Attachment10_Cost_Estimate_Form.xlsx
XLSX spreadsheet 42 KB Posted
- Attached to
- HAFC BICR HISTORIC FURNISHINGS REPORT
- Solicitation number
- 140P2124R0038
About this file
This document appears to be an attachment to a federal contract opportunity, specifically a sample cost estimate form. The form provides a detailed breakdown of anticipated costs for various elements of an exhibit project, including project management, research, travel, report preparation, shipping/distribution, and project closeout. It includes estimates for materials and labor hours across different task categories. While the document does not appear to be a complete solicitation or Performance Work Statement, it provides insight into the level of detail required for cost estimation in a federal contract opportunity. The related federal contract opportunity is for a "HAFC BICR HISTORIC FURNISHINGS REPORT" solicited by the Department of the Interior National Park Service.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gov't Est
| Attachment 10: Sample Cost Estimate Form | ||
| PROJECT MANAGEMENT | $0.00 | |
| Materials | $0.00 | |
| Labor | $0.00 | |
| RESEARCH | $0.00 | |
| Materials | $0.00 | |
| Labor | $0.00 | |
| SITE VISITS/TRAVEL | $0.00 | |
| Materials | $0.00 | |
| Labor | $0.00 | |
| REPORT PREPARATION | $0.00 | |
| Materials | $0.00 | |
| Labor | $0.00 | |
| REPORT PRODUCTION | $0.00 | |
| Materials | $0.00 | |
| Labor | $0.00 | |
| RIGHTS AND REPRODUCTIONS | $0.00 | |
| Materials | $0.00 | |
| Labor | $0.00 | |
| SHIPPING/DISTRIBUTION | $0.00 | |
| Materials | $0.00 | |
| Labor | $0.00 | |
| PROJECT CLOSEOUT | $0.00 | |
| Materials | $0.00 | |
| Labor | $0.00 |
| Total Materials Cost | $0.00 | |
| Total Labor Hours | $0.00 | |
| Total | $0.00 |
TRAVEL CLIN $0.00
Total Contract Amount $0.00
Details
| PROJECT MANAGEMENT (excluding travel) | |||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| Fabrication Drawings | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Miscellaneous | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | ||
| MARK-UP on materials | 15 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| detailer | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Fabrication Drawings $0.00
| Samples/Mock-ups/Prototypes | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| graphic samples | job | $0.00 | |||
| graphic samples-color proofs | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | ||
| MARK-UP on materials | 15 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| exhibit spec-fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Samples $0.00
| Exhibit Structures | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Sc 1 | |||||
| Locking Case | job | $0.00 | |||
| Brochure Holder | job | $0.00 | |||
| Sc 2 | |||||
| Frames and backers | job | $0.00 | |||
| Donation Box | job | $0.00 | |||
| Passport Station | job | $0.00 | |||
| Geology Vista Wall | job | $0.00 | |||
| Sc 3 | |||||
| Desk | job | $0.00 | |||
| Sc 4 | |||||
| Frames and backers | job | $0.00 | |||
| tactile model base | job | $0.00 | |||
| Reader rails | job | $0.00 | |||
| Multipurpose tables and stools | job | $0.00 | |||
| Benches | job | $0.00 | |||
| Sand/Wind base | job | $0.00 | |||
| Sc 5 | |||||
| Diorama base | job | $0.00 | |||
| Sc 7 | |||||
| Frames and backers | job | $0.00 | |||
| Benches | job | $0.00 | |||
| Diorama structure | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | ||
| MARK-UP on materials | 15 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| shop supervisor | hours @ | $0.00 | |||
