Attachment1 - OO-ALC Channel- 1May25.xlsx
XLSX spreadsheet 70 KB Posted
- Attached to
- OO ALC Channel Update
- Solicitation number
- FA820125Q0016
About this file
This Excel file is a detailed TV display requirements spreadsheet for the OO-ALC Channel Update project, detailing TV installation specifications across multiple Air Force locations. The document outlines a three-year phased deployment of 85" and 42" televisions across 8 geographically separated units, including locations in the United States and one overseas, with an estimated total of 157 TVs to be installed in 39 locations over three years.
The project requires a FedRAMP-approved, cloud-based digital signage platform for unclassified government networks, with hardware purchasing, installation, maintenance, and support services. Each TV installation requires specific details such as mounting type (predominantly wall-mounted), power and network port accessibility, estimated mounting height, and facility diagram submission. The televisions will be used to improve workforce engagement and communication for commanders, leadership, and employees across various Air Force Materiel Command and Sustainment Center facilities, with sites including AMARG/Davis Monthan, MMXG locations at Vandenberg, Minot, Malmstrom, and Randolph, and various squadron and group buildings.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OO-ALC Roll-up
| Proposal Instructions: OO-ALC Roll-up tab contains all needed TVs. The breakout tabs shows the location and phase that the TVs will be purchased for. TV size is listed on OO-ALC Roll-up tab only. Vendors must propose utilizing the correct TV size. | ||||||||||
| Misc | Facility Manager Name & DSN | Group | Squadron | Bldg # | Room # | Power outlet accessible? (Y/N) | Network port accessible? (Y/N) | Type of mounting bracket required (wall or ceiling) | Estimated height (in feet) from ground | Did you provide a facility diagram to Aerospace Sustainment (via TMT or email to OO-ALC.AS.StrategicComm@us.af.mil) indicating the location the TV display will be installed? (Y/N) |
| 85 " |
WHITAKER, MANDY M CIV USAF AFMC OO-ALC/AS: WHITAKER, MANDY M CIV USAF AFMC OO-ALC/AS:
Year 1 157 - Commodities group projections = 37 TVs in 15 location
Year 2 157- 37 from commodities - 48 TV GSU estimations =72 TVs
Year 3 157- 37 yr1 - 72 Tvs from year 2 = 48 Tvs in year 3 w/39 locations
| 51 Bulidings/locations | Andrew Gibbons 775-4187 | 309 AMXG | 571 AMXS | 1 | Main Hallway | N | N | Wall | 7' | ||
| 85" | Andrew Gibbons 775-4187 | 309 AMXG | 572 AMXS | 204 | Hangar Area | N | N | Wall | 15' | ||
| 85" | Andrew Gibbons 775-4187 | 309 AMXG | 572 AMXS | 206 | Hangar Area | N | N | Wall | 15' | ||
| 65" | Dusten Stewart 586-5814 | 309 AMXG | 576 AMXS | 220 | South wall Bay 4 hallway | N | N | Wall | 7' | ||
| 42" | Phil Benstog 385-358-4091 | 309 AMXG | 570 AMXS | 222 | Main hall entrance | N | N | Wall | 7' | ||
| 85" | Jon Fox 589-4581 | 309 AMXG | 570 AMXS | 225 | Crane mount for L1-L6 | N | N | Pillar | 10' | ||
| 85" | Jon Fox 589-4581 | 309 AMXG | 570 AMXS | 225 | Crane mount for L7-L10 | N | N | Pillar | 10' | ||
| 85" | Jon Fox 589-4581 | 309 AMXG | 309 AMXG | 225 | South Center upstaris Hallway | Y | N | Wall | 7' | ||
| 85" | Jon Fox 589-4581 | 309 AMXG | 570 AMXS | 225 | Above PCC's Docks 11-17 | N | N | Pillar | 10' | ||
| 85" | Jon Fox 589-4581 | 309 AMXG | 572 AMXS | 225 | Dock C2 | N | N | Wall | 15' | ||
| 85" | Jon Fox 589-4581 | 309 AMXG | 572 AMXS | 225 | Dock C3 | N | N | Wall | 15' | ||
| 65" | Jon Fox 589-4581 | 309 AMXG | 576 AMXS | 225 | Holding until shop is moved | N | N | Wall | 7' | ||
| 85" | Lacy Veenstra 589-5322 | 309 AMXG | 570 AMXS | 233 | NE Corner PCC | N | N | Wall | 10' | ||
