This solicitation is for a revised stewardship contract to restore forest health and reduce hazardous fuels along roads within the North Complex Fire area in California. Mandatory work includes mechanically removing unmerchantable trees and small fuels along roadsides, decking merchantable logs, improving watershed conditions through specified road work, and cutting and leaving roadside hazardous fuels. An optional item includes cutting and piling fuels within interior units. Removal of products under a timber sale agreement is optional. Mandatory road reconstruction and roadside hazardous fuel treatment items must be completed by October 31, 2023. Optional interior unit work, if awarded, must be finished by October 2024 or 2025 depending on the item. No product removal is required but could be priced and included under an optional item. The solicitation was reissued with restructured requirements to ensure priority work is accomplished.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment2_SF30_CorrectOptionalItem11Description.pdf | ||
| Amendment1_SF30_StrikeLaborLawClauses.pdf | ||
| Attachment8_Svc_Foresty_WageDet_1977_0727_031522.pdf | ||
| Attachment7_FirePlan.doc | DOC document | |
| Attachment6_ServiceWorkMap.pdf | ||
| Attachment3_AppendixC.pdf | ||
| Attachment2_AppendixB_Scaled.pdf | ||
| FinalSolicitation_BerryBrushIRSCRevised.pdf | ||
| Attachment12_ContractShapes.gdb.zip | ZIP file | |
| Attachment11_OriginalSolicitation_Site_Visit_Notes.pdf | ||
| Attachment4_ AppendixD.pdf | ||
| Attachment9_ConWageDecision_Hwy_CA20220007_040122.pdf | ||
| Attachment13_ButteCountyEncroachmentPermit.pdf | ||
| Attachment10_PresolicitationSiteVisitNotes_020822Mtg.pdf | ||
| Attachment5_VicinityMap_020722.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Berry Brush Stewardship IRSC 12363N22Q4021 Plumas NF, Feather River RD Page 1 of 10
APPENDIX A
TECHNICAL SPECIFICATIONS FOR SERVICE WORK ITEMS
SECTION I – DESCRIPTION OF WORK:
The objectives of this project are to perform mitigation treatment of standing and downed fire killed fuels along and adjacent to roads within the North Complex Fire of 2020. These roadside fuels treatments are a vital step of the continued post-fire restoration activities to ensure safe access and working conditions.
1. Mechanically remove unmerchantable trees and small diameter hazardous fuels along roadsides to landings to be later burned by FS or chipped/removed from contract area. Deck merchantable logs for possible removal.
2. Improve watershed condition through performance of specified road work.
3. Cut roadside hazardous fuels and leave in place if awarded.
4. Cut, deck and pile hazardous fuels within interior units if awarded.
5. Remove product per Timber Subject to Agreement if awarded.
SECTION II – WORK ITEMS
Mandatory Item 1-8: Road Reconstruction See Appendix D for road reconstruction.
Mandatory Item 9: Roadside Fuels Treatment – Cut, Skid, Deck, and Pile and Optional Item 10:
Roadside Fuels Treatment – Cut, Skid, Deck, and Pile
Optional Item 10
Unit Acres
8 48 9 76 12 4 16 109 18 31 19 76 20 64 21 93 25 23
Total 524
Mandatory Item 9
Unit Acres
2 7 4 12 5 3 6 10 7 66
10 134 11 47 17 82 26 74
Total 435
Plumas NF, Feather River RD Page 2 of 10
Cut and Skid Specifications:
1. Dead conifers and hardwoods from 8.0” DBH and larger that can reach roadsides shall be felled.
2. Structurally damaged trees 8.0” DBH and larger where failure and/or tree mortality is highly likely, or designated by FS, and that can reasonably hit the road shall be felled.
3. Live conifers and hardwoods with greater than 10% green crown remaining shall be retained as Leave
Trees. Stump sprouts do not count on hardwoods as live crown. Selected leave trees shall not be damaged by the Contractor’s operations.
4. No mechanical vegetation treatment shall occur within stream course buffer strips shown on Contract Area Map or other Restricted Areas identified on the ground and shown on Contract Area Map.
5. All vegetative trees shall be cut with a maximum allowable stump height of 12 inches as measured from the high side of the tree. Stump heights can be higher on slopes of 35 percent or more.
6. Unless otherwise agreed, tree bole material greater than 10 feet in length from all hardwood and conifer trees required to be cut or are previously downed shall be skid and/or yarded to landings shown on the CAM or agreed upon disposal sites to be piled or decked.
