This is a Site Survey Report (SSR) documenting existing conditions at the CXY Locator Outer Marker (LOM) facility in New Cumberland, Pennsylvania, prepared by Parsons for the Federal Aviation Administration's Real Property Disposition Program. The survey, conducted on December 18, 2024, inventories equipment, identifies environmental concerns, and recommends disposition and demolition actions for the FAA's surrender of the leased property to Upper Allen Township. The site comprises a 12 ft. x 7.5 ft. x 9 ft. pre-fabricated steel equipment shelter on a concrete slab foundation, approximately 68 years old in fair condition, with associated grounds containing grassed and gravel areas within a chain-link perimeter fence. The facility is accessed via Fisher Road near Mechanicsburg, Pennsylvania, at coordinates 40°10'41.5"N 77°00'20.5"W, with elevation of 518 feet above sea level.
The report identifies required regulatory compliance actions including permits from Upper Allen Township and the Commonwealth of Pennsylvania, asbestos notification forms submission to Pennsylvania Department of Environmental Protection, and preparation of an Environmental Screening Checklist per FAA Order 1050.19C. Environmental remediation is necessary to address contaminants of concern identified through a Preliminary Assessment/Site Investigation prepared due to pre-1984 site structures. Key logistical requirements include coordination with the FAA Middletown System Support Center, provision of contractor staging space on-site, scheduling during normal day shift hours with consideration for noise and traffic impacts, and securing timely FAA approvals of proposed plans. The scope encompasses environmental removal and disposal, demolition and removal of structures, site restoration with backfill of excavated areas, and utility disconnection as detailed in the supporting demolition disconnect sketch and environmental report appendix.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Support Services Contract 5
SITE SURVEY REPORT
New Cumberland, PA
December 18, 2024
Demolish, Remove, and Dispose of the
CXY Locator Outer Marker (LOM) Site Survey JCN: 22005048
Demolition JCN: 24009599
PREPARED BY: PARSONS
T5 New England Program Office 1200 District Avenue Burlington, MA 01803
PREPARED FOR: Federal Aviation Administration 1200 District Avenue
Burlington, MA 01803
CXY LOM Rev. 0, December 18, 2024
Table of Contents
EXECUTIVE SUMMARY
1.0 PARTICIPANTS AND SAFETY INFORMATION
2.0 SITE DESCRIPTION
3.0 UTILITY DISPOSITION TABLE
A. Demolition Disconnect Sketch
4.0 HAZARDOUS MATERIALS SUMMARY TABLE
5.0 PROPOSED SCOPE OF WORK
A. FAA SSC Action Required Prior to Site Demolition
B. Environmental Removal and Disposal
C. Demolish, Remove, and Dispose
D. Restoration Clause (Full Restore)
E. Notes
6.0 SITE PHOTOGRAPHS
APPENDIX A: Environmental Report
EXECUTIVE SUMMARY
This Real Property Disposition Program (RPDP) Site Survey Report (SSR) includes results of the site survey effort conducted on December 18, 2024 at the CXY Locator Outer Marker (LOM) facility in New Cumberland, Pennsylvania. This site is maintained by the Middletown, Pennsylvania System Support Center (SSC). The purpose of this site survey was to document existing site conditions and determine the actual level of effort required to dispose of and/or surrender possession of real property by the Federal Aviation Administration (FAA) to the property Lessor.
The report contains equipment inventories, environmental information, and recommended disposition and demolition actions for the site.
Sensitive environmental areas, as a direct result of past and/or current operations and maintenance of the facility are identified. Contaminants of concern are to be abated in all areas where demolition activities will result in their disturbance in order to mitigate worker exposures, possible site contamination, or to achieve regulatory compliance for proper removal, disposal, and restoration.
Risks and safety concerns, such as working around FAA facilities and potential environment hazards, have been identified and are addressed in the Parsons’ T5 Risk Management Plan
(RMP).
The work schedule is contingent upon timely FAA reviews and approvals of proposed plans.
Logistics support and agreements must be made in a timely fashion with our contractor in order to execute procurement and decommissioning efforts as scheduled. Schedule impacts may result from the inability to secure permits from the state and local regulatory agencies in a timely manner.
1.0 PARTICIPANTS AND SAFETY INFORMATION
LIST OF PARTICIPANTS:
Name Organization Phone # E-mail
Katherine Ronckovitz FAA ATO-W 202-267-1135 O 703-819-1117 C katherine.e.ronckovitz@faa.gov
Mark Boyle FAA ETO 603-881-1238 mark.boyle@faa.gov
Matthew Walker FAA SSC Manager 717-948-1990 O 223-279-9459 C matthew.walker@faa.gov
Douglas Campbell FAA SSC Coordinator 717-948-2695 O 223-279-9459 C douglas.a.campbell@faa.gov
Beth Terrell NISC Program Analyst 703-625-9504 beth.ctr.terrell@faa.gov
Allah Christmas FAA ESA PIM 404‐305‐7296 allah.christmas@faa.gov
Chris Barnhill Lead FAA RECO 404-305-5806 O 678-850-6565 C chris.barnhill@faa.gov
Antionette Small FAA Realty Specialist 817-222-4376 O 678-431-6250 C antionetter.r.small@faa.gov
Jessica S. Hayes FAA Realty Specialist 404-305-5606 jessica.s.hayes@faa.gov
Elizabeth Ditto FAA EOSH 404-594-0756 O elizabeth.ditto@faa.gov
Andrew Fotino TSSC PM 781-238-7082 O 339-927-6063 C andrew.j-ctr.fotino@faa.gov
Ritu Patel TSSC ESA Lead 339-832-2348 C ritu.m-ctr.patel@faa.gov
Thalia Quarterman TSSC Environmental Scientist/Specialist 404-432-7028 C thalia.e-ctr.quarterman@faa.gov mailto:beth.ctr.terrell@faa.gov mailto:allah.christmas@faa.gov
2.0 SITE DESCRIPTION
Site Information
Site Address
Nearest Address: 1849 Fisher Rd, Mechanicsburg, PA 17055 Nearest Intersection: Fisher Rd. & Southview Dr.