| 85" | Lacy Veenstra 589-5323 | 309 AMXG | 573 AMXS | 233 | Main Hall | N | N | Wall | 7' | ||
| 60" | Dave Hamilton 678-9023 | 309 AMXG | 570 AMXS | 237 | Main Hall by Dirctors Office | N | N | Wall | 7' | ||
| 60" | Dave Hamilton 678-9023 | 309 AMXG | 570 AMXS | 237 | Outside Of SAP room wall | N | N | Wall | 7' | ||
| 65" | Phil Benstog 385-358-4091 | 309 AMXG | 576 AMXS | 269 | South wall outside breakroom | N | N | Wall | 7' | ||
| 85" | Phil Benstog 385-358-4091 | 309 AMXG | 570 AMXS | 270 | East Wall of locker room | N | N | Wall | 7' | ||
| 60" | Phil Benstog 385-358-4091 | 309 AMXG | 570 AMXS | 270 | West side hallway entry | N | N | Wall | 7' | ||
| 85" | Eric Lee 837-1007 | 309 AMXG | 571 AMXS | 590 | Main Entrance | N | N | Wall | 7' | ||
| 85" | George Morgan 586-9821 | 309 AMXG | 570 AMXS | 640 | East Hangar Wall | N | N | Wall | 10' | ||
| 75" | Derek Billmire 247-1340 | 309 AMXG | 574 AMXS | 674 | Wall Walk Area | Y | N | Wall | 7' | ||
| 75" | Derek Billmire 247-1340 | 309 AMXG | 574 AMXS | 674 | Office Area | Y | N | Wall | 7' | ||
| 75" | George Morgan 586-9821 | 309 AMXG | 574 AMXS | 680 | Main Hallway | N | N | Wall | 7' | ||
| 55" | Dave Hamilton 678-9023 | 309 AMXG | 576 AMXS | 5G | West wall above progress boards | N | N | Wall | 10' | ||
| 85" | Dave Hamilton 678-9023 | 309 AMXG | 573 AMXS | TAMS | Center Section above double doors east side | N | N | Wall | 15' | ||
| 85" | Dave Hamilton 678-9023 | 309 AMXG | 573 AMXS | TAMS | Center Section above double doors west side | N | N | Wall | 15' | ||
| 85" | Dave Hamilton 678-9023 | 309 AMXG | 573 AMXS | TAMS | Center section break area | N | N | Wall | 15' | ||
| 85" | Clayton Lund, 775-3145 | 309 CMXG | 530 CMXS | 238 | West Side Foyer | Y | Y | Wall | 6' | Y | |
| 85" | Clayton Lund, 775-3145 | 309 CMXG | 530 CMXS | 238 | SE Corner inside door | Y | N | Wall | 8' | Y | |
| 85" | 309 CMXG | 238 | 238 East main hall east end | y | N | Wall | 12' | y | |||
| 85" | 309 CMXG | 238 | 238 east south wall | n | N | wall | 12 | y | |||
| 85" | 309 CMXG | 238 | 238 east break room | y | N | wall | 6' | y | |||
| 85" | 309 CMXG | 238 | 238 west breez way | y | N | wall | 10' | y | |||
| 85" | 309 CMXG | 238 | 238 west engineering office | y | N | wall | 6' | y | |||
| 85" | 309 CMXG | 238 | 238 radome shop wall | n | N | wall | 12' | y | |||
| 85" | 309 CMXG | 238 | 238 west B2 shop south wall | n | N | wall | 12' | y | |||
| 85" | 309 CMXG | 238 | 238 upstairs jfs shop | n | N | wall | 12' | y | |||
| 85" | 309 CMXG | 238 | 238 upstairs hydro shop | n | N | wall | 12' | y | |||
| 85" | 309 CMXG | 238 | 238 upstairs back of supervisor office N | N | wall | 10' | y | ||||
| 85" | 309 CMXG | 271 | shop wall | n | n | wall | 16' | y | |||
| 85" | Clayton Lund, 775-3145 | 309 CMXG | 530 CMXS | 243 | Front Foyer S. Side on the N. Wall | Y | N | Wall | 7' | Y | |
| 85" | Clayton Lund, 775-3145 | 309 CMXG | 530 CMXS | 252 | North Wall in Production Area | N | N | Wall | 8' | Y | |
| 85" | Clayton Lund, 775-3145 | 309 CMXG | 530 CMXS | 240 | Foyer area on S wall above breakroom door | N | N | Wall | 8' | Y | |
| 85" | Dustin Barker | 309 CMXG | 531 CMMXS | 503 A | 3rd Floor | Y | Y | Wall | 6' | N | |
| 85" | Dustin Barker | 309 CMXG | 531 CMMXS | 503 B | 2nd Floor | Y | Y | Wall | 6' | N | |
| 85" | Dustin Barker | 309 CMXG | 531 CMMXS | 503 | Main Floor | Y | Y | Wall | 6' | N | |
| 85" | Jeff Sommers | 309 CMXG | 531 CMMXS | 509 | Center North | Y | Y | Wall | 6' | N | |
| 85" | Jeff Sommers | 309 CMXG | 531 CMMXS | 746 | Main Floor | Y | Y | Wall | 6' | N | |
| 85" | Jeff Sommers | 309 CMXG | 531 CMMXS | 5 | Main Floor | Y | Y | Wall | 6' | N | |
| 85" | Jeff Sommers | 309 CMXG | 531 CMMXS | 2013 | Main Floor | Y | Y | Wall | 6' | N | |