7. Areas with slopes of 30 percent or greater, trees shall be felled and bucked, but not skidded. Contour fall across slopes for slope stability. Avoid jack strawing material. Ensure downed logs will stay in place and not roll on to roadways. Use of high stumps may be used here to allow for holding logs in place.
Deck Specifications:
1. All trees larger than 20” DBH with a minimum 20’ length piece shall be decked separately from piles.
2. Trees shall be decked as whole trees with no required processing.
3. Decks shall be located to allow for future processing and removal of products. Where practicable, decks shall be parallel to roads to allow future processing.
Pile Specifications:
1. Piles shall be neat, compact, and sufficiently free of dirt to allow consumption of the piled debris when burned.
2. Piles shall be constructed by alternating the butt ends of the logs and tops to help provide fine material on either end of the pile, to achieve pile compaction and to help aid in ignition.
3. No maximum height.
4. Minimum Pile height is 6 feet. Vegetative material will be moved distances up to 150 feet or as necessary to attain minimum height or meet other pile location criteria stated below.
5. Piles shall be located to minimize damage to residual, live trees (at least 75 feet from the boles of live trees) when piles are burned. No piles shall be located within 50 feet of ephemeral stream channels or within 100 feet of intermittent or perennial drainages or 50 feet of treatment unit boundaries with private property. No piles will be located within 150 feet horizontal distance of power lines or transmission lines.
No piles will be located within 100 feet horizontal distance of roadsides.
6. If because of unit shape, presence of live trees or terrain conditions it is not possible to attain distance limitations specified above, Contractor and Forest Service will agree on pile locations.
7. Piling shall be accomplished with minimal disturbance to topsoil and existing Down, Large logs (See Definitions). Minimize turning of tracked equipment.
8. A fire line to mineral soil shall be constructed around each pile and shall be a minimum 36 inches width.
Fire line will not contain any substantial quantities of dead, vegetative material. If multiple smaller piles
Plumas NF, Feather River RD Page 3 of 10 are within 250 feet horizontal distance of each other, larger fire lines can encircle multiple piles.
9. Piles shall be covered in two places with 15’ by 15’ pieces of waterproof covering.
Optional Item 11: Roadside Fuels Treatment – Cut, Skid, Deck, and Pile
Unit Acres 1 15 45 18 46 25 48 13 49 72 50 31 51 46
Total 220
Cut and pile all dead conifer and hardwood species (8.0-inch dbh and above) in units 1, 45-51 that can reach the roads with option to remove sawtimber in roadside areas and in remaining portion of units. Dead and damaged trees shall be cut and piled to the same general standards as Items 9 and 10.
Optional Item 12: Roadside Fuels Treatment – Cut and Leave
Unit Acres 29 24 37 19 38 21 44 9 56 8
Total 81
Fall and leave all dead conifer and hardwood species larger than 8.0-inch dbh that can reach the roads with option to remove sawtimber. No limbing required. Ditches and road prism shall be kept free of debris. Contour fall across slopes for slope stability. Avoid jack strawing material.
Optional Item 13: Interior Units Cut and Pile
Unit Acres Unit Acres 1opt 15 11opt 29 2opt 25 12opt 114 3opt 99 13opt 9 4opt 5 14opt 33 5opt 5 15opt 21 6opt 14 16opt 183 7opt 42 25opt 13 8opt 17 26opt 80 9opt 38 Total 742
Plumas NF, Feather River RD Page 4 of 10
• Cut all dead conifer and hardwood species 8.0-inch dbh and above in interior units.
• Live conifers and hardwoods with greater than 10% green crown remaining shall be retained as Leave
Trees. Stump sprouts do not count on hardwoods as live crown. Selected leave trees shall not be damaged by the Contractor’s operations.
• All cut trees and any downed slash or logs larger than 12” in diameter and 10’ in length shall be piled to the specifications of Items 9 and 10 above.
• No skidding, decking, or sorting of saw log size material is required unless material is added as TSA.
Optional Item 14: Removal of Timber Subject to Agreement
1. All products associated with units in Items 9, 10, and 11 are available for subsidized removal.
2. Products shall be scaled prior to loading on rail cars if applicable.
3. Pine logs may be transported within ecological bug/pest zones with no required mitigation measures to prevent the transport and spread of forest pests. See Figure 1 below.
4. Transportation of all other species and products are subject to pest mitigation measures including, but not limited to, debarking. Chemical fumigation treatment may be required to transport specific species to specific geographic areas.