County: Cumberland Site Coordinates: 40°10'41.5"N 77°00'20.5"W Access Road Coordinates: 40°10'37.2"N 77°00'14.9"W Site Elevation: 518 ft. above sea level SSC Office Address: Harrisburg International Airport FAA Middletown SSC Airport Rd, Bldg. 570 Middletown PA 17057
Land Ownership Information
Lease No. DTFAEN-13-L-00105; Expires 9/30/2023 Full Restoration (5) Lessor: Upper Allen Township
Drawings As-built and proposed construction drawings are available on ProjectWise. No drawings were found onsite.
Co-Located There are no co-located items on the FAA site.
Adjacent Property
North: Friendship Park South: Friendship Park West: Residential/agricultural area East: Friendship Park
Site Access/Site Access Concerns
Site coordinates sufficiently provide directions to the site. Equipment may have to be delivered to the site through Within You Farm’s gate adjacent to the site.
Site Drainage and Run-off
There is an upward slope on approach of the site, and the site itself is flat.
Site Grounds The site has a combination of grassed and gravel area within a chain-link perimeter fence. On the south side of the site, there is a paved parking area. North of the site is a grassed area used for public recreation.
Site Specific Integrated Risk Management Plan
Security Requirements There is one (1) FAA padlock on the perimeter fence, and one (1) doorknob lock core on the equipment shelter. FAA has keys to both padlocks.
Badging and Insurance Requirements
No specific requirements needed to perform work on the site.
Parsons’ insurance will suffice all insurance requirements.
Department of Transportation Personal Identity Verification (PIV) badge will suffice all badging requirements.
Subcontractor Staging Area Space is available on site for staging.
Working Hours
Work schedule will need to be determined. Work is anticipated to be conducted during normal day shift hours. Consideration for work hours, noise, traffic, and personal safety will be incorporated in the demolition work plan.
Environmental Screening Checklist
(ESC) Preparation Recommendation
An Environmental Screening Checklist should be prepared in accordance with FAA Order 1050.19C as a result of a lease termination.
Preliminary Assessment /Site Investigation
(PA/SI)
A PA/SI has been prepared by Parsons because site structures pre-date 1984.
Operational Risk Management Plan
(ORMP)
An ORMP is not required because the site is not co-located, or on an airfield/AOA.
7460-1
In accordance with 14 CFR § 77.9, filing a Form 7460-1 is not required because the referenced navigation facility has been decommissioned and surrounding structures are at a higher elevation than the LOM antenna and proposed construction equipment.
Permits o Upper Allen Township requires a construction/demolition permit to be applied for prior to demolition.
https://uatwp.org/i_want_to/read_download/applications_and_for ms.php#outer-9 o The state of PA also required a construction permit.
Apply for a Uniform Construction Code Building Permit | Commonwealth of Pennsylvania o Asbestos notification forms:
https://greenport.pa.gov/elibrary/GetFolder?FolderID=2685
Earth Work Backfill will be required at areas of excavation.
High Work N/A
Confined Space N/A https://uatwp.org/i_want_to/read_download/applications_and_forms.php#outer-9 https://uatwp.org/i_want_to/read_download/applications_and_forms.php#outer-9 https://www.pa.gov/services/dli/apply-for-a-uniform-construction-code-building-permit.html https://www.pa.gov/services/dli/apply-for-a-uniform-construction-code-building-permit.html https://greenport.pa.gov/elibrary/GetFolder?FolderID=2685
Site Facility
Equipment Shelter Type Pre-fabricated steel frame with wood
Size 12 ft. x 7.5 ft. x 9 ft.
Shelter Foundation Type Concrete slab Size 12 ft. x 7.5 ft. x 1 ft.
Shelter Entrance Type Concrete step Size 4 ft. x 2 ft. x 6 in.
Shelter State Cond. Fair Age ~68 years old
Sub Floor Materials Type Concrete Size 90 sq. ft.
Floor Tiles/Flooring Color Beige/brown Quantity <90 sq. ft.
Poles Type Two (2) wooden poles Height ~40 ft.
Pole Foundation Type N/A Size N/A
Fuel Storage Tank Cap. N/A Manuf./ Supplier N/A
Utility Poles Type
Wooden (1) outside FAA perimeter fence for pole-mounted transformer
Size ~40 ft.
(to remain)
Perimeter Fence Type
9 ft. chain link;
3 rows barbed wire;
6 ft. metal posts
Quantity
90 ft. x 90 ft. = 360 ln.
ft. chain link;
1,080. ln. ft. barbed wire;
40 posts
Access Road Type Asphalt Size Park road (to remain)
Access Road Gate Type N/A Size N/A
Facility Plot Area Type
Grass Size
90 ft. x 90 ft. = 8,100 sq. ft.
Gravel 42 ft. x 16 ft.= 720 sq.
ft
Inventory Onsite • Two (2) guy wires (~34 ft. each)
• Two (2) guy anchors
Inventory in Shelter • Miscellaneous wires
• One (1) each: caulk board
Other Structures • None
Electronics Equipment
Antenna Foundation Type Concrete Size 3 ft. diam. x 7 in. tall (vis)
Antenna Cables Type N/A Size N/A
Electronics Equipment • N/A
3.0 UTILITY DISPOSITION TABLE
Utility List Location Utility Company Name Meter/ Junction Box Service is:
Power CXY LOM stie PPL Electric 300087627 Active
Action:
FAA to contact power company to confirm power termination from the pole mounted transformer prior to demolition beginning. Power company to remove meter and powerlines from power meter to transformer.
All utilities to be checked by a third party for location prior to cutting or demolition beginning. See sketch below.
Water N/A N/A N/A N/A
Action:
Fuel Type N/A N/A N/A N/A
Action: N/A
Utility List Location Utility Company Name Service Number Service is:
Telephone N/A N/A N/A N/A
Action: N/A
Sewer, Storm, and Sanitary Systems
N/A N/A N/A N/A
Action: N/A
Fiber Optic N/A N/A N/A N/A
Action: N/A
A. Demolition Disconnect Sketch Power runs above ground from the pole-mounted transformer located outside of the west side of the FAA perimeter fence to the meter and disconnect switch located on the south side of the equipment shelter. FAA to contact power company to confirm power termination from the pole mounted transformer prior to demolition beginning. Power company to remove meter and powerlines to the pole-mounted transformer. Demolition crew to remove the meter housing and disconnect switch. Electric utility cable to be restored per section 5.D of this report. All utilities to be checked by a third party for location prior to cutting or demolition beginning.
