This solicitation is for upgrade and modification services to reverse osmosis processes and sterilization systems at a Veterans Affairs medical center. The contractor will survey the workspace area of concern to confirm all existing utilities that will be modified or unchanged during demolition and construction activities. The flush sink in the current EMS room will be moved approximately 10 feet to connect where the existing handwashing sink is located. The hand sink in that area will also be moved as indicated in other design drawings, with associated piping expanded or extended to provide both hot and cold water. The solicitation number is 36C25022B0006 for the opportunity titled "Y1NE--Upgrade Reverse Osmosis Processes / Sterilization 583-22-201" issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI Responses.pdf | ||
| 36C25022B0006 0001.docx | DOCX document | |
| Attachment - IX - RFI Form Solicitaton.docx | DOCX document | |
| Attachment - IV - Reverse Osmosis Site Plan Layout Drawing.pdf | ||
| Attachment - I - ABSO Foot Print Drawing.pdf | ||
| Attachment - VII - Wage Determination.pdf | ||
| Attachment - III - Reverse Osmosis Equipment Drawing.pdf | ||
| Attachment - II - Basement Plumbing Plan Drawing.zip | ZIP file | |
| 36C25022B0006.docx | DOCX document | |
| Attachment - VIII - Contractor EMR Certification Form.docx | DOCX document | |
| Attachment - VI - VA Final Rinse Water Usage Chart.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Area of Concern/Proposed Workspace Highlighted
Contractor will survey area of concern prior to start of demolition activities to confirm all utilities that will be modified and/or stay the same during the completion of the work.
Please note that flush sink in current EMS room will be moved approx. 10FT to be tied-in where current handwashing sink is located (ref. P- 403). Hand sink located here is to be moved as noted in other design drawings with associated piping expanded and/or extended to provide both hot and cold water.