This is a Statement of Work document containing informational photos showing the current condition of two buildings at Birch Hill Dam in Royalston, MA that require exterior rehabilitation work. The photos document all four sides (north, south, east, west) of both the Utility Building (66ft x 24ft) and Maintenance Garage (51ft x 25ft), with detailed images of damaged framing between overhead bay doors in the Maintenance Garage.

The photos reveal buildings with white vinyl siding, green trim, solar panels on the Utility Building roof, multiple garage bay doors, entry doors, and windows requiring replacement. The Utility Building's south facade shows three garage doors and multiple windows, while its east side shows electrical hookups, antennas, and a door marked for removal. The Maintenance Garage photos show significant framing damage between the overhead doors that needs repair. The document includes an aerial site map showing the buildings' locations relative to the dam structure and project office. Key visible elements requiring rehabilitation include deteriorated doors, windows, siding, insulation, framing and trim on both single-story structures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UTILITY BUILDING AND MAINTENANCE GARAGE EXTERIOR

REHABILITATION

U.S. ARMY CORPS OF ENGINEERS

BIRCH HILL DAM

ROYALSTON, MA

STATEMENT OF WORK

Informational Photos

Informational Photo Number 1: (South) Front side of Utility Building.

U.S. ARMY CORPS OF ENGINEERS

BIRCH HILL DAM

Informational Photo Number 2: (East) Side of Utility Building with power electric hookups, side entry door [identified as door to be removed] and antennas.

U.S. ARMY CORPS OF ENGINEERS

BIRCH HILL DAM

ROYALSTON, MA

STATEMENT OF WORK

Informational Photo Number 3: (North) Back side of Utility Building.

U.S. ARMY CORPS OF ENGINEERS

BIRCH HILL DAM

Informational Photo Number 4: (West) Side of Utility Building.

U.S. ARMY CORPS OF ENGINEERS

BIRCH HILL DAM

ROYALSTON, MA

STATEMENT OF WORK

INFORMATIONAL PHOTO NUMBER 5: (West) Front side of the Maintenance Garage

U.S. ARMY CORPS OF ENGINEERS

BIRCH HILL DAM

ROYALSTON, MA

STATEMENT OF WORK

Informational Photo Number 6: (South) Side of the Maintenance Garage.

U.S. ARMY CORPS OF ENGINEERS

BIRCH HILL DAM

Informational Photo Number 7: (North) Side of the Maintenance Garage.

U.S. ARMY CORPS OF ENGINEERS

BIRCH HILL DAM

ROYALSTON, MA

STATEMENT OF WORK

Informational Photo Number 8: (East) Back side of the Maintenance Garage.

U.S. ARMY CORPS OF ENGINEERS

BIRCH HILL DAM

Informational Photo Number 9: Damaged section of framing located between the two overhead bay doors inside Maintenance Garage.

U.S. ARMY CORPS OF ENGINEERS

BIRCH HILL DAM

ROYALSTON, MA

STATEMENT OF WORK

Informational Photo Number 10: Damaged section of framing located between the two overhead bay doors inside Maintenance Garage.