Attachment6_ServiceWorkMap.pdf
PDF 6 MB Posted
- Attached to
- Berry Brush Stewardship IRSC Revised Federal contract opportunity
- Solicitation number
- 12363N22Q4048
- Issued by
- Department of Agriculture Forest Service
About this file
This document includes a federal contract opportunity solicitation and a related contract area map and service work map. The solicitation seeks to restore forest health, treat hazardous fuels along and adjacent to roads within the North Complex Fire area of 2020, and reduce future risk of high severity wildfire. Mandatory work includes mechanically removing unmerchantable trees and small diameter hazardous fuels along roadsides to landings to later burn or chip/remove from the contract area. Optional work includes cutting roadside hazardous fuels and leaving in place, cutting and piling hazardous fuels within interior units, and removing timber subject to agreement. Mandatory work must be completed by October 31, 2023, with optional work due by October 31, 2024 or October 31, 2025 depending on the item. The maps provide location details and identify features like ownership boundaries, roads, streams, and work units.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment2_SF30_CorrectOptionalItem11Description.pdf | ||
| Amendment1_SF30_StrikeLaborLawClauses.pdf | ||
| Attachment13_ButteCountyEncroachmentPermit.pdf | ||
| Attachment10_PresolicitationSiteVisitNotes_020822Mtg.pdf | ||
| Attachment5_VicinityMap_020722.pdf | ||
| Attachment1_Appendix A.pdf | ||
| Attachment8_Svc_Foresty_WageDet_1977_0727_031522.pdf | ||
| Attachment7_FirePlan.doc | DOC document | |
| Attachment3_AppendixC.pdf | ||
| Attachment2_AppendixB_Scaled.pdf | ||
| FinalSolicitation_BerryBrushIRSCRevised.pdf | ||
| Attachment12_ContractShapes.gdb.zip | ZIP file | |
| Attachment11_OriginalSolicitation_Site_Visit_Notes.pdf | ||
| Attachment4_ AppendixD.pdf | ||
| Attachment9_ConWageDecision_Hwy_CA20220007_040122.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
N
N N N
N N N NN
NN
N N
N N N N
N N
T.21N R.5E
T.22N R.5E
T.21N R.6E
T.22N R.6E
!(10
!(17
!(11
!(21
!(16
!(9
!(19
!(20
!(8
!(16
!(18
!(25
!(20
!(12
!(26
!(7
!(4
!(6
!(2
!(5
!(26
3000220
2400 260
9 7
6 4
29 28
25 28
1615 17
N2
BC27561
N6
BC
22N34
21N33
N0
22N31
22N70X
N8
22N33
BC
5A
22N49
21N
21N07
N3
N8
BC49665A
21N36
21N44
BC
5-A
22N92X
22N49Y
21N80
22N54
N1
2X
N8
22N
BRUSH
22N84
22N01Y
22N96X
21N78
22N35
N8
22N39
N2
5G
BC
5-A
22N90
22N36
21N37X
BC54545-B
22N83
22N27X
21N71
N9
N5
1Y
21N31Y
23N60
22N77X
22N95X
N8
22N38
22N40Y
22N79X
22N78X
N9
21N25A
21N48
N0
6X
21N33B
21N
22N82
21N10X
22N49YB
N0
4Y
22N08
22N71A
N4
8Y
21N08X
22N84A
21N 27Y
23N 00A
22N22Y
22N39A
21N 02Y
B
21N79YA
22N 33A
BEAN CREEK
21N45Y
22N 31E
21N82
N3
4Y
22N93X
N3
1D
21N50Y
22N62B
21N71A
N0
6X A
22N09Y
N1
1X
21N09X
22N84B
21N02Y
22N 31C
23N28C
N3
1Y A
22N54A
21N27YA
N6
2A
N3
1F
22N46Y
22N 31K
22N31G
N5
4C
24N25D
24N25E
23N 28G
N2
8E
21N49B
22N04YA
21N36Y
21N30Y
23N28F
21N 80A
22N33D
21N81A
23N28H
22N83A
22N54B
N3
3B
22N 71B
21N33D
22N96XB
22N33C
22N01A
22N 90A
22N96XA
22N08A
22N62C
21N71C
22N84C
22N49A
22N35A 23N60G
21N30YA
21N60A
21N33Y
22N31
!(29
!(37
!(44
!(38
!(56
!(44
!(12opt
!(16opt
!(7opt
!(9opt
!(16opt !(15opt
!(26opt
!(2opt
!(22opt
!(14opt
!(3opt
!(11opt
!(16opt
!(8opt
!(6opt
!(1opt
!(26opt
!(3opt
!(3opt
!(8opt
!(1opt
!(3opt
!(4opt
!(13opt
!(3opt
!(5opt
!(25opt
!(16opt
!(11opt
!(6opt
!(25opt
!(11opt
!(49
!(50
!(51
!(46
!(51
!(45
!(48 !(48
!(1
DF
TRAC
SUSP
SPACE
ENDL
SEPM
Fell Scat 18"
MACH
DECK
All County and National Forest Roads to remain open (B6.22)
Traffic Control B6.33
