LARGE SCALE PLANS & SECTIONS
M-402 MECHANICAL LARGE SCALE PLANS & SECTIONS
M-403 MECHANICAL LARGE SCALE PLANS & SECTIONS
M-404 MECHANICAL LARGE SCALE PLANS & SECTIONS
M-501 AHU-1 DETAIL
M-502 AHU-2 DETAIL
M-503 AHU-3 DETAIL
M-504 AHU-4 DETAIL
M-505 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL DIAGRAMS
M-603 MECHANICAL DIAGRAMS
M-506 MECHANICAL DETAILS
M-701
M-702
M-703
M-704
M-705
M-706
M-707
M-708
M-709
M-710
M-711
M-712
MECHANICAL TAB AND DUCT CLEANING (REFERENCE) MECHANICAL SYMBOLS
MECHANICAL TAB AND DUCT CLEANING (REFERENCE) MECHANICAL ABBREVIATIONS
MECHANICAL TAB AND DUCT CLEANING (REFERENCE) OVERALL FLOOR PLAN
MECHANICAL TAB AND DUCT CLEANING (REFERENCE) ROOF PLAN
MECHANICAL TAB AND DUCT CLEANING (REFERENCE) CEILING PLAN EAST
MECHANICAL TAB AND DUCT CLEANING (REFERENCE) CEILING PLAN WEST
MECHANICAL TAB AND DUCT CLEANING (REFERENCE) HVAC - FLOOR PLAN EAST
MECHANICAL TAB AND DUCT CLEANING (REFERENCE) HVAC - FLOOR PLAN WEST
MECHANICAL TAB AND DUCT CLEANING (REFERENCE) HEATING WATER DIAGRAM
MECHANICAL TAB AND DUCT CLEANING (REFERENCE) MECHANICAL SCHEDULES
MECHANICAL TAB AND DUCT CLEANING (REFERENCE) MECHANICAL SCHEDULES
MECHANICAL TAB (REFERENCE) MECHANICAL SCHEDULES
PROJECT SUMMARY
THE USDA RESEARCH LAB IN WAPATO WAS CONSTRUCTED IN 1993 AND NEEDS TO REPLACE KEY MECHANICAL ITEMS AS THEY HAVE REACHED THE END OF
THEIR USEFUL LIFE. THIS PROJECT WILL REPLACE THE FOUR EXISTING ROOFTOP AIR HANDLING UNITS AT THE RESEARCH LAB WITH NEW UNITS.
THE REPLACEMENT AHUs WILL BE CUSTOM DESIGNED AND MANUFACTURED TO FIT THE UNIQUE FOOTPRINT, ACCESS, AND HEIGHT REQUIREMENTS OF THE
EXISTING UNITS AS WELL AS MEET ALL CURRENT APPLICABLE CODE AND USER REQUIREMENTS.
THIS PROJECT WILL BE AWORDED AS ONE CONTRACT, WITH THE ALTERNATE BID ITEMS AS DESCRIBED IN SECTION 01.11.00. CONTRACTOR SHALL
COORDINATE CAREFULLY WITH THE LABORATORY STAFF AND FACILITIES TEAM REGARDING THE VARIOUS BUILDING HVAC SHUTDOWNS REQUIRED TO
COMPLETE THE PROJECT. THE DESIGN ORDER OF REPLACEMENT IS REFLECTED BELOW:
1. THE BASE BID FOR THIS PROJECT IS THE COMPLETE REPLACEMENT OF AHU-4.
2. ALTERNATE 1 IS THE COMPLETE REPLACEMENT OF AHU-2.
3. ALTERNATE 2 IS THE COMPLETE REPLACEMENT OF AHU-1.
4. ALTERNATE 3 IS THE COMPLETE REPLACEMENT OF AHU-3.
THE ELECTRICAL DRAWINGS DETAIL THE ELECTRICAL-SPECIFIC REQUIREMENTS IN ACCORDANCE WITH THE ABOVE PHASING.
CRANE LIFT PLAN SHALL BE THE RESPONSIBILITY OF THE AWARDED CONTRACTOR. LOCATIONS FOR CRANE PLACEMENT HAVE BEEN IDENTIFIED ON THE
DRAWING PACKAGE. THE CRANE SHALL UTILIZE WOOD OR SIMILAR METHODS TO DISTRIBUTE THE OUTRIGGER AND WHEEL POINT LOADS WHERE THEY ARE
LOCATED OVER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING THE GROUND FOR THE CRANE AND RESTORING THE
SITE TO THE ORIGINAL CONDITION AS AGREED-UPON AT TIME OF AWARD TO INCLUDE ANY NECESSARY REPAIRS TO SPRINKLERS, SIDEWALKS, ASPHALT, ETC.
www.coffman.com
10 N Post Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/3
/2
:1
:3
P
M
03/31/2022
PRB
RKC
222046
G-000
COVER SHEET
FINAL
TURNOVER
DOCUMENTS
25230
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
WAPATO USDA AGRICULTURAL
RESEARCH SERVICES, TEMPERATE TREE
FRUIT & VEGETABLE UNIT
COMPLETE PHASED AIR HANDLING UNITS
REPLACEMENT
5230 KONNOWAC PASS RD.
WAPATO WA, 98951
YAKIMA, WA
WASHINGTON STATE YAKIMA COUNTY
YAKIMA COUNTY
WAPATO AGRICULTURAL
RESEARCH SERVICES
REV DATE DESCRIPTION
3-29-23
A
C
D
E
F.1
G
K
L
2 3 6 7 8 8.2 11 12 13 14 15 18 19 20
AHU 3AHU 1AHU 2AHU 4
REMOVE AHU - REPAIR CURB AS
REQUIRED. REMOVE SM CURB
CAP FOR REPLACEMENT
REMOVE AHU - REPAIR CURB AS
REQUIRED. REMOVE SM CURB
CAP FOR REPLACEMENT
REMOVE AHU - REPAIR CURB
AS REQUIRED. REMOVE SM
CURB CAP FOR REPLACEMENT
REMOVE AHU - REPAIR CURB
AS REQUIRED. REMOVE SM
CURB CAP FOR REPLACEMENT
9.2
J
16 17
REMOVE (E) ROOFING AS
NEEDED FOR NEW CURB
REMOVE (E) ROOFING AS
NEEDED FOR NEW CURB
REMOVE (E) ROOFING AS
NEEDED FOR NEW CURB
www.coffman.com
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
EIGHTY8 ARCHITECTUREC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/2
/2
:5
:3
P
M
03/29/2023
EDW
EDW
2022-55
AD-101
DEMO PLAN
FINAL
TURNOVER
DOCUMENTS
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
1/16" = 1'-0"
DEMO ROOF PLAN
2 33
C
D
E
F.1
G
H.1
K
L
2 3
5.1
6 7 8
11 12 13 14 15 18 19 20
B
J
M
16 17
OUTLINE OF STRUCTURAL RETROFITS
ABOVE. DEMO CEILING IN EACH ROOM
AS NEEDED FOR NEW STRUCTURAL
SUPPORTS, TYPICAL EACH UNIT.
www.coffman.com
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
EIGHTY8 ARCHITECTUREC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/2
/2
:5
:3
P
M
03/29/2023
EDW
EDW
2022-55
AD-102
DEMO RCP
FINAL
TURNOVER
DOCUMENTS
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
1/16" = 1'-0"
LEVEL 01 - DEMO RCP
3 33
GENERAL NOTES
1. FIRE BLOCKING @ ALL PLUMBING PENETRATIONS
2. TREATED WALL SHEATHING AT ALL LOCATIONS WHERE SHEATHING CONTACTS
CONCRETE ROOF DECK /OR WALL.
3. DRYWALL SHALL BE TREATED POLYVINYL ACETATE (PVA) WITH PERM RATING
OF LESS THAN 1 PRIOR TO PAINTING. PROVIDE 5/8" GWB AT CLG.
A
C
D
E
F.1
G
K
L
2 3 6 7 8
11 12 13 14 15 18 19 20
A-101
AHU 3AHU 1AHU 2AHU 4
A-101
J
16 17
INFILL WALL, 2x6 STL STUDS W/ EXTERIOR AIR BARRIER
GYP SHEATHING, WITH MINERAL FIBER SOUND BATT W/
R-19 VALUE, VAPOR RETARDER, RESLIENT CHANNELS
AND DRYWALL FINISH, TAPE AND PAINT TO MATCH
ADJACENT, ACCOUSTIC SEALANT AT ALL JOINTS, TYP AT
EACH AHU AIR COOLED TOWER SECTION
LEVEL 2
15' - 8"
1313.2
AHU
A-110
Sim
(E) SLOPED METAL ROOF SYSTEM
(E) METAL SIDING
15.115.2
A-101
TYP
A-110
TYP
AIR-COOLED CONDENSOR
SECTION OF AHU,
COORDINATE OFFSET WITH
(E) ROOF OVERHANG
BASE ISSOLATION PADS
13.2 14 15 15.313.1
A-101
TYP
15.2
A-101
TYP REMOVE WALL FINISH AND INSULATE WALL CAVITY WITH
MINERAL FIBER SOUND BATT W/ R-19 VALUE, REPLACE
WALL FINISH WITH DRYWALL ON RC CHANNEL, TAPE AND
PAINT TO MATCH ADJACENT, ACCOUSTIC SEALANT AT ALL
JOINTS, TYP AT EACH AHU COOLING TOWER SECTION
FLASHING FASTENED
TO WALL AND SET IN
SEALANT
GALVANIZED FLASHING
SET IN ACCOUSTIC
SEALANT
SEALANT AND BACKER ROD
AHU WALL
(E) WALL CONSTRUCTION
FLASHING FASTENED
TO WALL AND SET IN
SEALANT
GALVANIZED FLASHING
SET IN SEALANT
SEALANT AND BACKER ROD
AHU WALL
(E) WALL CONSTRUCTION
EA LEG MIN
0' - 5"
ACCOUSTIC SEALANT
AROUND EDGES
www.coffman.com
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
EIGHTY8 ARCHITECTUREC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/2
/2
:5
:3
P
M
03/29/2023
EDW
EDW
2022-55
A-101
MONITOR LEVEL
PLAN
FINAL
TURNOVER
DOCUMENTS
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
1/16" = 1'-0"
MONITOR PLAN
1/4" = 1'-0"
AHU ELEVATION
1/4" = 1'-0"
AHU - MONITOR LEVEL TYP INTERIOR
ELEVATION
1 1/2" = 1'-0"
INTERIOR FLASHING @ AHU
4 33
1 1/2" = 1'-0"
EXTERIOR FLASHING @ AHU
C
D
E
F.1
G
K
L
2 3 6 7 8
11 12 13 14 15 18 19 20
J
16 17
17.2
OUTLINE OF STRUCTURAL RETROFIT
FOR AHU. REPLACE ALL CEILING TILES
IN ROOM TO MATCH. PAINT ENTIRE
CEILING IN ROOMS WITH GYP BD,
TYPICAL OF 4 UNITS
FASTEN TOP RUNNER
TO STRUCTURE
CEILING
5/8" GYP BD
3 1/2" METAL STUDS
METAL CORNER
BEAD - TYP
SEE REF
CLG PLAN
SEE REF
CLG PLAN
CEILING -SEE
REFLECTED CEILING
PLAN
3 1/2" METAL STUD
DIAGONAL BRACING
T Y
P
.0
T Y
P
.0
H E
IG
H
T
H
#12 GA WIRES @ EA PIPE STRUT
SECURED TO MAIN RUNNER
WITHIN 2" OF CROSS RUNNER
INTERSECTION, TYP OF (4)
CROSS RUNNER
MAIN RUNNER
2"x2"x1/8" ANGLE @ EA PIPE
STRUT - ANCHOR TO STRUCT
FRAMING
STRUCTURE ABOVE
INSERT 1/4" DIAM MACHINE
BOLTS INTO FLATTENED PIPE
ENDS (TYP EACH END)
PIPE STRUT @ 12'-0" OC EA WAY-
SEE SCHEDULE FOR SIZE
PIPE STRUT SCHEDULE
HEIGHT (H) IN FT PIPE STRUT SIZE
0-7 1/2" STD WT PIPE
7-10 3/4" STD WT PIPE
10-16 1" STD WT PIPE
SEE RCP
SEE RCP
METAL
CORNER BEAD
FASTEN TOP
RUNNER TO
STRUCTURE
CEILING TYPE
PER RCP
GWB AT FACE
AND UNDERSIDE
OF SOFFIT:
PAINT AS
DESIGNATED IN
ELEVATION
EDGE TRIM
TYP
PER WALL TYPE
GENERAL NOTES
1. FIRE BLOCKING @ ALL PLUMBING PENETRATIONS
2. TREATED WALL SHEATHING AT ALL LOCATIONS WHERE SHEATHING CONTACTS
CONCRETE ROOF DECK /OR WALL.
3. DRYWALL SHALL BE TREATED POLYVINYL ACETATE (PVA) WITH PERM RATING
OF LESS THAN 1 PRIOR TO PAINTING. PROVIDE 5/8" GWB AT CLG.
www.coffman.com
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
EIGHTY8 ARCHITECTUREC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/2
/2
:5
:3
P
M
03/29/2023
EDW
EDW
2022-55
A-105
LEVEL 01 - RCP
FINAL
TURNOVER
DOCUMENTS
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
1/16" = 1'-0"
LEVEL 01 - RCP
1 1/2" = 1'-0"
BULKHEAD DETAIL
1 1/2" = 1'-0"
SUSP CLG SEISMIC DETAIL
3" = 1'-0"
CLG* CLG SOFFIT TRANS
5 33
C
D
E
F.1
G
K
L
2 3 6 7 8 11 12 13 14 15 18 19 20
AHU 3AHU 1AHU 2AHU 4
J
16 17
A-110
TYP
GENERAL NOTES
1. FIRE BLOCKING @ ALL PLUMBING PENETRATIONS
2. TREATED WALL SHEATHING AT ALL LOCATIONS WHERE SHEATHING CONTACTS
CONCRETE DECK /OR WALL.
ROOFING LEGEND
REPAIR MEMBRANE ROOF SYSTEM
EXISTING ROOFING
SURFACE MOUNTED
2 PIECE COUNTER FLASHING
TREATED WOOD
BLOCKING/ CANT
SM CAP, SET IN
SEALNT BED
FULLY ADHERED MEMBRANE
ROOFING, LAP OVER (E) ROOFING
(E) MECH CURB
SLOPE
INSULATE CAVITY BELOW
AHU W/ 4" MIN FIBEROUS
INSULATION
TERMINATION BAR
(E) ROOF STR AND INSULATION
BASE ISOLATION
PADS
AHU RAIL
CONTINUOUS SM
FLASHING SET IN
SEALANT FASTENED TO
RAIL OF AHU
M
IN
M
IN
STACK PIPE
SEALANT
DRAW BAND
METAL FLASHINGINSULATION @VOIDS
(FOR COLD STACKS)
REMOVABLE METAL
COUNTERFLASHING
BASE FLASHING
2x TREATED WOOD CURB
BUR
DECKING
METAL SLEEVE
(FOR HOT STACK)
SEALANT
L SHAPED FLASHING
AHU SLOPE
SEALANT AND
BACKER ROD
(E) EXTERIOR WALL SYSTEM
AHU
(E) SM EAVE AND VENTED
SOFFIT TO REMAIN
SURFACE MOUNTED
2 PIECE COUNTER FLASHING
TREATED WOOD
BLOCKING/ CANT
STL PLATE HOLDDOWN
PER STR
FULLY ADHERED MEMBRANE
ROOFING, LAP OVER (E) ROOFING
SLOPE
TERMINATION BAR
(E) ROOF STR AND INSULATION
ANCHOR BOLTS TO CONC CURB
AHU
BASE ISOLATION PADS
CONTINUOUS SM FLASHING
FROM BOTTOM, LAP TO
COVER CURB
www.coffman.com
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
EIGHTY8 ARCHITECTUREC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/2
/2
:5
:3
P
M
03/29/2023
EDW
EDW
2022-55
A-110
ROOF PLAN
FINAL
TURNOVER
DOCUMENTS
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
1/16" = 1'-0"
ROOF PLAN
3" = 1'-0"
ROOF FLASHING @ AHU CURB DETAIL
1 1/2" = 1'-0"
STACK PIPE FLASHING
3" = 1'-0"
ROOF FLASHING DETAIL1
6 333" = 1'-0"
ROOF FLASHING @ AHU HOLD DOWN
19.118.11817.21716.216.115.2151413.111.210.1 12.1
C5
S-101TYP
NEW 8" CONC CURB AND
BEAMS AS REQUIRED, TYP.
COORDINATE LOCATION
WITH MECHANICAL UNIT
F.1
G
W x1
W x1
W x1 4 W x1
W12x14
W12x14
W x1 4W12x14
NEW 8" CONC CURB AND BEAM TO BE
LOCATED AT SPLIT IN MECHANICAL
UNIT, TYP. CONTRACTOR TO
COORDINATE LOCATION AND QUANTITY
WITH ACTUAL UNIT SUPPLIED.
10.3 11 12 13.213 15.3 16.3 17.1 19
C6 S-101
TYP
LIMIT OF ALLOWABLE CURB EXTENSION.
SEE MECHANICAL FOR CLEARANCES.
AHU-2
35,000#
AHU-1
38,000#
AHU-3
35,000#
C5 TYP CONC CURB
SCALE: 1" = 1'-0"
B6 TYP BEAM TO BEAM SHEAR TAB CONNECTION
SCALE: 1" = 1'-0"
NEW STEEL BEAM PER PLAN.
FIELD VERIFY SLOPE. PLACE
TIGHT TO UNDERSIDE OF
EXISTING METAL ROOF DECK
(2) #4 CONT TOP AND BOT.
DRILL AND EPOXY INTO
EXIST CONC CURB
(4" MIN EMBED)
4" 4"
TOC
MATCH EXIST
EXIST METAL ROOF DECK.
NEW CONC CURB PER PLAN
2" CONC FILL OVER
EXIST METAL DECK
#4 @ 12" OC
11 2"
TY
P
2"
2" CLR
MAX, TYP
3"
STEEL BEAM PER PLAN.
FIELD VERIFY SLOPE
16" SHEAR TAB NEW OR EXISTING STEEL BEAM
PER PLAN. FIELD VERIFY SLOPE
2" 11
2"
(3) 3 4"Ø A325 BOLTS @ 3" OC
B5 TYP CONC REINF AT CORNERS
SCALE: 1" = 1'-0"
NOTES:
1. UNLESS NOTED OTHERWISE, LAP SPLICES IN CONCRETE BEAMS, WALLS, SLABS AND FOOTINGS
SHALL BE CLASS "B" TENSION LAP SPLICES AND LAP SPLICES IN CONCRETE COLUMNS SHALL BE
COMPRESSION LAP SPLICES.
2. STAGGER ALTERNATE SPLICES A MINIMUM OF ONE LAP LENGTH.
3. TOP BARS ARE ANY HORIZONTAL BARS PLACED SO THAT MORE THAN 12" OF FRESH CONCRETE IS
CAST IN THE MEMBER BELOW THE REINFORCEMENT.
4. REINFORCING YIELD STRENGTH Fy = 60 KSI.
5. FOR BEAMS AND COLUMNS ACI 25.4.2.2 CASE 1 APPLIES (CONCRETE COVER AT LEAST ONE BAR
DIAMETER AND CENTER TO CENTER SPACING AT LEAST TWO BAR DIAMETERS).
6. FOR ALL OTHER MEMBERS CASE 1 APPLIES (CONCRETE COVER AT LEAST ONE BAR DIAMETER AND
CENTER TO CENTER SPACING AT LEAST THREE BAR DIAMETERS).