| 85" | Jeff Sommers | 309 CMXG | 531 CMMXS | 257 | Main Floor | y | n | wall | 6 | y | |
| 85" | BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 265 | ABOVE RM 130 | Y | Y | WALL | 12 | Y | |
| 85" | BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 265 | ABOVE RM 181 | N | N | WALL | 15 | Y | |
| 85" | BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 265 | ABOVE RM 192 | N | N | WALL | 15 | Y | |
| 85" | BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 265 | ABOVE RM 158 | Y | Y | WALL | 15 | Y | |
| 85" | BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 510 | ABOVE MAIN BRK RM EAST | N | N | WALL | 15 | Y | |
| 85" | BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 510 | ABOVE ROLL UP DOOR NRTH | N | N | WALL | 15 | Y | |
| 85" | BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 510 | NEAR STEPS TO MAD ROOM | N | N | WALL | 15 | Y | |
| 85" | Robert "Kim" Sill - 586-8134 | 309 CMXG | 532 CMXS | 505 | Breakroom 202 | Y | n | wall | 7' 6" to top | Y | |
| 85" | Robert "Kim" Sill - 586-8134 | 309 CMXG | 532 CMXS | 507 | Main Foyer | y | n (TV Box) | wall | 9' to top | Y | |
| 85" | Robert "Kim" Sill - 586-8134 | 309 CMXG | 532 CMXS | 507 | Rossler Breakroom 206 E | y | n (TV Box) | ceiling | 9' to top | Y | |
| 85" | Robert "Kim" Sill - 586-8134 | 309 CMXG | 532 CMXS | 507 | Rossler Breakroom 206 W | y | n (TV Box) | ceiling | 9' to top | Y | |
| 85" | Robert "Kim" Sill - 586-8134 | 309 CMXG | 532 CMXS | 507 | Weld Shop Breakroom 183 | y | y | wall | 8' to top | Y | |
| 85" | Robert "Kim" Sill - 586-8134 | 309 CMXG | 532 CMXS | 507 | New Breakroom 260 | y | y | wall | 8' to top | Y | |
| 85" | Theresa Weaver | 309 EMXG | 523 EMXS | 5 | Bay E | N | N | Wall | 8' | Y | |
| 85" | Theresa Weaver | 309 EMXG | 523 EMXS | 5 | Bay B | N | N | Wall | 8' | Y | |
| 85" | Theresa Weaver | 309 EMXG | 523 EMXS | 5 | Bay D | N | N | Wall | 8' | Y | |
| 85" | Theresa Weaver | 309 EMXG | 523 EMXS | 5 | Bay P, upstairs | N | N | Wall | 8' | Y | |
| 85" | Theresa Weaver | 309 EMXG | 523 EMXS | 5 | Bay N | N | N | Wall | 8' | Y | |
| 85" | Theresa Weaver | 309 EMXG | 523 EMXS | 100 | Bay A | N | N | Wall | 8' | Y | |
| 85" | Theresa Weaver | 309 EMXG | 523 EMXS | 100 | Bay C | N | N | Wall | 8' | Y | |
| 85" | Theresa Weaver | 309 EMXG | 523 EMXS | 100 | Bay M | N | N | Wall | 8' | Y | |
| 85" | Theresa Weaver | 309 EMXG | 523 EMXS | 214 | Upstairs Breakroom | N | N | Wall | 8' | Y | |
| 85" | Zan Bird 586-4270 | 309 EMXG | 309 EMXG/OB | 100 Bay F | 20 | Y | Y | Wall | 10' | n | |
| 85" | Zan Bird 586-4270 | 309 EMXG | 309 EMXG/OB | 100 Bay F | 20 | Y | Y | Wall | 10' | n | |
| 85" | Wes Takacs | 309 EMXG | 526 EMXS | 843 | Admin | Y | Y | Wall | 4' | N | |
| 85" | Wes Takacs | 309 EMXG | 526 EMXS | 843 | Bay L Break Room | Y | Y | Wall | 5' | N | |
| 85" | Wes Takacs | 309 EMXG | 526 EMXS | 843 | Bay H Break Room | Y | N | Wall | 5' | N | |
| 85" | Wes Takacs | 309 EMXG | 526 EMXS | 843 | Bay M Break room | N | N | Wall | 5' | N | |
| 85" | Wes Takacs | 309 EMXG | 526 EMXS | 843 | Bay K | N | N | Wall | 8' | N | |
| 85" | Wes Takacs | 309 EMXG | 526 EMXS | 850 | Hallway | N | N | Wall | 5' | N | |
| 85" | Wes Takacs | 309 EMXG | 526 EMXS | 850 | By breakroom Bay G | N | N | Wall | 5' | N | |
| 85" | Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 100-K | see facility diagram | N | N | Wall | 8'-6" (9') | Y | |
| 85" | Mykal Arteaga, 586-8030 | 309 MMXG | 581 MMXS | 847 | see facility diagram | N | N | Wall | 8'-6" (9') | Y | |
| 85" | Mykal Arteaga, 586-8030 | 309 MMXG | 581 MMXS | 847 | see facility diagram | N | N | Wall | 10-12' | Y | |
| 85" | Mykal Arteaga, 586-8030 | 309 MMXG | 581 MMXS | 847 | see facility diagram | N | N | Wall | 10-12' | Y | |
