Attachment N - GRC 533 Baseline Template.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- 80GRC023CA001 Construction Management, Inspection, Surveying, and Testing Final Request For Proposal
- Solicitation number
- 80GRC023CA001
About this file
This document contains a baseline template for tracking labor, costs and performance on a federal contract. The template includes categories for direct and indirect labor hours and costs by prime contractor and major subcontractors. It also includes categories for tracking other direct costs such as subcontracts, travel, materials and indirect costs including overhead and fee. The template is to be used for entering actual labor and cost values incurred monthly over the life of the contract. Instructions are provided on how to populate the template including the contract number, start date and capital asset designation. Standardized cost categories are also defined for consistent reporting.
The related federal contract opportunity is a solicitation from NASA Glenn Research Center for construction management, inspection, surveying and testing services under solicitation number 80GRC023CA001. The solicitation is a final request for proposal for these services from the agency. No further details on response dates, award timing or required services are provided in this document.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Baseline
| Contract Number | |||||||||||||||||||||||||||||||||||||||||||||||||
| Contract Line Item Number (If Applicable) | |||||||||||||||||||||||||||||||||||||||||||||||||
| Contract Task Order (If Applicable) | |||||||||||||||||||||||||||||||||||||||||||||||||
| Baseline Version | |||||||||||||||||||||||||||||||||||||||||||||||||
| Contract/Task Start Year | |||||||||||||||||||||||||||||||||||||||||||||||||
| Contract/Task Start Month | |||||||||||||||||||||||||||||||||||||||||||||||||
| Capital Asset | Year: | 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ||||||||
| Month: | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | |||||||||
| Category | Category | ||||||||||||||||||||||||||||||||||||||||||||||||
| (Abbrev) | Reporting Category | Reporting Category | |||||||||||||||||||||||||||||||||||||||||||||||
| (Abbrev) | CY 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 1 | CY 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 2 | CY 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 3 | CY 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 4 | CY 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 5 | CY 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 6 | CY 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 7 | CY 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 8 | CY 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 9 | CY 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 10 | CY 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 11 | CY 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 12 | CY 1 TOTAL | CY 2 | |||||||||||||||||||||||||||||||||||||||||||||||
| Month 1 | CY 2 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 2 | CY 2 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 3 | CY 2 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 4 | CY 2 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 5 | CY 2 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 6 | CY 2 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 7 | CY 2 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 8 | CY 2 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 9 | CY 2 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 10 | CY 2 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 11 | CY 2 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 12 | CY 2 TOTAL | Cumulative Through CY 2 | CY 3 | ||||||||||||||||||||||||||||||||||||||||||||||
| Month 1 | CY 3 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 2 | CY 3 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 3 | CY 3 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 4 | CY 3 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 5 | CY 3 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 6 | CY 3 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 7 | CY 3 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 8 | CY 3 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 9 | CY 3 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 10 | CY 3 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 11 | CY 3 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 12 | CY 3 TOTAL | Cumulative Through CY 3 | CY 4 | ||||||||||||||||||||||||||||||||||||||||||||||
| Month 1 | CY 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 2 | CY 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 3 | CY 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 4 | CY 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 5 | CY 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 6 | CY 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 7 | CY 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 8 | CY 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 9 | CY 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 10 | CY 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 11 | CY 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 12 | CY 4 TOTAL | Cumulative Through CY 4 | CY 5 | ||||||||||||||||||||||||||||||||||||||||||||||
| Month 1 | CY 5 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 2 | CY 5 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 3 | CY 5 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 4 | CY 5 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 5 | CY 5 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 6 | CY 5 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 7 | CY 5 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 8 | CY 5 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 9 | CY 5 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 10 | CY 5 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 11 | CY 5 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Month 12 | CY 5 TOTAL | TOTAL CONTRACT | October | ||||||||||||||||||||||||||||||||||||||||||||||
| Direct Labor Hours | DLH | Prime | PRM | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||||||||||||||||||||||
| Subcontractor Labor Hours | SLH | Sub1 [Name] | Sub1 [Name] | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||||||||||||||||||||||