5. If additional mitigation measures are required or waived, contractor shall be notified prior to award of Option Item and price negotiated. If additional mitigation requirements are determined to be required or waived after award, modification shall be negotiated per the changes clause of FAR 52.212-4.
Figure 1: Pine Log Transport – Ecological pest zone with no required debarking mitigation of pine logs within Northern California and Oregon.
SECTION III – CONTROL OF WORK
The Contractor agrees to conduct its operations under this contract and other related business activities in compliance with Federal, State, and local statutes, standards, orders, permits and other regulations.
The Contractor shall meet all State and local environmental quality laws applicable to National Forest system lands.
Plumas NF, Feather River RD Page 5 of 10
Work may be done any time during the term of the contract, except under the following conditions:
(1) When conditions are such that operations shall be restricted or ceased due to increased fire risk.
(2) When seasonal operating restrictions for active raptor nests are in effect. All active nest sites and areas of restriction are shown on CAM and listed in the solicitation under Protection Measures Needed for Plants Animals, Cultural Resources, and Cave Resources. Restrictions would apply:
(3) If new nests are discovered
(4) When soil moisture conditions create excessive risk of damage to the soil
(5) When snow depth creates a situation where requirements cannot be met and/or work cannot be inspected, as determined by the COR
(6) The government reserves the right to prioritize the order in which Units are treated.
(7) If any cultural or archeological sites are discovered during operations of this contract, work will be suspended in the immediate vicinity of the site until a reconnaissance survey is completed by the Forest Archeologist. Areas excluded from treatment shall be deleted from the contract.
SECTION IV – INSPECTION AND ACCEPTANCE
For All Work Items:
At any point during the project, the Contractor and/or Project Manager may request (documented through email, text, or hand-written request) an in the field consultation with the Forest Service to inspect work progress, review contract specifications, or clarify issues. The Forest Service shall respond to Contractor’s request within 5 working days, excluding weekends and federal holidays.
GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN
The COR, or a designated inspector (GTM), will make periodic inspections while work is in progress, usually daily at first, as needed to assure work is proceeding satisfactorily. The Contractor shall notify the COR when units are started, when problems are encountered and when contract work needs government oversight.
1. Each unit will be inspected as a separate unit. Unit will not be averaged with other units for acceptance or payment.
2. When units are completed and ready for government inspection, Contractor’s designated Project manager shall request unit inspection in writing, prior to moving out of the general area.
3. The COR, or designated inspector, will determine compliance with contract specifications through informal visual inspections. In the event visual inspection indicates work to be in non-compliance with specifications, prompt corrective action and/or rework shall be required.
Government Inspection Procedures – Items 1-8
1. Visual inspection with spot measurements as needed to ensure compliance with specifications of Appendix D.
Government Inspection Procedures – Items 9 - 13
Plumas NF, Feather River RD Page 6 of 10
1. In the event visual inspection indicates work and/or rework to be in non-compliance with contract specifications, a series of verification plots shall be installed by the Government to determine compliance with specifications and percent of satisfactory work for treatment of each unit not meeting specification as observed with visual inspection.
2. Government verification plots will consist of a series of fixed area plots that will have 4 quadrants of pass or fail.
3. Plots and grid will be distributed so that a representative sample is obtained. Pile locations including landings may be sampled in plots to determine overall quality.
4. The COR or designated inspector will mark the center of each plot on the ground using flagging, stakes, or pin flags. Additional flagging will be hung near the plot center so that it may be seen from a distance.
The inspector will include the plot number, their initials and date on the flagging.
5. Plots will be numbered to correlate with the inspection form and transects on a unit map.
6. The minimum number of verification plots, per treatment unit, shall be as follows:
Unit Acreage Minimum No. of Plots 1 – 9 1 plot per 2 acres 10 – 29 10 plots 30 – 59 1 plot per 4 acres 60 – 99 20 plots 100 1 plot per 5 acres
7. Determination of acceptability of the work performed will be based on Government verification inspections and will be considered conclusive.
8. At each plot, the Government will examine the plot area and record findings on the items listed below:
a. Plot number
b. Number of satisfactory trees.
c. Number of excess trees.
d. Number of unacceptable and/or acceptable piles.