| 85" | Mykal Arteaga, 586-8030 | 309 MMXG | 581 MMXS | 850-G | see facility diagram | N | N | Wall | 12' | Y | |
| 85" | Mykal Arteaga, 586-8030 | 309 MMXG | 581 MMXS | 850-F | see facility diagram | N | N | Wall | 12' | Y | |
| 85" | Rick Payne, 777-6477 | 309 MMXG | 582 MMXS | 970 | see facility diagram | N | N | Wall | 10' (12') | Y | |
| 85" | Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 1424 | see facility diagram | N | N | Wall | 10' (11'6") | Y | |
| 85" | Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 1623 | see facility diagram | N | N | Wall | 9' (9'10") | Y | |
| 85" | Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 1642 | see facility diagram | N | N | Wall | 8' (8'5") | Y | |
| 85" | Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 2016 | see facility diagram | N | N | Wall | 8' (8'5") | Y | |
| 85" | Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 2023 | see facility diagram | N | N | Wall | 9' (10') | Y | |
| 85" | Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 2213 | see facility diagram | N | N | Wall | 8' (8'6") | Y | |
| 85" | Rick Payne, 777-6477 | 309 MMXG | 582 MMXS | 2405 | see facility diagram | N | N | Wall | 8' | Y | |
| 85" | Josh Curtis, 586-0744 | 309 MXSG | 809 MXSS | 214 | Hall South of bathrooms | Y | N | Wall | 5'6" | Y | |
| 85" | Josh Curtis, 586-0744 | 309 MXSG | 809 MXSS | 214 | Hall Across from Elavator | Y | N | Wall | 5'6" | Y | |
| 85" | Jacob Checketts 801-777-3191 | OO-ALC | 849 | ||||||||
| 42" | OB | OO-ALC | 849 | ||||||||
| 42" | EN | OO-ALC | TBD | ||||||||
| 42" | FM | OO-ALC | 849 | ||||||||
| 42" | AS | OO-ALC | 849 | ||||||||
| 42" | CAG | OO-ALC | 849 | ||||||||
| 42" | UCC | OO-ALC | 849 | ||||||||
| 42" | OB | OO-ALC | 849 | ||||||||
| 42" | OBM | OO-ALC | 849 | ||||||||
| 42" | Safety | OO-ALC | TBD | ||||||||
| 42" | IG | OO-ALC | 849 | ||||||||
| 42" | AOP | OO-ALC | 849 | ||||||||
| 42" | QA | OO-ALC | TBD | ||||||||
| 85" |
tc={6A8C370E-1511-4AF0-B95A-850F22FEF2F5}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Yellow Highlighted are AMARG and GSUs | Curtis Hunt | EMXG/Kadena | |||
| 85" | Curtis Hunt | EMXG/Kadena | |||
| 85" | Curtis Hunt | EMXG/Kadena | |||
| 85" | Curtis Hunt | EMXG/Kadena | |||
| 85" | Curtis Hunt | EMXG/Kadena | |||
| 85" | Curtis Hunt | EMXG/Kadena | |||
| 85" | Curtis Hunt | EMXG/Kadena | |||
| 85" | Curtis Hunt | EMXG/Kadena | |||
| 85" | Curtis Hunt | EMXG/Kadena | |||
| 85" | Curtis Hunt 94-915-634-1616 | EMXG/Kadena | EMXS | ||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | Allen Leo | MMXG/FE | 583 MMXS | 1502 | |
| 85" | Allen Leo | MMXG/FE | 583 MMXS | 1284 | |
| 85" | Raymond Brown | MMXG/Vandenberg | 583 MMXS | 11248 | |
| 85" | Raymond Brown | MMXG/Vandenberg | 583 MMXS | 5500 | |
| 85" | Raymond Brown | MMXG/Vandenberg | 583 MMXS | 8415 | |
| 85" | Raymond Brown | MMXG/Vandenberg | 583 MMXS | 9327 | |
| 85" | Michael Snodgrass | MMXG/Minot | 583 MMXS | 763 | |
| 85" | Chriss Hart | MMXG/Malmstrom | 583 MMXS | 1890 | |
| 85" | Jeffrey Shultz | AMXG/Randolph | 70 | ||
| 85" | Jeffrey Shultz | AMXG/Randolph | 75 | ||
| 85" | Jeffrey Shultz | AMXG/Randolph | 76 | ||
| 85" | Russell Cox | AMXG/Randolph | 83 | ||
| 85" | Russell Cox | AMXG/Randolph | 241 | ||
| 85" | Russell Cox | AMXG/Randolph | 229 |
YR1 CMXG
| Instructions: List TV display requirements below. Each line should represent a single TV Display, so if you have a requirement for 5 TV displays, then you will have 5 rows of data. | ||||||||||
| Facility Manager Name & DSN | Group | Squadron | Bldg # | Room # | Power outlet accessible? (Y/N) | Network port accessible? (Y/N) | Type of mounting bracket required (wall or ceiling) | Estimated height (in feet) from ground | Did you provide a facility diagram to Aerospace Sustainment (via TMT or email to OO-ALC.AS.StrategicComm@us.af.mil) indicating the location the TV display will be installed? (Y/N) | |