| exhibit spec-fabrication | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Exhibit Structures $0.00
| Display Objects and Specialty Elements | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Sc 4 | |||||
| Relief map model | job | $0.00 | |||
| Dunes tactile model | job | $0.00 | |||
| Sand/wind interactive | job | $0.00 | |||
| Sc 5 | |||||
| Sabkha/Grassland diorama | job | $0.00 | |||
| Animal tracks tactiles | job | $0.00 | |||
| Yucca tactile | job | $0.00 | |||
| Monitoring well | job | $0.00 | |||
| Dunes diorama | job | $0.00 | |||
| Endemic Species interactive | job | $0.00 | |||
| Samd grain interactive | job | $0.00 | |||
| Montane diorama | job | $0.00 | |||
| Animal scat tactiles | job | $0.00 | |||
| Alpine diorama | job | $0.00 | |||
| Bighorn tactile | job | $0.00 | |||
| Tree cookie tactile | job | $0.00 | |||
| Sc 7 | |||||
| Night diorama | job | $0.00 | |||
| animal tactiles | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | ||
| MARK-UP on materials | 15 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Map model maker | hours @ | $0.00 | |||
| Model maker | hours @ | $0.00 | |||
| 3D printer | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL DO and SE $0.00
| Electrical/Electronic | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Sc 2 | |||||
| Donation box tablet | job | $0.00 | |||
| Sc 3 | |||||
| Desk Monitors | job | $0.00 | |||
| Sc 4 | |||||
| relief model monitor | job | $0.00 | |||
| Sc 5 | |||||
| Audio speakers, player, motion sensor | job | $0.00 | |||
| Surge flow monitor | job | $0.00 | |||
| Sc 7 | |||||
| Star program equipment | job | $0.00 | |||
| Digital flipbook equipment | job | $0.00 |
| SUBTOTAL, AV EQUIPMENT | $0.00 | ||
| MARK-UP on materials | 15 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| AV - Videographer | hours @ | $0.00 | |||
| AV - Producer | hours @ | $0.00 | |||
| AV - Animator | hours @ | $0.00 | |||
| Audio Describer | hours @ | $0.00 | |||
| Exhibit sepc - Lighting | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Electrical/Mechanical/AV $0.00
| Graphics | |||||
| MATERIALS: | qty. | unit | dig output | amount | |
| Sc 1 | |||||
| 01.01-100 | job | $0.00 | |||
| 01.01-200 | job | $0.00 | |||
| 01.01-300 | job | $0.00 | |||
| 01.01-500 | job | $0.00 | |||
| Sc 2 | |||||
| 02.01-100 | job | $0.00 | |||
| 02.01-200 | job | $0.00 | |||
| 02.02-100 | job | $0.00 | |||
| 02.02-200 | job | $0.00 | |||
| 02.02-400 | job | $0.00 | |||
| 02.02-500 | job | $0.00 | |||
| 02.02-600 | job | $0.00 | |||
| 02.02-700 | job | $0.00 | |||
| 02.03-100 | job | $0.00 | |||
| 02.03-200 | job | $0.00 | |||
| 02.03-400 | job | $0.00 | |||
| 02.03-500 | job | $0.00 | |||
| 02.04-100 | job | $0.00 | |||
| 02.04-300 | job | $0.00 | |||
| 02.04-400 | job | $0.00 | |||
| Sc 4 | |||||
| 04.01-100 | job | $0.00 | |||
| 04.01-200 | job | $0.00 | |||
| 04.01-300 | job | $0.00 | |||
| 04.01-500 | job | $0.00 | |||
| 04.03-100/200/300 | job | $0.00 | |||
| Sc 5 | |||||
| 05.01-100 | job | $0.00 | |||
| 05.01-205 | job | $0.00 | |||
| 05.01-215 | job | $0.00 | |||
| 05.01-225 | job | $0.00 | |||
| 05.01-300 | job | $0.00 | |||
| 05.01-400 flipbook | job | $0.00 | |||
| 05.01-550 | job | $0.00 | |||
| 05.01-650 | job | $0.00 | |||
| 05.01-700 | job | $0.00 | |||
| 05.01-750 | job | $0.00 | |||
| 05.01-800 | job | $0.00 | |||
| 05.02-100 | job | $0.00 | |||
| 05.02-400 flipbook | job | $0.00 | |||
| 05.02-550 | job | $0.00 | |||
| 05.02-650 | job | $0.00 | |||
| 05.02-725/750 | job | $0.00 | |||
| 05.02-850 | job | $0.00 | |||
| 05.03-100 | job | $0.00 | |||
| 05.03-300 | job | $0.00 | |||
| 05.03-400 flipbook | job | $0.00 | |||