Cut trees which are still attached at the stump will be counted as excess trees Trees meeting cut specifications will be counted as excess trees Trees in excess of trees to be left will be counted as excess
Government Inspection Procedures – Item 14
The COR, or a designated inspector (GTM), will make periodic inspections of loads in transit per standard utilization inspection procedures, log storage and transfer locations prior to re-loading and transporting via rail if applicable. Government reserves the right to inspect product end-delivery locations to ensure domestic processing of products transported via rail. Scale certifications of surplus products will be compared to rail transport invoiced quantities.
Table 1 – Minimum Acceptable Quality Levels (AQL) of Work
ITEM DESCRIPTION SCHEDULE UNIT MIN
AQL
Plumas NF, Feather River RD Page 7 of 10
1-8 Spec Road Work-Road Reconstruction MANDATORY Mile 100% 9 Fuels Treatment – Cut, Skid, Deck, and Pile MANDATORY Acre 90% 10 Fuels Treatment – Cut, Skid, Deck, and Pile OPTIONAL Acre 90% 11 Fuels Treatment – Cut, Skid, Deck, and Pile OPTIONAL Acre 90% 12 Roadside Hazard Tree - cut and leave OPTIONAL Acre 90% 13 Interior Units - Fuels Treatment - Cut, Deck, and Pile OPTIONAL Acre 90% 14 Removal of Timber Subject to Agreement OPTIONAL TON 100%
Unsatisfactory Performance
1. If the work quality falls below the minimum AQL, the COR will immediately notify the Contractor, in writing, and order him to improve the quality of subsequent tree cutting.
2. If after rework has been performed and reinspected, and work quality still falls below minimum AQL percent, payment will either be made at a reduced rate, or not at all, as determined in SECTION V below.
3. Repeated failure to produce work quality at or above the minimum acceptable standard will be considered reason for contract termination for cause.
Reinspection Upon Contractor Request
1. If Government inspection results are unacceptable to the Contractor, a reinspection may be requested, in writing, within 5 business days after receipt of notice of said inspection results. The same inspection procedure will be used; however, the inspection pattern will be shifted so that new inspection plots will not overlap previously inspected plots.
2. If reinspection results – rounded up to the nearest whole percent – indicate a variance of more than 5 percent from the first inspection, the results of the second inspection will be used to calculate work quality and payment, and the Government will bear the cost of reinspection.
3. If reinspection results – rounded up to the nearest whole percent – are within 5 percent of the first inspection, plots from the initial inspection and the reinspection will be combined and used to calculate work quality and payment, and the Contractor shall bear the cost of reinspection.
SECTION V – PAYMENT METHODS
Method of Measurement for Acreages
Acreages were determined by using Global Positioning Systems (GPS). The acreage for each work item will be rounded to the nearest acre and is final unless:
a. The contract is modified or,
b. The Government makes a determination to remeasure or,
c. The Contractor exercises his/her option under the following Re-measurement provisions:
Re-measurement
1. The Contractor may request, in writing, remeasurement of any units under this contract if he/she feels that acreage stated on the project maps is incorrect. The remeasurement must be within the existing
Plumas NF, Feather River RD Page 8 of 10 perimeter of the respective unit. No variance of the unit perimeters as laid out on the ground for this contract will be allowed. All requests for remeasurement must be made prior to payment for each completed unit. Remeasurement will be performed by the Government.
2. If re-measurement indicates that a variance of ten percent or less exists on units of 1 to 5 acres, five percent or less exists on units of more than five but less than 20 acres, or if three percent or less exists on units of 20 acres or larger, the Contractor shall pay for the actual costs of the re-measurement. Under this condition, payment will be made on the acreage stated on the project maps. If the re-measurement indicates the actual acreage varies by more than the above factors from that stated on the project maps, the payment will be made on the re-measured acreage and the Forest Service will pay for the cost of the re-measurement.
Acceptance and Payment – Items 1-8 Specified Road Work
1. If visual inspection indicates acceptable work quality, the Contractor will be paid 100 percent of their bid rate.
2. Only one rework opportunity will be allowed for this item.
Acceptance and Payment –Items 9-13
1. If informal visual inspection indicates acceptable work quality, the Contractor will be paid 100 percent of their bid rate.
2. In the event that formal inspections are used, the rate of payment to the Contractor will be calculated as follows:
(a) For work quality of 90 percent or higher, the Contractor will be paid 100 percent of their bid rate.
(b) For work quality from 85 to 89 percent after rework, the Contractor will be paid the total multiplied by the bid rate.
(c) For work quality 84 percent and less after rework, no payment made to the Contractor.
Acceptance and Payment – Option Item 14 Full payment will be made with acceptable proof of transport for quantities invoiced.