| Clayton Lund, 775-3145 | 309 CMXG | 530 CMXS | 238 | West Side Foyer | Y | Y | Wall | 6' | Y | |
| Clayton Lund, 775-3145 | 309 CMXG | 530 CMXS | 238 | SE Corner inside door | Y | N | Wall | 8' | Y | |
| 238 | 238 East main hall east end | y | N | Wall | 12' | y | ||||
| 238 | 238 east south wall | n | N | wall | 12 | y | ||||
| 238 | 238 east break room | y | N | wall | 6' | y | ||||
| 238 | 238 west breez way | y | N | wall | 10' | y | ||||
| 238 | 238 west engineering office | y | N | wall | 6' | y | ||||
| 238 | 238 radome shop wall | n | N | wall | 12' | y | ||||
| 238 | 238 west B2 shop south wall | n | N | wall | 12' | y | ||||
| 238 | 238 upstairs jfs shop | n | N | wall | 12' | y | ||||
| 238 | 238 upstairs hydro shop | n | N | wall | 12' | y | ||||
| 238 | 238 upstairs back of supervisor office N | N | wall | 10' | y | |||||
| 271 | shop wall | n | n | wall | 16' | y | ||||
| Clayton Lund, 775-3145 | 309 CMXG | 530 CMXS | 243 | Front Foyer S. Side on the N. Wall | Y | N | Wall | 7' | Y | |
| Clayton Lund, 775-3145 | 309 CMXG | 530 CMXS | 252 | North Wall in Production Area | N | N | Wall | 8' | Y | |
| Clayton Lund, 775-3145 | 309 CMXG | 530 CMXS | 240 | Foyer area on S wall above breakroom door | N | N | Wall | 8' | Y | |
| Dustin Barker | 309 CMXG | 531 CMMXS | 503 A | 3rd Floor | Y | Y | Wall | 6' | N | |
| Dustin Barker | 309 CMXG | 531 CMMXS | 503 B | 2nd Floor | Y | Y | Wall | 6' | N | |
| Dustin Barker | 309 CMXG | 531 CMMXS | 503 | Main Floor | Y | Y | Wall | 6' | N | |
| Jeff Sommers | 309 CMXG | 531 CMMXS | 509 | Center North | Y | Y | Wall | 6' | N | |
| Jeff Sommers | 309 CMXG | 531 CMMXS | 746 | Main Floor | Y | Y | Wall | 6' | N | |
| Jeff Sommers | 309 CMXG | 531 CMMXS | 5 | Main Floor | Y | Y | Wall | 6' | N | |
| Jeff Sommers | 309 CMXG | 531 CMMXS | 2013 | Main Floor | Y | Y | Wall | 6' | N | |
| Jeff Sommers | 309 CMXG | 531 CMMXS | 257 | Main Floor | y | n | wall | 6 | y | |
| BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 265 | ABOVE RM 130 | Y | Y | WALL | 12 | Y | |
| BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 265 | ABOVE RM 181 | N | N | WALL | 15 | Y | |
| BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 265 | ABOVE RM 192 | N | N | WALL | 15 | Y | |
| BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 265 | ABOVE RM 158 | Y | Y | WALL | 15 | Y | |
| BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 510 | ABOVE MAIN BRK RM EAST | N | N | WALL | 15 | Y | |
| BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 510 | ABOVE ROLL UP DOOR NRTH | N | N | WALL | 15 | Y | |
| BOB McCONAUGHY 775-5879 | 309 CMXG | 533rd | 510 | NEAR STEPS TO MAD ROOM | N | N | WALL | 15 | Y | |
| Robert "Kim" Sill - 586-8134 | 309 CMXG | 532 CMXS | 505 | Breakroom 202 | Y | n | wall | 7' 6" to top | Y | |
| Robert "Kim" Sill - 586-8134 | 309 CMXG | 532 CMXS | 507 | Main Foyer | y | n (TV Box) | wall | 9' to top | Y | |
| Robert "Kim" Sill - 586-8134 | 309 CMXG | 532 CMXS | 507 | Rossler Breakroom 206 E | y | n (TV Box) | ceiling | 9' to top | Y | |
| Robert "Kim" Sill - 586-8134 | 309 CMXG | 532 CMXS | 507 | Rossler Breakroom 206 W | y | n (TV Box) | ceiling | 9' to top | Y | |
| Robert "Kim" Sill - 586-8134 | 309 CMXG | 532 CMXS | 507 | Weld Shop Breakroom 183 | y | y | wall | 8' to top | Y | |
| Robert "Kim" Sill - 586-8134 | 309 CMXG | 532 CMXS | 507 | New Breakroom 260 | y | y | wall | 8' to top | Y |
YR2 AMXG
| Instructions: List TV display requirements below. Each line should represent a single TV Display, so if you have a requirement for 5 TV displays, then you will have 5 rows of data. | ||||||||||