BAR
SIZE
CLASS B TENSION SPLICES, Lst COMPRESSION BARS, Lsc f'c = 2,500 OR 3,000 PSI f'c = 4,000 PSI f'c = ALL
REGULAR
BARS TOP BARS REGULAR
BARS TOP BARS OPEN
ENCLOSED W/ TIES
SPACED NOT MORE
THAN 4" O.C.
#3 24" 31" 19" 24" 12" 12"
#4 32" 41" 25" 32" 15" 13"
#5 40" 52" 31" 40" 19" 16"
#6 48" 62" 37" 48" 23" 20"
#7 69" 89" 54" 70" 27" 23"
#8 79" 102" 62" 80" 30" 25"
#9 89" 116" 70" 91" 34" 29"
#10 100" 130" 79" 102" 38" 32"
#11 111" 144" 87" 113" 43" 36"
A5 MINIMUM SPLICE LENGTHS FOR REINFORCING IN CONCRETE
LAP SPLICE PER
PER DETAIL A5
VERT BAR SAME SIZE
AS CURB REINF
CORNER BARS SAME SIZE AND
SPACING AS HORIZ CURB REINF
HORIZ CURB REINF
STD HOOK, TYP
EXIST CONC CURB
VARIES
COORDINATE WITH MECHANICAL
C6 TYP CONC CURB
SCALE: 1" = 1'-0"
NEW STEEL BEAM PER PLAN.
FIELD VERIFY SLOPE. PLACE
TIGHT TO UNDERSIDE OF
EXISTING METAL ROOF DECK
(2) #4 CONT TOP AND BOT.
DRILL AND EPOXY INTO
EXIST CONC CURB AT ENDS
(4" MIN EMBED)
4" 4"
TOC
MATCH EXIST
EXIST METAL ROOF DECK.
PL 3 8"x6x0'-6" @ 4'-0" OC WITH (2) 3 4"Ø
HEADED WELDED STUDS @ 4" GAGE
NEW CONC CURB PER PLAN
#4 @ 12" OC DRILL AND EPOXY
INTO EXIST CONC TOPPING
EXIST CONC TOPPING
2"
PL 3 8"x6x0'-6" @ 4'-0" OC WITH (2) 3 4"Ø
HEADED WELDED STUDS @ 4" GAGE
EXIST CONC TOPPING
F
G.1
321 3.1 4.1
W x1
W12x14
W12x14
AHU-4
26,000# www.coffman.com
10 N Post Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
03/31/2023
222046
KONNOWAC
PASS RD.
WAPATO, WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
FINAL
TURNOVER
DOCUMENTS
REV DATE DESCRIPTION
/1
5/
:2 1:
P
M
D1 ROOF FRAMING PLAN
SCALE: 1/8" = 1'-0"
GENERAL:
THE STRUCTURAL CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE STRUCTURE IS DESIGNED TO BE A STABLE UNIT AS A COMPLETED WHOLE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DESIGN, ERECT AND INSPECT TEMPORARY SHORES, BRACES, ETC. TO SUPPORT THE STRUCTURE AGAINST ALL ANTICIPATED LOADS INCLUDING GRAVITY, WIND AND LATERAL EARTH PRESSURE UNTIL ITS COMPLETION. OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER SHALL NOT INCLUDE INSPECTION OF THESE METHODS OF CONSTRUCTION.
CONSTRUCTION MATERIAL SHALL BE PLACED ON FRAMED FLOORS AND ROOFS SUCH THAT THE DESIGN LIVE
LOADS ARE NOT EXCEEDED.
WORKMANSHIP AND MATERIALS SHALL COMPLY WITH THE EDITIONS OF THE INTERNATIONAL BUILDING CODE AND TESTING STANDARDS ACCEPTED BY THE AUTHORITY HAVING JURISDICTION AND APPLICABLE AT THE TIME THE
PROJECT WAS PERMITTED.
NOTES AND DETAILS ON THE DRAWINGS TAKE PRECEDENCE OVER THE GENERAL STRUCTURAL NOTES AND TYPICAL DETAILS. WHERE NOTES AND DETAILS ON DRAWINGS AND THESE GENERAL NOTES AND TYPICAL DETAILS ARE IN CONFLICT WITH THE PROJECT SPECIFICATION, THE MOST STRINGENT SHALL WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ON THE PROJECT SUBJECT TO REVIEW BY THE ARCHITECT AND ENGINEER. "TYPICAL" DETAILS ARE NOT FLAGGED ON THE DRAWINGS, BUT APPLY UNLESS
NOTED OTHERWISE.
FRAMING MEMBERS WHICH ARE NOT DIMENSIONED SHALL BE ASSUMED EQUALLY SPACED BETWEEN
DIMENSIONED POINT OF MEMBERS SUBJECT TO REVIEW BY THE ARCHITECT AND ENGINEER.
CODE:
2018 EDITION OF THE INTERNATIONAL BUILDING CODE.
STRUCTURAL STEEL:
ROLLED SHAPES OTHER THAN WIDE-FLANGE SHAPES,
ALL PLATES, BARS AND RODS------------------------------------------------ ASTM A36, Fy = 36 KSI
ALL WIDE-FLANGE SHAPES---------------------------------------------------- ASTM A992, Fy = 50 KSI BOLTS----------------------------------------------------------------------------------- ASTM F3125 HEADED ANCHOR STUDS------------------------------------------------------- ASTM A108-69T, Fy = 50 KSI
FABRICATION AND ERECTION:
LATEST AISC AND AWS CODES APPLY. FABRICATE AND ERECT IN ACCORDANCE WITH LATEST EDITION OF AISC "SPECIFICATION FOR DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS". SPLICING OF STRUCTURAL MEMBERS IS NOT PERMITTED UNLESS NOTED ON THE DRAWINGS. ALL BEAMS SHALL BE ERECTED WITH
THE NATURAL CAMBER UPWARDS.
WELDING:
ALL WELDING SHALL BE BY CERTIFIED WELDERS HAVING CURRENT EXPERIENCE IN TYPE OF WELD SHOWN ON DRAWINGS OR NOTES. CERTIFICATES SHALL BE THOSE ISSUED BY AN ACCEPTED TESTING AGENCY. ALL WELDING SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AWS D1.1 "STRUCTURAL WELDING CODE - STEEL" OR ALTERNATE AWS CODES AS APPLICABLE. ALL STRUCTURAL WELDING PROCESSES SHALL MEET THE H2 LOW HYDROGEN CRITERIA OF AWS D1.1 ANNEX I UNLESS OTHERWISE NOTED. USE 70XX ELECTRODES OR EQUIVALENT WIRE.
SHOP WELDS AND FIELD WELDS SHALL BE SHOWN ON SHOP DRAWINGS. ALL COMPLETE PENETRATION WELDS SHALL BE TESTED AND CERTIFIED BY AN INDEPENDENT TESTING AGENCY. ALL DEFORMED BAR ANCHORS, DOWEL BAR
ANCHORS, HEADED STUDS, AND THREADED STUDS SHALL BE END WELDED PER MANUFACTURER'S
RECOMMENDATIONS.
BOLTS:
ALL BOLTS, ANCHOR BOLTS, EXPANSION BOLTS, ETC., SHALL BE INSTALLED WITH STEEL WASHERS. TYPE N BOLTS PER LATEST EDITION OF AISC "SPECIFICATION FOR STRUCTURAL JOINTS HIGH-STRENGTH BOLTS" AND MAY BE TIGHTENED TO THE SNUG-TIGHT CONDITION AS DEFINED BY AISC UNLESS NOTED OTHERWISE. HILTI BOLTS AND ANCHORS MAY BE
SUBSTITUTED WITH AN APPROVED ICC RATED PRODUCT.
1. REINFORCING FOR CONCRETE
2. POST INSTALLED ANCHORS
3. STRUCTURAL STEEL
SHOP DRAWINGS:
SUBMIT SHOP DRAWINGS FOR STRUCTURAL ENGINEER REVIEW PRIOR TO FABRICATION/ERECTION/INSTALLATION.
THE CONTRACTOR SHALL REVIEW AND APPROVE ALL SHOP DRAWINGS PRIOR TO ENGINEERING REVIEW.
ENGINEERS REVIEW IS ONLY FOR GENERAL CONFORMANCE WITH WITH THE DESIGN CONCEPT OF THE PROJECT AND GENERAL COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. SUBMIT ELECTRONIC COPY FOR ENGINEERING REVIEW THAT INCLUDES CONTRACTOR'S REVIEW COMMENTS. DOCUMENT WILL BE
MARKED AND RETURNED ELECTRONICALLY.
THE CONTRACTOR SHALL ALLOW 2 WEEKS FOR ENGINEER'S REVIEW OF SUBMITTALS. COMMENTS
OR MARKS ON SUBMITTALS ARE A NORMAL AND EXPECTED PART OF THE SUBMITTAL PROCESS AND SHALL NOT BE USED AS A BASIS FOR CHANGE ORDERS. TIME REQUIRED TO REVISE AND SUBMIT ANY SUBMITTAL SHALL BE CONSIDERED INHERENT TO THE SUBMITTAL REVIEW PROCESS AND SHALL NOT BE DEEMED A CHANGE ORDER.
RE-SUBMITTALS SHALL HAVE ALL REVISIONS CLEARLY IDENTIFIED WITH DRAWINGS CLOUDS AND REVISION DATES.
THE STRUCTURAL ENGINEER SHALL NOT BE RESPONSIBLE FOR THE REVIEW OF ANY UNMARKED REVISIONS.
SHOP DRAWINGS SHALL BE SUBMITTED FOR THE FOLLOWING ITEMS IN ADDITION TO ANY SUBMITTAL
REQUIREMENTS SPECIFIED ON THESE PLANS OR IN THE PROJECT SPECIFICATIONS:
GENERAL STRUCTURAL NOTES
CONCRETE:
CONCRETE CONSTRUCTION SHALL CONFORM WITH THE LATEST EDITION OF ACI 301, "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS" AND ACI 318, "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE". SUBMIT MIX DESIGNS FOR EACH CLASS OF CONCRETE. ALL CONCRETE SHALL BE NORMAL WEIGHT
CONCRETE UNLESS NOTED OTHERWISE.
CONCRETE CONTAINING SUPERPLASTICIZING ADMIXTURE SHALL HAVE A SLUMP NOT EXCEEDING 3", TO BE FIELD VERIFIED, PRIOR TO ADDING ADMIXTURE, AND NOT EXCEEDING 8" AT PLACEMENT. ADDITION OF WATER TO A MIX
WITH INSUFFICIENT SLUMP WILL NOT BE PERMITTED, EXCEPT AS ALLOWED PER ASTM C494.
MECHANICALLY VIBRATE ALL CONCRETE WHEN PLACED, EXCEPT THAT SLABS ON GRADE NEED BE VIBRATED ONLY AROUND UNDER-FLOOR DUCTS, ETC. CAST CLOSURE POUR AROUND COLUMNS AFTER DEAD LOAD IS APPLIED.
MINIMUM CONCRETE MIX DESIGN REQUIREMENTS SHALL BE AS FOLLOWS:
REINFORCING STEEL:
DEFORMED BARS: ASTM A615 GRADE 40 FOR #3 AND GRADE 60 FOR #4 AND LARGER.
CLEAR CONCRETE COVERAGE (APPLIES UNLESS NOTED OTHERWISE):
CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH-------------------------------------- 3" FORMED CONCRETE EXPOSED TO EARTH OR WEATHER-------------------------------------------------------- 2" FORMED CONCRETE NOT EXPOSED TO EARTH OR WEATHER------------------------------------------------- 11
2" FROM TOP SURFACE OF SLAB ON GRADE------------------------------------------------------------------------------ 11
2"
WELDING:
WELDING OF REINFORCING STEEL IS PROHIBITED. LAP SPLICES IN CONCRETE: UNLESS NOTED OTHERWISE, LAP SPLICES IN CONCRETE BEAMS, WALLS, SLABS AND FOOTINGS SHALL BE CLASS "B" TENSION LAP
SPLICES. STAGGER ALTERNATE SPLICES A MINIMUM OF ONE LAP LENGTH.
PROVIDE BENT CORNER BARS TO MATCH AND LAP WITH HORIZONTAL BARS AT CORNERS AND
INTERSECTIONS OF FOOTINGS AND WALLS. SPACING SHOWN FOR REINFORCING BARS ARE MAXIMUM ON CENTERS. ALL BARS PER CRSI SPECIFICATIONS AND HANDBOOK. SECURELY TIE ALL BARS IN POSITION
PRIOR TO PLACING CONCRETE.
CONC OVER METAL DECK 5 1/2 4000 3/4" 2% 4"
ITEM
MINIMUM
CEMENT CONTENT
(SACKS/CY)
28 DAY
STRENGTH
F'c (PSI)
MAX. SIZE
AGGREGATE
AIR
ENTR.
MAX.
SLUMP
DLP
KVP
GENERAL NOTES,
ROOF FRAMING
PLAN, DETAILS
S-101
CODE:
THE OWNER WILL EMPLOY AN ICC CERTIFIED SPECIAL INSPECTOR TO PROVIDE INSPECTION OF THE
FOLLOWING ITEMS PER IBC CHAPTER 17 AND THE REQUIREMENTS OF THE APPROPRIATE LOCAL
JURISDICTION:
CONCRETE AND REINFORCING STEEL: PER IBC TABLE 1705.3
STEEL: PER IBC SECTION 1705.22 AND AISC CHAPTER N
WELDING: PER AISC TABLE N5.4 AND IN COMPLIANCE WITH AWS D1.1
HIGH STRENGTH BOLTING: PER AISC TABLE N5.6
STEEL DETAILS: PER AISC CHAPTER N
1. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS, INCLUDING EXISTING FRAMING
MEMBER SIZES, DIMENSIONS, AND ROOF SLOPE.
2. LOCATION OF CONCRETE CURBS SHOWN ON PLAN ARE APPROXIMATE. CONTRACTOR TO
COORDINATE DIMENSIONS OF NEW CONCRETE CURBS WITH ACTUAL MECHANICAL UNITS
SUPPLIED.
3. CONTRACTOR TO NOTIFY STRUCTURAL ENGINEER IF UNIT WEIGHTS EXCEED THOSE LISTED.
PLAN NOTES
3/31/2023
GENERAL HVAC NOTES
1. SHEET METAL DUCTWORK AND COMPONENTS INCLUDING HANGING, SEALING, PLENUMS, & ACCESSORIES SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE LATEST EDITION OF SMACNA STANDARDS FOR HVAC DUCT CONSTRUCTION, NFPA 90A, & 90B STANDARDS.
2. ALL DUCTWORK OPENINGS SHALL BE COVERED DURING CONSTRUCTION.
3. ALL DAMPERS SHALL BE SET FULLY OPEN PRIOR TO BALANCING.
4. CONTRACTOR TO PROVIDE TRANSITION TO CONNECT TO ALL MECHANICAL EQUIPMENT. PROVIDE FLEXIBLE CONNECTION ON INTAKE AND DISCHARGE
OF ALL MECHANICAL EQUIPMENT.
5. DUCT DIMENSIONS SHOWN ARE INSIDE SHEET METAL DIMENSIONS OR CLEAR OPENING INSIDE LINED DUCT.
6. ALL ELBOWS SHALL BE LONG RADIUS ELBOWS WHEREVER POSSIBLE, OR SHALL HAVE TURNING VANES WHERE INDICATED ON PLANS. NO SQUARE
THROAT OR ZERO RADIUS ELBOWS ALLOWED.
7. ALL SUPPLY, RETURN AND EXHAUST AIR DUCTS SHALL HAVE THE TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS
SEALED AIRTIGHT WITH DUCT SEALANT (SMACNA SEAL CLASS "A").
8. BALANCE AIR SYSTEM TO QUANTITIES SHOWN, AND SUBMIT A COPY OF THE BALANCE REPORT TO THE ENGINEER FOR REVIEW.
GENERAL NOTES
1. CONTRACTOR SHALL SECURE, MAINTAIN, AND PAY FOR ALL REQUIRED PERMITS, LICENSES, AND INSPECTIONS FOR DURATION OF WORK UNLESS
DIRECTED OTHERWISE.
2. ALL WORK SHALL COMPLY WITH THE OWNER'S REQUIREMENTS, AND WITH ALL APPLICABLE STATE AND LOCAL CODES, OR AUTHORITY HAVING
JURISDICTION.
3. SUBSTITUTIONS OF EQUIPMENT OTHER THAN AS SPECIFIED SHALL BE THE COMPLETE RESPONSIBILITY OF THE CONTRACTOR, ANY ADDITIONAL ELECTRICAL, STRUCTURAL, MECHANICAL, OR ARCHITECTURAL REQUIREMENTS SHALL BE PROVIDED AT NO ADDITIONAL EXPENSE TO THE OWNER.
4. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT ATTEMPT TO SHOW ALL REQUIRED OFFSETS. COORDINATE WITH OTHER TRADES AND PROVIDE ALL NECESSARY OFFSETS. REFER TO ARCHITECTURAL, STRUCTURAL, AND ELECTRICAL DRAWINGS FOR CONSTRUCTION DETAILS.
5. REFER TO PROJECT MANUAL (SPECIFICATIONS) FOR ADDITIONAL REQUIREMENTS. PLANS AND SPECIFICATIONS SHALL BE TAKEN TOGETHER.
PROVIDE ALL WORK CALLED FOR IN EITHER. IN CASE OF CONFLICT BETWEEN SPECIFICATIONS AND PLANS THE MORE STRINGENT SHALL APPLY.
6. ALL EQUIPMENT AND MATERIAL ON THE JOB SITE PRIOR TO INSTALLATION SHALL BE COVERED AND PROTECTED FROM RAIN, DIRT, DUST, AND
DAMAGE.
7. VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT ACCESS CLEARANCES CAN BE MET. COORDINATE FINAL EQUIPMENT LOCATIONS W/ GENERAL CONTRACTOR AND OTHER TRADES TO ALLOW FOR REQUIRED MECHANICAL EQUIPMENT CLEARANCES.
8. A LEVEL WORKING SPACE MEASURING NO LESS THAN 30" WIDE BY 36" DEEP MUST BE PROVIDED IN FRONT OF CONTROL SIDE OF EQUIPMENT FOR
SERVICING.
9. PROVIDE NEC CODE MINIMUM HORIZONTAL AND VERTICAL WORKING CLEARANCES FOR ALL ELECTRICAL PANELS AND EQUIPMENT. OFFSET
MECHANICAL WORK AS REQUIRED.
10. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF INSTALLATION STANDARDS AND CONSTRUCTION CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO SHOP FABRICATION AND/OR FIELD INSTALLATION. DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE CONSTRUCTION DRAWINGS SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER.
11. ALL MECHANICAL EQUIPMENT, MATERIALS, AND INSTALLATION SHALL BE PROVIDED BY THE CONTRACTOR. ALL EQUIPMENT SHALL BE COMPLETE, INSTALLED, AND FULLY FUNCTIONAL PRIOR TO FINAL ACCEPTANCE OF THE WORK.
12. INSTALL ALL EQUIPMENT PER MANUFACTURERS RECOMMENDATIONS AND REQUIREMENTS. ANY CONFLICTS BETWEEN THE MANUFACTURERS DOCUMENTATION AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER.
13. DO NOT ALLOW ANY WORK TO BE COVERED UP OR ENCLOSED UNTIL INSPECTED, TESTED AND APPROVED BY OWNER'S REPRESENTATIVE OR
AUTHORITY HAVING JURISDICTION.
14. MECHANICAL EQUIPMENT SHALL NOT BE USED FOR TEMPORARY HEAT DURING CONSTRUCTION.
GENERAL PLUMBING NOTES
1. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO CONSTRUCT A COMPLETE, OPERATIONAL PLUMBING SYSTEM FOR THE ENTIRE
PROJECT AS SHOWN ON THESE DRAWINGS, INCLUDING ALL NECESSARY FEES AND PERMITS.
2. THE ENTIRE INSTALLATION SHALL CONFORM TO THE MOST RECENTLY ADOPTED REQUIREMENTS OF THE PLUMBING CODE, AND ALL OTHER APPLICABLE CITY, COUNTY, STATE, AND FEDERAL CODES AND REGULATIONS IN EFFECT AT THE DATE OF THE BID. CONFORM TO ANY CODES, RULES, REGULATIONS AND REQUIREMENTS THAT THE PROJECT OWNER HAS.
3. PRIOR TO FABRICATION AND INSTALLATION, THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL PLUMBING WORK WITH ALL OTHER TRADES INCLUDING THE MECHANICAL CONTRACTOR, FIRE PROTECTION CONTRACTOR, ELECTRICAL CONTRACTOR, GENERAL CONTRACTOR, AND ANY CONTRACTOR HIRED DIRECTLY BY THE OWNER. WHERE CONFLICTS MAY OCCUR, THEY SHALL BE RESOLVED PRIOR TO INSTALLATION.
4. THE WORKING DRAWINGS ARE DIAGRAMMATIC. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, THEY DO NOT SHOW EVERY OFFSET, BEND OR ELBOW NECESSARY FOR THE COMPLETE INSTALLATION IN THE SPACE PROVIDED. ALL LOCATIONS FOR PLUMBING EQUIPMENT AND PIPING SHALL BE CHECKED AND COORDINATED WITH THE ARCHITECTURAL, MECHANICAL, STRUCTURAL AND ELECTRICAL DRAWINGS.
5. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL FITTINGS, TRANSITIONS, VALVES, WORKING CLEARANCES, AND OTHER DEVICES AND ACCESSORIES REQUIRED FOR A COMPLETE, WORKABLE
INSTALLATION.
6. PROVIDE PROPER PROVISIONS FOR EXPANSION OR MOVEMENT OF ALL PIPING.
7. PROVIDE WATER HAMMER ARRESTORS (SHOCK ABSORBERS) AT ALL PIPE LOCATIONS WHERE VALVE CLOSURES MAY CAUSE WATER HAMMER OR RESULT IN EXCESSIVE PIPE VIBRATION OR MOVEMENT. (EXAMPLES INCLUDE FLUSH VALVES, SENSOR FAUCETS, AND WASHING MACHINES).
8. PROVIDE CLEANOUTS AS REQUIRED BY CODE, INCLUDING AT ALL SINKS, URINALS AND END OF RUNS.
DESIGN CONDITIONS
OUTDOORS
VENTILATION
INDOOR
ELEVATION
SUMMER 101.5°F DB / 67.7°F WB
WINTER 0.0°F DB
COOLING 77°F
HEATING 70°F
100% OUTDOOR AIR TO MATCH EXISTING
1064 FT ABOVE SEA LEVEL
LOCATION YAKIMA, WA
GENERAL ABBREVIATIONS
ø ROUND or DIAMETER
AAV AUTOMATIC AIR VENT
ABV ABOVE
AD ACCESS DOOR
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
AL ACOUSTIC LINED
AP ACCESS PANEL
APD AIR PRESSURE DROP
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AWT AVERAGE WATER TEMPERATURE
BB BASEBOARD
BBD BACKDRAFT DAMPER
BFF BELOW FINISH FLOOR
BHP BRAKE HORSEPOWER
BG BELOW GROUND/GRADE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
C CENTIGRADE
CC COOLING COIL
CD CEILING DIFFUSER
CFM CUBIC FEET PER MINUTE
CG CEILING GRILLE
CI CAST IRON
CLG CEILING
CO CLEANOUT
CMU CONCRETE MASONRY UNIT
CM CONDENSATE METER
CONC CONCRETE
CONN CONNECT or CONNECTION
CONST CONSTRUCTION
CONT CONTINUATION
(D) DEMOLISH
DB DECIBEL or DRY BULB
DDC DIRECT DIGITAL CONTROL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DPR DAMPER
DPS DIFFERENTIAL PRESSURE SWITCH
DWG DRAWING
(E) EXISTING
EA EACH
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
ELEC ELECTRIC or ELECTRICAL
ELEV ELEVATION
EMCS ENERGY MANAGEMENT CONTROL
SYSTEM
ERV ENERGY RECOVERY VENTILATOR
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXST EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDPR FIRE DAMPER
FFD FUNNEL FLOOR DRAIN
FF FINAL FILTER
FLR FLOOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOOR SINK
FSD COMBINATION FIRE/SMOKE DAMPER
FT FOOT/FEET
FTR FINNED TUBE RADIATION
FV FACE VELOCITY
GA GAGE or GAUGE
GAL GALLON
GALV GALVANIZED
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRD GRILLE, REGISTER, OR DIFFUSER
H HEIGHT
HBV HOSE BIBB
HD HEAD
HP HORSEPOWER
HRV HEAT RECOVERY VENTILATOR
HTG HEATING
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
HWG HIGH WALL GRILLE
HWR HIGH WALL REGISTER
HZ HERTZ
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCH or INCHES
INSUL INSULATION
INV INVERT
KH KICKSPACE HEATER
KW KILOWATT
KWH KILOWATT HOUR
L LENGTH
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LF LINEAR FOOT/FEET
LVG LEAVING
LWG LOW WALL GRILLE
LWR LOW WALL REGISTER
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MAV MANUAL AIR VENT
MBH 1000 BRITISH THERMAL UNITS
PER HOUR
MCA MINIMUM CIRCUIT AMPACITY
MCC MOTOR CONTROL CENTER
MFR MANUFACTURER
MOP MAXIMUM OVERCURRENT
PROTECTION
MUA MAKEUP AIR UNIT
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTG MOUNTING
(N) NEW
(NL) NEW LOCATION
N/A NOT APPLICABLE
N/C NORMALLY CLOSED
N/O NORMALLY OPEN
NC NOISE CRITERIA
N.I.C. NOT IN CONTRACT
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
O/C ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
PVC PRESSURE CONTROL VALVE
PD PRESSURE DROP
PH PHASE
PLCS PLACES
POC POINT OF CONNECTION
POUA POINT OF USE ALARM
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH (GAGE)
(REL) RELOCATE/RELOACTED
RA RETURN AIR
RAG RETURN AIR GRILLE
REQD REQUIRED
R.O. ROUGH OPENING
RPBP REDUCED PRESSURE BACKFLOW
PREVENTER
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SD SMOKE DETECTOR
SF SUPPLY FAN
SHT SHEET
SIM SIMILAR
SL SOUNDLINING
SP STATIC PRESSURE
SQ SQUARE
SQ FT SQUARE FOOT/FEET
SS STAINLESS STEEL
STD STANDARD
TAB TESTING, ADJUSTING & BALANCING
THK THICK
TP TRAP PRIMER or TEST PLUG
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
TU TERMINAL UNIT
UBC UNIFORM BUILDING CODE
UFC UNIFORM FIRE CODE
UMC UNIFORM MECHANICAL CODE
UPC UNIFORM PLUMBING CODE
UG UNDERGROUND
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
VA VALVE
VAC VACUUM
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
VTR VENT THRU ROOF
W WIDE
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER COLUMN
WCO WALL CLEANOUT
WG WATER GAGE
WGE WASTE GAS EVACUATION
WH WALL HYDRANT
WPD WATER PRESSURE DROP
WT WEIGHT
GENERAL LEGEND
THERMOSTAT. ADJACENT NUMBER
INDICATES TERMINAL UNIT CONTROLLED
HUMIDISTAT
SENSOR
CO2 SENSORCO2
T
H
S
PLUMBING FIXTURE TAG, SEE PLUMBING SCHEDULES
NOTES:
XX-X
SPECIFIC TO LOCATION(S) INDICATED.
A. NOTE APPLIES TO ENTIRE SHEET.
EXISTING
NEW
(E)
(N)
EXISTING (THIN)
NEW (MEDIUM)
POINT OF CONNECTION (POC)
EXISTING TO BE DEMOLISHED
DESIGNATOR HAS SCHEDULED VALUES, SEE MECHANICAL
SCHEDULES.
XX-X
x
SD DUCT SMOKE DETECTOR
SP DUCT STATIC PRESSURE
LINETYPES:
B
A
A
B
DETAIL SYMBOL:
A = IDENTIFYING NUMBER
B = SHEET WHERE DETAIL IS SHOWN
SECTION SYMBOL:
A = IDENTIFYING NUMBER
B = SHEET WHERE DETAIL IS SHOWN
HVAC DUCTWORK LEGEND
DUCTWORK
24x12 S/A
RECTANGULAR DUCT
SIZE (INCHES) FIRST
DIMENSION IS SIDE OF
DUCT SHOWN
DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS OF DUCT. DUCT SIZE
SHOWN DOES NOT INCLUDE INSULATION OR LINING UNLESS NOTED OTHERWISE. SEE
BELOW FOR DUCT SIZE TAG LEGEND.