Within 50' of each side of road Sale Area
Scat 30" Except in roadside disposal strip listed above
Landings
Designation of Timber(C2.35#,C2.353#,C2.11#)
Slash Treatment (C6.7#)
Erosion Prevention & Control (C6.6#) Not To Exceed 5 Acre
Sale Area
Fe lling, Bucking, and Limbing (C6.41#)
Min. stump he ight 6 inches
Ground Based Skidding (C6.42#)
Mandatory Item 1-8
Optional Item 12 Roadside Hazard Tree Treatment- Cut and Leave units 29,37,38,44,56
Specified road w ork-road reconstruction
Sale Area
Optional Item 13
Interior Units- Fue ls Treatment- Cut, Skid, Deck, and Pile units
1opt,2opt,3opt,4opt,5opt,6opt, 7opt,8opt,9opt,11opt,12opt,13opt, 14opt,15opt,16opt,25opt,26opt
Mandatory Item 9
Optional Item 10
Optional Item 11
Fuels Treatment- cut,Skid,Deck, and pile units 2,4,5,6,7,10,11,17,26
Fuels Treatment- cut,Skid,Deck, and pile units
8,9,12,16,18,19,20,21,25 Fuels Treatment- cut,Skid,Deck, and pile units 1,45,46,47,48,49,50,51
C6.315# - SALE OPERATIONS SCHEDULE. (8/2006) Unless otherwise agreed in writing, Purchaser’s Operations shall be performed in accordance with the following schedule
Subdivision/Area/Unit
Conditions of Operation
Purpose
Contract Area
Operations may occur when soil is dry; that is, soil moisture in the upper 8 inches is not sufficient to allow a soil sample to be squeezed and hold its shape, or will crumble when the hand is tapped.
Operations may also occur when the ground is frozen to a depth of 5 inches, or snow depth is at least 18 inches or machine compacted to 8 inches.
Soil Protection
Requirements Table ITM Individual Tree Mark, C2.35# DXDAM Designation by Damage Class C2.353# TSTA Timber Subject To Agreement C2.11# DF Directional Falling, C6.41# TRAC Ground Based Skidding , Skid Trail Layout, C6.42# SUSP Ground Based Skidding , One End Suspension, C6.42# SPACE Ground based Skidding, Skid T rail Spacing, C6.42# ENDL Ground Based Skidding, Endlining, C6.42# SEPM Special Erosion Prevention Measures, C6.6# COVER Slash Treatment, Cover Piles, C6.7# SCAT 18” Slash Treatment, Scattering , 18 inch depth C6.7# SCAT 30” Slash Treatment, Scattering , 30 inch depth C6.7# FELL Slash Treatment, Fell Damaged Trees, C6.7# MACH Slash Treatment, Machine Pile Landing, C6.7#
0 10.5 Miles
21N
Ephemeral (50 ft Stream Buffer) (C6.5) Intermittent (100 ft Stream Buffer) (C6.5) Perenial (100 ft Stream Buffer) (C6.5)
FS - Forest Service System Road (B6.22) P - Private Road (B6.22) Non-Forest Service Ownership (B1.1) USDA Forest Service Ownership (B1.1)
Contract Area Boundary (B1.1)
Noxious Weeds (C6.24#)
Water Hole (C5.35#)
FS - Forest Service Paved Road (B6.22)
Noxious Weeds (C6.24#)
Optional Item 11 (C2.11#) Optional Item 12 (C2.11#) Optional item 13 (C2.11#)
Mandatory Item 9 (C2.35#), (C2.3.53#) Optional Item 10 (C2.35#), (C2.3.53#)
Noxious Weeds (C6.24#)
Botany Control Area (C6.24#) Botany Control Area (C6.24#) Botany Control Area (C6.24#)
Reserve Trees (C2.3#) Control Rx 1 Rx 2
ÑØ
N
C
Berry Brush
IRSC
Service work Contract Area Map
All lines are approximate Reference Scale:
Main Map - 1:30,000 40 Feet Contour Intervals
For daily project activity level (PAL) information, Call PAL WEST at 1-800-847-7766 (C7.22#)
<BOL>Weather Station: Pike County Lookout (C7.22#) Project Activity Level: Westside
Map 1 of 3
/ Plumas National Forest Feather River Ranger District
Map Created by: Jose Rodriguez 05/11/2022 T:\FS\NFS\Plumas\Project\FRRD\PINS\GIS\FY_21\NorthComplexBerryBrushWUIHazardous
FuelsReduction\GIS\Implementation\Timber\Maps
"This map does no show all Contol areas under C6.24#"
File details come from the government source that posted it. Updated .