Attachment33_CAWO_Electronic_Programs_Specifications_for_Interim_and_Final_Deliverables.docx

DOCX document 21 KB Posted

Attached to
HAFC CAWO EXHIBIT FABRICATION Federal contract opportunity
Solicitation number
140P2122R0005
Issued by
Department of the Interior National Park Service

About this file

This document outlines specifications for interim and final deliverables for electronic programs produced under a federal contract. It requires the contractor to provide field documentation, source materials, and three sets of redundant hard drives after each shoot and with final deliverables. Interim deliverables are due within 20 business days of each shoot completion and must include shooting scripts, transcriptions, production stills, release forms, footage logs, source video and audio files, and proxy files. Final deliverables comprising completed programs organized into folders as specified must be submitted for review on two Mac-formatted and one Windows-formatted encrypted hard drives meeting the outlined requirements. Relatedly, the federal contract opportunity is for exhibit fabrication services for HAFC CAWO with the National Park Service as the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to HAFC CAWO EXHIBIT FABRICATION, newest first.
File Type Posted
Attachment_B_-_CAWO_Text_Level_IV_FINAL_03_House_20210319a_0002.docx DOCX document
Attachment_D_-_CAWO_Text_Level_IV_FINAL_05_and_07_20210319a_0002.docx DOCX document
Sol_140P2122R0005_Amd_0002.pdf PDF
Sol_140P2122R0005_Amd_0001.pdf PDF
CAWO_GL_Graphic_Layout_Schedule_20210319_0001.pdf PDF
Attachment18_Part_2_CAWO_Case_Layouts.pdf PDF
Attachment18_Part_1__CAWO_Case_Layouts.pdf PDF
Attachment12_CAWO_Content_Package.pdf PDF
Attachment7_Component_Inventory_Sample.xlsx XLSX spreadsheet
Attachment11_Part_9_Pages_161-180_CAWO_Production_Design_Documents.pdf PDF
Attachment11_Part_5_Pages_81-100_CAWO_Production_Design_Documents.pdf PDF
Attachment36_Cost_Estimate_Form.xlsx XLSX spreadsheet
Attachment24_CAWO_Electronic_Equipment_Schedule.pdf PDF
Attachment23_CAWO_Custom_Elements_Schedule.xlsx XLSX spreadsheet
Attachment22_CAWO_Case_Schedule.pdf PDF
Attachment21_CAWO_AV_Assets_Schedule_.pdf PDF
Attachment20_CAWO_Accessioned_Objects_Schedule.pdf PDF
Attachment31_NPS_Materials_Release_Form.pdf PDF
Attachment14_CAWO_New_Photography.pdf PDF
Attachment4_Programmatic_Accessibility_Guidelines_for_National_Park_Service_Interpretive_Media.pdf PDF
Attachment15_CAWO_Media_Programs_Part_1.pdf PDF
Attachment6_Component_Inventory_Schedule_Form.xlsx XLSX spreadsheet
Attachment11_Part_1_Pages_1-20_CAWO_Production_Design_Documents.pdf PDF
Attachment13_CAWO_Drawing_Package.pdf PDF
Attachment28_CAWO_Bookspines_Image_Schedule.pdf PDF
Attachment19_CAWO_Specialty_and_Lighting_Cutsheets.pdf PDF
Attachment35_CAWO_Electronic_Programs_File_Naming_Conventions.pdf PDF
Attachment32_CAWO_Electronic_Programs_Specifications_for_Interim_and_Final_Deliverables.docx DOCX document
Attachment30_NPS_Individual_Release_Form.pdf PDF
Attachment17_Descriptive_Tour_Equipment.pdf PDF
Attachment10_DescriptiveExhibitTourInstallationEquipmentGuide.pdf PDF
Attachment9_Art_Documentation_Form.pdf PDF
Attachment2_Exhibit_Conservation_Guidelines.pdf PDF
Attachment8_AV_Completion_Report.pdf PDF
Attachment15_CAWO_Media_Programs_Part_2_.pdf PDF
Attachment16_CAWO_Media_Cutsheets.pdf PDF
Attachment11_Part_12_Pages_221-241_CAWO_Production_Design_Documents.pdf PDF
Attachment11_Part_11_Pages_201-220_CAWO_Production_Design_Documents.pdf PDF
Attachment26_CAWO_Image_Schedule.pdf PDF
Attachment25_CAWO_Electronic_Programs_Schedule.pdf PDF
Attachment11_Part_10_Pages_181-200_CAWO_Production_Design_Documents.pdf PDF
Attachment11_Part_7_Pages_120-140_CAWO_Production_Design_Documents.pdf PDF
Attachment11_Part_6_Pages_101-120_CAWO_Production_Design_Documents.pdf PDF
Attachment11_Part_4_Pages_61-80_CAWO_Production_Design_Documents.pdf PDF
Attachment11_Part_3_Pages_41-60_CAWO_Production_Design_Documents.pdf PDF
Attachment11_Part_2_Pages_21-40_CAWO_Production_Design_Documents.pdf PDF
Attachment37_Past_Performance_Questionnaire.pdf PDF
Attachment5_National_Park_Service_Standard_Specifications_for_Planning_Design_Production_and_Installation_of_Electronic_Programs.pdf PDF
Attachment3_Architectural_Barriers_Act_(ABA)_Standards.pdf PDF
Attachment29_CAWO_Exterior_Sign_Elements.pdf PDF
Show all 50

