Attachment X - Current Projects.pdf
PDF 65 KB Posted
- Attached to
- 80GRC023CA001 Construction Management, Inspection, Surveying, and Testing Final Request For Proposal
- Solicitation number
- 80GRC023CA001
About this file
This document contains details on current and planned construction projects at a National Aeronautics and Space Administration (NASA) facility. There are over 100 projects listed spanning fiscal years 2017 through 2023, with magnitudes ranging from under $25,000 to over $10 million. Project types include repairs, replacements, renovations, retrofits, demolitions and new construction across various buildings. Planned work involves electrical, mechanical and civil infrastructure upgrades. The related solicitation is for construction management, inspection, surveying and testing services to support ongoing and future capital projects at the NASA Glenn Research Center facility. It does not specify pricing, response dates or period of performance details. Services required under the contract include project oversight, quality assurance, documentation and commissioning support.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
As of April 27, 2023
ProjectID Title Status CurrentPhase FY Magnitude
25705 B330 ACF DESIGN AND INSTALL OF ANTENNA EQUIPMENT Active Acquisition 2017 $1M ‐ $5M
33095 Roof Replacement ‐ Sub A & B5 Sections G and J Active Construction 2022 $100k ‐ $250k
33094 B399 West Gate Arm Active Construction 2022 $100k ‐ $250k
33087 FY22 HVAC PH2 Active Construction 2022 $100k ‐ $250k
33077 UST Removal ‐ LF and ATF Active Construction 2022 $100k ‐ $250k
33057 B34 Fire Alarm Active Construction 2022 $100k ‐ $250k
33051 B110 Zero G Elevator Repair Active Construction 2022 $100k ‐ $250k
33041 B14 Room 100A Modifications Active Construction 2021 $100k ‐ $250k
33034 E‐43 and E‐40 Exhauster Motor Rewinds Active Construction 2021 $100k ‐ $250k
33031 Thermotron Altitude Chamber Active Construction 2021 $100k ‐ $250k
33022 B49 Room 30 Mars Spring Tire (MST) Condition Rig Active Construction 2021 $100k ‐ $250k
33008 B100 Hallway Extension Active Construction 2021 $100k ‐ $250k
31987 B74 CT 3&6 Backup Air Compressor Active Construction 2020 $100k ‐ $250k
29954 B5 CW5 Wind Tunnel Active Construction 2020 $100k ‐ $250k
29947 B101 Medical Services Relocation Active Construction 2020 $100k ‐ $250k
29930 Retro Commissioning B142 Active Construction 2022 $100k ‐ $250k
29858 Temporary Service Air Connections to B50, B34, B105, and B49 Active Construction 2019 $100k ‐ $250k
29840 Retro Commissioning B106 Active Construction 2019 $100k ‐ $250k
33082 Telecommunications Central Office (TCO) Relocation Active Construction 2022 $1M ‐ $5M
30965 ISP Test Checkout and Readiness Active Construction 2020 $1M ‐ $5M
29834 Repair Cooling Tower #3 and #6 Water Distribution System Active Construction 2019 $1M ‐ $5M
29776 B9 Repair North Chilled Water Plant Active Construction 2019 $1M ‐ $5M
22632 B35 Demo Phase 1 Active Construction 2016 $1M ‐ $5M
20563 Repair Electrical Distribution Phase 3 ‐Tunnel Repair Active Construction 2018 $1M ‐ $5M
20499 B8 DEMO Active Construction 2022 $1M ‐ $5M
33076 SEC Dome Repair Active Construction 2022 $250k ‐ $500k