Disconnect switch and power meter.
Power company owned pole-mounted transformer. Power company to remove the powerlines to the LOM poles.
KEY
Above ground powerlines
Utility pole
4.0 HAZARDOUS MATERIALS SUMMARY TABLE
Recordkeeping, Notifications, and Manifests: Hazardous material documentation will be kept by the subcontractor conducting the abatement/disposal work and provided to the FAA Project Engineer with close-out paperwork. Risk and safety management plans are available upon FAA request.
Potential Environmental Issue Presence Comments
Tanks, piping No N/A
Distressed vegetation No N/A Transformers (who owns, label) Yes Power company owned pole-mounted transformer (to remain) Staining / evidence of contaminated soil or concrete
No N/A
Sump pump system and interior drainage system (if chemicals were present a source for their migration off of the property)
No N/A
Metal or other trash items either semi buried or exposed, metal surfaces could have lead paint, or be otherwise contaminated
No N/A
Adjacent water ways, ponds, lagoons, storm drains
No N/A
Odors, mold, mildew No N/A
Evidence of monitoring systems i.e., monitoring wells, boring caps…
No N/A
Hazardous Material (Regulated) Location Form
Concentration /
Quantity
Recommended Action if
Abatement is Required
FAA Action T-5 Action
Asbestos Containing Material (ACM)a
CXY LOM Gray floor tile
Trace Chrysotile 30 sq. ft.
ACM to be abated prior to demolition following federal and state notification procedures and abatement methods
Sign waste manifest, convey to Parsons
Copy of signed waste manifest showing proper disposal/recycling
Interior window glaze
Trace Chrysotile 18 ln. ft.
Toxicity Characteristic Leaching Procedure (TCLP)- Leada
CXY LOM Various locations
The lead concentration in the composite waste sample was non-detect and therefore below the EPA maximum concentration for lead (5.0 mg/L) for classification as hazardous.
Demolition waste will not be considered hazardous waste.
N/A N/A Dispose of as construction debris.
Hazardous Material (Regulated) Location Form
Concentration /
Quantity
Recommended Action if
Abatement is Required
FAA Action T-5 Action
Lead Based Paint (LBP)a CXY LOM White paint on exterior door frame
Lead concentration (4.0% by wt.) in one sample was above EPA threshold of 0.5% by wt.
N/A N/A May be disposed of as construction debris based on TCLP (lead) results
Polychlorinated Biphenyl (PCB) Surface Samplinga
CXY LOM Exterior window caulk
Non-detect – 4.0 mg/kg Concentrations of PCBs were below the Federal regulatory limit of 50 mg/kg
N/A
N/A Dispose of as construction debris
Lead in Soil Samplinga CXY LOM Soil around
CXY LOM
shelter and antenna foundation
19 – 790 mg/kg
Three concentrations of lead in soil were above EPA threshold of 200 mg/kg.
Specifically at the east dripline sample (270 mg/kg), north dripline sample (330 mg/kg), and south dripline sample (790 mg/kg)
Notify Environmental Cleanup Program (ECU)
N/A N/A
Hazardous Material (Regulated) Location Form
Concentration /
Quantity
Recommended Action if
Abatement is Required
FAA Action T-5 Action
PCB in Soil Samplinga CXY LOM Soil around
CXY LOM
shelter and antenna foundation
Non-detect PCBs were non-detect in samples and therefore were below the Reporting Limits (RLs). Reporting Limits (0.085 mg/kg – 0.10 mg/kg) were below the EPA threshold of 1 mg/kg
N/A N/A Dispose of as construction debris
Suspect PCB-containing equipment
CXY LOM N/A N/A N/A N/A N/A
Potential Mercury-containing equipment
CXY LOM N/A N/A N/A N/A N/A
Household-type chemicals, cleaners, and miscellaneous
CXY LOM N/A N/A N/A N/A N/A
Oils and lubricants CXY LOM N/A N/A N/A N/A N/A
Batteries CXY LOM N/A N/A N/A N/A N/A
Fuel Storage Tank CXY LOM N/A N/A N/A N/A N/A
Refrigerant CXY LOM N/A N/A N/A N/A N/A
Hazardous Material (Regulated) Location Form
Concentration /
Quantity
Recommended Action if
Abatement is Required
FAA Action T-5 Action
Building components containing potential Radioactive material
CXY LOM N/A N/A N/A N/A N/A
Charged-canisters associated with fire suppression systems
CXY LOM N/A N/A N/A N/A N/A
Creosote CXY LOM N/A N/A N/A N/A N/A aSee Appendix A for Environmental Report
5.0 PROPOSED SCOPE OF WORK
A. FAA SSC Action Required Prior to Site Demolition
1. The FAA SSC has been provided with copies of the Utility Disconnect Sketch(s). Refer to Section 3 – Utility Disposition Table for action items to be completed.
2. FAA SSC to remove all padlocks at the time of demolition commencement. In total there was one (1) FAA padlock on the perimeter fence, and one (1) shelter padlock identified during Parsons’ site survey.
3. FAA SSC to remove all FAA owned property/electronics equipment required to be excessed through the disposition process prior to the commencement of demolition activities.
a. One (1) each: caulk board
b. Multiple: miscellaneous wires
B. Environmental Removal and Disposal
1. Three concentrations of lead in soil were above EPA threshold of 200 mg/kg.
Specifically at the east dripline sample (270 mg/kg), north dripline sample (330 mg/kg), and south dripline sample (790 mg/kg). It is recommended that the site be referred to the Environmental Cleanup (ECU) Program.
2. Abate ACM identified in the asbestos analyses dated December 2024 using a state licensed contractor prior to demolition of the facility.
C. Demolish, Remove, and Dispose
1. Demolish and dispose of the CXY LOM equipment shelter, associated foundation, and appurtenances:
a. Prefabricated metal frame shelter with wood siding: 12 ft. x 7.5 ft. x 9 ft.
b. Shelter Foundation: 12 ft. x 7.5 ft. x 1 ft.
c. Concrete step pad: 4 ft. x 2 ft. x 6 in.