HAFC CAWO EXHIBIT FABRICATION has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 33 CAWO Electronic Programs Specifications for Interim and Final Deliverables September 23, 2021

I. Hard Drive Specifications

The contractor shall provide Interim and Final Deliverables for all Electronic Programs on hard drive unless otherwise specified in the Scope of Work. See Attachment 34: CAWO Table of Final Deliverables for Electronic Programs, Attachment 35: CAWO Electronic Programs Folder Structure, and Attachment 36: CAWO Electronic Programs File Naming Conventions for guidance on how to organize folders and files on these hard drives.

Hard drives shall meet the following requirements:

1. Industry standard USB 3, USB C, or faster connection.

2. Spinning-disk hard drives shall be 7200rpm (revolutions per minute) or higher.

3. Total space used shall not exceed 75% percent of drive capacity. (Example: a 10TB drive shall contain a maximum of 7.5TB of data)

4. All power and connector cords shall be included.

5. File systems:

A. Apple Hierarchical File System Plus (HFS+) for all Mac-formatted spinning hard drives B. Apple File System (APFS) for all Mac-formatted solid-state drives C. Microsoft New Technology File System (NTFS) for all Windows-formatted drives

6. Encryption is required on all hard drives.

A. Encryption software shall be approved by the COR prior to compiling the hard drives.

B. Mac-formatted drives shall be encrypted using FileVault.

C. Windows-formatted drives shall be encrypted using BitLocker.

7. Hard drives and packaging shall be physically labeled as follows:

A. Park alpha code (CAWO) B. AV number (see Attachment 34: CAWO Table of Final Deliverables for Electronic Programs) C. Drive sequence number (i.e., 1 of 3) D. Brief description of contents (organized by file structure guidelines—see Attachment 35: CAWO Electronic Programs Folder Structure)

II. Interim Deliverables

1. After each shoot, the contractor shall provide the following field documentation submittals and source materials on hard drive to the COR for review and approval:

A. Field Documentation

1. The approved Shooting Script and Filming Schedule

2. Transcriptions for any interviews or character dialogue

3. A minimum of five production stills and five behind-the-scenes photos for marketing materials. Photos shall be high resolution TIF or jpg, 300 dpi at 9” x 12” and cleared for all uses.

4. PDF scans of signed NPS release forms

5. Footage and audio logs, including:

a. date of filming

b. location of filming

c. description of scenes including any discrete scene numbers

d. camera(s) used

e. type of audio recorded

f. notes for syncing multi-camera shoots and separate audio recordings

g. other information pertinent to identifying the footage

h. Identification on anyone speaking on screen

i. thumbnails from each shot (using software such as Shotput Pro 6, TrueCheck, Foolcat, or equal)

B. Source Materials:

1. All original video files from all shoots in native camera file format. All files shall have unique file names, and the naming convention shall contain the park alpha code (CAWO).

2. Audio files both sync and wild in their native format 48K 16-bit.

3. Proxy files (produced synchronously in-camera or using a post-process) at 1080p resolution for playback using standard office software. Proxy files shall be “clean” with no burned-in timecode.

2. The contractor shall back up all Interim Deliverables on redundant hard drives after each shoot. A minimum of three redundant hard drives per shoot are required as follows:

A. Drive #1: Mac-formatted and encrypted per the specifications above. The contractor shall deliver this drive to the COR for review and approval no later than 20 business days after completion of each shoot.

B. Drive #2: Mac-formatted and encrypted per the specifications above. Identical to Drive #1. The contractor shall deliver this drive to the COR as part of the Final Deliverables package.

C. Drive #3: Windows-formatted and encrypted per the specifications above. Otherwise, identical to Drive #1. The contractor shall deliver this drive to the COR as part of the Final Deliverables package.

3. In addition to the hard drives provided to the COR, the contractor shall back up all digital files to a minimum of two physical locations and shall be responsible for the safety of all assets until the final deliverables are submitted and accepted.

III. Final Deliverables

1. The contractor shall provide Final Deliverables for all Electronic Programs on three redundant hard drives (or hard drive sets, if the required files will not fit onto a single drive) to the COR for review and approval.

A. Two of the hard drives shall be Mac-formatted and encrypted per the specifications above.

B. One of the hard drives shall be Windows-formatted and encrypted per the specifications above.

2. Final Deliverables shall be organized into folders as shown in Attachment 35: CAWO Electronic Programs Folder Structure. Each hard drive shall be divided into three main folders:

A. 01_FinalDeliverables B. 02_CompletionReport C. 03_Project Files

3. Each main folder shall contain multiple subfolders labeled and organized as shown in Attachment 34: CAWO Table of Final Deliverables for Electronic Programs and Attachment 35: CAWO Electronic Programs Folder Structure. Files within these folders shall follow the naming conventions referenced in Attachment 34: CAWO Table of Final Deliverables for Electronic Programs and Attachment 36: CAWO Electronic Programs File Naming Conventions.

File details come from the government source that posted it. Updated .