This solicitation seeks mechanical hazardous fuels reduction and road reconstruction services. Mandatory work includes mechanically removing unmerchantable trees and small diameter fuels along roads to landings through 10/31/2023. Optional work includes interior hazardous fuels cutting and piling, additional roadside fuel cutting, and possible product removal through varying later deadlines. The solicitation aims to restore forest health after the 2020 North Complex Fire through specified road reconstruction, roadside hazard reduction, and potential interior treatments. The Department of Agriculture Forest Service will award the contract under Stewardship Authority to achieve land management goals and meet local community needs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment2_SF30_CorrectOptionalItem11Description.pdf | ||
| Amendment1_SF30_StrikeLaborLawClauses.pdf | ||
| Attachment12_ContractShapes.gdb.zip | ZIP file | |
| Attachment11_OriginalSolicitation_Site_Visit_Notes.pdf | ||
| Attachment4_ AppendixD.pdf | ||
| Attachment9_ConWageDecision_Hwy_CA20220007_040122.pdf | ||
| Attachment8_Svc_Foresty_WageDet_1977_0727_031522.pdf | ||
| Attachment7_FirePlan.doc | DOC document | |
| Attachment6_ServiceWorkMap.pdf | ||
| Attachment3_AppendixC.pdf | ||
| Attachment2_AppendixB_Scaled.pdf | ||
| FinalSolicitation_BerryBrushIRSCRevised.pdf | ||
| Attachment10_PresolicitationSiteVisitNotes_020822Mtg.pdf | ||
| Attachment5_VicinityMap_020722.pdf | ||
| Attachment1_Appendix A.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Public Works Joshua Pack, Director
7 County Center Drive Oroville, California 95965
T: 530.538.7681 F: 530.538.7171 buttecounty.net/publicworks
BUTTE COUNTY PUBLIC WORKS UTILITY ENCROACHMENT PERMIT SPECIAL CONDITIONS
THE CONTRACTOR SHALL RESTRICT HIS WORK HOURS ON ALL PROJECT RELATED WORK
FROM 7 A.M. TO 5 P.M. DAILY, MONDAY THROUGH FRIDAY UNLESS OTHERWISE APPROVED
BY PUBLIC WORKS. THE RESTRICTION SHALL INCLUDE ALL ASSOCIATED MOVE ON, SET
UP, EQUIPMENT AND MATERIAL DELIVERY, AND OTHER PROJECT ACTIVITIES NOT STRICTLY
RELATED TO THE DAILY PROGRESS OF THE PROJECT, UNLESS OTHERWISE REQUESTED
AND APPROVED IN WRITING BY PUBLIC WORKS.
TRAFFIC CONTROL SHALL CONFORM TO SECTIONS 7-1.03, “PUBLIC CONVENIENCE,” 7-1.04,
“PUBLIC SAFETY,” AND SECTION 12, “TEMPORARY TRAFFIC CONTROL,” OF THE STANDARD
SPECIFICATIONS AND THESE SPECIAL CONDITIONS. NOTHING IN THESE SPECIAL
CONDITIONS SHALL BE CONSTRUED AS RELIEVING THE CONTRACTOR FROM HIS
RESPONSIBILITY AS PROVIDED IN SAID SECTION 7-1.04, “PUBLIC SAFETY”.
THE CONTRACTOR SHALL MAINTAIN ACCESS FOR THROUGH TRAFFIC DURING
OPERATIONS WITH TRAFFIC CONTROL MEASURES AS INDICATED IN THE ABOVE SECTIONS
OF THE STANDARD SPECIFICATIONS. CONTRACTOR SHALL NOT HOLD TRAFFIC IN EXCESS
OF (20) MINUTES EXCEPT WHERE IT IS OTHERWISE SPECIFIED IN THESE SPECIAL
CONDITIONS OR DETERMINED NECESSARY AND APPROVED BY THE ROAD COMMISSIONER
TO INTERMITTENTLY CLOSE SECTIONS OF THE ROADWAY TO TRAFFIC FOR VARIOUS
SAFETY ISSUES AND CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL SUBMIT TO
PUBLIC WORKS FOR APPROVAL A TRAFFIC CONTROL PLAN DETAILING THE NECESSARY
SIGNING, DELINEATION, AND SAFETY MEASURES REQUIRED PER THE APPLICABLE
PROVISIONS OF THE CURRENT EDITION OF THE “WORK AREA TRAFFIC CONTROL
HANDBOOK,” CALIFORNIA STATE TRAFFIC MANUAL OF TRAFFIC CONTROLS FOR
CONSTRUCTION AND MAINTENANCE WORK ZONES; THE “CALIFORNIA MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS” (FHWA CURRENT
EDITION, AS AMENDED FOR USE IN CALIFORNIA), AND THESE SPECIAL CONDITIONS. THE
CONTRACTOR SHALL SUBMIT THE TRAFFIC CONTROL PLANS TO PUBLIC WORKS FOR
APPROVAL AND WHENEVER CHANGES ARE PROPOSED. THE CONTRACTOR SHALL
INCLUDE A SCHEDULE OF ALL STREETS AND FACILITIES TO BE AFFECTED ALONG WITH
THE CONTRACTOR’S PROPOSED PUBLIC NOTIFICATION WITH PROPOSED TIMES, DATES,
AND LENGTHS OF ROAD CLOSURES. THE CONTRACTOR SHALL INCLUDE PRIMARY AND
SECONDARY POINTS OF CONTACT TO PUBLIC WORKS FOR ALL TRAFFIC CONTROL PLANS.