2. Demolish and dispose of the CXY LOM antenna and appurtenances:
a. Two (2) LOM Wood poles: ~50 ft.
b. Concrete antenna foundation: 3 ft. diam x 7 in. tall
c. Two (2) guy wires: ~34 ft. each
d. Two (2) guy anchors
3. Demolish and dispose of the CXY LOM fencing and appurtenances:
a. Chain link fence: 360 ln. ft. of 9 ft. tall chain link fence
b. Barbed wire: 1,080ln. ft. of barbed wire
c. Fence posts: 40 chain link fence posts
4. Demolish and dispose of the CXY LOM miscellaneous items:
a. Gravel plot section: 45 ft. x 16 ft. = 720 sq. ft.
b. Site plot: 90 ft. x 90 ft. = 1,800 sq. ft.
D. Restoration Clause (Full Restore)
CXY LOM is a leased site and is to be restored. The following list is for restoration of the site plot.
1. Remove all foundations and structures to 3 ft. below grade backfill with local, clean fill (clean fill dirt, local sand, etc.), and compact.
2. Remove all cables and conduit to 3 ft. below grade or where all vertical utilities transition to horizontal, whichever occurs first.
3. Remove all existing ground cover (e.g., gravel) other than topsoil.
4. Spread clean fill to a uniform depth of approximately 0.5 ft. where existing ground cover, foundations, utilities, etc. were removed.
Excerpt from Lease
E. Notes
1. Site access for large equipment may require the use of the Within You Farm access gate.
2. Neighboring farm, Within You farm contact information:
https://withinyoufarm.com/, +1717-610-5564 https://withinyoufarm.com/
6.0 SITE PHOTOGRAPHS
Facility: CXY LOM Location: New Cumberland, PA Date: 12/18/2024 Photographer: PARSONS Description:
CXY LOM equipment shelter facing northeast
Facility: CXY LOM Location: New Cumberland, PA Date: 12/18/2024 Photographer: PARSONS
CXY LOM equipment shelter facing west and west LOM pole
Facility: CXY LOM Location: New Cumberland, PA Date: 12/18/2024 Photographer: PARSONS
CXY LOM equipment shelter facing southwest
Facility: CXY LOM Location: New Cumberland, PA Date: 12/18/2024 Photographer: PARSONS
CXY LOM equipment shelter facing east
Facility: CXY LOM Location: New Cumberland, PA Date: 12/18/2024 Photographer: PARSONS
CXY LOM concrete antenna foundation
Facility: CXY LOM Location: New Cumberland, PA Date: 12/18/2024 Photographer: PARSONS
CXY LOM power meter
Facility: CXY LOM Location: New Cumberland, PA Date: 12/18/2024 Photographer: PARSONS
CXY LOM equipment shelter interior
Facility: CXY LOM Location: New Cumberland, PA Date: 12/18/2024 Photographer: PARSONS
Access gate
Facility: CXY LOM Location: New Cumberland, PA Date: 12/18/2024 Photographer: PARSONS
Pole-mounted transformer (to remain)
Facility: CXY LOM Location: New Cumberland, PA Date: 12/18/2024 Photographer: PARSONS
View of northeast side LOM pole
Facility: CXY LOM Location: New Cumberland, PA Date: 12/18/2024 Photographer: PARSONS
Site layout
CXY LOM
Equipment shelter
LOM Poles
Pole-mounted transformer
Access gate
Facility: CXY LOM Location: New Cumberland, PA Date: 12/18/2024 Photographer: PARSONS
Site location
CXY LOM site
APPENDIX A: Environmental Report
N
CXYLOM
Near1901 Fisher Road Shephersdstown , Pennsylvainia
ASBESTOS SAMPLE LOCATIONS
121801 121804
121802 121805
120803 121806
121807 121809
121808
121810 121811 121813 121813 121814 121815
ACM MATERIAL
ASBESTOS CONTAINING MATERIAL <1%
ATLAS #204BS08127
Near1901 Fisher Road Shephersdstown , Pennsylvainia
LEAD PAINT CHIP SAMPLE LOCATIONS
121801P 121802P
121803P
LEAD BASES PAINT
ATLAS #2041BS08127
Near1901 Fisher Road Shephersdstown , Pennsylvainia
PCB BUILDING MATERIALS SAMPLE LOCATiONS
121801PCB
121802PCB
121803PCB
121804PCB
121805PCB
Near1901 Fisher Road Shephersdstown , Pennsylvainia
CXY LOM LEAD AND PCB SOIL SAMPLE LOCATIONS
121801S
121802s
121803S
121804S
121805S
121806S
121807s 121808S 121809S
121810s
121811S
121812S 121813S
121814S
121815S
Photographic Documentation CXY LOM near Shepherdstown Pennsylvania Atlas Project No.: 204BS08127 www.oneatlas.com
Photo #01: West entrance side of CXY LOM & soil sample locations
Photo #02: South side of CXY LOM & soil sample locations
Photo #03: Eastside of CXY LOM with antenna foundation & soil sample locations.
Photo #04: North side of CXY LOM & soil sample locations
Photo #05. Interior of CXY LOM Photo #06. Asbestos containing 12’ x 12’” gray floor tile
Atlas Project No.: 204BS08127 www.oneatlas.com
Photo #07: Asbestos containing interior window glazing Photo #08: Representative view of exterior window caulk
Photo #09: Representative sample of concrete samples Photo #10: PCB containing caulk found at the east exterior window
Photo #11: Lead-based paint (LBP) on the white metal door case
Photo #12: Lead containing paint on the exterior white metal siding.
Atlas Project No.: 204BS08127 www.oneatlas.com
Photo #13: Non PCB Caulking found at the east exterior pipe penetration caulk
Photo #14: PCB samples collected of blue concrete foundation paint found to be negative
CE
RT
IF
IC
AT
E O
F
AN
AL
YS
IS
Ch ai n of
C us to dy
Jo b Na m e:
CX
Y
- 2
BS
CX
Y Da te S ub m itt ed
-2 0-
Cl ie nt
At la s T ec hn ica l C on su lta nt s Jo b Lo ca tio n:
M ec ha ni cs bu rg , P
A
F ish er
Ro ad , S he ph er ds to w n, P
A
Da te
A na ly ze d:
-0
2-
Ad dr es s:
R um se y
Ro ad
C ol um bi a M ar yl an d
Jo b Nu m be r:
4B S0
Re po rt
D at
2-
At te nt io
Pa t D in ch
P.