| Facility Manager Name & DSN | Group | Squadron | Bldg # | Room # | Power outlet accessible? (Y/N) | Network port accessible? (Y/N) | Type of mounting bracket required (wall or ceiling) | Estimated height (in feet) from ground | Did you provide a facility diagram to Aerospace Sustainment (via TMT or email to OO-ALC.AS.StrategicComm@us.af.mil) indicating the location the TV display will be installed? (Y/N) | |
| 85 " | Andrew Gibbons 775-4187 | 309 AMXG | 571 AMXS | 1 | Main Hallway | N | N | Wall | 7' | |
| 85" | Andrew Gibbons 775-4187 | 309 AMXG | 572 AMXS | 204 | Hangar Area | N | N | Wall | 15' | |
| 85" | Andrew Gibbons 775-4187 | 309 AMXG | 572 AMXS | 206 | Hangar Area | N | N | Wall | 15' | |
| 65" | Dusten Stewart 586-5814 | 309 AMXG | 576 AMXS | 220 | South wall Bay 4 hallway | N | N | Wall | 7' | |
| 42" | Phil Benstog 385-358-4091 | 309 AMXG | 570 AMXS | 222 | Main hall entrance | N | N | Wall | 7' | |
| 85" | Jon Fox 589-4581 | 309 AMXG | 570 AMXS | 225 | Crane mount for L1-L6 | N | N | Pillar | 10' | |
| 85" | Jon Fox 589-4581 | 309 AMXG | 570 AMXS | 225 | Crane mount for L7-L10 | N | N | Pillar | 10' | |
| 85" | Jon Fox 589-4581 | 309 AMXG | 309 AMXG | 225 | South Center upstaris Hallway | Y | N | Wall | 7' | |
| 85" | Jon Fox 589-4581 | 309 AMXG | 570 AMXS | 225 | Above PCC's Docks 11-17 | N | N | Pillar | 10' | |
| 85" | Jon Fox 589-4581 | 309 AMXG | 572 AMXS | 225 | Dock C2 | N | N | Wall | 15' | |
| 85" | Jon Fox 589-4581 | 309 AMXG | 572 AMXS | 225 | Dock C3 | N | N | Wall | 15' | |
| 65" | Jon Fox 589-4581 | 309 AMXG | 576 AMXS | 225 | Holding until shop is moved | N | N | Wall | 7' | |
| 85" | Lacy Veenstra 589-5322 | 309 AMXG | 570 AMXS | 233 | NE Corner PCC | N | N | Wall | 10' | |
| 85" | Lacy Veenstra 589-5323 | 309 AMXG | 573 AMXS | 233 | Main Hall | N | N | Wall | 7' | |
| 60" | Dave Hamilton 678-9023 | 309 AMXG | 570 AMXS | 237 | Main Hall by Dirctors Office | N | N | Wall | 7' | |
| 60" | Dave Hamilton 678-9023 | 309 AMXG | 570 AMXS | 237 | Outside Of SAP room wall | N | N | Wall | 7' | |
| 65" | Phil Benstog 385-358-4091 | 309 AMXG | 576 AMXS | 269 | South wall outside breakroom | N | N | Wall | 7' | |
| 85" | Phil Benstog 385-358-4091 | 309 AMXG | 570 AMXS | 270 | East Wall of locker room | N | N | Wall | 7' | |
| 60" | Phil Benstog 385-358-4091 | 309 AMXG | 570 AMXS | 270 | West side hallway entry | N | N | Wall | 7' | |
| 85" | Eric Lee 837-1007 | 309 AMXG | 571 AMXS | 590 | Main Entrance | N | N | Wall | 7' | |
| 85" | George Morgan 586-9821 | 309 AMXG | 570 AMXS | 640 | East Hangar Wall | N | N | Wall | 10' | |
| 75" | Derek Billmire 247-1340 | 309 AMXG | 574 AMXS | 674 | Wall Walk Area | Y | N | Wall | 7' | |
| 75" | Derek Billmire 247-1340 | 309 AMXG | 574 AMXS | 674 | Office Area | Y | N | Wall | 7' | |
| 75" | George Morgan 586-9821 | 309 AMXG | 574 AMXS | 680 | Main Hallway | N | N | Wall | 7' | |
| 55" | Dave Hamilton 678-9023 | 309 AMXG | 576 AMXS | 5G | West wall above progress boards | N | N | Wall | 10' | |
| 85" | Dave Hamilton 678-9023 | 309 AMXG | 573 AMXS | TAMS | Center Section above double doors east side | N | N | Wall | 15' | |
| 85" | Dave Hamilton 678-9023 | 309 AMXG | 573 AMXS | TAMS | Center Section above double doors west side | N | N | Wall | 15' | |
| 85" | Dave Hamilton 678-9023 | 309 AMXG | 573 AMXS | TAMS | Center section break area | N | N | Wall | 15' |
YR2 EMXG
| Instructions: List TV display requirements below. Each line should represent a single TV Display, so if you have a requirement for 5 TV displays, then you will have 5 rows of data. | ||||||||||