*Stewardship Credits will be earned first, whenever practical. Forest Service Funds will be used if the availability of Stewardship Credits is exhausted or if appropriated dollars are obligated to a specific item.
SECTION VI – DEFINITIONS
ACCEPTABLE QUALITY LEVEL (AQL): Acceptance of work will be based on compliance with all specifications corresponding to the appropriate task(s); refer to the Performance Requirements Summary in
Plumas NF, Feather River RD Page 9 of 10
Section E.4 of the contract. A minimum AQL is required for all service work – hand or mechanical. The minimum AQL will receive a satisfactory performance rating.
BIOMASS TREES: Any conifer material 6 feet in height to 3.0 to 9.9 inches DBH.
BOLE SPACING: The horizontal distance in feet from the edge of one leave tree bole to another leave tree bole, measured from the outside bark of each tree.
CIRCULAR PLOT: A sample plot within a thinning unit that is used to determine the number of desirable trees and other contract specifications.
COARSE WOODY DEBRIS: Woody material left on the ground to meet wildlife habitat requirements.
CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.
CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.
CLEARCUT: A cutting prescription in which all trees within a boundary are designated to be cut.
CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.
CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.
CUT TREES: Trees that do not possess the characteristics of desirable leave trees and are required to be cut.
As described by the contract or otherwise marked to be cut.
CUTTING UNIT: See Treatment Unit definition
DAMAGED TREES: Trees damaged beyond recovery. A tree that is larger than 2 feet in height, and has the top knocked out, is leaning more than 10 degrees, has less than one half of its original limbs, or has approximately 50% of bark removed from the circumference of the bole.
DBH: Diameter at breast height, measured at a point of 4.5 feet above the ground level on the uphill side of the tree.
DECKING: Stockpiling of trees in a designated area.
DEAD/DYING TREES: Trees with the crown foliage changing from green to red, yellow, or needleless. Any tree that has pitch tubes indicating Mountain Pine Beetle infestation.
DESIGNATION BY SPECIES AND DIAMETER (DXSD): A cutting prescription in which species and diameter are used to determine which trees will be left and which will be cut.
DIB: Diameter inside bark.
HANG-UP TREE: Any cut tree suspended above ground level.
HEALTHY REGENERATION: Young, healthy, dwarf mistletoe free conifers, less than 4.9 inches in diameter, free of defect or characteristics listed in Section II, 2.2.2.
LEAVE TREE: Trees that possess desirable characteristics and that serve to create the basis for designated spacing requirements or are otherwise designated to be left.
Plumas NF, Feather River RD Page 10 of 10
NON-SAWTIMBER TREE: For all conifer species, minimum diameter of 5 inches DBH to minimum diameter by species identified in Appendix B, Division A.
OVERSTORY REMOVAL: A cutting prescription where all trees greater than a specified size are cut. Trees less than the specified size are protected.
PAYMENT UNIT: See Treatment Unit.
PERFORMANCE REQUIREMENTS SUMMARY (PRS): Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the Contractor.
PILING: Material moved to an agreed upon location shall be piled for future treatment by Forest Service.
PROGRESSION OF WORK: Work conducted in a progressive, workmanlike and orderly manner by the Contractor.
RESERVE CLUMPS: Groups of trees within a treatment area that are protected from cutting, may also include Individual Reserve trees.
SAWTIMBER TREE: Included timber meeting sawlog size specifications as defined in Appendix B, Division A.2.
SLASH: Woody material existing or created that has accumulated on the forest floor. Woody material includes logs, pieces of logs, tops, and branches.
UNIT: See Treatment Unit.
TEMPORARY ROADS: Non-permanent roads that are constructed by Contractor for the purpose of treatment unit access.
TREATMENT UNIT: An individual area on the ground in which activities will be performed and which may appear as a separate pay item in the Schedule of Items.
UNSATISFACTORY WORK: If work quality falls below the AQL, the COR will issue a work order or notice of noncompliance to the Contractor in writing. Untreated or unsatisfactory treated areas shall be reworked to obtain satisfactory work quality.
WHOLE TREE YARDING: Whole tree logging includes cutting tree and removing the entire tree, including tops and branches, to the landing.
WILDLIFE TREE: Standing tree marked to be reserved as a wildlife tree. Used by birds and small mammals for shelter, nesting, perching, etc.
| Acceptance and Payment – Items 1-8 Specified Road Work |
| 2. Only one rework opportunity will be allowed for this item. |