O
. N um be r:
No t P ro vi de d
Da te
S am pl ed
-1 8-
Pe rs on
S ub m itt in g:
in
Su m ar y of P ol ar ize d
Li gh t M ic ro sc op y
F or be s B lv d.
La nh am , M
D, (3
) 4
-2
· T ol l F re e (8
) 3
-0
· F ax
(3
) 4
-2
1/
AM
A
Sa m pl e
Nu m be r
Cl nt
Sa pl e
Nu m be r
To ta l As be st os ry so til e Pe rc en t Am ite rc en t Cr oc id ol ite en t O th
As be st en t
M in al
W oo l
Pe rc en t
Fi be rg la ss en t
O rg an ic en t Sy nt he tic en t
O en t
Pa rt ic ul at e
Pe rc en t
Sa m pl e
Ty pe pl e Co lo r
Ho m og en ei ty
An ys t
ID
Co m en ts
FT
Gr ay
Ho og en ou s
PC
og en ou og en ou
NA
D
TR
S Bl ac k
Ho m og en ou
NA
D
M
S Bl ac k
Ho m og en ou
NA
D
M
S Bl ac k
Ho m og en ou
NA
D
CC
ul ti Ho m og en ou
NA
D ti Ho m og en ou
NA
D ti
Ho m og en ou
NA
D
CK
ti
La ye re d
NA
D ti
La ye re
NA
D ti
La ye re
W
G Be ig e
Ho m og en ou
W
G Be ig e
Ho m og en ou
W
G Be ig e
Ho m og en ou
IF
IC
AT
E O
F
AN
AL
n of
C us to dy
Na
- 2
BS
CX
Y Da te S ub m itt ed
-2 0-nt
At la s T ec hn ica l C on su lta nt s Jo b Lo ca ha ni cs bu rg , P
A
F ish
Ro ad , S he ph er ds to w n, P
A
Da te
A na ly
2-es s:
R um se y
Ro ad
C ol um bi a M ar yl an d
Jo b Nu m be r:
4B S0 rt
D
2-nt in
. N um be r:
No t P ro vi de d
Da te
S am pl ed
-1 8-on
S ub m itt in m ar y of P ol ar ize d
Li gh t M ic ro sc op y
F or be s B lv d.
La nh am , M
D, (3
) 4
-2
· T ol l F re e (8
) 3
-0
· F ax
(3
) 4
-2
2/
Te ni ca l
Di re ct or ich ae l G re en rg
Th is re po rt a pp lie s o nl y to th e sa m pl e, o r s am pl es , i nv es tig at ed a nd is n ot n ec es sa ril y in di ca tiv e of th e qu al ity o r c on di tio n of a pp ar en tly id en tic al o r s im ila r p ro du ct s.
As a m ut ua l p ro te ct io n to cl ie nt s, th e pu bl ic, a nd th es e
La bo ra to rie s, th is re po rt is su bm itt ed a nd ac ce pt ed fo r t he e xc lu siv e us e of th e cli en t t o w ho m it is a dd re ss ed a nd u po n th e co nd iti on th at it is n ot to b e us ed
, i n w ho le o r i n pa rt
, i n an y ad ve rt isi ng o r p ub lic ity m at te r w ith ou t p rio r w rit te n au th or iza tio n fr om u s.
Sa m pl e ty pe s, lo ca tio ns , a nd co lle ct io n pr ot oc ol s a re b as ed u po n th e in fo rm at io n pr ov id ed b y th e pe rs on s s ub m itt in g th em a nd , u nl es s c ol le ct ed b y pe rs on ne l o f t he se L ab or at or ie s, w e ex pr es sly d isc la im a ny k no w le dg e an d lia bi lit y fo r t he a cc ur ac y an d co m pl et en es s o f t hi s i nf or m at io n.
R es id ua l sa m pl e m at er ia l w ill b e di sc ar de d in a cc or da nc e w ith th e ap pr op ria te re gu la to ry g ui de lin es
, u nl es s o th er w ise re qu es te d by th e cli en t.
Th is re po rt m us t n ot b e us ed to cl ai m
, a nd d oe s n ot im pl y pr od uc t c er tif ica tio n, a pp ro va l, or e nd or se m en t b y
NY
E
LA
P, A
IH
A-
LA
P, o r a ny a ge nc y of th e Fe de ra l G ov er nm en t.
Al l r ig ht s r es er ve d.
A
M A
An al yt ic al S er vi ce s, In c.
e fo llo w in g fo ot no te s o nl y ap pl y to th os e sa m pl es w hi ch th e to ta l a sb es to s r es ul t i s f la gg ed w ith a n ot e nu m be r.
TE
M R
EC
OM
M
EN
DA
TI
ON
Pl ea se n ot e, d ue to re so lu tio n lim ita tio ns w ith o pt ica l m icr os co py a nd
/o r i nt er fe re nc e fro m m at rix co m po ne nt s o f t hi s s am pl e, re su lts w hi ch a re re po rt ed v ia P
LM
a s n eg at iv e or tr ac e
1% ) f as st os m ay co nt ai n a sig ni fic an t q ua nt ity o f a sb es to s.