| Subcontractor Labor Hours | SLH | Sub2 [Name] | Sub2 [Name] | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||||||||||||||||||||||
| Subcontractor Labor Hours | SLH | Sub3 [Name] | Sub3 [Name] | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||||||||||||||||||||||
| Total Labor Hours | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Direct Labor Cost | DLC | Prime | PRM | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Subcontractor Labor Cost | SLC | Sub1 [Name] | Sub1 [Name] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Subcontractor Labor Cost | SLC | Sub2 [Name] | Sub2 [Name] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Subcontractor Labor Cost | SLC | Sub3 [Name] | Sub3 [Name] | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Total Labor Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Prime Indirect Labor Cost | ILC | Fringe | FRG | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Prime Indirect Labor Cost | ILC | Overhead | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Prime Indirect Labor Cost | ILC | Other | OTH | ||||||||||||||||||||||||||||||||||||||||||||||
| Total Indirect Labor Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Other Direct Cost | ODC | Small Subcontractors | SUB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Other Direct Cost | ODC | Consultants | CON | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Other Direct Cost | ODC | Facility and Lease Costs | FAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Other Direct Cost | ODC | Training | TRN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Other Direct Cost | ODC | Travel | TRV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Other Direct Cost | ODC | Equipment | EQP | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Other Direct Cost | ODC | Materials and Supplies | MS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Other Direct Cost | ODC | Licenses | LIC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Other Direct Cost | ODC | Other | OTH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Total Other Direct Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Indirect Cost | IC | Other Indirect | OTH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Indirect Cost | IC | Labor G & A | GA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Indirect Cost | IC | COM | COM | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Indirect Cost | IC | Material G&A/Material Overhead | MOG | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| Total Indirect Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee | FEE | Fee | FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | TOT | TOTAL | TOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
CY = Contract Year
Instructions
| Instructions: |
| Complete the baseline template tab for the contract. If the contract has multiple Contract Line Item Number or Task Orders complete a tab for each item and no summary contract page is required. |
| Fill out the information in the upper left corner as follows: |
| Contract Number: Enter contract number of the contract |
| Contract Line Item Number: Enter if contract has multiple Contract Line Item numbers. Leave blank if not applicable |
| Contract Task Order: Enter if providing information for a task order under the contract. Leave blank if not applicable |
| Baseline Version: For initial baseline submittal enter 1, for each re-baseline increment the version number by 1. |
| Contract/Task Start Year: Enter the calendar year the contract period of performance is scheduled to begin |
| Contract/Task Start Month:Select from the dropdown list the month the contract period of performance is scheduled to begin |
| Capital Asset: Indicate with the drop down list if the award is for a capital asset. |
| Cost Reporting Categories: |
| The template utilizes standardized cost reporting categories. Refer to the Reporting Categories tab for additional information on what to report on each line. If a reporting category is not applicable, then leave the row blank. |
Reporting Categories
| Provide these values | Provide these values | |||||
| Numerical Indicator (NI) | Category | Category | ||||
| (Abbrev) | Reporting Category | Reporting Category | ||||
| (Abbrev) | Notes | |||||
| 1 | Direct Labor Hours | DLH | Prime | PRM | ||
| 2 | Major Subcontractor Labor Hours | SLH | Sub1 [Name] | Sub1 Subcontractor Name1 | First four characters of Reporting Category should always be Sub1 (No Space) | |
| 3 | Major Subcontractor Labor Hours | SLH | Sub2 [Name] | Sub1 Subcontractor Name1 | First four characters of Reporting Category should always be Sub2 (No Space) | |
| 4 | Major Subcontractor Labor Hours | SLH | Sub3 [Name] | Sub2 Subcontractor Name2 | First four characters of Reporting Category should always be Sub3 (No Space). Not limited to 3, should be consistent with what is reported on 533 | |
| 5 | Direct Labor Cost | DLC | Prime | PRM | ||
| 6 | Major Sub Labor Cost | SLC | Sub1 [Name] | Sub1 Subcontractor Name1 | Report fully burdened sub-contract labor | |
| 7 | Major Sub Labor Cost | SLC | Sub2 [Name] | Sub1 Subcontractor Name1 | Report fully burdened sub-contract labor | |
| 8 | Major Sub Labor Cost | SLC | Sub3 [Name] | Sub2 Subcontractor Name2 | Report fully burdened sub-contract labor | |
| 9 | Prime Indirect Labor Cost | ILC | Fringe | FRG | ||
| 10 | Prime Indirect Labor Cost | ILC | Overhead | OH | ||
| 12 | Prime Indirect Labor Cost | ILC | Other Indirect Labor | OTH | ||
| 13 | Other Direct Cost | ODC | Small Subcontractors | SUB | ||
| 14 | Other Direct Cost | ODC | Consultants | CON | ||
| 15 | Other Direct Cost | ODC | Facility and Lease Costs | FAC | ||
| 16 | Other Direct Cost | ODC | Training | TRN | ||
| 17 | Other Direct Cost | ODC | Travel | TRV | ||
| 18 | Other Direct Cost | ODC | Equipment | EQP | ||
| 19 | Other Direct Cost | ODC | Materials and Supplies | MS | ||
| 20 | Other Direct Cost | ODC | Licenses | LIC | ||
| 21 | Other Direct Cost | ODC | Other | OTH | ||
| 22 | Indirect Cost | IC | Other Indirect | OTH | ||
| 23 | Indirect Cost | IC | Material Overhead/Material G&A | MOG | Report Material Handling, and/or Material Overhead, and/or Material G&A | |
| 24 | Indirect Cost | IC | Labor G & A | GA | ||
| 25 | Indirect Cost | IC | COM | COM | Facilities Capital Cost of Money | |
| 26 | Fee | FEE | Fee | FEE | ||
| TOTAL | TOT | TOTAL | TOT |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .