RFI Responses.pdf
PDF 1 MB Posted
- Attached to
- Y1NE--Upgrade Reverse Osmosis Processes / Sterilization 583-22-201 Federal contract opportunity
- Solicitation number
- 36C25022B0006
About this file
This document contains responses to questions regarding a solicitation for upgrading reverse osmosis processes and sterilization at a Department of Veterans Affairs medical center. The solicitation involves replacing the existing reverse osmosis system with a new Nustream system at the Sterile Processing Department located at 1481 W 10th St in Indianapolis, Indiana. The period of performance is 120 days from notice to proceed. Walls must meet VA specifications for metal stud framing and drywall. Doors, frames and hardware must also meet VA specifications. Epoxy flooring will be installed per VA flooring specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25022B0006 0001.docx | DOCX document | |
| Attachment - IX - RFI Form Solicitaton.docx | DOCX document | |
| Attachment - IV - Reverse Osmosis Site Plan Layout Drawing.pdf | ||
| Attachment - I - ABSO Foot Print Drawing.pdf | ||
| Attachment - VII - Wage Determination.pdf | ||
| Attachment - III - Reverse Osmosis Equipment Drawing.pdf | ||
| Attachment - II - Basement Plumbing Plan Drawing.zip | ZIP file | |
| 36C25022B0006.docx | DOCX document | |
| Attachment - V - Reverse Osmosis Workspace Drawing.pdf | ||
| Attachment - VIII - Contractor EMR Certification Form.docx | DOCX document | |
| Attachment - VI - VA Final Rinse Water Usage Chart.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
REQUEST FOR INFORMATION (RFI)
36C25022B0006
PROJECT NUMBER: 583-22-201 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Reverse Osmosis
PROJECT LOCATION: Department of Veterans Affairs
1481 W 10th St
Indianapolis, IN 46202
TO:
Christopher C. Lee, Contracting Officer
Department of Veterans Affairs
8888 Keystone Dr.
Indianapolis, IN 46202-2884
RFI NO.: DATE: SPEC/DWG. REFERENCE:
REPLY NEEDED BY:
INFORMATION NEEDED:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
VA Response: Though TIR34 references utilizing ultraviolet disinfection for the distribution system, it is not a required component of the system as detailed in TIR34 as disinfection can be obtained with other metholodogy.
Jordanna Kendrot, P.E., VAMC 1/25/2022 jstolly
Typewritten Text
Rick Swagger
Ft. Wayne, IN
260-750-7948
1-3-2022
Typical TIR 34 STD108 Refers to using ultraviolet disinfection for the distribution system. The Nustream system noted in the Solicitation does not show a UV unit. Is there a reason UV was omitted?
2022-01-26T08:08:59-0500
Christopher C. Lee 1590216 specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
Department of Veterans Affairs
RFI NO.: 001 DATE: 01/13/2022 SPEC/DWG. REFERENCE:
1. Please provide specifications for doors, frames, and hardware for the 2 new doors.
2. Please provide specifications or model of floor sink for the proposed EMS closet.
3. Are the new wall construction to be 20ga. 3-5/8” metal studs and 1 layer of 5/8” drywall on each side? Is the GWB to be water resistant?
4. What type of paint is to be used on the walls? Please provide specifications.
5. During walk through it was discussed that the RO loop can be mounted below existing ceiling, please confirm.
6. The corridor wall construction is block, are we able to use flush mount door frame with Dimple anchors? This would allow for the opening to be cut to the frame size without having to tooth the block wall.
7. Will masonry frame need to be grout filled?
8. Please confirm that this a phased project and SPS will be completed prior to starting work on GI phase.
9. The project has 120-day duration, materials may have lead times of 18 to weeks to procure doors hardware etc. will project duration be extended to allow material procurement.
10. Could the VA provide dimensions and picture of the space where RO equipment will be placed in the GI area?
11. Is the existing block wall structural? If so, will a lintel need to be installed above door? Or can masonry be removed full height of door width and be filled in with metal stud framing and drywall.
12. Can new walls be framed to existing drywall ceiling or will ceiling need to be removed to frame to existing deck?
SUBMITTED BY: Eagle Contractors Inc City/State: Indianapolis, IN
PHONE NO.: (317) 559-2582
VA Response:
1. Doors, frames, and hardware for doors to be installed must meet the following VA Specifications:
Division 08 11 13 for “Hollow Metal Doors and Frames”
2. No identified specification for sink except must be able to be suitable for mop and bucket use.
3. Yes. Yes.
4. Sherwin Williams brand paint; eggshell white
5. Yes; RO loop associated with new system may be mounted below existing ceiling inside conduit.
Existing RO loop to be cut and capped after being drained in-place by Contractor.
6. Yes.
7. No
8. No longer applicable, GI portion of work to be descoped.
9. Following NTP, material ordering, mobilization and completion of work must be completed during proposed duration. Revised RFP includes updated Period of Perforamnce.
10. No longer applicable, GI portion of work to be descoped.
11. Block wall is not structural but does extend to deck as it is part of fire suite of SPS. Lintel will need to be install above door.
12. Walls inside of SPD footprint can be framed to existing drywall ceiling.
Blank Page
2022-01-26T08:11:44-0500
Christopher C. Lee 1590216
1. Wall construction materials must meet VA Specifications
2. No longer applicable, GI portion of work to be descoped.
3. Doors, frames, and hardware for doors to be installed must meet the following VA Specifications: Division 08 11 13 for “Hollow Metal Doors and Frames”
4. No, but RO system to be installed must meet TIR34 requirements. Submit pricing based on this requirement
5. .
6. Contractor is to complete survey of utility chase as component of pre-construction survey.
jherring
Jeff Herring
Celina, OH
419-778-7024
01/13/2022
01/20/2022
1. Can the material for the new wall construction be specified?
2. Can drawings, dimensions, and pictures of the GI space be provided?
3. Can a SPEC be provided for the new doors including fire rating?
4. Does the contractor need to provide purposed RO system with their bid?
5. Was this site visit mandatory and must be attended in order to bid this project?
6. Does the contractor need to provide a survey of the utility chase or will the VA provide this survey?
2022-01-26T08:31:01-0500
Christopher C. Lee 1590216 specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
Department of Veterans Affairs
RFI NO.: 002 DATE: 01/17/2022 SPEC/DWG. REFERENCE:
Please provide type of flooring to be used in rooms A-B069 and EMS, as this floor will need to be cut to re-locate drain lines in floor.
SUBMITTED BY: Eagle Contractors Inc City/State: Indianapolis, IN
PHONE NO.: (317) 559-2582
Epoxy floor will be installed as per the following VA specifications: Division 09 “Finishes”
2022-01-26T08:16:39-0500
Christopher C. Lee 1590216
1. There are 10 pieces of equipment that utilize RO water in SPS using approximately 306 GPH.
2. No longer applicable, GI portion of work to be descoped.
3. No.
Jeff Herring
419-778-7024
Celina, OH
01/20/2022
01/25/2022
1. What are the model numbers and QTY of each point of RO/DI water use in SPS?
2. What are the model numbers and QTY of each point of RO/DI water use is GI?
1 & 2 - needed to verify sizing of water system
3. Any immediate plans for expansion in either department?