It is re co m m en de d th at th e ad di tio na l a na ly tic al te ch ni qu e of T
EM
b e us ed to ch ec k fo r a sb es to s f ib er s b el ow th e re so lu tio n lim its o f o pt ica l m icr os co py
M
AT
RI
X
RE
DU
CT
IO
N
RE
CO
M
M
EN
DA
TI
ON
P le as e no te
, d ue to in te rfe re nc e fro m th e m at rix co m po ne nt s o f t hi s s am pl e, re su lts w hi ch a re re po rt ed v ia
P
LM
a s n eg at iv e or tr ac e
1%
) f or a sb es to s m ay co nt ai n a sig ni fic an t qu an tit y of a sb es to s w hi ch is o bs cu re d fro m vi ew
. I t i s r ec om m en de d th at th e ad di tio na l p re pa ra tio n te ch ni qu e of g ra vim et ric re du ct io n be p er fo rm ed o n th is sa m pl e to m in im ize th e ob sc ur in g ef fe ct s o f m at rix co m po ne nt s, fo llo w ed b y re an al ys is by P
LM
a nd /o r T
EM
An al ys is M et ho d
EP
A/
0/
R-
/1 d at ed Ju ly
NA
D
“N o As be st os D et ec te d”
T R
“T ra ce e qu al s l es s t ha n
1% o f t hi s c om po ne nt
Un ce rt ai nt y:
F or sa m pl es co nt ai ni ng a sb es to s i n ra ng e of
-1 0% th e
CV
is
.4
3, 1-
C
V
0.
C V
0.
. A ll re su lts a re to b e co ns id er ed p re lim in ar y an d su bj ec t t o ch an ge u nl es s s ig ne d by th e
Te ch ni ca l D ire ct or o r
De pu ty
An al ys t(s
Pe er a
Ch ai ke en ee
IF
IC
AT
E O
F
AN
AL
n of
C us to dy
Na
- 2
BS
Da te S ub m itt ed
/2 0/ nt
At la s T ec hn ica l C on su lta nt s Jo b Lo ca ha ni cs bu rg , P
A
Fi sh er R oa d, Sh ep he rd st ow n, P A
Da te
A na ly
/3
0/ es s:
R um se y
Ro ad
C ol um bi a M ar yl an d
Jo b Nu m be r:
4B S0 rt
D
0/ nt in
. N um be r:
No t P ro vi de d
Da te
S am pl ed
/1 8/ on
S ub m itt in re po rt a pp lie s o nl y to th e sa m pl e(
s) a na ly ze d as re ce iv ed a nd is n ot n ec es sa ril y in di ca tiv e of th e qu al ity o r c on di tio n of a pp ar en tly id en tic al o r s im ila r p ro du ct s.
As a m ut ua l p ro te ct io n to c lie nt s, th e pu bl ic, a nd th es e
La bo ra to rie s, th is re po rt su bm itt ed a nd a cc ep te d fo r t he e xc lu siv e us e of th e cl ie nt to w ho m it is a dd re ss ed a nd u po n th e co nd iti on th at it is n ot to b e us ed , i n w ho le o r i n pa rt , i n an y ad ve rt isi ng o r p ub lic ity m at te r, no r s ha ll it be re pr od uc ed
, e xc ep t i t f ul l, w ith ou t p rio r w rit te n au th or iza tio n fr om u s.
Sa m pl e ty pe s, lo ca tio ns , c ol le ct io n pr ot oc ol s, ai r v ol um es a nd /o r s ur fa ce w ip e ar ea m ea su re m en ts a re b as ed u po n in fo rm at io n pr ov id ed b y th e pe rs on (s
) s ub m itt in g th em
, a nd u nl es s c ol le ct ed b y pe rs on ne l o f t he se
La bo ra to rie s, w e ex pr es sly d isc la im a ny k no w le dg e an d lia bi lit y fo r t he a cc ur ac y an d co m pl et en es s o f t hi s in fo rm at io n an d fo r a na ly tic al re su lts ca lcu la te d ba se d on th is in fo rm at io n.
R es id ua l s am pl e m at er ia l w ill b e di sc ar de d in a cc or da nc e w ith th e ap pr op ria re gu la to ry g ui de lin es
, u nl es s o th er w ise re qu es te d by th e cli en t.
NV
LA
P ac cr ed ita tio n ap pl ie s o nl y to p ol ar ize d lig ht m icr os co py o f b ul k sa m pl es a nd tr an sm iss io n el ec tr on m icr os co py o f A
HE
RA
a ir sa m pl es
. T hi s r ep or t m us t n ot b e us ed to c la im , a nd d oe s no t i m pl y pr od uc t c er tif ica tio n, a pp ro va l, or e nd or se m en t, by
N Y
EL
AP
, M
DE
, A
IH
A-
LA
P, N
VL
AP
, N
IS
T, o r a ny a ge nc y of th e Fe de ra l G ov er nm en t.
Al l r ig ht s r es er ve d.
A
M A
An al yt ic al S er vi ce s, F or be s B lv d.
La nh am
, M D, (3
) 4
-2
· T ol l F re e
(8
) 3
-0
· F ax (3
) 4
-2 m ar y of
A to m ic
A bs or pt io n
An al ys is fo r L ea d
AM
A
Sa m pl e
N um be r
Cl ie nt S am pl e N um be r An al ys is pl e rt in g
Li m it Fi na l R es ul t Co m m
-1
P
Fl am
AA
t C hi p
0.
Pb
<0 .0
5%
-2
P
Fl am t C hi p
0.
0.
-3
P
Fl am t C hi p
0.
4.
Pr ar at io n M et ho d:
A
ST
M
E
-1
An al ys is M et ho d Fo r F la m e
AA
: E
PA
S
W -8
0B
N/
A
No t A pp lic ab le
; m g/
Kg p ar ts p er m ill io n (p pm ) o n a dr y w ei gh t b as is;
m g/
L = p ar r m ill io n
(p pm
Pb p er ce nt le ad o n a dr y w ei gh t b as is;
u g m icr og ra m s;
u g/
L = p ar ts p er b ill io n
(p pb
No te : A ll sa m pl es w er e re ce iv ed in g oo d co nd iti on u nl es s o th er w ise n ot ed
No te
: A ll re su lts h av e tw o sig ni fic an t d ig its . A ny a dd iti on al d ig its sh ow n sh ou ld n ot b e co ns id er ed w he n in te rp re tin g th e re lt.
ys t( s)
: S up hi n
Ch in na pa d
Se e
Q C
Su m m ar y fo r a na ly tic al re su lts o f q ua lit y co nt ro l s am pl es a ss oc ia te d w ith th es e sa m pl es
Ai r a nd W ip e re su lts a re n ot co rr ec te d fo r a ny b la nk re su lts . F in al re su lts fo r a ir an d w ip e sa m pl es a re b as ed o n cli en t s up pl ie d in fo rm at io n no t v er ifi ed b y th is la bo ra to ry
Al l r es ul ts a re to b e co ns id er ed p re lim in ar y an d su bj ec t t o ch an ge u nl es s s ig ne d by th e Te ch ni ca l D ire ct or o r D ep ut y.
IF
IC
AT
E O
F
AN
AL
n of
C us to dy
Na
- 2
BS
Da te S ub m itt ed
/2 0/ nt
At la s T ec hn ica l C on su lta nt s Jo b Lo ca ha ni cs bu rg , P
A
Fi sh er R he rd st ow n, P A
Da te
A na ly
0/ es s:
R um se y
Ro ad
C ol um bi a M ar yl an d
Jo b Nu m be r:
4B S0 rt
D
0/ nt in
. N um be r:
No t P ro vi de d
Da te
S am pl ed
/1 8/ on
S ub m itt in re po rt a pp lie s o nl y to th e sa m pl e(
s) a na ly ze d as re ce iv ed a nd is n ot n ec es sa ril y in di ca tiv e of th e qu al ity o r c on di tio n of a pp ar en tly id en tic al o r s im ila r p ro du ct s.
As a m ut ua l p ro te ct io n to c lie nt s, th e pu bl ic, a nd th es e
La bo ra to rie s, th is re po itt ed a nd a cc ep te d fo r t he e xc lu siv e us e of th e cl ie nt to w ho m it is a dd re ss ed a nd u po n th e co nd iti on th at it is n ot to b e us ed , i n w ho le o r i n pa rt , i n an y ad ve rt isi ng o r p ub lic ity m at te r, no r s ha ll it be re pr od uc ed
, e xc ep t i t f ul l, w ith ou t p rio r w rit te n au th or iza tio n fr om u s.
Sa m pl e ty pe s, lo ca tio ns , c ol le ct io n pr ot oc ol s, ai r v ol um es a nd /o r s ur fa ce w ip e ar ea m ea su re m en ts a re b as ed u po n in fo rm at io n pr ov id ed b y th e pe rs on (s
) s ub m itt in g th em
, a nd u nl es s c ol le ct ed b y pe rs on ne l o f t he se
La bo ra to rie s, w e ex pr es sly d isc la im a ny k no w le dg e an d lia bi lit y fo r t he a cc ur ac y an d co m pl et en es s o f t hi s in fo rm at io n an d fo r a na ly tic al re su lts ca lcu la te d ba se d on th is in fo rm at io n.
R es id ua l s am pl e m at er ia l w ill b e di sc ar de d in a cc or da nc e w ith th e ap pr op re gu la to ry g ui de lin es
, u nl es s o th er w ise re qu es te d by th e cli en t.
NV
LA
P ac cr ed ita tio n ap pl ie s o nl y to p ol ar ize d lig ht m icr os co py o f b ul k sa m pl es a nd tr an sm iss io n el ec tr on m icr os co py o f A
HE
RA
a ir sa m pl es
. T hi s r ep or t m us t n ot b e us ed to c la im , a nd d oe s no t i m pl y pr od uc t c er tif ica tio n, a pp ro va l, or e nd or se m en t, by
N Y
EL
AP
, M
DE
, A
IH
A-
LA
P, N
VL
AP
, N
IS
T, o r a ny a ge nc y of th e Fe de ra l G ov er nm en t.
Al l r ig ht s r es er ve d.
A
M A
An al yt ic al S er vi ce s, F or be s B lv d.
La nh am
, M D, (3
) 4
-2
· T ol l F re e
(8
) 3
-0
· F ax (3
) 4
-2 ni ca l Di re
Ge ge La nd
F or be s B lv d.
La nh am
, M D, (3
) 4
-2
· T ol l F re e
(8
) 3
-0
· F ax (3
) 4
-2
Ov vi ew ys is
Ty pe
: F la m pl e
Ty pe
: L ea d Pa in t
An al ys is
Da te
: 1 2/
/2
Pr ep ar at io n
Bl k lt:
.0 p pm rt Li m it
Ve rif ica tio n Sa m pl en t R ec ov er y:
7.
Du ica
RP
D:
/A rix S pi ke
A na ly sis
Sp ik ed S am pl e Pe rc en t R ec ov er y:
9.
9% e
Du pl ica te
P er ce nt
R ec ov er y:
.6
.6 rix B nk lt:
-0
.0
Co nt ro l S am pl
#1 en t R ec ov er y:
.4
Co nt ro l S am pl
#2 en t R ec ov er y:
.6 fe re nc e Sa m en t R ec ov er y:
Ca lib ra tio n Cu rv rr el at io n:
.9
Se l D ilu tio n
/ B en ch S pi ke l D ilu tio n
RP
D:
Be nc h
Sp ik e Pe rc en t R ec ov er y:
No
Bo
D up lic at e re su lts a re b el ow th e re po rt in g lim it, m ak in g
RP
D lim its fo r t he se
Q C sa m pl es n ot ap ica bl e.
pl es In clu de
-1
, 6
2-
2, 2-
QC
um m ar y fo r S
DG
F or be s B lv d.
La nh am
, M D, (3
) 4
-2
· T ol l F re e
(8
) 3
-0
· F ax (3
) 4
-2
CE
RT
IF
IC
AT
E
O F
AN
AL
n of C us to dy
Na
- 2
BS
Da te
S ub m itt ed
/2
0/ nt
At la s T ec hn ica l C on su lta nt s
Jo b
Lo ca ha ni cs bu rg
, P A
F ish er R he rd st ow n, P A
Da te A na ly
0/ es s:
R um se y
Ro ad
C ol um bi a M ar yl an d
Jo b Nu m be r:
4B S0 rt
D
0/ nt in
. N um be r:
No t P ro vi de d
Da te
S am pl ed
/1 8/ on
S ub m itt in m ar y of A to m ic A bs or pt io n An al ys is fo r L ea d
AM
A
Sa m pl e
N um be r
Cl ie nt S am pl e N um be r An al ys is pl e
Q ua nt ifi ca tio n
Li m it Fi na l R es ul t Co m m
T Fl am
TC
LP
0.
m g/ L
<0
.5 m g/ L ni ca l
Di re
Li ttl et on re po rt a pp lie s o nl y to th e sa m pl e, o r s am pl es , i nv es tig at ed a nd is n ot n ec es sa ril y in di ca tiv e of th e qu al ity o r c on di tio n of a pp ar en tly id en tic al o r s im ila r p ro du ct s.