| Facility Manager Name & DSN | Group | Squadron | Bldg # | Room # | Power outlet accessible? (Y/N) | Network port accessible? (Y/N) | Type of mounting bracket required (wall or ceiling) | Estimated height (in feet) from ground | Did you provide a facility diagram to Aerospace Sustainment (via TMT or email to OO-ALC.AS.StrategicComm@us.af.mil) indicating the location the TV display will be installed? (Y/N) | |
| Example | John Doe, 777-xxxx | 309 AMXG | 574 AMXS | 225 | n/a | Y | Y | Ceiling | 10' | Y |
| Theresa Weaver | 309 EMXG | 523 EMXS | 5 | Bay E | N | N | Wall | 8' | Y | |
| Theresa Weaver | 309 EMXG | 523 EMXS | 5 | Bay B | N | N | Wall | 8' | Y | |
| Theresa Weaver | 309 EMXG | 523 EMXS | 5 | Bay D | N | N | Wall | 8' | Y | |
| Theresa Weaver | 309 EMXG | 523 EMXS | 5 | Bay P, upstairs | N | N | Wall | 8' | Y | |
| Theresa Weaver | 309 EMXG | 523 EMXS | 5 | Bay N | N | N | Wall | 8' | Y | |
| Theresa Weaver | 309 EMXG | 523 EMXS | 100 | Bay A | N | N | Wall | 8' | Y | |
| Theresa Weaver | 309 EMXG | 523 EMXS | 100 | Bay C | N | N | Wall | 8' | Y | |
| Theresa Weaver | 309 EMXG | 523 EMXS | 100 | Bay M | N | N | Wall | 8' | Y | |
| Theresa Weaver | 309 EMXG | 523 EMXS | 214 | Upstairs Breakroom | N | N | Wall | 8' | Y | |
| Zan Bird 586-4270 | 309 EMXG | 523 EMXS | 100 Bay F | 20 | Wall | 8' | y | |||
| Zan Bird 586-4270 | 309 EMXG | 309 EMXG/OB | 100 Bay F | 20 | Y | Y | Wall | 10' | n | |
| Wes Takacs | 309 EMXG | 526 EMXS | 843 | Admin | Y | Y | Wall | 4' | N | |
| Wes Takacs | 309 EMXG | 526 EMXS | 843 | Bay L Break Room | Y | Y | Wall | 5' | N | |
| Wes Takacs | 309 EMXG | 526 EMXS | 843 | Bay H Break Room | Y | N | Wall | 5' | N | |
| Wes Takacs | 309 EMXG | 526 EMXS | 843 | Bay M Break room | N | N | Wall | 5' | N | |
| Wes Takacs | 309 EMXG | 526 EMXS | 843 | Bay K | N | N | Wall | 8' | N | |
| Wes Takacs | 309 EMXG | 526 EMXS | 850 | Hallway | N | N | Wall | 5' | N | |
| Wes Takacs | 309 EMXG | 526 EMXS | 850 | By breakroom Bay G | N | N | Wall | 5' | N |
YR2 MMXG
| Instructions: List TV display requirements below. Each line should represent a single TV Display, so if you have a requirement for 5 TV displays, then you will have 5 rows of data. | ||||||||||
| Facility Manager Name & DSN | Group | Squadron | Bldg # | Room # | Power outlet accessible? (Y/N) | Network port accessible? (Y/N) | Type of mounting bracket required (wall or ceiling) | Estimated height (in feet) from ground (top of TV) | Did you provide a facility diagram to Aerospace Sustainment (via TMT or email to OO-ALC.AS.StrategicComm@us.af.mil) indicating the location the TV display will be installed? (Y/N) | |
| Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 100-K | see facility diagram | N | N | Wall | 8'-6" (9') | Y | |
| Mykal Arteaga, 586-8030 | 309 MMXG | 581 MMXS | 847 | see facility diagram | N | N | Wall | 8'-6" (9') | Y | |
| Mykal Arteaga, 586-8030 | 309 MMXG | 581 MMXS | 847 | see facility diagram | N | N | Wall | 10-12' | Y | |
| Mykal Arteaga, 586-8030 | 309 MMXG | 581 MMXS | 847 | see facility diagram | N | N | Wall | 10-12' | Y | |
| Mykal Arteaga, 586-8030 | 309 MMXG | 581 MMXS | 850-G | see facility diagram | N | N | Wall | 12' | Y | |
| Mykal Arteaga, 586-8030 | 309 MMXG | 581 MMXS | 850-F | see facility diagram | N | N | Wall | 12' | Y | |
| Rick Payne, 777-6477 | 309 MMXG | 582 MMXS | 970 | see facility diagram | N | N | Wall | 10' (12') | Y | |
| Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 1424 | see facility diagram | N | N | Wall | 10' (11'6") | Y | |
| Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 1623 | see facility diagram | N | N | Wall | 9' (9'10") | Y | |
| Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 1642 | see facility diagram | N | N | Wall | 8' (8'5") | Y | |
| Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 2016 | see facility diagram | N | N | Wall | 8' (8'5") | Y | |
| Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 2023 | see facility diagram | N | N | Wall | 9' (10') | Y | |
| Jon Kay, 775-6515 | 309 MMXG | 582 MMXS | 2213 | see facility diagram | N | N | Wall | 8' (8'6") | Y | |
| Rick Payne, 777-6477 | 309 MMXG | 582 MMXS | 2405 | see facility diagram | N | N | Wall | 8' | Y |
YR2 MXSG
| Instructions: List TV display requirements below. Each line should represent a single TV Display, so if you have a requirement for 5 TV displays, then you will have 5 rows of data. | ||||||||||
| Facility Manager Name & DSN | Group | Squadron | Bldg # | Room # | Power outlet accessible? (Y/N) | Network port accessible? (Y/N) | Type of mounting bracket required (wall or ceiling) | Estimated height (in feet) from ground | Did you provide a facility diagram to Aerospace Sustainment (via TMT or email to OO-ALC.AS.StrategicComm@us.af.mil) indicating the location the TV display will be installed? (Y/N) |
| Josh Curtis, 586-0744 | 309 MXSG | 809 MXSS | 214 | Hall South of bathrooms | Y | N | Wall | 5'6" | Y |
| Josh Curtis, 586-0744 | 309 MXSG | 809 MXSS | 214 | Hall Across from Elavator | Y | N | Wall | 5'6" | Y |
YR2 Staff Offices
| Misc | Facility Manager Name & DSN | Group | Squadron | Bldg # | Room # | Power outlet accessible? (Y/N) | Network port accessible? (Y/N) | Type of mounting bracket required (wall or ceiling) | Estimated height (in feet) from ground | Did you provide a facility diagram to Aerospace Sustainment (via TMT or email to OO-ALC.AS.StrategicComm@us.af.mil) indicating the location the TV display will be installed? (Y/N) |
| 85" |
WHITAKER, MANDY M CIV USAF AFMC OO-ALC/AS: WHITAKER, MANDY M CIV USAF AFMC OO-ALC/AS:
| Highlighted lines are ALC/GSU | Jacob Checketts 801-777-3191 | OO-ALC | 849 | ||
| 42" | OB | OO-ALC | 849 | ||
| 42" | EN | OO-ALC | 849 | ||
| 42" | FM | OO-ALC | 849 | ||
| 42" | AS | OO-ALC | 849 | ||
| 42" | CAG | OO-ALC | 849 | ||
| 42" | UCC | OO-ALC | 849 | ||
| 42" | OB | OO-ALC | 849 | ||
| 42" | OBM | OO-ALC | 849 | ||
| 42" | Safety | OO-ALC | 849 | ||
| 42" | IG | OO-ALC | 849 | ||
| 42" | AOP | OO-ALC | 849 | ||
| 42" | QA | OO-ALC | 849 |
YR3 AMARG (GSU & Other)
| Instructions: List TV display requirements below. Each line should represent a single TV Display, so if you have a requirement for 5 TV displays, then you will have 5 rows of data. | ||||||||||
| Facility Manager Name & DSN | Group | Squadron | Bldg # | Room # | Power outlet accessible? (Y/N) | Network port accessible? (Y/N) | Type of mounting bracket required (wall or ceiling) | Estimated height (in feet) from ground | Did you provide a facility diagram to Aerospace Sustainment (via TMT or email to OO-ALC.AS.StrategicComm@us.af.mil) indicating the location the TV display will be installed? (Y/N) | |
| 85" |
WHITAKER, MANDY M CIV USAF AFMC OO-ALC/AS: WHITAKER, MANDY M CIV USAF AFMC OO-ALC/AS:
| Estimated 21 locations | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | AMARG/Davis Monthan | ||||
| 85" | Allen Leo | MMXG/FE | 583 MMXS | 1502 | |
| 85" | Allen Leo | MMXG/FE | 583 MMXS | 1284 | |
| 85" | Raymond Brown | MMXG/Vandenberg | 583 MMXS | 11248 | |
| 85" | Raymond Brown | MMXG/Vandenberg | 583 MMXS | 5500 | |
| 85" | Raymond Brown | MMXG/Vandenberg | 583 MMXS | 8415 | |
| 85" | Raymond Brown | MMXG/Vandenberg | 583 MMXS | 9327 | |
| 85" | Michael Snodgrass | MMXG/Minot | 583 MMXS | 763 | |
| 85" | Chriss Hart | MMXG/Malmstrom | 583 MMXS | 1890 | |
| 85" | Jeffrey Shultz | AMXG/Randolph | 70 | ||
| 85" | Jeffrey Shultz | AMXG/Randolph | 75 | ||
| 85" | Jeffrey Shultz | AMXG/Randolph | 76 | ||
| 85" | Russell Cox | AMXG/Randolph | 83 | ||
| 85" | Russell Cox | AMXG/Randolph | 241 | ||
| 85" | Russell Cox | AMXG/Randolph | 229 |
File details come from the government source that posted it. Updated .