DUCT SIZE
DUCT SYSTEM ABBREVIATION
(NOT ALWAYS BE SHOWN)
INSULATED DUCT
SOUND LINED DUCT
24x12ø
FLAT OVAL DUCT
SIZE (INCHES) FIRST
DIMENSION IS SIDE OF
DUCT SHOWN
24ø ROUND DUCT
18ø24x12
CHANGE IN DUCT SIZE
AND/OR SHAPE
SUPPLY AIR (SA)
OUTSIDE AIR (OSA)
RECTANGULAR DUCT
TURNED UP/SECTION
ROUND/FLAT OVAL DUCT
TURNED UP/SECTION
RECTANGULAR DUCT
TURNED DOWN/AWAY
ROUND/FLAT OVAL DUCT
TURNED DOWN/AWAY
RETURN AIR (RA)
RECTANGULAR DUCT
TURNED UP/SECTION
ROUND/FLAT OVAL DUCT
TURNED UP/SECTION
RECTANGULAR DUCT
TURNED DOWN/AWAY
ROUND/FLAT OVAL DUCT
TURNED DOWN/AWAY
EXHAUST AIR (EA)
RECTANGULAR DUCT
TURNED UP/SECTION
ROUND/FLAT OVAL DUCT
TURNED UP/SECTION
RECTANGULAR DUCT
TURNED DOWN/AWAY
ROUND/FLAT OVAL DUCT
TURNED DOWN/AWAY
DAMPERS
VOLUME/BALANCING
DAMPER
FIRE DAMPER (FD)
SMOKE DAMPER (SD)
FIRE/SMOKE DAMPER
(FSD)
BACKDRAFT DAMPER
MOTORIZED DAMPER
DUCT SYSTEM ABBREVIATIONS
M
SUPPLY AIRSA
OUTSIDE AIROSA
COMBUSTION AIRCA
RETURN AIRRA
TRANSFER AIRTA
EXHAUST AIREA
FLEXIBLE DUCT
DUCT SYMBOLS
DUCT END CAP
DUCT ACCESS DOOR
AD
SUPPLY AIR (SA)
TERMINAL
RETURN AIR (RA) OR
TRANSFER AIR (TA) TERMINAL
AIR TERMINAL
IDENTIFICATION
EXHAUST AIR (EA) TERMINAL
GRILLE, REGISTER, OR OPEN
DUCT
X
CFM
AIRFLOW DIRECTION
SOUND ATTENUATOR
PIPING LEGEND
CS
CR
CWS
CWR
CONDENSER
WATER SUPPLY
CONDENSER
WATER RETURN
CHILLED WATER
SUPPLY
CHILLED WATER
RETURN
HWS
HWR
HEATING HOT
WATER SUPPLY
HEATING HOT
WATER RETURN
HGS
HGR
HEATING GLYCOL
SUPPLY
HEATING GLYCOL
RETURN
FOS
FOR
FUEL OIL SUPPLY
FUEL OIL RETURN
SMS
SMR
SNOWMELT
GLYCOL SUPPLY
SNOWMELT
GLYCOL RETURN
RL
REFRIGERANT
LIQUID LINE
RS
REFRIGERANT
SUCTION LINE
HRS
HIGH PRESSURE
REFRIGERANT
SUCTION LINE
GWS
GWR
GEOTHERMAL
WATER SUPPLY
GEOTHERMAL
WATER RETURN
G NATURAL GAS
PG PROPANE GAS
LPG
LIQUID PETROLEUM
GAS
CA COMPRESSED AIR
LPS
LOW PRESSURE
STEAM SUPPLY
LPR
LOW PRESSURE
STEAM RETURN
LPC
LOW PRESSURE
CONDENSATE
MPS
MEDIUM PRESSURE
STEAM SUPPLY
MPR
MEDIUM PRESSURE
STEAM RETURN
MPC
MEDIUM PRESSURE
CONDENSATE
HPS
HIGH PRESSURE
STEAM SUPPLY
HPR
HIGH PRESSURE
STEAM RETURN
HPC
HIGH PRESSURE
CONDENSATE
D
CONDENSATE
DRAIN (D)
VAC VACUUM (VAC)
PLUMBING/PIPING SYMBOLS LEGEND
VALVE
GATE VALVE
BALL VALVE
GLOBE VALVE
PLUG VALVE
BUTTERFLY VALVE
SPECIALTY VALVE
OS & Y VALVE
STOP COCK
PRESSURE REDUCING
VALVE
PRESSURE REGULATING
VALVE
CHECK VALVE
SPRING CHECK VALVE
STRAINER
STRAINER W/
BLOWDOWN
BACKFLOW PREVENTER
BALANCING VALVE
AUTOMATIC BALANCING
VALVE
A
RELIEF VALVE
FUEL ANTI-SIPHON
VALVE
F
FUSIBLE OIL SAFETY
VALVE
MOTORIZED VALVE
NEEDLE VALVE
M M
SOLENOID VALVE
S S
AUTOMATIC CONTROL
VALVE
FLOW SWITCH
PRESSURE SWITCH
FS
PS
PIPE ELBOW DOWN
(OR AWAY)
PIPE ELBOW UP
(OR TOWARDS)
PIPE TEE DOWN
(OR AWAY)
PIPE TEE UP
(OR AWAY)
FLOW DIRECTION
PIPE SLOPE
& DIRECTION
REDUCER, CONCENTRIC
REDUCER, ECCENTRIC
UNION
FLANGES
BLIND FLANGE
END CAP
PT PLUG (TEST PORT)
FLEX CONNECTOR/
COUPLING
EXPANSION JOINT
EXPANSION GUIDE
PIPE ANCHOR
HOSE QUICK
DISCONNECT
HOSE THREAD DRAIN
BALL VALVE
HOSE BIBB
WALL HYDRANT
HOSE THREAD DRAIN
VALVE
FIRE DEPARTMENT
CONNECTION
WATER HAMMER
ARRESTOR
THERMOWELL
THERMOMETER
DIAL THERMOMETER
T
PRESSURE GAUGE
W/ COCK
P
PRESSURE GAUGE
W/ COCK & SIPHON
P
AIR VENT
A - AUTOMATIC
C - COIN
M - MANUAL
H - HIGH VOLUME
A
BASKET STRAINER
AIR FILTER W/
COALESCER & DRAIN
AIR FILTER W/
COALESCER, DRAIN,
REGULATOR & GAUGE
PUMP (SYMBOLIC -
ARROW INDICATES
FLOW DIRECTION)
WATER METERM
WATER HAMMER
ARRESTOR (PLAN)
V#
S=2% www.coffman.com
10 N Post Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/3
/2
:4
:1
P
M
03/31/2022
PRB
RKC
222046
M-001
MECHANICAL
NOTES LEGENDS
AND
ABBREVIATIONS
FINAL
TURNOVER
DOCUMENTS
25230
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
'-1
0"
83'-8"
AHU-4
AHU-2 AHU-1 AHU-3
CRANE LOCATION 'A'
CRANE LOCATION 'B'
AHU ACCESS MONITOR
AHU ACCESS MONITOR
'-4
'-7
GENERAL NOTES
A. SEE PROJECT SUMMARY ON G-000 FOR SITE WORK SCOPE.
B. SEE REFERENCE DRAWING C103 FOR EXISTING SITE
INFORMATION.
www.coffman.com
10 N Post Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/3
/2
:0
:3
P
M
03/31/2022
PRB
RKC
222046
M-002
MECHANICAL SITE
PLAN
FINAL
TURNOVER
DOCUMENTS
25230
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
NTS1
SITE PLAN
1 2 3 4.1 5.1 6 7 8 10
10.1
3.1 4.3 5.3 6.2 7.1 8.2 9 10.3 11 11.2
12.1 13 13.2 14 15 15.3 16.1 16.3 17.1 18 19 20
13.1
L
A
A.1
A.2
A.3
B
B.1
C
D
E
F.1
G
H.1
K
(E) AHU-2 (E) AHU-3
AHU ACCESS MONITOR
AHU ACCESS MONITOR
MD-404
1 MD-402
MD-401
MD-403
(E) AHU-1
M-401
M-402
M-403
M-404
GENERAL NOTES
A. AS OUTLINED ON G-000, BASE BID IS THE REMOVAL AND
REPLACEMENT OF AHU-4. AHU-2 REPLACEMENT IS ALTERNATE 1,
AHU-1 REPLACEMENT IS ALTERNATE 2, AND AHU-3 REPLACEMENT
IS ALTERNATE 3. SEE SECTION 01.11.00.
B. THESE DRAWINGS HAVE BEEN PREPARED USING OWNER
PROVIDED RECORD DRAWINGS DATED 07/09/1993 AND THROUGH
FIELD OBSERVATIONS. VERIFY EXISTING CONDITIONS AS THEY
APPLY TO THIS PROJECT AND INCLUDE IN BID A SUFFICIENT
ALLOWANCE TO COVER ANY DISCREPANCY BETWEEN THE
DRAWINGS AND THE ACTUAL CONDITIONS AS THEY CURRENTLY
EXIST.
C. EXISTING LINE WORK IS SHOWN WITH LIGHT LINES AND DEMO
WORK IS SHOWN WITH BOLD BROKEN LINES, TYP.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL
EQUIPMENT THE OWNER DOES NOT WISH TO RETAIN FOR FUTURE
USE.
E. CONTRACTOR SHALL COORDINATE ANY SHUT DOWN OF SYSTEMS
WITH OWNER, SEE SECTION 01.14.00.
F. CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING EACH
AHU IS FULLY DISCONNECTED FROM PIPING AND DUCTWORK
PRIOR TO LIFTING WITH CRANE. ITEMS TO REMAIN SHALL BE
SUPPORTED FROM BELOW TO AVOID ANY DAMAGE TO THE
BUILDING OR ITEMS BELOW. DUCTWORK SHALL BE PRESERVED
FOR INSTALLATION TO THE NEW AHU.
G. INDUSTRIAL COLD WATER PIPES SHALL BE DISCONNECTED FROM
AHU AND DEMOLISHED BACK TO THE PIPE RACK LOCATED IN THE
ROOF MONITOR.
www.coffman.com
10 N Post Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/3
/2
:4
:2
P
M
03/31/2022
PRB
RKC
222046
MD-101
MECHANICAL
DEMOLITION ROOF
PLAN
FINAL
TURNOVER
DOCUMENTS
25230
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
1/16" = 1'-0"1
MECHANICAL DEMOLITION ROOF PLAN
13 13.2 14 15 15.313.1
E
F.1
G
MD-401
4'
3' - 10"
3' - 4"
5'
WALL OPENING WIDTH
44' - 3 1/2"
DEMO CD PIPING
DEMO HGS & HGR PIPING
TO ISOLATION VALVE
DEMO EVAP WATER
PIPING
DEMO INDUSTRIAL WATER
PIPING
(E) AHU-1
3 4
(E) EXHAUST AIR DUCT
OPENING IN AHU FLOOR
(E) SUPPLY AIR DUCT
OPENING IN AHU FLOOR
LEVEL 2
15' - 8"
Roof 22' - 8"
F.1
(E) AHU-1
GENERAL NOTES
A. WORK ON THIS SHEET IS PART OF ALTERNATE 1.
B. THESE DRAWINGS HAVE BEEN PREPARED USING OWNER
PROVIDED RECORD DRAWINGS DATED 07/09/1993 AND THROUGH
FIELD OBSERVATIONS. VERIFY EXISTING CONDITIONS AS THEY
APPLY TO THIS PROJECT AND INCLUDE IN BID A SUFFICIENT
ALLOWANCE TO COVER ANY DISCREPANCY BETWEEN THE
DRAWINGS AND THE ACTUAL CONDITIONS AS THEY CURRENTLY
EXIST.