THE CONTRACTOR SHALL STRICTLY ADHERE TO THE APPROVED TRAFFIC CONTROL PLAN
AND ANY CHANGES THEREIN.
IN ADDITION TO THE EXISTING WARNING AND DIRECTIONAL SIGNS, THE CONTRACTOR
SHALL FURNISH THE REQUIRED CONSTRUCTION SIGNS, POSTS, MOUNTING HARDWARE,
AND ERECT, WITHIN OR ADJACENT TO THE LIMITS OF WORK, SUCH CONSTRUCTION
SUPPLEMENTAL WARNING AND DIRECTIONAL SIGNS NECESSARY OR AS OTHERWISE
ORDERED BY THE ROAD COMMISSIONER. AFTER INSTALLATION, THE CONTRACTOR SHALL
MAINTAIN THE EXISTING SIGNS AS NECESSARY UNTIL THE COMPLETION OF THE WORK.
Attachment 13 Solicitation 12363N22Q4045
ROAD CLOSURES ARE ALLOWED ONLY DURING PREDETERMINED “WORKING HOURS,” AS
APPROVED BY THE ROAD COMMISSIONER. THE CONTRACTOR SHALL SUBMIT A “CLOSURE
REQUEST” TO THE DEPARTMENT IN WRITING THAT INCLUDES THE FOLLOWING
INFORMATION: 1) DURATION AND LOCATION OF CLOSURE, 2) DETOUR ROUTE AND
TEMPORARY TRAFFIC CONTROL PLAN, 3) EXPECTED DATE OF PUBLIC NOTICING AND
ROADWAY POSTING, 4) PRIMARY AND SECONDARY IMT POINT OF CONTACTS FOR THE
CLOSURE. ROAD CLOSURES ARE NOT GUARANTEED AND MAY BE AUTHORIZED AS
NECESSARY TO COMPLETE WORK OPERATIONS SUCH THAT ALL LANES SHALL BE RE-
OPENED TO TRAFFIC WHEN IT IS DETERMINED SAFE AND SATISFACTORY TO DO SO AT THE
CONCLUSION OF DAILY OPERATIONS, PER THE APPROVAL OF THE ROAD COMMISSIONER.
ANY EXTENDED WORKING HOURS REQUIRED BY THE CONTRACTOR SHALL BE APPROVED
BY PUBLIC WORKS. THE CONTRACTOR SHALL PLACE OR REMOVE THE NECESSARY
TRAFFIC BARRICADES, MOVE EQUIPMENT EITHER ON OR OFF THE JOB SITE, PERFORM ALL
OPERATIONS, INCLUDING NECESSARY TEMPORARY TRAFFIC CONTROL MEASURES PRIOR
TO OPENING THE ROADWAY TO TRAFFIC.
PROPER CRIBBING IS REQUIRED FOR ALL OUTRIGGER / POINT LOADOPERATIONS.
NO EQUIPMENT ON THE ROADWAY SHALL BE EQUIPPED WITH STEEL TRACKS AND MUST
BE FITTED WITH RUBBER PADS OR EQUIPPED WITH RUBBER TRACKS.