As a m ut ua l p ro te ct io n to cl ie nt s, th e pu bl ic, a nd th es e
La bo ra to rie s, th is re po itt ed a nd a cc ep te d fo r t he e xc lu siv e us e of th e cl ie nt to w ho m it is a dd re ss ed a nd u po n th e co nd iti on th at it is n ot to b e us ed , i n w ho le o r i n pa rt , i n an y ad ve rt isi ng o r p ub lic ity m at te r w ith ou t p rio r w rit te n au th or iza tio n fr om u s.
Sa m pl e ty s, lo ca tio ns , a nd co lle ct io n pr ot oc ol s a re b as ed u po n th e in fo rm at io n pr ov id ed b y th e pe rs on s s ub m itt in g th em a nd , u nl es s c ol le ct ed b y pe rs on ne l o f t he se La bo ra to rie s, w e ex pr es sly d isc la im a ny k no w le dg e an d lia bi lit y fo r t he a cc ur ac y an d co m pl et en es s of th is in fo rm at io n.
T he re su lts a pp ly o nl y to th e sa m pl e( s) te st ed a s r ec ei ve d.
R es id ua l s am pl e m at er ia l w ill b e di sc ar de d in a cc or da nc e w ith th e ap pr op ria te re gu la to ry g ui de lin es
, u nl es s o th er w ise re qu es te d by th e cli en t.
Th is re po rt m us t n ot b e us ed to cla im
, a nd d oe s n ot im pl y pr od uc t c er tif ica tio n, a pp ro va l, or e nd or se m en t b y
NY
E
LA
P, A
IH
A-
LA
P, o r a ny a ge nc y of th e Fe de ra l G ov er nm en t.
Al l r ig ht s r es er ve d.
A
M A
An al yt ica l S er vi ce s, ys is
M et ho d fo r F la m e:
E
PA
0B
Pr ar at io n M et ho d fo r T
CL
P Sa m pl es : E
PA
(fo llo w ed b y
EP
A
0/
R-
/2
(M if ne ce ss ar y) lts e xp re ss ed a s m ill ig ra m s p er li te r ( m g/
L) o f T
CL
P ex tr ac t Re gu la to ry
Li m it
5.
m g of Le ad p er li te r o f T
CL
P ex tr ac t Al l r es ul ts a re to b e co ns id er ed p re lim in ar y an d su bj ec t t o ch an ge u nl es s s ig ne d by th e
Te ch ni ca l D ire ct or o r D ep ut y.
ys t(
s) : S up hi n Ch in na pa
F or be s B lv d.
La nh am
, M D, (3
) 4
-2
· T ol l F re e
(8
) 3
-0
· F ax (3
) 4
-2
Ov vi ew ys is
Ty pe
: F la m pl e
Ty pe
: T
CL
P An al ys is Da te : 1
2/
/2
Pr ep ar at io n
Bl k lt:
-0 .0 rt Li m it
Ve rif ica tio n Sa m en t R ec ov er y:
6.
Du ica rix S pi ke
A na ly sis ed S am pl e Pe rc en t R ec ov er y:
8.
1% e
Du pl ica te
P er ce nt
R ec ov er y:
6.
1%
.0 rix B nk lt:
Co nt ro l S am pl
#1 en t R ec ov er y:
.8
Co nt ro l S am pl
#2 en t R ec ov er y:
9.
fe re nc e Sa m en t R ec ov er y:
Ca lib ra tio n Cu rv rr el at io n:
.9 l D ilu tio n
/ B en ch S pi ke l D ilu tio n
RP
D:
Be nc h
Sp ik e Pe rc en t R ec ov er y:
No
Bo
D up lic at e re su lts a re b el ow th e re po rt in g lim it, m ak in g
RP
D lim its fo r t he se
Q C sa m pl es n ot ap ica bl e.
pl es In clu de
QC
um m ar y fo r S
DG
Sample Summary 3
Case Narrative 4
Sample Results 5
24L1715-01 5
24L1715-02 6
24L1715-03 7
24L1715-04 8
24L1715-05 9
Sample Preparation Information 10
QC Data 11
Polychlorinated Biphenyls By GC/ECD 11
B395441 11
B395442 12
Dual Column RPD Report 13
Flag/Qualifier Summary 18
Certifications 19
Chain of Custody/Sample Receipt 20
Sample Summary 4
Case Narrative 6
Sample Results 7
24L1713-01 7
24L1713-02 10
24L1713-03 13
24L1713-04 16
24L1713-05 19
24L1713-06 22
24L1713-07 25
24L1713-08 28
24L1713-09 31
24L1713-10 34
24L1713-11 37
24L1713-12 40
24L1713-13 43
24L1713-14 46
24L1713-15 49
Sample Preparation Information 52
QC Data 54
Polychlorinated Biphenyls By GC/ECD 54
B395396 54
Metals Analyses (Total) 56
B395390 56
B395456 56
Table of Contents (continued) Dual Column RPD Report 57
Flag/Qualifier Summary 61
Certifications 62
Chain of Custody/Sample Receipt 64
| CXY LOM SSR.pdf |
| EXECUTIVE SUMMARY |
| 1.0 PARTICIPANTS AND SAFETY INFORMATION |
| 2.0 SITE DESCRIPTION |
| 3.0 UTILITY DISPOSITION TABLE |
| A. Demolition Disconnect Sketch |
| 4.0 HAZARDOUS MATERIALS SUMMARY TABLE |
| 5.0 PROPOSED SCOPE OF WORK |
| A. FAA SSC Action Required Prior to Site Demolition |
| B. Environmental Removal and Disposal |
| C. Demolish, Remove, and Dispose |
| D. Restoration Clause (Full Restore) |
| E. Notes |
| 6.0 SITE PHOTOGRAPHS |
| APPENDIX A: Environmental Report |
204BS08127 CXY LOM Building Report Final.pdf
File details come from the government source that posted it. Updated .