C. EXISTING LINE WORK IS SHOWN WITH LIGHT LINES AND DEMO
WORK IS SHOWN WITH BOLD BROKEN LINES, TYP.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL
EQUIPMENT THE OWNER DOES NOT WISH TO RETAIN FOR FUTURE
USE, INCLUDING THE AHUs. CONTRACTOR TO REMOVE THE
EXISTING DISTECH CONTROLS FROM EACH AHU AND TURN THEM
OVER TO THE ARS LOCATION MONITOR.
E. CONTRACTOR SHALL COORDINATE ANY SHUT DOWN OF SYSTEMS
WITH OWNER, SEE SECTION 01.14.00.
F. CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING EACH
AHU IS FULLY DISCONNECTED FROM PIPING AND DUCTWORK
PRIOR TO LIFTING WITH CRANE. ITEMS TO REMAIN SHALL BE
SUPPORTED FROM BELOW TO AVOID ANY DAMAGE TO THE
BUILDING OR ITEMS BELOW. DUCTWORK SHALL BE PRESERVED
FOR INSTALLATION TO THE NEW AHU.
G. PRIOR TO DEMOLITION, CONTRACTOR TO EVACUATE THE R-22
REFRIGERANT FROM EACH AHU IN ACCORDANCE WITH
APPLICABLE REGULATIONS.
www.coffman.com
10 N Post Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/3
/2
:4
:2
P
M
03/31/2022
PRB
RKC
222046
MD-401
MECHANICAL
LARGE SCALE
DEMO PLAN
FINAL
TURNOVER
DOCUMENTS
25230
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
1/4" = 1'-0"1
AHU-1 DEMOLITION PLAN
1/2" = 1'-0"2
AHU-1 DEMOLITION
KEY NOTES
1 STEAM HUMIDIFIER PIPE SHALL BE DISCONNECTED AND
DEMOLISHED DOWN TO BELOW ROOF LEVEL, WITHIN A FOOT OF
THE LATERALS. INSTALL VALVE WHERE ACCESSIBLE AND CAP
THE VALVE FOR POTENTIAL FUTURE USE OF INACTIVE STEAM
PIPING.
2 BASE BID INCLUDES THE REPLACEMENT OF THE EXISTING
HEATING GLYCOL CONTROL VALVES AND ACTUATORS WITH
NEW AT EACH AHU. CONTRACTOR TO INVESTIGATE EXISTING
VALVE CV AND REPLACE WITH EQUAL. CONTRACTOR SHALL
INCLUDE A DEDUCTIVE ALTERNATE IN BID FOR LEAVING THE
CONTROL VALVES AND ACTUATORS IN PLACE.
3 INDUSTRIAL COLD WATER PIPES SHALL BE DISCONNECTED
FROM AHU AND DEMOLISHED BACK TO ACTIVE MAIN IN THE PIPE
RACK LOCATED IN THE ROOF MONITOR.
4 DEMOLISH CONDENSATE WATER DRAIN PIPING BACK TO FLOOR
AND CAP ABOVE FLOOR.
5 DEMOLISH EXISTING EXHAUST DUCT.
6 REMOVE (E) AHU-1.
7 EXISTING CURB.
HGS & HGR
PIPING
10 10.1 10.3 11 11.2 12 12.1
F.1
G
(E) AHU-2
MD-402
9' - 11 1/4"
3' - 10"
4'
3' - 4"
5'
DEMO CD PIPING
DEMO HGS & HGR PIPING
TO ISOLATION VALVE
DEMO EVAP WATER
PIPING
DEMO INDUSTRIAL WATER
PIPING
WALL OPENING WIDTH
43' - 11 3/4"
(E) SUPPLY AIR DUCT
OPENING IN AHU FLOOR
(E) EXHAUST AIR DUCT
OPENING IN AHU FLOOR
3 4
HGS
HGR
LEVEL 2
15' - 8"
Roof 22' - 8"
F.1
(E) AHU-2
GENERAL NOTES
A. WORK ON THIS SHEET IS PART OF ALTERNATE 2.
B. THESE DRAWINGS HAVE BEEN PREPARED USING OWNER
PROVIDED RECORD DRAWINGS DATED 07/09/1993 AND THROUGH
FIELD OBSERVATIONS. VERIFY EXISTING CONDITIONS AS THEY
APPLY TO THIS PROJECT AND INCLUDE IN BID A SUFFICIENT
ALLOWANCE TO COVER ANY DISCREPANCY BETWEEN THE
DRAWINGS AND THE ACTUAL CONDITIONS AS THEY CURRENTLY
EXIST.
C. EXISTING LINE WORK IS SHOWN WITH LIGHT LINES AND DEMO
WORK IS SHOWN WITH BOLD BROKEN LINES, TYP.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL
EQUIPMENT THE OWNER DOES NOT WISH TO RETAIN FOR FUTURE
USE, INCLUDING THE AHUs. CONTRACTOR TO REMOVE THE
EXISTING DISTECH CONTROLS FROM EACH AHU AND TURN THEM
OVER TO THE ARS LOCATION MONITOR.
E. CONTRACTOR SHALL COORDINATE ANY SHUT DOWN OF SYSTEMS
WITH OWNER, SEE SECTION 01.14.00.
F. CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING EACH
AHU IS FULLY DISCONNECTED FROM PIPING AND DUCTWORK
PRIOR TO LIFTING WITH CRANE. ITEMS TO REMAIN SHALL BE
SUPPORTED FROM BELOW TO AVOID ANY DAMAGE TO THE
BUILDING OR ITEMS BELOW. DUCTWORK SHALL BE PRESERVED
FOR INSTALLATION TO THE NEW AHU.
G. PRIOR TO DEMOLITION, CONTRACTOR TO EVACUATE THE R-22
REFRIGERANT FROM EACH AHU IN ACCORDANCE WITH
APPLICABLE REGULATIONS.
www.coffman.com
10 N Post Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/3
/2
:4
:2
P
M
03/31/2022
PRB
RKC
222046
MD-402
MECHANICAL
LARGE SCALE
DEMO PLAN
FINAL
TURNOVER
DOCUMENTS
25230
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
1/4" = 1'-0"1
AHU-2 DEMOLITION PLAN
1/2" = 1'-0"2
AHU-2 DEMOLITION
KEY NOTES
1 STEAM HUMIDIFIER PIPE SHALL BE DISCONNECTED AND
DEMOLISHED DOWN TO BELOW ROOF LEVEL, WITHIN A FOOT OF
THE LATERALS. INSTALL VALVE WHERE ACCESSIBLE AND CAP
THE VALVE FOR POTENTIAL FUTURE USE OF INACTIVE STEAM
PIPING.
2 BASE BID INCLUDES THE REPLACEMENT OF THE EXISTING
HEATING GLYCOL CONTROL VALVES AND ACTUATORS WITH
NEW AT EACH AHU. CONTRACTOR TO INVESTIGATE EXISTING
VALVE CV AND REPLACE WITH EQUAL. CONTRACTOR SHALL
INCLUDE A DEDUCTIVE ALTERNATE IN BID FOR LEAVING THE
CONTROL VALVES AND ACTUATORS IN PLACE.
3 INDUSTRIAL COLD WATER PIPES SHALL BE DISCONNECTED
FROM AHU AND DEMOLISHED BACK TO ACTIVE MAIN IN THE PIPE
RACK LOCATED IN THE ROOF MONITOR.
4 DEMOLISH CONDENSATE WATER DRAIN PIPING BACK TO FLOOR
AND CAP ABOVE FLOOR.
5 DEMOLISH EXISTING EXHAUST DUCT.
6 REMOVE (E) AHU-2.
7 EXISTING CURB.
HGS & HGR
PIPING
16.1 16.3 17.1 18
F.1
G
M-401
(E) AHU-3
MD-403
1' - 0" 0' - 2 1/2"
3' - 10"
4'
5'
3' - 4"
WALL OPENING WIDTH
43' - 5"
DEMO CD PIPING
DEMO HGS & HGR PIPING
TO ISOLATION VALVE
DEMO EVAP WATER
PIPINGDEMO INDUSTRIAL WATER
PIPING
HGS
HGR
(E) EXHAUST AIR DUCT
OPENING IN AHU FLOOR
(E) SUPPLY AIR DUCT
OPENING IN AHU FLOOR
LEVEL 2
15' - 8"
Roof 22' - 8"
F.1
(E) AHU-3
HGS & HGR
PIPING
GENERAL NOTES
A. WORK ON THIS SHEET IS PART OF ALTERNATE 3.
B. THESE DRAWINGS HAVE BEEN PREPARED USING OWNER
PROVIDED RECORD DRAWINGS DATED 07/09/1993 AND THROUGH
FIELD OBSERVATIONS. VERIFY EXISTING CONDITIONS AS THEY
APPLY TO THIS PROJECT AND INCLUDE IN BID A SUFFICIENT
ALLOWANCE TO COVER ANY DISCREPANCY BETWEEN THE
DRAWINGS AND THE ACTUAL CONDITIONS AS THEY CURRENTLY
EXIST.
