ATTACHMENTS F AND G.pdf
PDF 4 MB Posted
- Solicitation number
- 36C24226Q0417
About this file
This document is a set of attachments containing campus infrastructure diagrams and photographic documentation of water system facilities. Attachment F provides one-line schematic drawings (not to scale) depicting potable water lines (shown in blue) and fire suppression lines (shown in red) across the campus. The drawings include a detailed schematic representation of the SCWA (Suffolk County Water Authority) water meter pit and booster pump system, followed by schematics of potable water and fire line distribution serving Buildings 30, 32, 74, 81, 94, and 220. A third detailed view shows the interconnected piping, valve locations, and line sizes (ranging from 6 inches to 8 inches in diameter) serving Buildings 30, 94, and 220.
Attachment G is an image gallery documenting existing water infrastructure components and facilities. The gallery includes photographs of air stripping towers (two units), a blower system, clear wells, the main valve vault (Cla-Valves), three operational booster pumps (identified as Pumps A, B, and C with close-up views), the Water Treatment Plant located in Building 220, and well house facilities associated with Buildings 30, 32, 74, 81, and 94. These images show Well Houses #1 through #5 with their respective plumbing setups, an external pump/motor cage, electrical control panels, and the Suffolk County Water Authority booster pump vault with electrical panel. The photographs provide visual documentation of equipment condition and current system configuration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226Q0417 0001.docx | DOCX document | |
| NY20260012 Davis Bacon.pdf | ||
| ATTACHMENT E.pdf | ||
| 2015-4157 NY 12.03.2025.pdf | ||
| ATTACHMENTS A-B-C-D Redacted.pdf | ||
| 36C24226Q0417.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT F: CAMPUS ONE-LINE DRAWINGS OF POTABLE WATER (BLUE) AND FIRE
LINES (RED)
SCWA WATER METER PIT AND
BOOSTER PUMP ONE-LINE
SCHEMATIC REPRESENTATION
(NOT TO SCALE)
BUILDINGS 30, 32, 74, 81, 94 AND
220 ONE-LINE POTABLE WATER
AND FIRE LINE SCHEMATIC
REPRESENTATION
DETAILED VIEW OF BUILDINGS
30, 94 AND 220. ONE-LINE
POTABLE WATER LINES, FIRE
LINES, AND VALVES. SCHEMATIC
REPRESENTATION
ATTACHMENT G: IMAGE GALLERY
Air Stripping Tower #2
Air Stripping Tower #1
Air Stripping Tower #1
Air Stripping Tower #2 Blower
Clear Well
Cla-Valves Main Vault
Clear Well
Water Treatment Plant (Building 220)
Booster Pump A Booster Pump B
Booster Pump C
Close-up view 1
Close-up view 2
Well House #1 Well House #1 Plumbing Set-Up
BUILDING 74
Well House #2 Plumbing Set-up
Well #2R External Pump/Motor Cage Well House #2
BUILDING 30
Well House #4 and Plumbing Set-up
Well House #3 and Plumbing Set-up
BUILDING 32
BUILDING 81
Suffolk County Water Authority Booster Pump Vault and Electrical Pannel
BUILDING 94
Well House #5, Plumbing Set-up, Electrical Control Pannel.
File details come from the government source that posted it. Updated .