33067 FY22 HVAC Repairs Active Construction 2022 $250k ‐ $500k
33030 Elevator Repairs ‐ Various Buildings Active Construction 2022 $250k ‐ $500k
31992 Transformer M2 & H2 Rehabilitation Active Construction 2021 $250k ‐ $500k
33086 ATF/Replace SUB F 34.5 KV Cable Active Construction 2022 $25k ‐ $100k
33072 MIC Gender Neutral Restrooms Active Construction 2022 $25k ‐ $100k
33070 B5/Install Sanitary Drainage for Deer Pit Active Construction 2022 $25k ‐ $100k
33069 B25 Meter Replacement Active Construction 2022 $25k ‐ $100k
33063 RSB Gender Neutral Restrooms Active Construction 2022 $25k ‐ $100k
29871 Repair of Manholes (Center) Active Construction 2019 $25k ‐ $100k
23639 B301 VF‐12 WORK PLATFORM MODIFICATION Active Construction 2016 $25k ‐ $100k
33071 FY22 Pavement Repairs Active Construction 2022 $500k ‐ $1M
33066 Mobile Liquid Nitrogen Vaporizer Active Construction 2022 $500k ‐ $1M
33046 ISP Crane Bridge Repair Active Construction 2021 $500k ‐ $1M
33037 Phase 1 Repair Antiquated High Voltage Cables (J8 and C1) Active Construction 2021 $500k ‐ $1M
33033 ACF Outfitting Active Construction 2021 $500k ‐ $1M
33012 FY22 EMCS Expansion Active Construction 2021 $500k ‐ $1M
29961 ATF Fire Alarm System Replacement Active Construction 2020 $500k ‐ $1M
29890 B340 Roof and AHU Replacement Active Construction 2019 $500k ‐ $1M
29881 10x10 Corrosion Protection and Abatement Active Construction 2019 $500k ‐ $1M
29872 Repair by Replacement ‐‐ B11 Roof Active Construction 2019 $500k ‐ $1M
29836 Repair Electrical Distribution System Phase 4 Active Construction 2019 $500k ‐ $1M
29801 ISP Thrust Anchor Bolt/Walkway Replacement Active Construction 2022 $500k ‐ $1M
26731 REPAIR STEAM SYSTEM PHASE 4 Active Construction 2018 $500k ‐ $1M
26729 CENTRAL PROCESS SYSTEM PHASE 1 Active Construction 2018 $500k ‐ $1M
25713 B‐2 WATER PUMP REFURBISHMENT Active Construction 2017 $500k ‐ $1M
24695 W‐8 MOTOR REPLACEMENT Active Construction 2017 $500k ‐ $1M
20498 Demolition of B99 and B102 Active Construction 2015 $500k ‐ $1M
30961 J4/J5/J6 Transformer Active Construction 2020 $5M ‐ $10M
33107 NEAT Relocation (Shared) Active Construction 2022 Over $10M
20552 AEROSPACE COMMUNICATIONS FACILITY Active Construction 2019 Over $10M
29923 NEAT Relocation Altitude Chamber Active Construction 2022 See NEAT Shared
29919 NEAT (CCL) Pump Building Active Construction 2020 See NEAT Shared
29918 NEAT (CCL) Shop Demo/Building Mods Active Construction 2020 See NEAT Shared
29916 NEAT Relocation ‐ Electrical Power Upgrades Active Construction 2020 See NEAT Shared
33113 B5 & B77 LV Power Panel Replacement Active Design 2022 $100k ‐ $250k
33111 B85 Acoustical Building Lighting Active Design 2022 $100k ‐ $250k
33110 B64 Basement Lighting Active Design 2022 $100k ‐ $250k
33108 B49 Retrocommissioning Active Design 2022 $100k ‐ $250k
33089 B110 Lobby Renovations Active Design 2022 $100k ‐ $250k
33043 PSL Relay Replacement Active Design 2021 $100k ‐ $250k
30982 B34 QARE Rig Phase 2 Active Design 2020 $100k ‐ $250k
29892 Repair of Loading Docks ‐ B5, B37, B38, B60, B105 Active Design 2022 $100k ‐ $250k
29841 Retrocommissioning B60 Active Design 2019 $100k ‐ $250k
33131 B77 Roof Replacement Phase 2 Active Design 2023 $1M ‐ $5M