C. EXISTING LINE WORK IS SHOWN WITH LIGHT LINES AND DEMO
WORK IS SHOWN WITH BOLD BROKEN LINES, TYP.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL
EQUIPMENT THE OWNER DOES NOT WISH TO RETAIN FOR FUTURE
USE, INCLUDING THE AHUs. CONTRACTOR TO REMOVE THE
EXISTING DISTECH CONTROLS FROM EACH AHU AND TURN THEM
OVER TO THE ARS LOCATION MONITOR.
E. CONTRACTOR SHALL COORDINATE ANY SHUT DOWN OF SYSTEMS
WITH OWNER, SEE SECTION 01.14.00.
F. CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING EACH
AHU IS FULLY DISCONNECTED FROM PIPING AND DUCTWORK
PRIOR TO LIFTING WITH CRANE. ITEMS TO REMAIN SHALL BE
SUPPORTED FROM BELOW TO AVOID ANY DAMAGE TO THE
BUILDING OR ITEMS BELOW. DUCTWORK SHALL BE PRESERVED
FOR INSTALLATION TO THE NEW AHU.
G. PRIOR TO DEMOLITION, CONTRACTOR TO EVACUATE THE R-22
REFRIGERANT FROM EACH AHU IN ACCORDANCE WITH
APPLICABLE REGULATIONS.
www.coffman.com
10 N Post Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/3
/2
:4
:2
P
M
03/31/2022
PRB
RKC
222046
MD-403
MECHANICAL
LARGE SCALE
DEMO PLAN
FINAL
TURNOVER
DOCUMENTS
25230
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
1/4" = 1'-0"1
AHU-3 DEMOLITION PLAN
1/2" = 1'-0"2
AHU-3 DEMOLITION
KEY NOTES
1 STEAM HUMIDIFIER PIPE SHALL BE DISCONNECTED AND
DEMOLISHED DOWN TO BELOW ROOF LEVEL, WITHIN A FOOT OF
THE LATERALS. INSTALL VALVE WHERE ACCESSIBLE AND CAP
THE VALVE FOR POTENTIAL FUTURE USE OF INACTIVE STEAM
PIPING.
2 BASE BID INCLUDES THE REPLACEMENT OF THE EXISTING
HEATING GLYCOL CONTROL VALVES AND ACTUATORS WITH
NEW AT EACH AHU. CONTRACTOR TO INVESTIGATE EXISTING
VALVE CV AND REPLACE WITH EQUAL. CONTRACTOR SHALL
INCLUDE A DEDUCTIVE ALTERNATE IN BID FOR LEAVING THE
CONTROL VALVES AND ACTUATORS IN PLACE.
3 INDUSTRIAL COLD WATER PIPES SHALL BE DISCONNECTED
FROM AHU AND DEMOLISHED BACK TO ACTIVE MAIN IN THE PIPE
RACK LOCATED IN THE ROOF MONITOR.
4 DEMOLISH CONDENSATE WATER DRAIN PIPING BACK TO FLOOR
AND CAP ABOVE FLOOR.
5 DEMOLISH EXISTING EXHAUST DUCT.
6 REMOVE (E) AHU-3.
7 EXISTING CURB.
1 2 3 3.1
F.1
G
MD-404
2' - 10"
3'
3'
2' - 11 1/2"
(E) AHU-4
DEMO HGS & HGR
PIPING TO ISOLATION
VALVE
EXITING TO REMAIN
DEMO CD PIPING
DEMO EVAP WATER PIPING
DEMO INDUSTRIAL WATER PIPING
HGS
HGR
(E) EXHAUST AIR DUCT
OPENING IN AHU FLOOR
(E) SUPPLY AIR DUCT
OPENING IN AHU FLOOR
(E) PLUMBING VENT TO REMAIN.
(+/-) 11'-0" ABOVE FINISHED ROOF
LEVEL 2
15' - 8"
Roof 22' - 8"
E
F.1
(E) AHU-4
HGS & HGR
PIPING
GENERAL NOTES
A. WORK ON THIS SHEET IS PART OF BASE BID.
B. THESE DRAWINGS HAVE BEEN PREPARED USING OWNER
PROVIDED RECORD DRAWINGS DATED 07/09/1993 AND THROUGH
FIELD OBSERVATIONS. VERIFY EXISTING CONDITIONS AS THEY
APPLY TO THIS PROJECT AND INCLUDE IN BID A SUFFICIENT
ALLOWANCE TO COVER ANY DISCREPANCY BETWEEN THE
DRAWINGS AND THE ACTUAL CONDITIONS AS THEY CURRENTLY
EXIST.
C. EXISTING LINE WORK IS SHOWN WITH LIGHT LINES AND DEMO
WORK IS SHOWN WITH BOLD BROKEN LINES, TYP.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL
EQUIPMENT THE OWNER DOES NOT WISH TO RETAIN FOR FUTURE
USE, INCLUDING THE AHUs. CONTRACTOR TO REMOVE THE
EXISTING DISTECH CONTROLS FROM EACH AHU AND TURN THEM
OVER TO THE ARS LOCATION MONITOR.
E. CONTRACTOR SHALL COORDINATE ANY SHUT DOWN OF SYSTEMS
WITH OWNER, SEE SECTION 01.14.00.
F. CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING EACH
AHU IS FULLY DISCONNECTED FROM PIPING AND DUCTWORK
PRIOR TO LIFTING WITH CRANE. ITEMS TO REMAIN SHALL BE
SUPPORTED FROM BELOW TO AVOID ANY DAMAGE TO THE
BUILDING OR ITEMS BELOW. DUCTWORK SHALL BE PRESERVED
FOR INSTALLATION TO THE NEW AHU.
G. PRIOR TO DEMOLITION, CONTRACTOR TO EVACUATE THE R-22
REFRIGERANT FROM EACH AHU IN ACCORDANCE WITH
APPLICABLE REGULATIONS.
www.coffman.com
10 N Post Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/3
/2
:4
:2
P
M
03/31/2022
PRB
RKC
222046
MD-404
MECHANICAL
LARGE SCALE
DEMO PLAN
FINAL
TURNOVER
DOCUMENTS
25230
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
COMPLETE
PHASED AIR
HANDLING
UNITS
REPLACEMENT
1/4" = 1'-0"1
AHU-4 DEMOLITION PLAN
1/2" = 1'-0"2
AHU-4 DEMOLITION
KEY NOTES
1 STEAM HUMIDIFIER PIPE SHALL BE DISCONNECTED AND
DEMOLISHED DOWN TO BELOW ROOF LEVEL, WITHIN A FOOT OF
THE LATERALS. INSTALL VALVE WHERE ACCESSIBLE AND CAP
THE VALVE FOR POTENTIAL FUTURE USE OF INACTIVE STEAM
PIPING.
2 BASE BID INCLUDES THE REPLACEMENT OF THE EXISTING
HEATING GLYCOL CONTROL VALVES AND ACTUATORS WITH
NEW AT EACH AHU. CONTRACTOR TO INVESTIGATE EXISTING
VALVE CV AND REPLACE WITH EQUAL. CONTRACTOR SHALL
INCLUDE A DEDUCTIVE ALTERNATE IN BID FOR LEAVING THE
CONTROL VALVES AND ACTUATORS IN PLACE.
3 INDUSTRIAL COLD WATER PIPES SHALL BE DISCONNECTED
FROM AHU AND DEMOLISHED BACK TO ACTIVE MAIN IN THE PIPE
RACK LOCATED IN THE ROOF MONITOR.
4 DEMOLISH CONDENSATE WATER DRAIN PIPING BACK TO FLOOR
AND CAP ABOVE FLOOR.
5 DEMOLISH EXISTING EXHAUST DUCT.
6 REMOVE (E) AHU-4.
7 EXISTING CURB.
1 2 3 4.1 5.1 6 7 8 10
10.1
3.1 4.3 5.3 6.2 7.1 8.2 9 10.3 11 11.2
12.1 13 13.2 14 15 15.3 16.1 16.3 17.1 18 19 20
13.1
L
A
A.1
A.2
A.3
B
B.1
C
D
E
F.1
G
H.1
K
AHU ACCESS MONITOR
AHU ACCESS MONITOR
M-401
M-402
M-403
M-404
AHU-1 AHU-3
AHU-2
AHU-4
(E) VTR
(E) LAB EXHAUST
1 1
MIN. R 30'-0" CLEAR
FROM FUME EXHAUST
HOODS
MIN. R 20'-0" CLEAR
FROM REFRIGERENT
VENTS
MIN. R 10'-0" CLEAR
FROM PLUMBING
VENTS
(E) FHE-10
(E) FHE-2
(E) FHE-1
(E) FHE-3
(E) FHE-5
(E) FHE-4
(E) FHE-6
(E) FHE-7
MIN. R 30'-0" CLEAR
FROM FUME EXHAUST
HOODS
MIN. R 20'-0" CLEAR
FROM REFRIGERENT
VENTS
MIN. R 10'-0" CLEAR
FROM PLUMBING
VENTS
MIN. R 20'-0" CLEAR
FROM REFRIGERENT
VENTS
MIN. R 10'-0" CLEAR
FROM PLUMBING
VENTS
VTR TERMINATES 11'-0"
ABOVE FINISHED ROOF
GENERAL NOTES
A. AS OUTLINED ON G-000, BASE BID IS THE REMOVAL AND
REPLACEMENT OF AHU-4. AHU-2 REPLACEMENT IS ALTERNATE 1,
AHU-1 REPLACEMENT IS ALTERNATE 2, AND AHU-3 REPLACEMENT
IS ALTERNATE 3.
B. LOCATE PLUMBING VENTS AND EXHAUST FANS 10-0" MIN. FROM
HVAC AIR INTAKES.
C. LOCATE ALL SERVICABLE EQUIPMENT 10'-0" MIN. FROM ROOF
EDGE OR PARAPET.
www.coffman.com
10 N Post Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
C
EE
/3
/2
:4
:1
P
M
03/31/2022
PRB
RKC
222046
M-101
OVERALL
MECHANCIAL ROOF
PLAN
FINAL
TURNOVER
DOCUMENTS
25230
KONNOWAC
PASS RD.
WAPATO WA,
98951
ARS
CO…