ALL DEBRIS SHALL BE REMOVED FROM THE COUNTY RIGHT OF WAY. ALL STUMPS WITHIN
THE COUNTY RIGHT-OF-WAY SHALL BE GROUND FLUSH TO GRADE, WITH THE FOLLOWING
ADDITIONAL REQUIREMENT FOR GRINDING STUMPS: STUMPS LOCATED AT AN ELEVATION
ABOVE 3000 FEET, AND WITHIN 10 FEET OF EDGE OFPAVEMENT, AND IF ON A GRADE WITH
THE SAME PLANE THAT IS ADJACENT TO THE ROADWAY (NOT ON OTHER SIDE OF DITCH),
SHALL BE GROUND FLUSH TO THE GROUND SURFACE MATCHING THE EXISTING GRADE;
REMOVAL BELOW THE EXISTING GRADE IS NOT REQUIRED AND DISCOURAGED. STUMPS
BEYOND 10 FEET, OR OUTSIDE OF THE ROADWAY CLEAR FREE ZONE, SHALL NOT EXCEED
A HEIGHT OF FOUR (4) INCHES MEASURED AT THE HIGH SIDE OF THE STUMP. ALL STUMPS
LOCATED AT AN ELEVATION BELOW 3000 FEET SHALL NOT EXCEED A HEIGHT OF FOUR (4)
INCHES MEASURED AT THEHIGH SIDE OF THE STUMP. NO EXCAVATION OR GRINDING
BELOW THE ORIGINAL SURFACE GRADE IS ALLOWED. NO EXCAVATION OR GRINDING
ALLOWED BEHIND GUARDRAIL.
NO EXPOSED ROOT BALLS SHOULD BE CREATED; HOWEVER ANY EXPOSED ROOT BALLS
CREATED DURING THIS PROJECT WILL BE TIPPED BACK INTO AN UPRIGHT POSITION OR
GRINDED BY THE CONTRACTOR. EACH TREE SHALL BE FELLED AND LOADED FOR
REMOVAL AS APPROPRIATE FOR ITS DISPOSAL METHOD. MATERIAL MAY BE CHIPPED AND
LEFT ON SITE AS SITE CONDITIONS ALLOW AND DIRECTED BY THE ENGINEER. THE
CONTRACTOR SHALL SHOW A PREFERENCE FOR THE USE OFMECHANICAL EQUIPMENT TO
LOAD AND REASONABLY COMPACT DEBRIS INTO TRUCKS AND TRAILERS. WOOD CHIPS
BROADCASTED ON SITE MUST NOT BE PLACED THICKER THAN 4” IN ANY LOCATION. WOOD
CHIPS MUST NOT BE PLACED ON GRADES IN A WAY THAT WILL ALLOW FOR THE
MIGRATION OF MATERIALS, OR GREATER THAN 20% +/- 2%. WOOD CHIPS MUST ALSO NOT
BE PLACED IN OR NEXT TO DRAINAGE DITCHES OR SWALES.ANY GROUND DISTURBANCE
SHALL BE RETURNED TO THE STATE IT WAS BEFORE WORK OCCURRED OR BETTER.
CONTRACTOR SHALL CLEAN ANY DUFT MATERIAL AND/OR DEBRIS FROM ROADSIDE
DITCHES AND GRADE TO DRAIN. CONTRACTOR IS RESPONSIBLE FOR THE REPLACEMENT
AND/OR REPAIR OF ANY DAMAGED AC DIKE OR AC ROADWAY DAMAGE THAT OCCURS
DURING OPERATIONS. REMOVAL OF EXCESS SHALL BEGIN BY APRIL 1ST 2021 NOT TO
EXCEED SIX MONTHS.
CONTRACTOR MUST PURSUE ANY OTHER REQUIRED PERMITS FROM ANY FEDERAL,
STATE OR LOCAL AGENCY, INCLUDING ANY THAT MAY BE REQUIRED BY BUTTE COUNTY
ENVIRONMENTAL HEALTH DEPARTMENT.
THE CONTRACTOR SHALL SUBMIT WEEKLY WORK LOCATIONS TO
PWPERMITS@BUTTECOUNTY.NET, AND OR ENGAGE THE COUNTY IN WEEKLY
OPERATIONS PLANNING MEETING(S). CONTRACTOR SHALL INFORM THE COUNTY OF
EXPECTED OPERATIONS TO THE LEVEL THAT INSPECTORS SHOULD BE ABLE TO
LOCATE AND INSPECT CONTRACTOR’S WORK ON A DAILY BASIS. CONTRACTOR SHALL
PROVIDE A PRIMARY AND SECONDARY POINT OF OPERATIONAL CONTACT THAT CAN BE
CONTACTED AT ANY TIME DURING THIS PERMIT TO ADDRESS PROBLEMS THAT ARISE.
CONTACT THE BUTTE COUNTY PUBLIC WORKS 24 HOURS PRIOR TO STARTING WORKAT