| 05.03-550 | job | $0.00 | |||
| 05.03-551/552/553 | job | $0.00 | |||
| 05.03-600 | job | $0.00 | |||
| 05.04-100 | job | $0.00 | |||
| 05.04-150 | job | $0.00 | |||
| 05.04-250 | job | $0.00 | |||
| 05.04-300 | job | $0.00 | |||
| 05.04-400 flipbook | job | $0.00 | |||
| 05.04-550 | job | $0.00 | |||
| 05.04-650/675 | job | $0.00 | |||
| 05.04-750 | job | $0.00 | |||
| 05.04-850 | job | $0.00 | |||
| 05.04-900 | job | $0.00 | |||
| Sc 7 | |||||
| 07.01-100 | job | $0.00 | |||
| 07.01-200 | job | $0.00 | |||
| 07.02-215/225/235/245/255 | job | $0.00 | |||
| 07.02-500 | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | ||
| MARK-UP on materials | 15 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Graphics supervisor | hours @ | $0.00 | |||
| Custom Illustrator | hours @ | $0.00 | |||
| Graphics specialist | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Graphics $0.00
| Conservation (Artifact/Prop Mounting) | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Mounting and conservation materials | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | ||
| MARK-UP on materials | 15 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Mount maker | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Conservation $0.00
| PROJECT CLOSEOUT | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| miscellaneous | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | ||
| MARK-UP on materials | 15 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Closeout $0.00
| SHIPPING | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Packing | job @ | $0.00 | |||
| Shipping | job @ | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Exhibit Spec - Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
INSTALLATION
| LABOR | hours | x | rate | amount | |
| Phase 1 | |||||
| Project Manager | hours @ | $0.00 | |||
| Exhibit Spec - Fabricator | hours @ | $0.00 | |||
| Exhibit Spec - Fabricator | hours @ | $0.00 | |||
| Exhibit Spec - Electrical/LightingTech | hours @ | $0.00 |
| Phase 2 | |||
| Project Manager | hours @ | $0.00 | |
| Exhibit Spec - Fabricator | hours @ | $0.00 | |
| Exhibit Spec - Fabricator | hours @ | $0.00 | |
| Exhibit Spec - Fabricator | hours @ | $0.00 | |
| Exhibit Spec - Electrical/LightingTech | hours @ | $0.00 | |
| Model Maker | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Installation $0.00
| TRAVEL | |||||
| Postaward meeting | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| air fare | job @ | $0.00 | |||
| per diem | days @ | $0.00 | |||
| lodging | days @ | $0.00 | |||
| Rental car and gas | days @ | $0.00 | |||
| Misc. | job @ | $0.00 |
Number travelers Project Manager $0.00
| Installation Phase 1 | |||
| air fare | job @ | $0.00 | |
| per diem | days @ | $0.00 | |
| Lodging | days @ | $0.00 | |
| Rental car and gas | days @ | $0.00 | |
| Misc. | job @ | $0.00 |
Number travelers crew $0.00
| Installation Phase 2 | |||
| air fare | job @ | $0.00 | |
| per diem | days @ | $0.00 | |
| Lodging | days @ | $0.00 | |
| Rental car and gas | days @ | $0.00 | |
| Misc. | job @ | $0.00 |
Number travelers crew $0.00
| Building Prep Visit | |||
| air fare | job @ | $0.00 | |
| per diem | days @ | $0.00 | |
| Lodging | days @ | $0.00 | |
| Rental car and gas | days @ | $0.00 | |
| Misc. | job @ | $0.00 |
Number travelers crew $0.00
| Audio Description Installation | |||
| air fare | job @ | $0.00 | |
| per diem | days @ | $0.00 | |
| Lodging | days @ | $0.00 | |
| Rental car and gas | days @ | $0.00 | |
| Misc. | job @ | $0.00 |
Number travelers crew $0.00
Total Travel $0.00
File details come from the government source that posted it. Updated .