33125 B90 10x10 Corrosion Protection and Abatement Phase 2 Active Design 2023 $1M ‐ $5M
33085 Repair Antiquated HV Cables Phase 2 Active Design 2022 $1M ‐ $5M
33055 B302 Consolidation Active Design 2023 $1M ‐ $5M
33017 FY22 Arc Flash Analysis Active Design 2021 $1M ‐ $5M
29835 Repair Storm Sewer System Phase 3 Active Design 2019 $1M ‐ $5M
29829 B7 Demolition Active Design 2019 $1M ‐ $5M
33050 Layered Pressure Vessels NDE Active Design 2022 $250k ‐ $500k
33044 Building 64 Expansion Joints Active Design 2021 $250k ‐ $500k
33042 B142 Data Center Mini‐Splits Active Design 2021 $250k ‐ $500k
33029 Retrocommissioning B105 Active Design 2021 $250k ‐ $500k
33134 B34 Room 138 Gas Detection System Active Design 2023 $25k ‐ $100k
33102 B5 Relief Valves Active Design 2022 $25k ‐ $100k
33083 B49 R147 Cooling loop Active Design 2022 $25k ‐ $100k
33075 ESG Cooling Tower Design Study Active Design 2022 $25k ‐ $100k
33133 B3 Consolidation Active Design 2023 $500k ‐ $1M
33132 B3211 ISP Chamber Ring Platform and Ladders Refurbishment Active Design 2023 $500k ‐ $1M
33129 B302 Demolition Active Design 2023 $500k ‐ $1M
33128 FY23 HVAC Repairs Active Design 2023 $500k ‐ $1M
33097 Repair Antiquated Cables RG2G1 & RG2G2 (J2) Active Design 2022 $500k ‐ $1M
33088 Electrical Distribution Repairs ‐ Replacement of RG1H1 and RG1H2 (J1) Active Design 2022 $500k ‐ $1M
33056 Repair High Voltage Electrical Transformers, PSL Substation J Active Design 2022 $500k ‐ $1M
29950 Central Process System Phase 2 Active Design 2020 $500k ‐ $1M
29867 B5 Roof Replacement Ph1 ‐ Sections F, I Active Design 2019 $500k ‐ $1M
29812 B39 Recoat Roof Active Design 2019 $500k ‐ $1M
20576 FY20 BUILDING 15 DEMOLITION Active Design 2015 $500k ‐ $1M
27742 B330 MSL Equipment Active Design 2018 $5M ‐ $10M
25707 B301 UPGRADE LN2 CAPACITY DESIGN Active Design 2017 $5M ‐ $10M
33136 FY23 EV Charging Stations Active Requirements 2023 $100k ‐ $250k
33135 B125 Lobby and Exterior Renovations Active Requirements 2023 $100k ‐ $250k
33130 FY23 Elevator Repairs Active Requirements 2023 $100k ‐ $250k
33105 Patrol Rd Pipe Creek Culvert Replacement Active Requirements 2022 $100k ‐ $250k
33103 B309 Rm101 Exhaust Active Requirements 2022 $100k ‐ $250k
33100 B301 Generator Replacement Active Requirements 2022 $100k ‐ $250k
33137 B330 ACF Roof Active Requirements 2023 $1M ‐ $5M
33090 Repair Steam Distribution System, Phase 5 of 5 Active Requirements 2022 $1M ‐ $5M
33115 CPS 150PSIG Blowdown ‐ Noise Abatement Active Requirements 2022 $250k ‐ $500k
33112 Westover Road Water Line Replacement Active Requirements 2022 $250k ‐ $500k
33099 B4 ‐ AST Installation Active Requirements 2022 $250k ‐ $500k
33114 Campus Center Planning Active Requirements 2022 $25k ‐ $100k
33093 B301 Clean Room Low OX Detection Active Requirements 2022 $25k ‐ $100k
29952 B85 10X10 EJ2 Expansion Joint Replacement Active Requirements 2020 $500k ‐ $1M
29846 480V MCC Replacement, various buildings Active Requirements 2019 $500k ‐ $1M
33106 FY23 Pavement Maintenance Active 2023 $500k ‐ $1M
29805 10x10 Pit #1 Bypass Line Repair Active 2019 $500k ‐ $1M
PROJECT COUNT MAGNITUDE
0 Under $25k
13 $25k ‐ $100k
32 $100k ‐ $250k
11 $250k ‐ $500k
32 $500k ‐ $1M
16 $1M ‐ $5M
3 $5M ‐ $10M
2 Over $10M